1029 Atlantic Blvd COMM20-0032 1 of 10 new commercial bldg permit - permit, energy calculationsOWNER:ADDRESS:CITY:STATE:ZIP:
EQUITY ONE ATLANTIC
VILLAGE INC 1600 NE MIAMI GARDENS DR NORTH MIAMI
BEACH FL 33179
COMPANY:ADDRESS:CITY:STATE:ZIP:
CRABTREE CONSTRUCTION
COMPANY 2235 URBAN ROAD JACKSONVILLE FL 32210
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
177602-0040
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
1029 ATLANTIC BLVD COMMERCIAL NEW
COMMERCIAL
ONE STORY MEDICAL OFFICE
BUILDING $1500000.00
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL
Notes:
All runoff must remain on-site during construction.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN
YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT
MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU
INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE
RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 3Issued Date: 1/26/2021
PERMIT NUMBER
COMM20-0032
ISSUED: 1/26/2021
EXPIRES: 7/25/2021
COMMERCIAL PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
BUILDING PERMIT 455-0000-322-1000 0 $3680.00
2 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL
Notes:
Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container
cannot be placed on City right-of-way.
3 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL
Notes:
Full right-of-way restoration, including sod, is required.
4 PUBLIC WORKS RUNOFF INFORMATIONAL
Notes:
All runoff must remain on-site. Cannot raise lot elevation.
5 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL
Notes:
Any damage done to infrastructure must be repaired by Contractor.
6 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL
Notes:
Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is
needed, call 247-5878.
7 PUBLIC UTILITIES ADDITIONAL COMMENTS PUBLIC UTILITIES INFORMATIONAL
Notes:
All water & sewer utility connections must be inspected prior to cover up. Please call the inspection line at 247-5814 to schedule inspections 24 hours in
advance. Failure to do so will result in future failed inspections and additional fees.
8 BUILDING BUILDING OFFICIAL NOTES INFORMATIONAL
Notes:
Roofing requires separate permits
9 PUBLIC WORKS BUILDING INFORMATIONAL
Notes:
FEMA BFE = 6.7 ft.
Minimum FFE = 9.2 ft. NAVD
10 PUBLIC WORKS ROOF IN-PROGRESS INSPECTION REQUIRED INFORMATIONAL
Notes:
a. The roof sheathing for all new construction must remain uncovered until the Roof Sheathing Inspection is approved.
b. All roofing projects require an In-Progress Inspection.
c. Sheathing installation and replacement guidelines per APA.
d. Underlayment must conform to FBC-R Table 905.1.1
e. Shingles must conform to ASTM D3161 G or H, or ASTM D7158 F
2 of 3Issued Date: 1/26/2021
PERMIT NUMBER
COMM20-0032
ISSUED: 1/26/2021
EXPIRES: 7/25/2021
COMMERCIAL PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
BUILDING PLAN CHECK 455-0000-322-1001 0 $1840.00
CROSS CONNECTION 400-0000-343-3701 0 $50.00
FIRE DEPARTMENT FEE 45500002080800 0 $150.00
PU REVIEW COMMERCIAL BLDG 001-0000-329-1007 0 $75.00
PW REVIEW COMMERCIAL BLDG 001-0000-329-1004 0 $150.00
STATE DBPR SURCHARGE 455-0000-208-0700 0 $82.80
STATE DCA SURCHARGE 455-0000-208-0600 0 $55.20
ZONING REVIEW COMMERCIAL AND INDUSTRIAL USES 001-0000-329-1003 0 $350.00
TOTAL: $6,433.00
3 of 3Issued Date: 1/26/2021
PERMIT NUMBER
COMM20-0032
ISSUED: 1/26/2021
EXPIRES: 7/25/2021
COMMERCIAL PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
DESCRIPTION ACCOUNT QTY PAID
PermitTRAK $6,433.00
COMM20-0032 Address: 1029 ATLANTIC BLVD APN: $6,433.00
