Loading...
475 SKATE RD ROOF21-0092 j;: ` --`' Building Permit Application Updated io/9/ia ..,_, City of Atlantic Beach Building Department **ALL INFORMATION 800 Seminole Road, Atlantic Beach, FL 32233 HIGHLIGHTED IN GRAY 0109 IS REQUIRED. Phone: (904) 247-5826 Email: Building-Dept@coab.us NOOK Z( OQ _ Job Address: 47 5 Oeia:t Q I`-f�1• Permit Number: �} L Z Legal Description v3 /& 7 co-i�196-::, g_'P p--/` G2t /L, RERE# / 5dl— DValuation of Work(Replacement Cost)$ � Heated/Cooled SF J Non Heated/Cooled • Class of Work: ❑New ❑Addition DAlteration ❑Repair ❑Move ❑Demo ❑Pool ❑Windo oor—" E IVE I) • Use of existing/proposed structure(s): ❑Commercial ,if.Qesidential ULL 0 1 2021 • If an existing structure, is a fire sprinkler system installed?: ❑Yes ❑No N/A- „ • Will tree(s) be removed in association with proposed project? DYes(must submit separate Tree 17 e m Describe in detail the type of work to be performed: y_a - G'I `( ca '{ f /o L� 3a �i ' Florida Product Approval# for multiple products use product approval form Property Owner Inform tion .. // // _ Name / 1r0,Jey1-1 es j CSC_ Address kp,, �`J ,ACity at: f V Cl/ l e'��- , State --L Zip 3 aPhone C -7/L.... ` //3R E-Mail { Er-7'50)9m ef/t-L, , e.47,1,- Owner (Th.Owner or Agent(If •gent, Power cif Attorney or Agency Letter Required) Contractor Information y� t Name of Com any 0 / ' ---at'44(.1 14:54e2 Qualifyi ent .41---i-ti 01 ��7CC LU(.2 Jr—I-- Address 1�I'0a2t(P ” ,VA-C- /f '',j �" ' ' City\JE C.rfDNOj( State . Zip a6c) Office Phone ,�,,} Job Site Contact Number State Certification/Registration# CLG j �2? 63 E-Mail h Mt% r )CAP-) ` , - Architect Name&Phone# Engineer's Name&Phone# X Workers Compensation Insurer 8'r,c 4 ,c I 4 Cas,,,„./ OR Exempt❑ Expiration Date Y /je4.2 .2 Application is hereby made to obtain a permit to do the work and inst Ilations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE: In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S AFFIDAVIT: I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBT� N FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECO' i NG YOUR ``STI OF COMM) ENCEMENT. i1f/-1 Qom. _ CtA 1J �� r►• (Signature of Owner or Age t) (Signature -- ontractor) Signed and sworn to(or aff r ed)before me this- D—day of Signed and sworn to(or affirmed)before me this _ day of k.D i zO bas►-:.i4 4 (32f_ , Ct by I A 4 / •,.i ` GINDLESPERG ION / // �F�' pyt`•"'- TONI GG ,_..JI natuf. t y}� CARMEN • '•,., MY COMMISSION# i""�"• E FEET F :j. ;'w'r •��r EXPIRES:October 6,2023 , • 1,4 MY COMMISSION#GG 966962 a"' N..ryPublicUnderwriters oar ,. ,,. _ ';,-'��,�o= EXPIRES:June 10,?024 ,•, y __......,.__, 'Personally Known OR .,F•••••o ,, F F goner Thru Notary Public Undenvrkers [ ]Produced IdentificationL [ ]Produced Identification ; Type of Identification: �. Type of Identification: JS UT� r'L' ' �� CO Tilf._ `N IUi iT E, IN DU=!IC -:iiFi i.i<o ++ =0110 i'm. i 7/.S a L ()i L() atat-a:•'•}- 4:,,, t Ho. Countyo t1;„!e',- t To whom It may conCerrr Th-.4 undersigned hereby informs you that imiinro;eme.nta will be made to certain real property, anti in accordance'°;itn Section l'i'_•of-the Florida Staiutea,the following information ation is stated in this NOTICE'OF COYIi'eia'e_NC?:'l ENT. Lica i dc_cIim ion of propeny being improved: 31- /6 /7 -Gy ( - X i L '1 .t ,II „ . it ; Address.of DrcpE1t!bainc Improved. 7 S 5 4sc I Gera,_i description of imbrovemen-: /?e - girt' _:::ler �,-r) PAP -it s / L _..nese 6 a'3 /. 5” 6 Sj . A _,,x, g, 4 F' 3a.a m ,.e._.n.e-e_t in site o;:he imoro �r,.en. _ =ee.Sin ioia Titleholder cif other then v'-=:nerr Naalie Adtitese i�i a ky:, 75,-�, , /A \ -c /61 '-,,1k`L ,r_ FL .: _ yo Phone Pio.��io i/ 74,- `1 /Li ctt =�x Surety any) Address Amount of bond S hone No. Fe: Nc. Net e and a__ra=8 of any person m_,.-;a loan for the toonstr''_dcn of the improvements. Name Name of person within the o=-orFlorida.offer hen '.T__.-,-esi'i',�„Di owner upon whom ncices ofother occunlents may se . Name Phone No. -_..N_. in addition tohimself.owner•desionetes the io11owl-c person c7 receive a co=y of the L ienor's Notice as provided in Sections3,135 t?i f_j.Florida Statutes (RI in at C•:.nefs oo.tionl Address Phone No. s::NC. Expiration date of Notice of Co Imencemexpiration date .e o gin;(the _fC_�Gn !3 one(1)year from the data of C..C;.CCiIr1G unie_S_ different data is speCifi$rii; THIS SPACE POT-7 1=ECORDUS;ONLY C 'I'e u oa,1, ''-- .4l/'. ' DATE ► 1. C z Doc#2021317176,OR BK 20035 Page 2448, w:c.-m=^is_da='7.1 1 - L' - b ( 1.