Loading...
1029 Atlantic Blvd COMM20-0032 1 of 10 new commercial bldg permit - permit, energy calculationsOWNER:ADDRESS:CITY:STATE:ZIP: EQUITY ONE ATLANTIC VILLAGE INC 1600 NE MIAMI GARDENS DR NORTH MIAMI BEACH FL 33179 COMPANY:ADDRESS:CITY:STATE:ZIP: CRABTREE CONSTRUCTION COMPANY 2235 URBAN ROAD JACKSONVILLE FL 32210 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 177602-0040 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 1029 ATLANTIC BLVD COMMERCIAL NEW COMMERCIAL ONE STORY MEDICAL OFFICE BUILDING $1500000.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 3Issued Date: 1/26/2021 PERMIT NUMBER COMM20-0032 ISSUED: 1/26/2021 EXPIRES: 7/25/2021 COMMERCIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $3680.00 2 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container cannot be placed on City right-of-way. 3 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 4 PUBLIC WORKS RUNOFF INFORMATIONAL Notes: All runoff must remain on-site. Cannot raise lot elevation. 5 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 6 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. 7 PUBLIC UTILITIES ADDITIONAL COMMENTS PUBLIC UTILITIES INFORMATIONAL Notes: All water & sewer utility connections must be inspected prior to cover up. Please call the inspection line at 247-5814 to schedule inspections 24 hours in advance. Failure to do so will result in future failed inspections and additional fees. 8 BUILDING BUILDING OFFICIAL NOTES INFORMATIONAL Notes: Roofing requires separate permits 9 PUBLIC WORKS BUILDING INFORMATIONAL Notes: FEMA BFE = 6.7 ft. Minimum FFE = 9.2 ft. NAVD 10 PUBLIC WORKS ROOF IN-PROGRESS INSPECTION REQUIRED INFORMATIONAL Notes: a. The roof sheathing for all new construction must remain uncovered until the Roof Sheathing Inspection is approved. b. All roofing projects require an In-Progress Inspection. c. Sheathing installation and replacement guidelines per APA. d. Underlayment must conform to FBC-R Table 905.1.1 e. Shingles must conform to ASTM D3161 G or H, or ASTM D7158 F 2 of 3Issued Date: 1/26/2021 PERMIT NUMBER COMM20-0032 ISSUED: 1/26/2021 EXPIRES: 7/25/2021 COMMERCIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 BUILDING PLAN CHECK 455-0000-322-1001 0 $1840.00 CROSS CONNECTION 400-0000-343-3701 0 $50.00 FIRE DEPARTMENT FEE 45500002080800 0 $150.00 PU REVIEW COMMERCIAL BLDG 001-0000-329-1007 0 $75.00 PW REVIEW COMMERCIAL BLDG 001-0000-329-1004 0 $150.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $82.80 STATE DCA SURCHARGE 455-0000-208-0600 0 $55.20 ZONING REVIEW COMMERCIAL AND INDUSTRIAL USES 001-0000-329-1003 0 $350.00 TOTAL: $6,433.00 3 of 3Issued Date: 1/26/2021 PERMIT NUMBER COMM20-0032 ISSUED: 1/26/2021 EXPIRES: 7/25/2021 COMMERCIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $6,433.00 COMM20-0032 Address: 1029 ATLANTIC BLVD APN: $6,433.00 BUILDING $3,680.00 BUILDING PERMIT 455-0000-322-1000 0 $3,680.00 BUILDING PLAN REVIEW $1,840.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $1,840.00 FIRE DEPARTMENT FEE $150.00 FIRE DEPARTMENT FEE 45500002080800 0 $150.00 PUBLIC UTILITIES $50.00 CROSS CONNECTION 400-0000-343-3701 0 $50.00 PUBLIC UTILITIES PLAN REVIEW $75.00 PU REVIEW COMMERCIAL BLDG 001-0000-329-1007 0 $75.00 PUBLIC WORKS PLAN REVIEW $150.00 PW REVIEW COMMERCIAL BLDG 001-0000-329-1004 0 $150.00 STATE SURCHARGES $138.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $82.80 STATE DCA SURCHARGE 455-0000-208-0600 0 $55.20 ZONING PLAN REVIEW $350.00 ZONING REVIEW COMMERCIAL AND INDUSTRIAL USES 001-0000-329-1003 0 $350.00 TOTAL FEES PAID BY RECEIPT: R14713 $6,433.00 Printed: Tuesday, January 26, 2021 3:22 PM Date Paid: Tuesday, January 26, 2021 Paid By: Ryan Crabtree Pay Method: CREDIT CARD 417278439 1 of 1 Cashier: JJ Cash Register Receipt City of Atlantic Beach Receipt Number R14713 COMM20-0032CONTAINS THE CONTRACTOR Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION Permit Number: COMM20-0032 Site Address: 1021 ATLANTIC BLVD 953-975 City, State Zip Code: ATLANTIC BEACH, FL 32233 Applied: 8/21/2020 Approved: Issued: Parent Permit: Parent Project: Applicant: <NONE> Owner: EQUITY ONE ATLANTIC VILLAGE INC Contractor: <NONE> Description: ONE STORY MEDICAL OFFICE BUILDING new address 1029 Atlantic Finaled: Status: UNDER REVIEW Details: BAPTIST PRIMARY CARE MEDICAL OFFICE BUILDING LIST OF REVIEWS SENT DATE RETURNED DATE DUE DATE TYPE CONTACT STATUS REMARKS Review Group: AUTO 8/21/2020 8/21/2020 SUBMITTAL COMPLETENESS Permit Tech APPROVED Notes: tried loading drawings and could not.