BUILDING $3,680.00
BUILDING PERMIT 455-0000-322-1000 0 $3,680.00
BUILDING PLAN REVIEW $1,840.00
BUILDING PLAN CHECK 455-0000-322-1001 0 $1,840.00
FIRE DEPARTMENT FEE $150.00
FIRE DEPARTMENT FEE 45500002080800 0 $150.00
PUBLIC UTILITIES $50.00
CROSS CONNECTION 400-0000-343-3701 0 $50.00
PUBLIC UTILITIES PLAN REVIEW $75.00
PU REVIEW COMMERCIAL BLDG 001-0000-329-1007 0 $75.00
PUBLIC WORKS PLAN REVIEW $150.00
PW REVIEW COMMERCIAL BLDG 001-0000-329-1004 0 $150.00
STATE SURCHARGES $138.00
STATE DBPR SURCHARGE 455-0000-208-0700 0 $82.80
STATE DCA SURCHARGE 455-0000-208-0600 0 $55.20
ZONING PLAN REVIEW $350.00
ZONING REVIEW COMMERCIAL AND
INDUSTRIAL USES 001-0000-329-1003 0 $350.00
TOTAL FEES PAID BY RECEIPT: R14713 $6,433.00
Printed: Tuesday, January 26, 2021 3:22 PM
Date Paid: Tuesday, January 26, 2021
Paid By: Ryan Crabtree
Pay Method: CREDIT CARD 417278439
1 of 1
Cashier: JJ
Cash Register Receipt
City of Atlantic Beach
Receipt Number
R14713
COMM20-0032CONTAINS THE CONTRACTOR
Final Plumbing
Final Electrical
Final HVAC
CC Final
Final Building*
Swimming Pool Steel
Swimming Pool Safety
Electrical Grounding & Bonding
Swimming Pool Final (Bldg)
Swimming Pool Final (PW)
Formed Columns/ Beams*
Masonry Cell Fill
Structural Steel*
OTHER:
OTHER:
OTHER:
OTHER:
OTHER:
Power Pole
Silt Fence
Piers/ Stem Walls
Underground Plumbing
Underground Electric
Foundation/ Footing
Slab**
Retaining Wall Footing
Driveway
Sewer (Building Dept)
Sewer Tap (Utilities Dept)
Rough Electric*
Rough Plumbing/ Top Out*
Rough Mechanical*
House Wrap
Wall Sheathing
Roof Sheathing
Tie-down Framing Connections
Rough Framing
Roofing In Progress
Window/Door In-Progress
Insulation Ceiling
Insulation Wall
Exterior Lath
Stucco Scratch Coat
Exterior Siding In-Progress
Brick Flashing & Ties
Early Power
Gas Rough
Gas Final*
* When all rough electric, plumbing, mechanical are complete but before any work is
covered up.
* When all gas piping is complete and wallboard is installed but before gas is
attached to any appliance. All outlets must be capped and pipe pressurized at a
minimum of 15 lbs.
* For new living space: When all construction work including electrical, plumbing,
mechanical, exterior finish, grading, required paving and landscaping is complete
and the building is ready for occupancy, but before being occupied
Additional inspections may apply to your project if your project
contains these elements:
INSPECTIONS REQUIRED FOR BUILDING PERMITS
To verify compliance with building codes, inspections of the work authorized are required at various points of the construction.
The following inspections are typically required for residential projects:
Date: Initial: Date: Initial:
_____________________________________________________
Permit Type
____________________________________________________
Permit No.
__________________________________________________________
Job Address
____________________________________________________
Contractor
POST THIS CARD WITH PERMITS AND PERMIT
DOCUMENTATION IN FRONT OF BUILDING
Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends
Building Department Public Works/Utilities Fire Department
Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789
Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203
* When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all
electrical, plumbing and mechanical work is in place, but before concrete is poured.
* When all structural steel members are in place and all connections are complete,
but before such work is covered or concealed.
** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION
Permit Number: COMM20-0032
Site Address: 1021 ATLANTIC BLVD 953-975
City, State Zip Code: ATLANTIC BEACH, FL 32233
Applied: 8/21/2020 Approved:
Issued:
Parent Permit:
Parent Project:
Applicant: <NONE>
Owner: EQUITY ONE ATLANTIC VILLAGE INC
Contractor: <NONE>
Description: ONE STORY MEDICAL OFFICE BUILDING new address 1029
Atlantic
Finaled:
Status: UNDER REVIEW
Details:
BAPTIST PRIMARY CARE MEDICAL OFFICE BUILDING
LIST OF REVIEWS
SENT DATE RETURNED
DATE DUE DATE TYPE CONTACT STATUS REMARKS
Review Group: AUTO
8/21/2020 8/21/2020 SUBMITTAL
COMPLETENESS Permit Tech APPROVED
Notes:
tried loading drawings and could not.(too large)
requested smaller files
contact is the Architect.
11 ATTACHMENTS
O:\BUILDING\ATTACHMENTS FOR PLAN REVIEW
8/21/2020 1/5/2021 9/4/2020 BUILDING Dan Arlington APPROVED
Notes:
SFHA
8/21/2020 1/5/2021 9/4/2020 FIRE Fire APPROVED
Notes:
From: Dipierri, Miguel [mailto:DiPierri@coj.net]
Sent: Tuesday, January 5, 2021 1:03 PM
To: Johnston, Jennifer <jjohnston@coab.us>
Subject: RE: COMM20-0032
APPROVED COMM 20-0032 . CAN’T SIGN
8/21/2020 9/2/2020 9/4/2020 PUBLIC UTILITIES Public Utilities APPROVED
W/CONDITIONS
Notes:
See Conditions of Approval that will be printed on Permit.
8/21/2020 8/27/2020 9/4/2020 PUBLIC WORKS Public Works APPROVED
W/CONDITIONS
Notes:
See Conditions of Approval that will be printed on Permit.
Printed: Tuesday, 05 January, 2021 1 of 2
Permit Reviews
City of Atlantic Beach
8/21/2020 9/2/2020 9/4/2020 ZONING Zoning DENIED
Notes:
Flat Roof: Section 24-171(c)1 states "Roofs, which give the appearance of a flat roof from any street side of the building, are prohibited. Roofs may be
gabled, hipped, mansard or otherwise designed so as to avoid the appearance of a flat roof from the adjoining street." Please revise accordingly.
Bicycle Parking: 4 total bicycle spaces are required and these spaces/bike rack(s) must be located no further than 50 feet from the main entrance. Please
revise to show that these requirements are met.
Signage: Please submit a separate sign permit for all proposed signage.
Printed: Tuesday, 05 January, 2021 2 of 2
Permit Reviews
City of Atlantic Beach
COMcheck Software Version 4.1.1.0
Envelope Compliance Certificate
Project Title:
2017 Florida Building Code, Energy Conservation
Project Type:New Construction
Vertical Glazing / Wall Area:28%
Location:Atlantic Beach, Florida
Climate Zone:2a
Construction Site:
Baptist Primary Care
Atlantic Village
Atlantic Beach, FL 32233
Owner/Agent:
Baptist Health
Designer/Contractor:
Project Information
Energy Code:
Baptist Primary - Atlantic Beach
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package(s)
Building Area Floor Area
1-Health Care-Clinic : Nonresidential 4997
Envelope Assemblies
Assembly Cavity
R-Value
Cont.