-.the nr _r_L r! _s escnsilh a_- _.e. Number Pages: 1 , i ci �` "f''c , pl - -_rin Recorded 12/01/2021 09:28 AM, rt •.s_ !ia detirs::_t _lam;rasand cectereliartsn JODY PHILLIPS CLERK CIRCUIT COURT DUVAL 'EA,' `=`"a COUNTY RECORDING $10.00 L___ — i:r Gcmm ecn ii ,s;T�re_s: i 7-E73:77&;•.• n:..n �s'v;Py,; TONI GINDLESPERGER ` t«.. '' MY COMMISSION#GG 353178 *: `gilt =�^ �:• :,•:.-7,i EXPIRES:October 6,2023 ''' OF 6`. Bonded Thru Notary Public Underwriters %lib_ NEnno I etc. APPENDIX 1:ATTACHMENT REQUIREMENTS tOR WIND UPLIFT RESISTANCE TABLE DECK APPLICATION TYPE DESCRIPTION PAGE 1A Wood New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 5 1B Wood New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 6-8 1C Wood New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 8 1D Wood New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 9-10 1E Wood New,Reroof(Tear-Off)or Recover D Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 11-13 1F-1 Wood New,Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 13-16 1F-2 Wood New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 16-18 1G Wood New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 18 2A Steel or Structural concrete New,Reroof(Tear-Off)or Recover B Mech.Attached Base Insulation,Bonded Top Insulation,Bonded Roof Cover 19-21 28 Steel or Structural concrete New,Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 22-26 2C Steel or Structural concrete New,Reroof(Tear-Off)or Recover D Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 27-29 3A Structural concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 30-39 38 Structural concrete New or Reroof(Tear-Off) A-3 Bonded Temp Roof/Vapor Barrier,Bonded Insulation,Bonded Roof Cover 40 3C Structural concrete New or Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 40 4A LWIC/steel New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 41-42 40 LWIC/structural concrete New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 43-46 4C LWIC/structural concrete New,Reroof(Tear-Off) A-1 Bonded Vapor Barrier,Bonded Insulation,Bonded Roof Cover 47-48 4D LWIC/steel New or Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 49-51 4E LWIC/steel or struct.conc. New or Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 52-57 4F LWIC/steel Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 57 4G LWIC/steel Reroof(Tear-Off) F Non-Insulated,Bonded Roof Cover 58 5A Cementitious wood fiber New or Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 59 5B Cementitious wood fiber New or Reroof(Tear-Off)or Recover A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 60 5C Cementitious wood fiber Reroof(Tear-Off)or Recover C Mech.Attached Insulation,Bonded Roof Cover 61 5D Cementitious wood fiber New,Reroof(Tear-Off)or Recover E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 61 6A Existing gypsum Reroof(Tear-Off) A-1 Bonded Insulation,Bonded Roof Cover 62-64 68 Existing gypsum Reroof(Tear-Off) A-2 Mech.Attached Anchor Sheet,Bonded Insulation,Bonded Roof Cover 64-65 6C Existing gypsum Reroof(Tear-Off) C Mech.Attached Insulation,Bonded Roof Cover 65 6D Existing gypsum Reroof(Tear-Off) E Non-Insulated,Mech.Attached Base Sheet,Bonded Roof Cover 66 7A Various Recover A-1 Bonded Insulation,Bonded Roof Cover 67-74 7B Various Recover _ F Non-Insulated,Bonded Roof Cover 74 NEMO ETC,LLC Evaluation Report 3520.03.04-R24 for FL2533-R24 Certificate of Authorization#32455 7"'EDITION(2020)FBC NON-HVHZ EVALUATION Revision 25:07/20/2020 02019 NEMO ETC,LLC CertainTeed Flintlastic'Modified Bitumen Roof Systems;(610)893-5400 Appendix 1,Page 1 of 74 NEMoIetc. TABLE 1F-2: WOOD DECKS–NEW CONSTRUCTION,REROOF(Ti AR-OFF)OR RECOVER SYSTEM TYPE E: NON-INSULATED,MECHANICALLY ATTACHED BASE SHEET,BONDED ROOF COVER Base Sheet Roof Cover(Note 15) MDP System Deck Primer – No. (Note 1) Base Fasteners Attach Base Ply Cap Ply (Psf) FlintFast 3 in.Insulation Plates with FlintFast 6-inch o.c.at min.2-inch lap and FlintPrime or Min.15/32-inch #12 or#14;Trufast 3"Metal Insulation Plates (Optional) W-90 plywood;24-inch Flintlastic SA NailBase o.c.in four(4),equally FlintPrime SA SBS-SA SBS-SA -127.5` with DP or HD;OMG 3 in.Round Metal Plates spaced,staggered center rows at plates span with OMG#14 HD HYBRID SYSTEMS: FlintFast 3 in.Insulation Plates with FlintFast 6-inch o.c.at 4-inch lap and 6- FlintPrime or Min.15/32-inch Glasbase;Flexiglas;Flintlastic Base #12 or#14;Trufast 3"Metal Insulation Plates 565- W-91 plywood;24-inch 20;Poly SMS Base;Ultra Poly SMSinch o.c.in three(3),equally FlintPrime S A SBS-SA-1-1 TA or APP-TA -97.5 with DP or HD;OMG 3 in.Round Metal Plates spaced,staggered center rows at