Loading...
Canal Bulkhead Extension - 20I had a meeting with Rick this morning and will provide DEP's approval as a part of the normal permitting process. DEP has been to both lots and approved construction. Sent from my iPhone On Apr 2, 2014, at 8:34 AM, Pete Rodrigues <Pete@rpcgc.com<mailto:Pete@rpcgc.com>> wrote: Rick The individual home owners that are requesting bulkheads are not apart if the ABCC project and will all have to file for their own permits independent of ABCC ... Again, NO relationship other than material and subcontractor Thanks Pete Rodrigues, President RPC General Contractors, Inc. On Apr 2, 2014, at 7:40, "Carper, Rick" <rcarper@coab.us<mailto:rcarper@coab.us>> wrote: Pete & Doug, Mark says he was told the eastbank bulkhead is now going to be extended three lots to the north of the end shown on Plan sheet 20. Given bulkhead height of 7.5 ft, this would appear to result in some filling / impact to the floodplain. Has this been addressed through the WMD? If yes, please provide documentation. This extension will require modification to the building permit (or separate building permits for each lot impacted). Rick Ricky L. Carper, P.E. Public Works Director/City Engineer City of Atlantic Beach 1200 Sandpiper Lane Atlantic Beach, FL 32233 rcarper@coab.us<mailto:rcarper@coab.us> PH: (904) 247-5834 Fax: (904) 247-5843 Florida Public Works - First to Respond, Last to Leave www.apwaflorida.com<http://www.apwaflorida.com>