(too large) requested smaller files contact is the Architect. 11 ATTACHMENTS O:\BUILDING\ATTACHMENTS FOR PLAN REVIEW 8/21/2020 1/5/2021 9/4/2020 BUILDING Dan Arlington APPROVED Notes: SFHA 8/21/2020 1/5/2021 9/4/2020 FIRE Fire APPROVED Notes: From: Dipierri, Miguel [mailto:DiPierri@coj.net] Sent: Tuesday, January 5, 2021 1:03 PM To: Johnston, Jennifer <jjohnston@coab.us> Subject: RE: COMM20-0032 APPROVED COMM 20-0032 . CAN’T SIGN 8/21/2020 9/2/2020 9/4/2020 PUBLIC UTILITIES Public Utilities APPROVED W/CONDITIONS Notes: See Conditions of Approval that will be printed on Permit. 8/21/2020 8/27/2020 9/4/2020 PUBLIC WORKS Public Works APPROVED W/CONDITIONS Notes: See Conditions of Approval that will be printed on Permit. Printed: Tuesday, 05 January, 2021 1 of 2 Permit Reviews City of Atlantic Beach 8/21/2020 9/2/2020 9/4/2020 ZONING Zoning DENIED Notes: Flat Roof: Section 24-171(c)1 states "Roofs, which give the appearance of a flat roof from any street side of the building, are prohibited. Roofs may be gabled, hipped, mansard or otherwise designed so as to avoid the appearance of a flat roof from the adjoining street." Please revise accordingly. Bicycle Parking: 4 total bicycle spaces are required and these spaces/bike rack(s) must be located no further than 50 feet from the main entrance. Please revise to show that these requirements are met. Signage: Please submit a separate sign permit for all proposed signage. Printed: Tuesday, 05 January, 2021 2 of 2 Permit Reviews City of Atlantic Beach COMcheck Software Version 4.1.1.0 Envelope Compliance Certificate Project Title: 2017 Florida Building Code, Energy Conservation Project Type:New Construction Vertical Glazing / Wall Area:28% Location:Atlantic Beach, Florida Climate Zone:2a Construction Site: Baptist Primary Care Atlantic Village Atlantic Beach, FL 32233 Owner/Agent: Baptist Health Designer/Contractor: Project Information Energy Code: Baptist Primary - Atlantic Beach Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations. Additional Efficiency Package(s) Building Area Floor Area 1-Health Care-Clinic : Nonresidential 4997 Envelope Assemblies Assembly Cavity R-Value Cont. R-Value Proposed U-Factor Budget U- Factor(a) Gross Area or Perimeter Roof 1: Insulation Entirely Above Deck: High Albedo Roof Required, 3- Year-Aged Solar Reflectance = 0.55, Thermal Emittance = 0.75 (d), [Bldg. Use 1 - Health Care-Clinic] 4997 ---30.0 0.032 0.039 Floor 1: Slab-On-Grade:Unheated, [Bldg. Use 1 - Health Care-Clinic] (c)308 ------0.730 0.730 NORTH Exterior Wall 1 copy 2: Steel-Framed, 16" o.c., [Bldg. Use 1 - Health Care-Clinic] 934 19.0 3.8 0.077 0.077 Window 3: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID SN68, SHGC 0.25, PF 0.20, [Bldg. Use 1 - Health Care- Clinic] (b) 265 ------0.290 0.500 EAST Exterior Wall 1 copy 1: Steel-Framed, 16" o.c., [Bldg. Use 1 - Health Care-Clinic] 1588 19.0 3.8 0.077 0.077 Window 2: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID SN68, SHGC 0.25, PF 0.20, [Bldg. Use 1 - Health Care- Clinic] (b) 411 ------0.290 0.500 Window 2 copy 1: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID SN68, SHGC 0.25, PF 1.00, [Bldg. Use 1 - Health Care- Clinic] (b) 128 ------0.290 0.500 SOUTH Exterior Wall 1 copy 3: Steel-Framed, 16" o.c., [Bldg. Use 1 - Health Care-Clinic] 934 19.0 3.8 0.077 0.077 Window 4: Metal Frame with Thermal Break:Fixed, Perf. Specs.: Product ID SN68, SHGC 0.25, PF 0.20, [Bldg. Use 1 - Health Care- Clinic] (b) 177 ------0.290 0.500 Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 231 ofPage COMM20-0032 Inspection Checklist Requirements: 0.0% were addressed directly in the COMcheck