plates span Base with OMG#14 HD Min.19/32-inch Glasbase;Flexiglas;Flintlastic Base 7-inch o.c.at 3-inch lap and 7- SBS-AA,SBS- W-92 plywood;24-inch 20;Poly SMS Base;Ultra Poly SMS Note 2 inch o.c.in three(3),equally None SBS-SA-H TA or APP-TA -105.0 span Base spaced,staggered center rows FlintFast 3 in.Insulation Plates with FlintFast 6-inch o.c.at 4-inch lap and 6- FlintPrime or Min.15/32-inch Glasbase;Flexiglas;Flintlastic Base #12 or#14;Trufast 3"Metal Insulation Plates SBS- W-93 plywood;24-inch 20;Poly SMS Base;Ultra Poly SMS inch o.c.in four(4),equally FlintPrime SA SBS-SA-H TA or APP-TA -127.5 with DP or HD;OMG 3 in.Round Metal Plates spaced,staggered center rows at plates span Base with OMG#14 HD CONVENTIONAL SYSTEMS: Min.23/32-inch Glasbase;All Weather/Empire 12-inch o.c.at 4-inch lap and 36- BP-AA,SBS- SBS-AA,SBS- W-94 plywood;24-inch Base;Flexiglas Base;Flintlastic Note 2 inch o.c.in two(2),equally None AA,SBS-TA -30.0' TA or APP-TA span Base 20;Yosemite Venting Base spaced,staggered center rows or APP-TA Min.23/32-inch Glasbase;All Weather/Empire 12-inch o.c.at 4-inch lap and 24- BP-AA,SBS- SBS AA,SBS- W-95 plywood;24-inch Base;Flexiglas Base;Flintlastic Note 2 inch o.c.in two(2),equally None AA,SBS-TA -45.0" TA or APP-TA span Base 20;Yosemite Venting Base spaced,staggered center rows or APP-TA Min.23/32-inch 12-inch o.c.at 4-inch lap and 36- BP-AA,SBS- SBS-AA,SBS- Poly SMS Base;Ultra Poly SMS Note 2 inch o.c.in two(2),equally None AA,SBS-TA -45.0' W-96 plywood;24-inch Base or APP-TA span spaced,staggered center rows or APP-TA FlintFast 3 in.Insulation Plates with FlintFast (Optional) Min.15/32-inch Glasbase;Flexiglas;Flintlastic Base6-inch o.c.at 4-inch lap and 6- BP-AASBS SBS AA,SBS- #12 or#14;Trufast 3"Metal Insulation Plates inch o.c.in three(3),equally None 97.5 with DP or HD;OMG 3 in.Round Metal Plates plywood;24-inch 20;Poly SMS Base;Ultra Poly SMS lates AA,SBS-TA TA or APP-TA span Base;Yosemite Venting Base spaced,staggered center rows or APP-TA with OMG#14 HD Min.15/32-inch6-inch o.c.at 4-inch lap and 6- OMG 3 in.Round Metal Plates with OMG#14 inch o.c.in three(3),equally None APP-TA APP-TA -97.5 W-98 plywood;24-inch Flintlastic APP Base T HD span spaced,staggered center rows. Glasbase;Flexiglas;Flintlastic Base Min.15/32-inch FlintFast 3 in.Insulation Plates with FlintFast 8-inch o.c.at 4-inch lap and 8- (Optional) SBS-AA or W-99 plywood;24-inch 20;All Weather/Empire Base; #14;Trufast 3"Metal Insulation Plates with inch o.c.at three(3)equally None BP-AA,SBS- -97.5 Poly SMS Base;Ultra Poly SMS AA or SBS-TA SBS-TA span Trufast HD spaced,staggered center rows _�—� Base;Yosemite Venting Base Evaluation Report 3520.03.04-R24 for FL2533-R24 NEMO ETC,LLC Certificate of Authorization#32455 7"'EDITION(2020)FBC NON-HVHZ EVALUATION Revision 25:07 20 2020 ©2019 NEMO FTC,ILC CertainTeed Flintlastic•Modified Bitumen Roof Systems;(610)893-5400 Appendix 1,Page 17 of 74 ONEMO I etc. The following notes apply to the systems outlined herein: 1. The roof system evaluation herein pertains to above-deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. 2. Unless otherwise noted,fasteners and stress plates for insulation attachment shall be as follows. Fasteners shall be of sufficient length for the following engagements: > Wood Deck: OMG#14 Roofgrip with Flat Bottom Plate(Accutrac),OMG HD with OMG 3 in.Galvalume Steel Plate,Dekfast#14 with Hex Plate or 3"Round Insulation Plate,Trufast HD with Trufast 3" Metal Insulation Plates or FlintFast#14 Fastener with FlintFast 3"Insulation Plates. Minimum 0.75-inch plywood penetration or minimum 1-inch wood plank embedment. Y Steel Deck: OMG#12 or#14 Roofgrip with Recessed or Flat Bottom Plate(Accutrac),OMG#12 Standard or HD with OMG 3 in.Galvalume Steel Plate,Dektast#12 or#14 with Hex Plate or 3"Round Insulation Plate,Trufast DP or HD with Trufast 3"Metal Insulation Plates or FlintFast#12 or#14 Fastener with FlintFast 3"Insulation Plates. Minimum 0.75-inch steel penetration and engage the top flute of the steel deck. v Structural Concrete: OMG#14 Roofgrip with Recessed or Flat Bottom Plate(Accutrac),OMG HD or CD-10 with OMG 3 in.Galvalume Steel Plate,Dekfast#14 or DekSpike with Hex Plate or 3"Round Insulation Plate,Trufast HD or CF with Trufast 3"Metal Insulation Plates or FlintFast#14 fastener with FlintFast 3"Insulation Plates. Minimum 1-inch embedment. Fasteners installed with a pilot hole in accordance with the fastener manufacturer's published installation instructions. 