Loading...
1936 Beach Ave MCRS21-0002 Roof Mounted SolarOWNER:ADDRESS:CITY:STATE:ZIP: HOEY GERALD W 1936 BEACH AVE ATLANTIC BEACH FL 32233-5937 COMPANY:ADDRESS:CITY:STATE:ZIP: Tesla Energy Operations 8500 PARKLINE BLVD SUITE 100 Orlando Fl 32809 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169542 0710 BEACHSIDE REPLAT JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 1936 BEACH AVE MECHANICAL RESIDENTIAL OTHER ROOF- MOUNTED PHOTO VOLTAIC SYSTEM $9835.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00 SOLAR COLLECTOR SYSTEM 455-0000-322-1000 0 $30.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $84.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 12/30/2021 PERMIT NUMBER MCRS21-0002 ISSUED: 12/30/2021 EXPIRES: 6/28/2022 MECHANICAL RESIDENTIAL OTHER PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD 2 of 2Issued Date: 12/30/2021 PERMIT NUMBER MCRS21-0002 ISSUED: 12/30/2021 EXPIRES: 6/28/2022 MECHANICAL RESIDENTIAL OTHER PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD DESCRIPTION ACCOUNT QTY PAID PermitTRAK $84.00 MCRS21-0002 Address: 1936 BEACH AVE APN: 169542 0710 $84.00 BLDG SUBSEQUENT PLAN REVIEW FEES $50.00 BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00 MECHANICAL $30.00 SOLAR COLLECTOR SYSTEM 455-0000-322-1000 0 $30.00 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R18392 $84.00 Printed: Thursday, December 30, 2021 1:10 PM Date Paid: Thursday, December 30, 2021 Paid By: Tesla Energy Operations Pay Method: CREDIT CARD 567934462 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R18392 ~+; CENTRALSQUARE Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION IN fE'1r l@N l lN E~ ~I@ ~1-iM Musr CAIi. BY 4PM PREVIOUS DAY FOR NIEXI' DAY INSPECIION MCRS21-0002 Doc# 2021076347, OR BK 19647 Page 936, Number Pages: 1, Recorded 03/24/2021 03:08 PM, JODY PHILLIPS CLERK CIRCUIT COURT DUVAL COUNTY RECORDING $10.00 NOTICE OF COMMENCEMENT Permit No. _____ _ Tax Folio No. 169542-0710 State ofFlorida, County of Duval THE UNDERSIGNED hereby give notice that the improvement will be made to certain real property in accordance with Chapter 713. Florida Statutes. the following information is provided in this Notice of Commencement. I. Description of property (legal description of property and address if available): 1936 Beach Ave Atlantic Beach, FL 32233 2. General Description of improvements: Installation of Roof-Mounted Photovoltaic System and Tesla Powerwall(s) 3. Owner Information: _.. a) Name and Address: (;1 c,;,.1 t /J. • ._,:·•, .. , y }'l /cc. 936 Beach Ave Atlantic Beach, FL 32233 b) Interest in property:-'-H"°o"'mc..::ee..:::o.:..:w.:..:ne:.:r'---------------'------------- c) Name and address of simple titleholder (if other than owner): N/A 4. Contractor Information: a) Name and Address: Tesla Enery Operations Inc/ 8500 Parkline Blvd Ste 100 Orlando, FL 32809 b) Phone Number:--'9"'54-'-.s'-4-'1.oo'--'3s'--------------- 5. Surety Information: a) Name and Address: _,N-=/-'-'A,__ ___________________________ _ b) Phone Number:~~---------------- c) Amount of Bond: $~N=/A~-------------- 6. I .ender Information: a) Name and Address:-'-"'-=----------------------------- b) Phone Number:_,..,.,.. _______________ _ 7. Person within the State of Florida designated by owner upon whom notices or other documents may be served as provided by 713.13 (I )(a) 7, Florida Statutes: a) Name and Address: .:.:N::.:./A_;__ ___________________________ _ b) Phone Numbers of Designated Person:~N~/A _______________ _ 8. In addition to