R-Value
Proposed
U-Factor
Budget U-
Factor(a)
Gross Area
or
Perimeter
Roof 1: Insulation Entirely Above Deck: High Albedo Roof Required, 3-
Year-Aged Solar Reflectance = 0.55, Thermal Emittance = 0.75 (d),
[Bldg. Use 1 - Health Care-Clinic]
4997 ---30.0 0.032 0.039
Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Health Care-Clinic] (c)308 ------0.730 0.730
NORTH
Exterior Wall 1 copy 2: Steel-Framed, 16" o.c., [Bldg. Use 1 - Health
Care-Clinic]
934 19.0 3.8 0.077 0.077
Window 3: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID SN68, SHGC 0.25, PF 0.20, [Bldg. Use 1 - Health Care-
Clinic] (b)
265 ------0.290 0.500
EAST
Exterior Wall 1 copy 1: Steel-Framed, 16" o.c., [Bldg. Use 1 - Health
Care-Clinic]
1588 19.0 3.8 0.077 0.077
Window 2: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID SN68, SHGC 0.25, PF 0.20, [Bldg. Use 1 - Health Care-
Clinic] (b)
411 ------0.290 0.500
Window 2 copy 1: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID SN68, SHGC 0.25, PF 1.00, [Bldg. Use 1 - Health Care-
Clinic] (b)
128 ------0.290 0.500
SOUTH
Exterior Wall 1 copy 3: Steel-Framed, 16" o.c., [Bldg. Use 1 - Health
Care-Clinic]
934 19.0 3.8 0.077 0.077
Window 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.:
Product ID SN68, SHGC 0.25, PF 0.20, [Bldg. Use 1 - Health Care-
Clinic] (b)
177 ------0.290 0.500
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
231 ofPage
COMM20-0032
Inspection Checklist
Requirements: 0.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.1.1.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2017 Florida Building Code, Energy Conservation
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C103.2
[PR1]1
Plans and/or specifications provide all
information with which compliance
can be determined for the building
envelope and document where
exceptions to the standard are
claimed.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR3]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the service water
heating systems and equipment and
document where exceptions to the
standard are claimed. Hot water
system sized per manufacturer's
sizing guide.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C103.2
[PR8]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the exterior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include exterior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C402.4.1
[PR10]1
The vertical fenestration area <= 30
percent of the gross above-grade wall
area.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
236 ofPage
Section
#
& Req.ID
Plan Review Complies?Comments/Assumptions
C402.4.1
[PR11]1
The skylight area <= 3 percent of the
gross roof area.
Complies
Does Not
Not Observable
Not Applicable
C402.4.2
[PR14]1
In enclosed spaces > 2,500 ft2
directly under a roof with ceiling
heights >15 ft. and used as an office,
lobby, atrium, concourse, corridor,
storage, gymnasium/exercise center,
convention center, automotive
service, manufacturing, non-
refrigerated warehouse, retail store,
distribution/sorting area,
transportation, or workshop, the
following requirements apply: (a) the
daylight zone under skylights is >=
half the floor area; (b) the skylight
area to daylight zone is >= 3 percent
with a skylight VT >= 0.40; or a
minimum skylight effective aperture
>= 1 percent.
Complies
Does Not
Not Observable
Not Applicable
C402.5.9.(
1-4)
[PR16]1
Ceilings with vented dropped ceiling
cavities over conditioned spaces have
a continuous air barrier between the
conditioned space and the vented
unconditioned space and are sealed to
the air barrier of the walls. Unvented
dropped ceiling cavities over
conditioned spaces without air barrier
between the conditioned and
unconditioned space are sealed from
the exterior environment and adjacent
spaces by a continuous air barrier and
is sealed to the air barrier of the walls.
Unconditioned spaces above separate
tenancies contain dividing partitions
between the tenancies to form a
continuous air barrier that is sealed at
the ceiling and roof. Building cavities
designed to be air distribution system
components are sealed according to
the criteria for air ducts, plenums, etc.
in Section C403.2.7.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
237 ofPage
Section
#
& Req.ID
Footing / Foundation Inspection Complies?Comments/Assumptions
C303.2
[FO4]2
Slab edge insulation installed per
manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[FO6]1
Exterior insulation protected against
damage, sunlight, moisture, wind,
landscaping and equipment
maintenance activities.
Complies
Does Not
Not Observable
Not Applicable
C402.2.5
[FO3]2
Slab edge insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[FO12]3
Radiant heating systems panels
insulated to >=R-3.5 on face opposite
space being heated.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C403.2.4.
5,
C403.2.4.
6
[FO9]3
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
238 ofPage
Section
#
& Req.ID
Framing / Rough-In Inspection Complies?Comments/Assumptions
C303.1.3
[FR12]2
Fenestration products rated in
accordance with NFRC.
Complies
Does Not
Not Observable
Not Applicable
C303.1.3
[FR13]1
Fenestration products are certified as
to performance labels or certificates
provided.
Complies
Does Not
Not Observable
Not Applicable
C402.4.3
[FR10]1
Vertical fenestration SHGC value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.4.3,
C402.4.3.
4
[FR8]1
Vertical fenestration U-Factor.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1
[FR16]1
The building envelope contains a
continuous air barrier that is sealed in
an approved manner and either
constructed or tested in an approved
manner. Air barrier penetrations are
sealed in an approved manner.