3. Unless otherwise noted,insulation may be any one layer or combination of FBC Approved(Local or Statewide)board(s)that meet FBC 1505 and,for foam plastic,FBC Chapter 26,when installed with the roof cover, 4. Minimum 200 psi,minimum 2-inch thick FBC Approved lightweight insulating concrete may be substituted for rigid insulation board for System Types B,C or D,whereby fasteners are installed through the lightweight insulating concrete to engage the structural deck. The structural deck shall be of equal or greater type,thickness and strength to the steel and structural concrete deck listings. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction. This is a wind uplift resistance allowance and does not purport to address non-wind-uplift-related issues,such as deck venting or moisture levels within the LWIC and the potential effect on overlying components. 5. Preliminary insulation attachment for System Type D:Unless otherwise noted,refer to Section 2.2.10.1.3 of FM Loss Prevention Data Sheet 1-29(February 2020). 6. Unless otherwise noted,insulation adhesive application rates are as follows. Ribbon or bead width is at the time of application;the ribbons/beads shall expand as noted in the manufacturer's published instructions. Y Hot asphalt(HA): Full coverage at 25-30 lbs/square Y Ashland,Inc."Pliodeck Insulation Adhesive"(A-PD): Continuous 0.75 inch wide ribbons,12-inch o.c. Ribbons of subsequent layers shall be perpendicular to those in the layer below. Y Dupont"INSTA STIK Quik Set Commercial Roofing Adhesive"(0-IS): Continuous 0.75 to 1 inch wide ribbons,12-inch o.c. • ICP Adhesives and Sealants"Polyset BOARD-MAX": Continuous 3-inch ribbons,12-inch o,c. • ICP Adhesives and Sealants"Polyset CR-20": Continuous 2.5 to 3-inch wide ribbons,12-inch o.c. - HS Fuller"Millennium One Step Foamable Adhesive"(M-OSFA): Continuous 0.25 to 0.5-inch wide ribbons,12-inch o.c. Y HB Fuller"Millennium PG-1 Pump Grade Adhesive"(M-PGI): Continuous 0.5 to 0.75-inch wide ribbons,12-inch o.c. Y OMG OlyBond 500 or OlyBond Green(0B500): Continuous 0.75-inch wide ribbons,12-inch o.c.(PaceCart,SpotShot or Canister) Y Note: When multiple layers(s)of insulation and/or coverboard ore installed in ribbon-applied adhesive,boards shall be staggered from layer-to-layer. Y Note: The maximum edge distance from the adhesive ribbon to the edge of the insulation board shall be not less than one-half the specified ribbons spacing. 7. Unless otherwise noted,all insulations are flat-stock or taper board of the minimum thickness noted. Tapered polyisocyanurate at the following thickness limitations may be substituted with the following Maximum Design Pressure(MDP)limitations. In no case shall these values be used to'increase'the MDP listings in the tables;rather if MDP listing below meets or exceeds that listed for a particular system in the tables,then the thinner board listed below may be used as a drop-in for the equivalent thicker material listed in the table: Y Ashland,Inc."Pllodeck Insulation Adhesive"(A-PD)@ 12-inch o.c. MDP -105.0 psf (Min.1.0-inch) - Ashland,Inc."Pliodeck Insulation Adhesive"(A-PD)@ 6-inch o.c. MDP -277.5 psf (Min.1.0-inch) Y Dupont"INSTA STIK Quik Set Commercial Roofing Adhesive"(0-IS): MDP -120.0 psf (Min.1.0-inch) > ICP Adhesives and Sealants"Polyset CR-20": MDP -117.5 psf (Min.1.0-inch) Y HB Fuller"Millennium One Step Foamable Adhesive"(M-OSFA): MDP -157.5 psf (Min.1.0-inch) ➢ HS Fuller"Millennium PG-1 Pump Grade Adhesive"(M-PG1): MDP -157.5 psf (Min.1.0-inch) Y OMG OlyBond 500(06500): MDP -45.0 psf (Min.0.5-inch Multi-Max FA3) • OMG OlyBond 500(08500): MDP -187.5 psf (Min.0.5-inch ISO 95+GL) Y OMG OlyBond 500(0B500): MDP -315.0 psf (Min.0.5-inch ENRGY 3) > OMG OlyBond 500(OB500): MDP -487.5 psf (Min.0.5-inch ACFoam II) 8. For adhered roof insulation and board sine: Unless otherwise noted,refer to Section 2.2.10.6.2 of FM Loss Prevention Data Sheet 1-29(February 2020). Evaluation Report 3520.03.04-R24 for FL2533-R24 NEMO ETC,LLC Certificate of Authorization#32455 7i"EDITION(2020)FBC NON-HVHZ EVALUATION Revision 25:07/20/2020 02019 NEMO ETC,tLC CertainTeed Flintiest{.Modified Bitumen Roof Systems;(6101 893-5400 Appendix 1,Page 2 of 74 NEMO I etc. 9. For mechanically attached components or partially-bonded insulation,the maximum design pressure for the selected assembly shall meet or exceed at least the Zone 1 PRIME design pressure determined in accordance with FBC Chapter 16. Elevated pressure zones shall employ an attachment density designed by a qualified design professional to resist the elevated pressure criteria. Commonly used methods are ANSI/SPRI WD1,FM Loss Prevention Data Sheet 1-29,Roofing Application Standard RAS 117 and Roofing Application Standard RAS 137. Assemblies marked with an asterisk'carry the limitations set forth in Section 2.2.10.1 of FM Loss Prevention Data Sheet 1-29(February 2020)for Zone 2/3 enhancements. 