Loading...
Attachment C 219 N Newnan Street, 4th Floor •Jacksonville, Florida, 32202 October 15, 2021 Shane Corbin, City Manager City of Atlantic Beach 800 Seminole Road RE: COMPLETE STREETS PLANNING & INITIAL DESIGN CONCEPTS, MAIN STREET Dear Mr. Corbin: As requested, please see the attached scope of services to provide Complete Streets Planning & Initial Design to the City of Atlantic Beach for the local road Main Street. Our firm services include Civil Engineering, Construction Engineering Inspection (CEI), Material Testing, Planning services with specialized work in Transportation Planning, Strategic Funding including Grant Writing, Project Management, and Reimbursement/Funding Assistance, Asset and Infrastructure Maintenance, Permit Inspections, Building Code Inspections, Bridge Coatings, and Intelligent Transportation System (ITS) inspections. We are proud to partner with our subconsultant DDEC led by Traffic Engineer Uyen Dang P.E.. DDEC brings successful, thoughtful and creative approach and design that has led to successful municipal construction projects. For this assignment our services consist of: • Initial planning and concept review • Alternative corridor concepts, stakeholder engagement, commission presentation • Planning Grant Application narrative development AE Engineering is excited to provide support services to the City of Atlantic Beach on this contract and future opportunities. Please feel free to contact me to discuss the details of the proposal at your convenience. Thanks again for this important opportunity. Sincerely, Roderick Myrick, P.E., President Attachement C 10-16-21 Town Hall Minutes Continuing Services Contract 1 Scope of Services The scope of services for this contract includes providing Planning and Engineering staff to assist the City of Atlantic Beach on tasks (outlined below), on an hourly basis. Please see below an outline of our expected services followed by associated hours and fees for consideration and approval. We strive to meet expectations on time and under budget. Should funds be available, other tasks can be performed as identified. Scope of Services: City of Atlantic Beach Complete Streets Targeted Planning & Preliminary Design Project Location: Main Street Task 1: Review existing conditions of existing planning documents, traffic analysis, comprehensive plan, bicycle network, parking policy and other functionality of the corridor. • Review existing and future land used of the Main Street neighborhood boundaries • Review census data and identify mode priority • Conduct a site visit and parking counts for daytime, night time and weekend along the project limits • Identify business and residential stakeholders adjacent to the corridor • As-builts research • Collect traffic data • Review available commentary, commission minutes or other available public input regarding Main Street and community mission regarding Complete Streets Deliverables: Existing conditions memo Task 2: Provide alternative corridor analysis for complete streets, intersection improvements and connectivity nodes • Provide circulation and cut through pattern of Main Street • Prepare traffic calming alternatives and strategy that align with adopted community objectives • Prepare and implement public engagement strategy for target stakeholders • Prepare exhibits and conduct a corridor workshop for commission leadership Deliverables: Initial design alternatives and workshop presentation materials Task 3: Provide preliminary planning document • Prepare preliminary design concept • Prepare typical sections and rendering • Identify funding sources for short-term and long-term • Prepare NFTPO project scope and/or grant support documentation and submittal package as identified and agreed upon by local staff and leadership where required Deliverables: Planning document, typical sections and rendering Other tasks: • Prepare project website and communication strategy to engage stakeholders in Complete Streets Workshop findings Attachement C 10-16-21 Town Hall Minutes Continuing Services Contract 2 Time and Fee Table Task ID Elements Task Detail Estimated Time in hours Total Time in Hours 1 Review existing conditions • Review existing and future land use of the Main Street neighborhood boundaries • Review census data and identify mode priority • Conduct a site visit and parking counts for daytime, night time and weekend along the project limits • Identify business and residential stakeholders adjacent to the corridor • As-builts research • Collect traffic data • Review available commentary, commission minutes or other available public input regarding Main Street and community mission regarding Complete Streets • Deliverable, Existing Conditions Memo 2 Provide alternative corridor