software COMcheck Software Version 4.1.1.0 Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2017 Florida Building Code, Energy Conservation Section # & Req.ID Plan Review Complies?Comments/Assumptions C103.2 [PR1]1 Plans and/or specifications provide all information with which compliance can be determined for the building envelope and document where exceptions to the standard are claimed. Complies Does Not Not Observable Not Applicable C103.2 [PR2]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the mechanical systems and equipment and document where exceptions to the standard are claimed. Load calculations per acceptable engineering standards and handbooks. Complies Does Not Not Observable Not Applicable C103.2 [PR3]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the service water heating systems and equipment and document where exceptions to the standard are claimed. Hot water system sized per manufacturer's sizing guide. Complies Does Not Not Observable Not Applicable C103.2 [PR4]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the interior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable C103.2 [PR8]1 Plans, specifications, and/or calculations provide all information with which compliance can be determined for the exterior lighting and electrical systems and equipment and document where exceptions to the standard are claimed. Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts, transformers and control devices. Complies Does Not Not Observable Not Applicable C402.4.1 [PR10]1 The vertical fenestration area <= 30 percent of the gross above-grade wall area. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 236 ofPage Section # & Req.ID Plan Review Complies?Comments/Assumptions C402.4.1 [PR11]1 The skylight area <= 3 percent of the gross roof area. Complies Does Not Not Observable Not Applicable C402.4.2 [PR14]1 In enclosed spaces > 2,500 ft2 directly under a roof with ceiling heights >15 ft. and used as an office, lobby, atrium, concourse, corridor, storage, gymnasium/exercise center, convention center, automotive service, manufacturing, non- refrigerated warehouse, retail store, distribution/sorting area, transportation, or workshop, the following requirements apply: (a) the daylight zone under skylights is >= half the floor area; (b) the skylight area to daylight zone is >= 3 percent with a skylight VT >= 0.40; or a minimum skylight effective aperture >= 1 percent. Complies Does Not Not Observable Not Applicable C402.5.9.( 1-4) [PR16]1 Ceilings with vented dropped ceiling cavities over conditioned spaces have a continuous air barrier between the conditioned space and the vented unconditioned space and are sealed to the air barrier of the walls. Unvented dropped ceiling cavities over conditioned spaces without air barrier between the conditioned and unconditioned space are sealed from the exterior environment and adjacent spaces by a continuous air barrier and is sealed to the air barrier of the walls. Unconditioned spaces above separate tenancies contain dividing partitions between the tenancies to form a continuous air barrier that is sealed at the ceiling and roof. Building cavities designed to be air distribution system components are sealed according to the criteria for air ducts, plenums, etc. in Section C403.2.7. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 237 ofPage Section # & Req.ID Footing / Foundation Inspection Complies?Comments/Assumptions C303.2 [FO4]2 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [FO6]1 Exterior insulation protected against damage, sunlight, moisture, wind, landscaping and equipment maintenance activities. Complies Does Not Not Observable Not Applicable C402.2.5 [FO3]2 Slab edge insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [FO12]3 Radiant heating systems panels insulated to >=R-3.5 on face opposite space being heated. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C403.2.4. 5, C403.2.4. 6 [FO9]3 Snow/ice melting system sensors for future connection to controls. Freeze protection systems have automatic controls installed. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 238 ofPage Section # & Req.ID Framing / Rough-In Inspection Complies?Comments/Assumptions C303.1.3 [FR12]2 Fenestration products rated in accordance with NFRC. Complies Does Not Not Observable Not Applicable C303.1.3 [FR13]1 Fenestration products are certified as to performance labels or certificates provided. Complies Does Not Not Observable Not Applicable C402.4.3 [FR10]1 Vertical fenestration SHGC value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.4.3, C402.4.3. 4 [FR8]1 Vertical fenestration U-Factor.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1 [FR16]1 The building envelope contains a continuous air barrier that is sealed in an approved manner and either constructed or tested in an approved manner. Air barrier penetrations are sealed in an approved manner. Complies Does Not Not Observable Not Applicable C402.5.2, C402.5.4 [FR18]3 Factory-built fenestration and doors are labeled as meeting air leakage requirements. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 239 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.5, C404.5.1, C404.5.2 [PL6]3 Heated water supply piping conforms to pipe length and volume requirements. Refer to section details. Complies Does Not Not Observable Not Applicable C404.6.1, C404.6.2 [PL3]1 Automatic time switches installed to automatically switch off the recirculating hot-water system or heat trace. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.6.3 [PL7]3 Pumps that circulate water between a heater and storage tank have controls that limit operation from startup to <= 5 minutes after end of heating cycle. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2310 ofPage Section # & Req.ID Plumbing Rough-In Inspection Complies?Comments/Assumptions C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable C404.7 [PL8]3 Water distribution system that pumps water from a heated-water supply pipe back to the heated-water source through a cold-water supply pipe is a demand recirculation water system. Pumps within this system have controls that start the pump upon receiving a signal from the action of a user of a fixture or appliance and limits the temperature of the water entering the cold-water piping to 104°F. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2311 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C402.2.6 [ME41]3 Thermally ineffective panel surfaces of sensible heating panels have insulation >= R-3.5. Complies Does Not Not Observable Not Applicable C402.5.5, C403.2.4. 3 [ME3]3 Stair and elevator shaft vents have motorized dampers that automatically close. Complies Does Not Not Observable Not Applicable C403.2.12 .1 [ME65]3 HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.12 .1 [ME65]3 HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.12 .1 [ME65]3 HVAC fan systems at design conditions do not exceed allowable fan system motor nameplate hp or fan system bhp. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.12 .3 [ME117]2 Fans have efficiency grade (FEG) >= 67. The total efficiency of the fan at the design point of operation <= 15% of maximum total efficiency of the fan. Complies Does Not Not Observable Not Applicable C403.2.12 .3 [ME117]2 Fans have efficiency grade (FEG) >= 67. The total efficiency of the fan at the design point of operation <= 15% of maximum total efficiency of the fan. Complies Does Not Not Observable Not Applicable C403.2.12 .3 [ME117]2 Fans have efficiency grade (FEG) >= 67. The total efficiency of the fan at the design point of operation <= 15% of maximum total efficiency of the fan. Complies Does Not Not Observable Not Applicable C403.2.9. 1.1 [ME60]2 HVAC ducts and plenums insulated and sealed according to Florida Section C403.2.9, Table C403.2.9.1. Complies Does Not Not Observable Not Applicable C403.2.9. 