himself/herself, Owner designates N/A of_N_/_A ____ to receive a copy of the Lienor's Notice as provided in Section 713.13 (1) (b), Florida Statutes. a) Name and Address: -'-'N=/A_,_ __________________________ _ b) Phone Number of person or entity designated by owner: _N~/A~------------ 9. Expiration date of Notice of Commencement (the expiration date may not be before the completion of construction and final payment to the contractor. but will be one (I) year from the date of recording unless a different date is specified: ___________________ _ WARNING TO OWNER: ANY PAYMENTS MADE BY THE OWNER AFTER TJ:IE EXPIRATION OF THE NOTICE OF COMMENCEMENT ARE CONSIDERED IMPROPER PAYMENTS UNDER CHAPTER 713, PART I, SECTION 713.13, FLORIDA STATUTES, AND CAN RESULT IN YOUR PA YING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE COMMENCING WORK OR RECORDING YOUR NOTICE OF COMMENCEMENT. Under penalty of perjury, I declare that I have read the foregoing notice of commencement and that the facts stated therein are true to the best of my knowledge and belief The foreKing instru_m~nt wa_s acknowledged before me by means of IZ!vhysical presep~e -~rDonline notarization, thisiAll' day of Jr~~ , 202:.l. by {lu-C\,/ cl W 1-:fu~whojs. . .P..~CS().!l.al!}'. ~nown to (Name of Person) _, · - me or produced ____________ as identification. as -'-H=o=me=o=wn=e,_r -,--,----,-,,-----,--,--- (Type of Authority, e.g .. officer, attorney in fact, etc.) for Gerald Hoey/ Josee Hoey (Name of Party Instrument was Executed for) Commissioned (Affix Nolary Seal Above) 1/2020 MCRS21-0002 Revision Request/Correction to Comments City of Atlantic Beach Building Department 800 Seminole Rd, Atlantic Beach, FL 32233 **ALL INFORMATION HIGHLIGHTED IN GRAY IS REQUIRED. Phone: (904) 247-5826 Email: Bui ld i ng-Dept@coab.us PERMIT#: _______ _ D Revision to Issued Permit OR 0 Corrections to Comments Date: 1210912021 Project Address: _1_93_6_B_ea_ch_Av_e ______________________________ _ Contractor/Contact Name: _D_a_nie_l_F_on_zi_· ___________________________ _ Contact Phone: (954) 541-0036 Email: Jacksonvillepic@Tesla.com ....:...,__;_ __________ _ Description of Proposed Revision/ Corrections: Building Permit Application updated with building portion on job value, Electrical permit application added JEA Approval letter added, Three Line Diagram on plans have been updated to JEA's requirements. Attached copy of contract to refer pricing (electrical app 80% of job value and building app 20% of job value) l,_o_an_ie_, _Fo_n_zi __________ affirm the revision/correction to comments is inclusive of the proposed changes. (printed name) • Will proposed revision/corrections add additional square footage to original submittal? 0No D Yes (additional s.f. to be added: ____________ ) •~ill proposed revision/corrections add additional increase i e to original submittal? l.i.JNo D*Yes (additional increase in building value : $-M-~'-c--+-~---) {Contractor must sign if increase in valuation) (Office Use Only) Y1' Approved LJ Denied L Not Applicable to Department Permit Fee Due$. _____ _ Revision/Plan Review Comments, _____________________________ _ Department Review Required: Building Planning & Zoning Tree Administrator Public Works Public Utilities Public Safety Fire Services Reviewed By Date Updated 10/17/18 MCRS21-0002 Building Permit Application ,~ ;, City of Atlantic Beach Building Department :Ji 800 Seminole Road, Atlantic Beach, Fl 32233 Phone: (904) 247-5826 Email: Building--De pt @coab.us Updated 10/9/18 ••ALL INPORMA'llQN