Complies
Does Not
Not Observable
Not Applicable
C402.5.2,
C402.5.4
[FR18]3
Factory-built fenestration and doors
are labeled as meeting air leakage
requirements.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
239 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C404.6.1,
C404.6.2
[PL3]1
Automatic time switches installed to
automatically switch off the
recirculating hot-water system or heat
trace.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2310 ofPage
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies?Comments/Assumptions
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2311 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C402.5.5,
C403.2.4.
3
[ME3]3
Stair and elevator shaft vents have
motorized dampers that automatically
close.
Complies
Does Not
Not Observable
Not Applicable
C403.2.12
.1
[ME65]3
HVAC fan systems at design
conditions do not exceed allowable
fan system motor nameplate hp or fan
system bhp.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.12
.1
[ME65]3
HVAC fan systems at design
conditions do not exceed allowable
fan system motor nameplate hp or fan
system bhp.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.12
.1
[ME65]3
HVAC fan systems at design
conditions do not exceed allowable
fan system motor nameplate hp or fan
system bhp.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.12
.3
[ME117]2
Fans have efficiency grade (FEG) >=
67. The total efficiency of the fan at
the design point of operation <= 15%
of maximum total efficiency of the
fan.
Complies
Does Not
Not Observable
Not Applicable
C403.2.12
.3
[ME117]2
Fans have efficiency grade (FEG) >=
67. The total efficiency of the fan at
the design point of operation <= 15%
of maximum total efficiency of the
fan.
Complies
Does Not
Not Observable
Not Applicable
C403.2.12
.3
[ME117]2
Fans have efficiency grade (FEG) >=
67. The total efficiency of the fan at
the design point of operation <= 15%
of maximum total efficiency of the
fan.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
1.1
[ME60]2
HVAC ducts and plenums insulated
and sealed according to Florida
Section C403.2.9, Table C403.2.9.1.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
2
[ME79]2
All ducts, air handlers, filter boxes,
building cavities, mechanical closets
and enclosed support platforms that
form the primary air containment
passageways for air distribution
systems are constructed and erected
in accordance with Table C403.2.9.2
and with Chapter 6 of the Florida
Building Code, Mechanical. Ducts are
be constructed, braced, reinforced
and installed to provide structural
strength and durability. All transverse
joints, longitudinal seams and fitting
connections are securely fastened in
accordance with the applicable
standards of this section.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2312 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C403.2.9.
1.2
[ME80]2
Duct insulation is protected from
damage but not limited to the
following: 1. Insulation exposed to
weather is suitable for outdoor
service. Cellular foam insulation is
protected or painted with a coating
that is water retardant and provides
shielding from solar radiation. 2.
Insulation covering cooling ducts
located outside the conditioned space
is vapor retardant located outside the
insulation, all penetrations and joints
of which shall be sealed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
1.3
[ME81]2
Additional insulation with vapor
barrier is provided where the
minimum duct insulation requirements
of Section C403.2.9.1.1 are
determined to be insufficient to
prevent condensation.
Complies
Does Not
Not Observable
Not Applicable
C403.2.13
[ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
C403.2.3
[ME55]2
HVAC equipment efficiency verified.Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.9.
3
[ME10]2
Ducts, air handlers, filter boxes,
building cavities, mechanical closets
and enclosed support platforms that
form the primary air containment
passageways for air distribution
systems are sealed in accordance with
the applicable criteria of this section
and Table C403.2.9.2.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
4
[ME78]2
Cavities in framed spaces are not
used to deliver air from or return air to
the conditioning system unless they
contain an air duct insert which is
insulated in accordance with Section
C403.2.9.1 and constructed and
sealed in accordance with the
requirements of Section C403.2.9.2
appropriate for the duct materials
used.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
5
[ME76]2
Air distribution systems are sized and
designed in accordance with
recognized engineering standards.
Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
C403.2.9.
6
[ME77]2
Air-handling units not installed in
attics of commercial buildings.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2313 ofPage
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies?Comments/Assumptions
C408.2.2.