10. For assemblies with all components fully bonded,the maximum design pressure for the selected assembly shall meet or exceed critical design pressure determined in accordance with FBC Chapter 16. No rational analysis is permitted for these systems. 11. For mechanically attached components over existing decks,fasteners shall be tested in the existing deck for withdrawal resistance. A qualified design professional shall review the data for comparison to the minimum requirements for the system. Testing and analysis shall be in accordance with ANSI/SPRI FX-1 or Testing Application Standard TAS 105. 12. For bonded insulation or membrane over existing substrates in a re-roof(tear off)or recover installation,the existing deck or existing roof surface shall be examined for compatibility with the adhesive to be installed. If any surface conditions exist that bring system performance into question,field uplift testing in accordance shall be conducted on mock-ups of the proposed new roof assembly. For bonded insulation or membrane over existing substrates in a recover installation,the existing roof system shall be capable of resisting project design pressures on its own merit to the satisfaction of the Authority Having Jurisdiction,as documented through field uplift testing. Field uplift testing shall be in accordance with ASTM E907,FM Loss Prevention Data Sheet 1-52 or Testing Application Standard TAS 124. 13. Refer to FBC 1511 for requirements and limitations regarding recover installations. For Structural Concrete Deck or Recover Applications using System Type D,the insulation is optional. Alternatively,an FBC Approved insulation board or coverboard may be used as a separation layer. Board products shall be preliminarily attached prior to roof cover installation(Note 5 herein). The separator component shall be documented as meeting FBC 1505 and,for foam plastic,FBC Chapter 26,when installed with the roof cover in Recover applications. 14. Lightweight insulating concrete(LWIC)shall be cast in accordance with FBC Section 1917 to the satisfaction of the Authority Having Jurisdiction. For systems where specific LWIC is referenced,refer to current LWIC Product Approval for specific deck construction and limitations. Unless otherwise noted,for systems where specific LWIC is not referenced,the minimum design mix shall be 300 psi. In all cases,the minimum top-coat thickness is 2-inches. For LWIC over structural concrete,reference is made to FBC Section 1917.4.1,Point 1. For"pre-existent"LWIC references,listings were established through testing over lightweight concrete cast using only foaming agent(ASTM C896),water and Portland cement(ASTM C150),with no proprietary additives,in accordance with procedures adopted by Miami-Dade BCCO(FBC CER1592). Use of these listings in new construction or re-roof(tear-off)applications is at the discretion of the Designer or Record and Authority Having Jurisdiction, 15. Unless otherwise noted,refer to the following references for bonded applications. MI r,IHf I C[7MIIINA II11V, REFERENCE LAYER MATERIAL APPLICATION Base Ply: Flintlastic Base 20,Flintlastic Poly SMS Base,Flintlastic Ultra Poly SMS Base Note: Base ply cures overnight prior to application of the ply or cap ply. FlintBond Brush or Karnak No.81 Cold Process Modified Bitumen SBS-CA1 Ply: Flintlastic Base 20,Flintlastic Poly SMS Base,Flintlastic Ultra Poly SMS Base Adhesive Brush Grade at 1 gal/square Cap Ply: Flintlastic FR Cap 30,Flintlastic FR Cap 30 CoolStar,Flintlastic FR-P,Flintlastic FR-P CoolStar,Flintlastic Premium FR-P,Flintlastic Premium FR-P CoolStar,Flintlastic GMS,Flintlastic GMS CoolStar BP-CA2 Base Ply: Glasbase,All Weather/Empire Base,Flexiglas Base,Flintlastic Base 20 Base Ply: Flintlastic Base 20,Flintlastic Poly SMS Base,Flintlastic Ultra Poly SMS Base Ply: Flintlastic Base 20,Flintlastic Poly SMS Base,Flintlastic Ultra Poly SMS Base Henry#903 Adhesive at 1.5 gal/square. SBS•CA2 Cap Ply: Flintlastic FR Cap 30,Flintlastic FR Cap 30 CoolStar,Flintlastic FR-P,Flintlastic FR-P CoolStar,Flintlastic Premium FR-P,Flintlastic Premium FR-P CoolStar,Flintlastic GMS,Flintlastic GMS CoolStar BP-CA3 Base Ply: Glasbase,All Weather/Empire Base,Flexiglas Base,Flintlastic Base 20 Base Ply: Flintlastic Base 20,Flintlastic Poly SMS Base,Flintlastic Ultra Poly SMS Base