Loading...
1201 Gladiola FOUND21-0007 Foundation RepairOWNER:ADDRESS:CITY:STATE:ZIP: RHODES CAROL J 1201 GLADIOLA ST ATLANTIC BEACH FL 32233 COMPANY:ADDRESS:CITY:STATE:ZIP: FOUNDATION SYSTEMS, INC.PO BOX 50545 JACKSONVILLE BEACH FL 32240 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 171027 0000 ATLANTIC BEACH SEC H JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 1201 GLADIOLA ST FOUNDATION ONLY SINGLE OR TWO FAMILY FOUNDATION ONLY FOUNDATION REPAIR $16250.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $135.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $67.50 STATE DBPR SURCHARGE 455-0000-208-0700 0 $3.04 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.03 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 12/3/2021 PERMIT NUMBER FOUN21-0007 ISSUED: 12/3/2021 EXPIRES: 6/1/2022 FOUNDATION ONLY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 TOTAL: $207.57 2 of 2Issued Date: 12/3/2021 PERMIT NUMBER FOUN21-0007 ISSUED: 12/3/2021 EXPIRES: 6/1/2022 FOUNDATION ONLY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION 1 IMPORTANT PERMIT AND INSPECTION NOTES BUILDING. 1. No fill dirt can be delivered without prior approval from Public Works. Per COAB, 24-68. 2. The bottom of all foundation footings must be minimum 12 inches below existing grade, per COAB, 24-68 and FBC-B, Section 403.1.4. Site conditions may require footings to be deeper or higher above finished grade. Please review COAB Bulletin 1-16 to ensure minimum Finished Floor Elevation (FFE). 3. Fill dirt inside foundation walls must be compacted in 8-inch lifts, per FBC-R506.2.1. Please submit compaction tests, from a third-party testing agency, for every 16 inches of fill or fraction thereof. 4. At Final Inspection, a 6-inch clearance between exterior wall coverings and final grade (top of sod or mulch) will be required, per FBC-R318.7. Please plan FFE and lot grading accordingly. 5. Where questionable soils are found, during inspection, soil and compaction tests may be required, per FBC- R401. 6. Please provide a form-board or stem wall elevation form, from a licensed surveyor, for slab inspection. 7. Please review COAB Bulletin 2-18 to determine if a survey with setbacks and dimensions to property lines is required for slab inspection. 8. The placement and protection of steel reinforcement (Rebar) must comply with FBC-R606 (Masonry) and R608 (Concrete), including required Standard Hooks at top and bottom of vertical rebar. 9. Inspections: a. In-Progress Inspections are required for Exterior Siding and Window and Door Inspections and should be scheduled for the first day of work. b. A Scratch-Coat Inspection is required for stucco work. If you intend to apply a double-up, brown - coat, please call the Building Department to schedule a same-day Scratch-Coat Inspection. c. All roofing projects require an In-Progress Inspection, Residential and Commercial. d. The roof must be complete and the building dried in before scheduling rough trades inspections. 10. The joint tape for ZIP Board products is considered the dry-in or House Wrap for the building and must be inspected before covering over. All holes and penetrations in the sheathing and overdriven nails must be sealed. 11. Please post the building permit documents in a conspicuous location, before start of construction, including the Building Permit, Notice Of Commencement (NOC), and Construction Site Management Plan. The Police Department may review the management plan for compliance and parking. 12. Blocking any sidewalk or street is prohibited without prior approval from the Police Department and City Manager. 2 13. All work must match the approved plans. All changes to the approved plans must be re-submitted for plan review and approved before it can be inspected. Building inspectors are not authorized to approve changes to the approved plans in the field. (See Mechanical) 14. Where excavation is required for new construction, the provisions of FBC-B, Section 3307 will apply, including a 10-Day prior notice to adjoining property owners and protection of adjoining properties. Where the excavation exceeds 24 inches, temporary retaining walls must designed by the Engineer Of Record (EOR) and installed during or immediately after excavation. EXISTING BUILDINGS – REMODELS, RENOVATIONS, ADDITIONS, CHANGE OF OCCUPANCY. 1. Existing buildings are reviewed and permitted under the Florida Building Code-Existing Buildings (FBC- EB). The applicant must specify the method of compliance, per FBC-EB 301.1, and include that information on the plans, with the Design Criteria and Code Analysis. 2. The requirements for the method specified will be found in the corresponding FBC-EB Chapter. 3. When it is discovered during construction that the Compliance Method is not correct, or the project has expanded into another Compliance Method, revised plans will be required to update the Permit. No inspections will be conducted until the approved revisions are on site. 4. Any wall opened by removing interior or exterior wall coverings is considered a Work Area, and current provisions for Energy Conservation, including weatherproofing and insulation will apply. 5. Building inspectors are not authorized to approve changes to the approved plans in the field. ROOFING. a. The roof sheathing for all new construction must remain uncovered until the Roof Sheathing Inspection is approved. b. All roofing projects require an In-Progress Inspection. c. Sheathing installation and replacement guidelines per APA. d. Underlayment must conform to FBC-R Table 905.1.1 e. Shingles must conform to ASTM D3161 G or H, or ASTM D7158 F ELECTRICAL. 1. Electrical work must comply with the provisions of the 2014 NEC. 2. Anti-Oxidant Compound is required on all exterior aluminum wiring connections, unless the Listing Approval Documents for the conductors and the termination points, at each end, specifically allow connection without the compound. (Three documents will be required) PLUMBING. 1. Water supply and drain pipes must be insulated outside of conditioned areas, per FBC-R, P2603.5. 2. Where the entire sanitary drainage system is replaced, the existing building drain and building sewer must be internally examined to verify proper size and slope and that piping is not broken or obstructed, 3 per FBC-R, P2502.1. 3. COAB requires an additional sewer cleanout near the sewer tap with a T-1 concrete box for protection. 4. Water service piping must be properly supported and covered by a minimum of 12 inches of soil, per FBC-R, P2604.3. MECHANICAL. 1. All equipment and duct work must match the approved plans and Energy Sheets. The Manual S is the approved duct plan, and the as-built duct work must match the approved plans, or a revised Manual S or equivalent must be submitted for review. An equivalent must include duct and trunk layout and sizes, available static pressure, actual air flow, and total effective length, signed by the Mechanical Contractor with State License Number. FUEL GAS. 1. Fuel gas systems from the regulator to the appliances must comply with the FBC-Gas. 2. LP gas storage systems and outside piping must comply with NFPA 58. 3. All underground gas piping and tubing must be buried with 12-inches of cover. 4. CSST gas piping must comply with the manufacturer’s installation instructions and terms of approval. 4 01/23/20, 02/13/20 FOUN21-0007