2 [ME79]2 All ducts, air handlers, filter boxes, building cavities, mechanical closets and enclosed support platforms that form the primary air containment passageways for air distribution systems are constructed and erected in accordance with Table C403.2.9.2 and with Chapter 6 of the Florida Building Code, Mechanical. Ducts are be constructed, braced, reinforced and installed to provide structural strength and durability. All transverse joints, longitudinal seams and fitting connections are securely fastened in accordance with the applicable standards of this section. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2312 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C403.2.9. 1.2 [ME80]2 Duct insulation is protected from damage but not limited to the following: 1. Insulation exposed to weather is suitable for outdoor service. Cellular foam insulation is protected or painted with a coating that is water retardant and provides shielding from solar radiation. 2. Insulation covering cooling ducts located outside the conditioned space is vapor retardant located outside the insulation, all penetrations and joints of which shall be sealed. Complies Does Not Not Observable Not Applicable C403.2.9. 1.3 [ME81]2 Additional insulation with vapor barrier is provided where the minimum duct insulation requirements of Section C403.2.9.1.1 are determined to be insufficient to prevent condensation. Complies Does Not Not Observable Not Applicable C403.2.13 [ME71]2 Unenclosed spaces that are heated use only radiant heat. Complies Does Not Not Observable Not Applicable C403.2.3 [ME55]2 HVAC equipment efficiency verified.Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.2.9. 3 [ME10]2 Ducts, air handlers, filter boxes, building cavities, mechanical closets and enclosed support platforms that form the primary air containment passageways for air distribution systems are sealed in accordance with the applicable criteria of this section and Table C403.2.9.2. Complies Does Not Not Observable Not Applicable C403.2.9. 4 [ME78]2 Cavities in framed spaces are not used to deliver air from or return air to the conditioning system unless they contain an air duct insert which is insulated in accordance with Section C403.2.9.1 and constructed and sealed in accordance with the requirements of Section C403.2.9.2 appropriate for the duct materials used. Complies Does Not Not Observable Not Applicable C403.2.9. 5 [ME76]2 Air distribution systems are sized and designed in accordance with recognized engineering standards. Refer to section details. Complies Does Not Not Observable Not Applicable C403.2.9. 6 [ME77]2 Air-handling units not installed in attics of commercial buildings. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2313 ofPage Section # & Req.ID Mechanical Rough-In Inspection Complies?Comments/Assumptions C408.2.2. 1 [ME53]3 Air system balancing accomplished in a manner to first minimize throttling losses, then for fans with fan system power greater than 1 hp, fan speeds shall be adjusted to meet design flow conditions. Balancing procedures shall be in accordance with NEBB Procedural Standards, the AABC, National Standards, or equivalent procedures. Complies Does Not Not Observable Not Applicable C403.2.6. 1 [ME59]1 Demand control ventilation provided for spaces >500 ft2 and >25 people/1000 ft2 occupant density and served by systems with air side economizer, auto modulating outside air damper control, or design airflow >3,000 cfm. Complies Does Not Not Observable Not Applicable C403.2.6. 2 [ME115]3 Enclosed parking garage ventilation has automatic contaminant detection and capacity to stage or modulate fans to 50% or less of design capacity. Complies Does Not Not Observable Not Applicable C403.2.7 [ME57]1 Exhaust air energy recovery on systems meeting Table C403.2.7(1) and C403.2.7(2). Complies Does Not Not Observable Not Applicable C403.2.8 [ME116]3 Kitchen exhaust systems comply with replacement air and conditioned supply air limitations, and satisfy hood rating requirements and maximum exhaust rate criteria. Complies Does Not Not Observable Not Applicable C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C403.4.4. 6 [ME110]3 Multiple zone VAV systems with DDC of individual zone boxes have static pressure setpoint reset controls. Complies Does Not Not Observable Not Applicable See the Mechanical Systems list for values. C408.2.2. 