Loading...
193 Beach Ave COMM21-0048 Lintel, Header RevisionDESCRIPTION ACCOUNT QTY PAID PermitTRAK $50.00 COMM21-0048 Address: 193 BEACH AVE APN: 170314 1004 $50.00 BLDG SUBSEQUENT PLAN REVIEW FEES $50.00 BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00 TOTAL FEES PAID BY RECEIPT: R17526 $50.00 Printed: Wednesday, October 6, 2021 10:05 AM Date Paid: Wednesday, October 06, 2021 Paid By: HYGEMA HOUSE MOVERS, INC Pay Method: CREDIT CARD 192252890 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R17526 Behrens Engineering, LLC|1949 Jersey Street, Suite C, Jacksonville, FL 32210 | p: (904) 626-6598| e: Andrew@Behrens-Engineering.com Page 1 of 3 October 1, 2021 Contractor: Mark Boyles Hygema House Movers, Inc. P.O. Box 2655 Jacksonville, FL 32203 Project Address: 193 Beach Ave 2 – Lintel Repair 193 Beach Ave 2 Atlantic Beach, FL 32233 Dear Mr. Boyles, Please accept this letter as the Engineers’ repairs for an existing concrete window lintel at the above project address. This concrete lintel located on the west side of the existing two-story structure was experiencing spalling concrete at the bottom of the member. Upon removal of the spalled concrete there was no grout discovered within the continuous cell of the lintel. Additionally, both sides of the window opening were missing vertical reinforcement and grout. Please refer to the image below on page 2 with instructions on how to repair and reinforce the existing concrete lintel and vertical CMU members on either side of the window opening in conjunction with the originally provided Behrens Engineering, LLC. structural plans: DocuSign Envelope ID: 5F17F00D-0151-4CF3-AEF8-FEB5A2EDAD3B Behrens Engineering, LLC|1949 Jersey Street, Suite C, Jacksonville, FL 32210 | p: (904) 626-6598| e: Andrew@Behrens-Engineering.com Page 2 of 3 See rebar anit-corrosive products and grout products per Behrens Engineering, LLC. structural plans dated 9-11-2021, sheet S1.1 Drill & epoxy ea. #5 vertical bar into exist. foundation a min. of 4" embed. @ both locations. Open faces of all vertical cells (full height of reinforcement) and add (1) new full length #5 vertical rebar to ea. side of window opening. Lap 36" min. as needed. Filling all vertical CMU cells on ea. side of window with high strength 3000 psi grout. Remove and replace exist. full length corroded rebar member with same size full length member. Add new full length #4 bar at bottom of lintel prior to filling with high strength 3000 psi grout. Add new #3 stirrup bar to ea. damaged exist. stirrup bar present. Drill & epoxy into lintel min. 4" embed. Exist. concrete lintel. DocuSign Envelope ID: 5F17F00D-0151-4CF3-AEF8-FEB5A2EDAD3B Behrens Engineering, LLC|1949 Jersey Street, Suite C, Jacksonville, FL 32210 | p: (904) 626-6598| e: Andrew@Behrens-Engineering.com Page 3 of 3 Should you need additional information or have questions, please feel free to contact me at 904-626-6598. Sincerely, Andrew Behrens, PE, CGC Professional Engineer FL License Number 88483 DocuSign Envelope ID: 5F17F00D-0151-4CF3-AEF8-FEB5A2EDAD3B 10/1/2021