1
[ME53]3
Air system balancing accomplished in
a manner to first minimize throttling
losses, then for fans with fan system
power greater than 1 hp, fan speeds
shall be adjusted to meet design flow
conditions. Balancing procedures shall
be in accordance with NEBB
Procedural Standards, the AABC,
National Standards, or equivalent
procedures.
Complies
Does Not
Not Observable
Not Applicable
C403.2.6.
1
[ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
C403.2.6.
2
[ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
C403.2.7
[ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.7(1)
and C403.2.7(2).
Complies
Does Not
Not Observable
Not Applicable
C403.2.8
[ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
C403.5,
C403.5.1,
C403.5.2
[ME123]3
Refrigerated display cases, walk-in
coolers or walk-in freezers served by
remote compressors and remote
condensers not located in a
condensing unit, have fan-powered
condensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2314 ofPage
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2315 ofPage
Section
#
& Req.ID
Rough-In Electrical Inspection Complies?Comments/Assumptions
C405.2.1
[EL15]1
Lighting controls installed to uniformly
reduce the lighting load by at least
50%.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1
[EL18]1
Occupancy sensors installed in
required spaces.
Complies
Does Not
Not Observable
Not Applicable
C405.2.1,
C405.2.2.
3
[EL23]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
C405.2.2.
1
[EL22]2
Automatic controls to shut off all
building lighting installed in all
buildings.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3
[EL16]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.3,
C405.2.3.
1,
C405.2.3.
3
[EL21]1
Enclosed spaces with daylight area
under skylights and rooftop monitors
are equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
C405.2.4
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
C405.2.5
[EL25]null
Automatic lighting controls for exterior
lighting installed. Controls will be
daylight controlled, set based on
business operation time-of-day, or
reduce connected lighting > 30%.
Complies
Does Not
Not Observable
Not Applicable
C405.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2316 ofPage
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2317 ofPage
Section
#
& Req.ID
Insulation Inspection Complies?Comments/Assumptions
C303.1
[IN3]1
Roof insulation installed per
manufacturer’s instructions. Blown or
poured loose-fill insulation is installed
only where the roof slope is <=3 in
12.
Complies
Does Not
Not Observable
Not Applicable
C303.1
[IN10]2
Building envelope insulation is labeled
with R-value or insulation certificate
providing R-value and other relevant
data.
Complies
Does Not
Not Observable
Not Applicable
C303.2
[IN7]1
Above-grade wall insulation installed
per manufacturer’s instructions.
Complies
Does Not
Not Observable
Not Applicable
C303.2.1
[IN14]2
Exterior insulation is protected from
damage with a protective material.
Verification for exposed foundation
insulation may need to occur during
Foundation Inspection.
Complies
Does Not
Not Observable
Not Applicable
C402.2.1
[IN17]3
Insulation intended to meet the roof
insulation requirements cannot be
installed on top of a suspended
ceiling. Mark this requirement
compliant if insulation is installed
accordingly.
Complies
Does Not
Not Observable
Not Applicable
C402.2.3
[IN6]1
Above-grade wall insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.5
[IN8]2
Floor insulation R-value.Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.2.6
[IN18]3
Radiant panels and associated
components, designed for heat
transfer from the panel surfaces to the
occupants or indoor space are
insulated with a minimum of R-3.5.
Complies
Does Not
Not Observable
Not Applicable
C402.3
[IN5]3
High-albedo roofs satisfy one of the
following: 3-year-aged solar
reflectance >= 0.55 and thermal
emittance >= 0.75 or 3-year-aged
solar reflectance index >= 64.0.
Complies
Does Not
Not Observable
Not Applicable
C402.2.2
[IN2]1
Roof R-value. For some ceiling
systems, verification may need to
occur during Framing Inspection.
Complies
Does Not
Not Observable
Not Applicable
See the Envelope Assemblies table for values.
C402.5.1.
1
[IN1]1
All sources of air leakage in the
building thermal envelope are sealed,
caulked, gasketed, weather stripped
or wrapped with moisture vapor-
permeable wrapping material to
minimize air leakage.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2318 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
C303.3,
C408.2.5.