1 [ME53]3 Air outlets and zone terminal devices have means for air balancing. Complies Does Not Not Observable Not Applicable C403.5, C403.5.1, C403.5.2 [ME123]3 Refrigerated display cases, walk-in coolers or walk-in freezers served by remote compressors and remote condensers not located in a condensing unit, have fan-powered condensers that comply with Sections C403.5.1 and refrigeration compressor systems that comply with C403.5.2.. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2314 ofPage 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2315 ofPage Section # & Req.ID Rough-In Electrical Inspection Complies?Comments/Assumptions C405.2.1 [EL15]1 Lighting controls installed to uniformly reduce the lighting load by at least 50%. Complies Does Not Not Observable Not Applicable C405.2.1 [EL18]1 Occupancy sensors installed in required spaces. Complies Does Not Not Observable Not Applicable C405.2.1, C405.2.2. 3 [EL23]2 Independent lighting controls installed per approved lighting plans and all manual controls readily accessible and visible to occupants. Complies Does Not Not Observable Not Applicable C405.2.2. 1 [EL22]2 Automatic controls to shut off all building lighting installed in all buildings. Complies Does Not Not Observable Not Applicable C405.2.3 [EL16]2 Daylight zones provided with individual controls that control the lights independent of general area lighting. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 2 [EL20]1 Primary sidelighted areas are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.3, C405.2.3. 1, C405.2.3. 3 [EL21]1 Enclosed spaces with daylight area under skylights and rooftop monitors are equipped with required lighting controls. Complies Does Not Not Observable Not Applicable C405.2.4 [EL4]1 Separate lighting control devices for specific uses installed per approved lighting plans. Complies Does Not Not Observable Not Applicable C405.2.4 [EL8]1 Additional interior lighting power allowed for special functions per the approved lighting plans and is automatically controlled and separated from general lighting. Complies Does Not Not Observable Not Applicable C405.2.5 [EL25]null Automatic lighting controls for exterior lighting installed. Controls will be daylight controlled, set based on business operation time-of-day, or reduce connected lighting > 30%. Complies Does Not Not Observable Not Applicable C405.3 [EL6]1 Exit signs do not exceed 5 watts per face. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2316 ofPage 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2317 ofPage Section # & Req.ID Insulation Inspection Complies?Comments/Assumptions C303.1 [IN3]1 Roof insulation installed per manufacturer’s instructions. Blown or poured loose-fill insulation is installed only where the roof slope is <=3 in 12. Complies Does Not Not Observable Not Applicable C303.1 [IN10]2 Building envelope insulation is labeled with R-value or insulation certificate providing R-value and other relevant data. Complies Does Not Not Observable Not Applicable C303.2 [IN7]1 Above-grade wall insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable C303.2.1 [IN14]2 Exterior insulation is protected from damage with a protective material. Verification for exposed foundation insulation may need to occur during Foundation Inspection. Complies Does Not Not Observable Not Applicable C402.2.1 [IN17]3 Insulation intended to meet the roof insulation requirements cannot be installed on top of a suspended ceiling. Mark this requirement compliant if insulation is installed accordingly. Complies Does Not Not Observable Not Applicable C402.2.3 [IN6]1 Above-grade wall insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.5 [IN8]2 Floor insulation R-value.Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.2.6 [IN18]3 Radiant panels and associated components, designed for heat transfer from the panel surfaces to the occupants or indoor space are insulated with a minimum of R-3.5. Complies Does Not Not Observable Not Applicable C402.3 [IN5]3 High-albedo roofs satisfy one of the following: 3-year-aged solar reflectance >= 0.55 and thermal emittance >= 0.75 or 3-year-aged solar reflectance index >= 64.0. Complies Does Not Not Observable Not Applicable C402.2.2 [IN2]1 Roof R-value. For some ceiling systems, verification may need to occur during Framing Inspection. Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. C402.5.1. 1 [IN1]1 All sources of air leakage in the building thermal envelope are sealed, caulked, gasketed, weather stripped or wrapped with moisture vapor- permeable wrapping material to minimize air leakage. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2318 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C303.3, C408.2.5. 2 [FI17]3 Furnished O&M instructions for systems and equipment to the building owner or designated representative. Complies Does Not Not Observable Not Applicable C303.3, C408.2.5. 3 [FI8]3 Furnished O&M manuals for HVAC systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C403.2.4. 2.4 [FI56]3 Minimum one humidity control device per installed humidification/dehumidification system. Controls prevent simultaneous operation of humidification and dehumidification equipment. Complies Does Not Not Observable Not Applicable C403.2.4. 2.4 [FI56]3 Minimum one humidity control device per installed humidification/dehumidification system. Controls prevent simultaneous operation of humidification and dehumidification equipment. Complies Does Not Not Observable Not Applicable C403.2.4. 2.4 [FI56]3 Minimum one humidity control device per installed humidification/dehumidification system. Controls prevent simultaneous operation of humidification and dehumidification equipment. Complies Does Not Not Observable Not Applicable C402.5.3 [FI51]3 Where open combustion air ducts provide combustion air to open combustion fuel burning appliances, the appliances and combustion air opening are located outside the building thermal envelope or enclosed in a room, isolated from inside the thermal envelope. Such rooms are sealed and insulated. Complies Does Not Not Observable Not Applicable C402.5.8 [FI26]3 Recessed luminaires in thermal envelope to limit infiltration and be IC rated and labeled. Seal between interior finish and luminaire housing. Complies Does Not Not Observable Not Applicable C403.2.1 [FI50]3 HVAC systems and equipment design loads calculated in accordance with ANSI/ASHRAE/ACCA Standard 183 or ACCA Manual N or by an approved equivalent computational procedure. Design loads shall be attached to the code compliance form submitted to the building department when the building is permitted or, in the event the mechanical permit is obtained at a later time, the sizing calculation shall be submitted with the application for the mechanical permit. Complies Does Not Not Observable Not Applicable C403.2.2 [FI27]3 HVAC systems and equipment capacity does not exceed calculated loads. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2319 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1 [FI47]3 Heating and cooling to each zone is controlled by a thermostat control. Minimum one humidity control device per installed humidification/dehumidification system. Complies Does Not Not Observable Not Applicable C403.2.4. 1.1 [FI42]3 Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. Complies Does Not Not Observable Not Applicable C403.2.4. 1.1 [FI42]3 Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. Complies Does Not Not Observable Not Applicable C403.2.4. 1.1 [FI42]3 Heat pump controls prevent supplemental electric resistance heat from coming on when not needed. Complies Does Not Not Observable Not Applicable C403.2.4. 1.2 [FI38]3 Thermostatic controls have a 5 °F deadband. Complies Does Not Not Observable Not Applicable C403.2.4. 1.3 [FI20]3 Temperature controls have setpoint overlap restrictions. Complies Does Not Not Observable Not Applicable C403.2.4. 