Millennium Hurricane Force Membrane Adhesive,beads spaced SBS-CA3 Ply: Flintlastic Base 20,Flintlastic Poly SMS Base,Flintlastic Ultra Poly SMS Base 6-inch o.c. Ca pl Flintlastic FR Cap 30,Flintlastic FR Cap 30 CoolStar,Flintlastic FR-P,Flintlastic FR-P CoolStar,Flintlastic p y' Premium FR-P,Flintlastic Premium FR-P CoolStar,Flintlastic GMS,Flintlastic GMS CoolStar NEMO ETC,LLC Evaluation Report 3520.03.04-R24 for FL2533-R24 Certificate of Authorization#32455 71"EDITION(2020)FBC NON-HVHZ EVALUATION Revision 25:07/20/2020 ©2019 NEMO ETC,ILC CertainTeed Flintlastic'Modified Bitumen Roof Systems;(610)893-5400 Appendix 1,Page 3 of 74 CertainTeed FLINTLASTIC® Application Handbook - Third Edition An educational program for professional roofing contractors FL1NTLAS77C APPliCATION SPECIALIST . - • • . ,•;: • - --• , - , . • ,• ' .:.31qt••1 • • • 41111 CertainTeed SAINT-GOBAIN Adhesives Product Name ( Description Specifications I Cold-applied,high strength,asbestos-free,SBS modified asphalt adhesive ASTM 03019,Type III FlintBond' with excellent adhesive and elongation properties.Available in spray, brush,trowel and caulk grades. Coatings Product Name Description 1 Specifications Premium-grade,self-protecting,moisture-resistant,heat-resistant reflective ASTM D2824,Type II, FlintCoat'—A 300 roof coating.Refined solvents blended with pigment flakes of pure ASTM D3805 aluminium,mineral fibers and selected asphalts. Professional-grade,self-protecting,moisture-resistant,heat-resistant, FlintCoat'—A 150 long-lasting reflective root coating.Refined solvents blended with pigment ASTM D2824,Type III flakes of pure aluminium,mineral fibers and selected asphalts. Premium,protective,highly reflective,white,heat-resistant roof coating. ASTM 06083 FlintCoat'—W Thick,etastomeric acrylic copolymer is highly flexible and resists cracking. it peeling and mildew. Solvent-free(odorless)emulsion roof coating to create a smooth surface on ASTM D1227,Type II, FlintCoat E an otherwise rough or cracked asphalt roof surface to support the application Class I of reflective coatings,such as FlintCoat-W. Repair Product Name Description I Specifications I Asbestos-free wet/dry rubberized flashing cement,compounded with a blend ASTM 04586 Type I FlintPatch`' of rubber-reinforced asphalt,mineral fibers and refined solvents in a heavy, ASTM 03409 pliable consistency for ease of application by trowel. Liquid Flashing and Repair LProduct Name I Description High performance,odorless,seamless,self-terminating,two-part urethane-based waterproofing system. SmartFlash" Flashpacks available with all tools and material necessary to flash and repair approximately 25 square feet of area. 9 Vent Pipes After installing the base sheet, position a piece of smooth Flintlastic membrane and mark the dimensions of the vents. Cut a hole corresponding ` Lead Sleeve fl /wlihPrIrned Flashing _ c\e`��<bc Compound : cc4� -..---It �� } �6 } \ i9," .� , I \` 4,`• 1 d i =.4(i `\G is { eye `' � a Roof '. �� Deck f ,_x. Vent pipe detail, hot asphalt applications to the pipe size so that a snug fit is achieved. The membrane piece must be large enough to extend a minimum of 4" beyond the outside edge of the vent flange in all directions. Secure the membrane strip using hot asphalt or SBS modified bitumen flashing adhesive and press into place. Install the vent pipe collar, properly fastened. Install the Flintlastic SBS membrane. Use modified bitumen flashing adhesive to seal the base of the vent pipe where the field membrane ends. Primed <^ Lead Flange =,:a;� Flashing L. i' ..:4-- Compound Plumbing ` °r Vent Stack Hot Asphalt • G j o e . 1 I . , _ n:o .' `e cF' ROOf `� 1`{t. o Deck , X44,.1. 1. ` i Insulation . Alternate detail, lead pipe flashing 37 Basic Application: Flintlastic SA Modified Bitumen Important Application Considerations • Do not attempt application if ice, snow, moisture or dew are present. Bonding substrates must be clean, dry and free of dust or other inhibitors of proper adhesion. Ambient temperature must be 50°F or above. • Store Flintlastic SA rolls indoors on pallets, protected from the elements. Rolls that are improperly stored or have been warehoused for prolonged oeriods of time may lose their tack. • Do not apply membrane that has been improperly stored, exposed to moisture, or has lost its tack. If the material isn't bonding, STOP the application! • Always remember to put safety first and follow all OSHA safety guidelines with any roofing installation. • Substrates must be free of dust, dirt, oil, debris and moisture. • Primer, if used, must