3
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.4
[FI56]3
Minimum one humidity control device
per installed
humidification/dehumidification
system. Controls prevent
simultaneous operation of
humidification and dehumidification
equipment.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.4
[FI56]3
Minimum one humidity control device
per installed
humidification/dehumidification
system. Controls prevent
simultaneous operation of
humidification and dehumidification
equipment.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.4
[FI56]3
Minimum one humidity control device
per installed
humidification/dehumidification
system. Controls prevent
simultaneous operation of
humidification and dehumidification
equipment.
Complies
Does Not
Not Observable
Not Applicable
C402.5.3
[FI51]3
Where open combustion air ducts
provide combustion air to open
combustion fuel burning appliances,
the appliances and combustion air
opening are located outside the
building thermal envelope or enclosed
in a room, isolated from inside the
thermal envelope. Such rooms are
sealed and insulated.
Complies
Does Not
Not Observable
Not Applicable
C402.5.8
[FI26]3
Recessed luminaires in thermal
envelope to limit infiltration and be IC
rated and labeled. Seal between
interior finish and luminaire housing.
Complies
Does Not
Not Observable
Not Applicable
C403.2.1
[FI50]3
HVAC systems and equipment design
loads calculated in accordance with
ANSI/ASHRAE/ACCA Standard 183 or
ACCA Manual N or by an approved
equivalent computational procedure.
Design loads shall be attached to the
code compliance form submitted to
the building department when the
building is permitted or, in the event
the mechanical permit is obtained at a
later time, the sizing calculation shall
be submitted with the application for
the mechanical permit.
Complies
Does Not
Not Observable
Not Applicable
C403.2.2
[FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2319 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.1
[FI42]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.1
[FI42]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.1
[FI42]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.2
[FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.3
[FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2
[FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
C404.12.2
[FI53]3
Public lavatory facilities equipped with
outlet devices which limit the flow of
hot water to a maximum of 0.5 gpm or
are equipped with self-closing valves
that limit delivery to a per cycle
maximum of 0.25 gallons of hot water
for recirculating systems and to a
maximum of 0.50 gallons for non-
recirculating systems.
Complies
Does Not
Not Observable
Not Applicable
C404.12.2
[FI57]3
Public lavatory water temperature
<=110°F.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2320 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C404.12.1
[FI52]3
Showers used for non-safety reasons
equipped with flow control devices to
limit the water discharge to a
maximum of 2.5 gpm per shower
head. Flow restricting inserts used as
a component part of a showerhead
are mechanically retained at the point
of manufacture
Complies
Does Not
Not Observable
Not Applicable
C408.2.2
[FI54]3
Construction documents require that a
written balance report be provided to
the building owner or rep for HVAC
systems serving zones with total
condition area > 5,000 sqft. Air
distribution systems shall be tested,
adjusted, and balanced by a licensed
engineer or certified company.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
2.1,
C403.2.4.
2.2
[FI40]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
C404.3
[FI11]3
Heat traps installed on supply and
discharge piping of non-circulating
systems.
Complies
Does Not
Not Observable
Not Applicable
C404.4
[FI25]2
All piping insulated in accordance with
section details and Table C403.2.10.
Complies
Does Not
Not Observable
Not Applicable
C404.6.1
[FI12]3
Controls are installed that limit the
operation of a recirculation pump
installed to maintain temperature of a
storage tank. System return pipe is a
dedicated return pipe or a cold water
supply pipe.
Complies
Does Not
Not Observable
Not Applicable
C405.4.1
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C405.5.1
[FI19]1
Exterior lighting power is consistent
with what is shown on the approved
lighting plans, demonstrating
proposed watts are less than or equal
to allowed watts.
Complies
Does Not
Not Observable
Not Applicable
See the Exterior Lighting fixture schedule for values.
C408.2.1
[FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
1
[FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
C408.2.3.
2
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2321 ofPage
Section
#
& Req.ID
Final Inspection Complies?Comments/Assumptions
C408.2.4
[FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
1
[FI16]3
Furnished as-built drawings for
electric power systems within 90 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
3
[FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
C408.2.5.
4
[FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3)
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2322 ofPage
Project Title:
Data filename:
Baptist Primary - Atlantic Beach
D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck
05/26/20Report date:
2323 ofPage