2 [FI39]3 Each zone equipped with setback controls using automatic time clock or programmable control system. Complies Does Not Not Observable Not Applicable C404.12.2 [FI53]3 Public lavatory facilities equipped with outlet devices which limit the flow of hot water to a maximum of 0.5 gpm or are equipped with self-closing valves that limit delivery to a per cycle maximum of 0.25 gallons of hot water for recirculating systems and to a maximum of 0.50 gallons for non- recirculating systems. Complies Does Not Not Observable Not Applicable C404.12.2 [FI57]3 Public lavatory water temperature <=110°F. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2320 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C404.12.1 [FI52]3 Showers used for non-safety reasons equipped with flow control devices to limit the water discharge to a maximum of 2.5 gpm per shower head. Flow restricting inserts used as a component part of a showerhead are mechanically retained at the point of manufacture Complies Does Not Not Observable Not Applicable C408.2.2 [FI54]3 Construction documents require that a written balance report be provided to the building owner or rep for HVAC systems serving zones with total condition area > 5,000 sqft. Air distribution systems shall be tested, adjusted, and balanced by a licensed engineer or certified company. Complies Does Not Not Observable Not Applicable C403.2.4. 2.1, C403.2.4. 2.2 [FI40]3 Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7-day clock, 2- hour occupant override, 10-hour backup Complies Does Not Not Observable Not Applicable C404.3 [FI11]3 Heat traps installed on supply and discharge piping of non-circulating systems. Complies Does Not Not Observable Not Applicable C404.4 [FI25]2 All piping insulated in accordance with section details and Table C403.2.10. Complies Does Not Not Observable Not Applicable C404.6.1 [FI12]3 Controls are installed that limit the operation of a recirculation pump installed to maintain temperature of a storage tank. System return pipe is a dedicated return pipe or a cold water supply pipe. Complies Does Not Not Observable Not Applicable C405.4.1 [FI18]1 Interior installed lamp and fixture lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Interior Lighting fixture schedule for values. C405.5.1 [FI19]1 Exterior lighting power is consistent with what is shown on the approved lighting plans, demonstrating proposed watts are less than or equal to allowed watts. Complies Does Not Not Observable Not Applicable See the Exterior Lighting fixture schedule for values. C408.2.1 [FI28]1 Commissioning plan developed by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.3. 1 [FI31]1 HVAC equipment has been tested to ensure proper operation. Complies Does Not Not Observable Not Applicable C408.2.3. 2 [FI10]1 HVAC control systems have been tested to ensure proper operation, calibration and adjustment of controls. Complies Does Not Not Observable Not Applicable 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2321 ofPage Section # & Req.ID Final Inspection Complies?Comments/Assumptions C408.2.4 [FI29]1 Preliminary commissioning report completed and certified by registered design professional or approved agency. Complies Does Not Not Observable Not Applicable C408.2.5. 1 [FI7]3 Furnished HVAC as-built drawings submitted within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.2.5. 1 [FI16]3 Furnished as-built drawings for electric power systems within 90 days of system acceptance. Complies Does Not Not Observable Not Applicable C408.2.5. 3 [FI43]1 An air and/or hydronic system balancing report is provided for HVAC systems. Complies Does Not Not Observable Not Applicable C408.2.5. 4 [FI30]1 Final commissioning report due to building owner within 90 days of receipt of certificate of occupancy. Complies Does Not Not Observable Not Applicable C408.3 [FI33]1 Lighting systems have been tested to ensure proper calibration, adjustment, programming, and operation. Complies Does Not Not Observable Not Applicable Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2322 ofPage Project Title: Data filename: Baptist Primary - Atlantic Beach D:\Gregory Engineering\2020 Projects\20007 (BPC Atlantic Village)\E-calcs\20007_BPCatlantic.cck 05/26/20Report date: 2323 ofPage