Canal Bulkhead Extension - 20I had a meeting with Rick this morning and will provide DEP's approval as a part of the normal permitting process.
DEP has been to both lots and approved construction.
Sent from my iPhone
On Apr 2, 2014, at 8:34 AM, Pete Rodrigues <Pete@rpcgc.com<mailto:Pete@rpcgc.com>> wrote:
Rick
The individual home owners that are requesting bulkheads are not apart if the ABCC project and will all have to file for their own permits independent of ABCC ... Again, NO relationship
other than material and subcontractor
Thanks
Pete Rodrigues, President
RPC General Contractors, Inc.
On Apr 2, 2014, at 7:40, "Carper, Rick" <rcarper@coab.us<mailto:rcarper@coab.us>> wrote:
Pete & Doug, Mark says he was told the eastbank bulkhead is now going to be extended three lots to the north of the end shown on Plan sheet 20. Given bulkhead height of 7.5 ft, this
would appear to result in some filling / impact to the floodplain. Has this been addressed through the WMD? If yes, please provide documentation. This extension will require modification
to the building permit (or separate building permits for each lot impacted).
Rick
Ricky L. Carper, P.E.
Public Works Director/City Engineer
City of Atlantic Beach
1200 Sandpiper Lane
Atlantic Beach, FL 32233
rcarper@coab.us<mailto:rcarper@coab.us>
PH: (904) 247-5834
Fax: (904) 247-5843
Florida Public Works - First to Respond, Last to Leave
www.apwaflorida.com<http://www.apwaflorida.com>