analysis for Complete Streets • Provide circulation and cut through pattern of Main Street • Prepare traffic calming alternatives and strategy that align with adopted community objectives • Prepare and implement public engagement strategy for target stakeholders • Prepare exhibits and conduct a corridor workshop for commission leadership Attachement C 10-16-21 Town Hall Minutes Continuing Services Contract 3 3 Provide preliminary planning document • Prepare preliminary design concept • Prepare typical sections and rendering • Identify funding sources for short- term and long-term • Prepare NFTPO project scope and/or grant support documentation and submittal package as identified and agreed upon by local staff and leadership where required Deliverables: Planning document, typical sections and renderings a. Contract Rate Estimated Fee: $ 44,960 Attachement C 10-16-21 Town Hall Minutes Continuing Services Contract 4 Professional Services Agreement: Task Order Client: City Of Atlantic Beach Project: Complete Streets, Main Street Agreement Date: 10/1/2021 Project number: Attention: Shane Corbin Email:scorbin@coab.org Contract Title: Continuing Services Contract This task order is made between AE Engineering Inc. (Consultant) and the City of Atlantic Beach (City) for services in connection with the project above. In consideration of the existing agreements with the City, the City and Consultant agree to the task order as follows: TOTAL INITIAL AMOUNT ………. $44,960 A. SCHEDULE Job Description Amount Complete Streets Planning & Initial renderings, Main Street Task 1 Review existing conditions Task 2 Provide alternative corridor analysis for complete streets Task 3 Provide preliminary planning document B. CORRESPONDENCE To ensure prompt response, email all correspondence to the appropriate contact listed below. Signed contracts, Notices, Correspondence: Attn: Heather Neville, AICP Email: HNeville@AEEngineeringInc.com Attn: Catherine McLeod, Contract Manager Email:CMcleod@AEEngineeringinc.com C. All terms and conditions of the existing continuing services contract not modified here in shall remain in force and effect Consultant AE Engineering Inc Client City of Atlantic Beach Signed by: Heather Neville Title: Director of Planning Email: hneville@aeengineeringinc.com Signature: Signed by: Shane Corbin Title: City Manager Email: scorbin@coab.com Signature: Attachement C 10-16-21 Town Hall Minutes Senior Principal (Licensed)Principal (Licensed)Senior Professional EngineerSenior Planner (Licensed)Senior DesignerDesignerWeb DeveloperCommunications SpecialistGrants CoordinatorAdministrative Assistant285.00$ 250.00$ 185.00$ 185.00$ 140.00$ 120.00$ 120.00$ 150.00$ 140.00$ 85.00$ Task 1: Review existing conditions of existing planning documents, traffic analysis, comprehensive plan, bicycle network, parking policy and other functionality of the corridor. Review existing and future land used of the Main Street neighborhood boundaries 1 1 1 Review census data and identify mode priority 1 1 Conduct site visit and parking counts for daytime, night time and weekend along the project limits 4 4 Identify business and residential stakeholders adjacent to the corridor 2 Asbuilts research and coordination 2 Collect traffic data 6 5 Prepare Existing Conditions Memo 2 8 8 Sub Total Hours 3 22 0 21 0 0 0 0 0 0 Sub Total Fees 855.00$ 5,500.00$ -$ 3,885.00$ -$ -$ -$ -$ -$ -$ Total Task 1 10,240.00$ Task 2: Provide alternative corridor analysis for complete streets, intersection improvements and connectivity nodes Provide circulation and cut through pattern of Main Street 2 2 Prepare traffic calming alternatives and strategy 4 2 Prepare and implement public engagement strategy for target stakeholders 4 8 8 Prepare exhibits and conduct a corridor workshop 4 4 4 4 Project Stakeholder Workshop 4 4 4 4 4 4 Presentation to Commission Meeting 2 2 Sub Total Hours 4 20 0 22 16 0 0 8 0 4 Sub Total Fees 1,140.00$ 5,000.00$ -$ 4,070.00$ 2,240.00$ -$ -$ 1,200.00$ -$ 340.00$ Total Task 2 13,990.00$ Task 3: Provide preliminary planning document Prepare preliminary typical section concept 8 4 40 Prepare typical sections and rendering 8 40 Identify funding sources for short term and long term (Estimating and prepare project scope)2 8 4 Prepare MPO grant documentations and submittal package 8 Sub Total Hours 2 24 0 16 80 0 0 0 0 0 Sub Total Fees 570.00$ 6,000.00$ -$ 2,960.00$ 11,200.00$ -$ -$ -$ -$ -$ Total Task 3 20,730.00$ Other Tasks: Prepare project website with marketing strategy to engage stakeholders 40 40 Sub Total Hours 0 0 0 0 40 0 40 0 0 0 Sub Total Fees -$ -$ -$ -$ 5,600.00$ -$ 4,800.00$ -$ -$ -$ Total Task 1 10,400.00$ Total Fee 44,960.00$ Total Fee and Add Alternate 55,360.00$ Attachement C 10-16-21 Town Hall Minutes