be applied at the specified rate and must be allowed to thoroughly dry. • Work with manageable lengths of MidPly and Cap for the particular job. Where appropriate, cut rolls into 1/3- or 1/2-roll lengths and allow material to relax prior to installation. • In cooler weather, a hand-held hot air welding gun can be used to warm the sidelap areas and improve adhesion (prior to application of the FlintBond SBS Modified Bitumen Adhesive). • Use caution with the weighted roller at endlap areas. Don't squeeze out too much adhesive. • When applying MidPly (or PlyBase) directly to substrate, design adequate roof ventilation into the system through the use of roof relief vents. • Do not mix Flintlastic SA membranes with other types of roof membranes. Flintlastic SA membranes are specifically designed to be applied together. -he permanent top film of the MidPly, PlyBase and NailBase cannot receive torching, hot asphalt or other non selfadhering application methods. The Flintlastic SA Cap (or SA Cap FR), PlyBase and MidPly cannot be applied to any surfaces other than as described herein. • Do not use cold adhesives with Flintlastic SA membranes other than for flashing details and cap sheet overlaps as described herein. • Refer to the CertainTeed Commercial Roof Systems Manual for complete requirements. • All plies of the assembly should be installed in one day. If blue film must be exposed for longer periods of time, cover with tarp or suitable alternate protection. 38 • When applying Flintlastic SA on slopes exceeding 1" in 12", membranes shall be back nailed. When applied parallel to the slope, Flintlastic SA shall be blind-nailed at end laps 2" in from top edge, 6" o.c. through tin aiscs and to wood nailers. See General Requirements Section of the CertainTeed Commercial Roof Systems Manual for details. Deck Preparation CertainTeed recommends the use of Flintlastic SA NailBase base sheet in ;-oniunction with all self-adhering membrane roof installations. Flintlastic SA NailBase can be mechanically attached to nailable substrates or applied using hot asphalt (non-nailable substrates). For non-nailable substrates where use of hot asphalt to adhere the base sheet may not be appropriate, Flintlastic SA MidPly or Flintlastic SA PlyBase may be used in lieu of Flintlastic SA NailBase on surfaces properly primed with FlintPrime' SA. However, note that without the use of a base sheet, the membrane may be difficult to later remove (if necessary) and certain UL and FM listings for the products may not apply. Prior to application of Flintlastic SA products, ensure roofs have positive drainage. Consult the local building official for minimum slope and drainage requirements. Application of Flintlastic SA NailBase Beginning at the low point of the roof, mechanically fasten Flintlastic SA NailBase to nailable deck using appropriate fasteners. Start with an appropriate roll width (1/3 or 1/2 roll) �. to accommodate offsetting of sidelaps of subsequent layers of MidPly and/or Cap sheet. Install '° 1 • so that no sidelaps are against the -- flow of water. A minimum fastening pattern is every 9" on center on sidelaps and every 18" on center in two staggered rows in the field of the sheet. Prime non-nailable substrates such as concrete using FlintPrime SA polymer-based primer. Allow to dry thoroughly, but not more than ot 4 hours to retain tack-enhancing IF D properties. Apply SA NailBase using ASTM Type III or IV hot asphalt* at the rate of 25 lbs. per 100ft2 (Spot mopping - 15 lbs. per 100f12) or self-adhere SA PlyBase (or MidPly). 39 Overlap base sheet sidelaps 2" and endlaps 4". Offset endlaps a minimum • of 3'. Turn base sheet over fascia. Do not leave installed base exposed. Cover in the same day with Flintlastic SA MidPly and/or Flintlastic SA Cap or SA Cap FR). Don't leave the installed Flintlastic SA NailBase exposed to the weather; cover with Flintlastic SA Cap the same day. Application of Flintlastic SA Mid Ply or PlyBase to insulate decks SA MidPly or PlyBase may be adhered directly to mechanically fastened FlintBoard ISO or adhered to FlintBoard ISO Cold. Before installing, sweep the surface of the insulation boards to remove any dust, dirt or sand particles that could interfere with adhesion. Start application at the low point of the roof. Install flush to roof edge. Design layout so that no sidelaps are against the flow of water. Application of Interply Note: Proceed to "Before Installing Flintlastic SA Cap (or SA Cap FR)" if installing a 2-ply system. Before installing Flintlastic SA MidPly (or PlyBase), sweep the underlying base sheet or primed surface to remove any dust, dirt or sand particles that could interfere with adhesion. Apply MidPly (or PlyBase) over installed Flintlastic SA NailBase or, for ~ion-nailable decks such as concrete, properly primed substrates. Surface must be dry and free from dust or dirt. Start MidPly (or PlyBase) application at the low point of the roof with appropriate roll width to offset sidelaps 18" from sidelaps of base sheet. nstall flush to roof edge if over base sheet, otherwise turn the MidPly (or PlyBase) over the fascia minimum 2" and secure. Design layout so that no sidelaps are against the flow of water. Out rolls into manageable lengths. Fold the membrane back halfway . lengthwise to remove the split release film. Press membrane securely into place, and repeat with -`'l the opposite half of the membrane. ^.r ' Use a heavy, weighted roller over �- the entire surface of the Flintlastic • { SA MidPly (or PlyBase) membrane y :, n to secure the membrane. Work outwards to eliminate voids. ,. 40 Overlap sidelaps of subsequent MidPly (or PlyBase) membrane lengths 2" and endlaps 6". Offset (stagger) endlaps minimum 3'. Cut endlaps at opposing diagonal corners at an angle approximately 5-1/2" long by the seivage dimension from the corners to minimize "T"-seams. Apply a bead or small trowel dab (quarter size) of FlintBond" SBS Modified Bitumen Adhesive. trowel or caulk grade, at the edge of the angled cut to avoid a sapiiiary. Use of a hand-held hot air gun at the joint area prior to rolling the mnemorane will maximize adhesion. In areas prone to cold temperatures, snow ana freeze-thaw cycles, it may be more effective to use the hot air gun to form joints, and to completely fill all mole holes with asphalt that has been slightly melted using the gun. It is recommended to apply a bead of FlintBond SBS Modified Bitumen Adhesive, caulk grade, at all MidPly (or PlyBase) side and endlaps to eliminate a capillary. Don't leave the installed Flintlastic SA MidPly (or PlyBase) exposed to the weather: cover with Flintlastic SA Cap the same day. Before Installing Flintlastic SA Cap (or SA Cap FR) ✓�Yf j If roof edge detail utilizes edge metal, proceed as follows. If MidPly has been applied, install minimum 26 gauge edge metal using appropriate fasteners, and set entirely in a uniform 1/8"-1/4" thick troweling of FlintBond SBS Modified Bitumen Adhesive, trowel grade. Remove any oil from the metal surface using a vinegar and water solution. Prime the horizontal surface of the metal with FlintPrime SA and allow primer to dry. Apply a bead of caulk grade FlintBond adhesive to the edge of the metal where it meets the MidPly. Proceed with Flintlastic SA Cap (or SA Cap FR) installation. If MidPly is not specified: Over the Flintlastic SA NailBase, install a 9" wide strip of MidPly onto the field of the roof and flush to the roof edge, self-adhered. Install minimum 26 gauge edge metal using appropriate fasteners, set entirely in a uniform 1/8"-1/4' thick troweling of FlintBond SBS 41 Modified Bitumen Adhesive, trowel grade. Remove any oil from the metal surface using a vinegar and water solution. Prime the horizontal surface of the metal with FlintPrime or FlintPrime SA and allow primer to dry. Apply a bead of caulk grade FlintBond SBS Modified Bitumen Adhesive at the roof side edge of the metal where it meets the MidPly strip. Proceed with cap sheet installation. Similarly, complete your sheet metal flashing installation using cut MidPly =lashing collars at all flashing details prior to flashing application. Seal edges of MldPly flashing collars with a bead of FlintBond. See "Typical Construction Details," starting on page 45 for examples. If MidPly has been installed as part of the system, set flanges in trowel grade FlintBond and properly fasten. All cap sheet flashings installed to transitions that overlap onto mineral surface must be set in a uniform troweling of FlintBond trowel grade adhesive. Application of Flintlastic SA Cap (or SA Cap FR) Before installing Flintlastic SA Cap (or SA Cap FR), sweep the surface of the installed SA NailBase (or PlyBase) or MidPly clean. To install Flintlastic SA Cap (or SA Cap FR), start at the low point of the roof with an appropriate .xt roll width to offset sidelaps from the underlying membrane a minimum 415.- of 5of 18". Work with manageable 4 t lengths for proper handling. ' a�\� Position SA Cap (or SA Cap FR) with selvage edge release strip , at high side of roof. Install in weather-lapped fashion, with no laps against the flow of water. 42