HIGHI.ICIMTID w.euv IS REQUIRED, Job Address: 1938 Beach Ave Atlantic Beach, FL 32233 Permit Number: __________ _ Legal Description 44-18 09-2S.29E Beachslae Replat L0t 2 RE# 169542-0710 Valuation of Work (Replacement Cost) $_9_,_8_3_5 ____ Heated/Cooled SF _____ Non-Heated/Cooled ____ _ • Class ofWoric □New □Addition ■Aiteration □Repair □Move □Demo □Pooi □Window/Door • Use of existing/proposed structure(s): □Commercial a Residential • If an existing structure, is a fire sprinkler system installed?: □Yes □No • Will tree/cl be r emoved in association with orooosed oroiect? OYesJmust submit senarate Tree RemovalJ>ermitl □No Describe In detail the type of work to be performed: Installation of Roof-Mounted Photo-Voltaic System Florida Product Approval# __________________ for multiple products use product approval form Property Owner Information Name Gqyf h4 lu /lg;,v-r :Ttb erf" If /bc:-v Address 1938 Beach Ava City Atl■ntlc e..c11 r sfue _F_L __ Zip 32233 Phone ""'"(9_04_.)_2_4_9-07_8_5 _______ _ E-Mail Jerry@beachuwoodcrafls.com Owner or Agent (If Agent, Power of Attorney or Agency Letter Required) __________________ _ Contractor Information Name of Company Teala Energy Operations, Inc. Address 8500 Parkline BJvd Ste 100 Office Phone 954-541-0036 State Certification/Registration# CBC1262832 Architect Name & Phone# NIA Qualifying Agent _D_a_nill_l_F_o_nzl _________________ _ City Orlando State FL Zip 32809 ---Job Site Contact Number _______________ _ E-Mail anUJ1man@te1la.com ----------------------------------Engineer's Name & Phone# _N_IA ________________________________ .....,. Workers Compensation Insurer MARSH RISK & INSURANCE SERVICES OR Exempt o Expiration Date _1_Dl3_1l20_2_1 ___ _ Application is hereby made to obtain a permit to do the work and installations as indicated. I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING, SIGNS, WELLS, POOLS, FURNACES, BOILERS, HEATERS, TANKS, and AIR CONDITIONERS, etc. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. OWNER'S AFFIDAVIT:/ certify that all the foregoing information is accurate and that all work will be done in compliance with·all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YO TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR RECORDING UR NOTICE OF COM NCEMENT. ROPERTY. IF YOU INTEND EV BEFORE ( Signature of Contractor) Signed and sworn to (or · · y of Y VW'lv-,'1 , 1o r., I hJ'(ersonally Known [ I Produced ldentific Type of Identification:~~~~~~~~~~~~~- [x] Personally Known OR I ] Produced Identification Type of Identification: Solar Purchase Disclosure v. 2021 5468340 SOLAR PURCHASE DISCLOSURE This disclosure is designed to help you understand the key terms of your purchase of a solar electric system (“System”). It is not a substitute for your purchase contract (“Contract”), loan or any other documents associated with this transaction. Information presented below is subject to the terms of your Contract. Read all documents carefully so you fully understand the transaction. For more information on becoming a smart solar consumer please visit www.seia.org/consumers. Provider: Tesla, Inc. Address: 3500 Deer Creek Road Palo Alto, CA 94304 Tel.: 888-518-3752 License # (if applicable): Not Applicable Email: energycustomersupport@tesla.com Installer: Tesla Energy Operations, Inc. Address: 901 Page Avenue Fremont, CA 94538 Tel.: 888-765-2489 State/County Contractor License #: FL EC13006226/ CCC1331559 Email: energycustomersupport@tesla.com Customer: Gerald Hoey System Installation Address: 1936 Beach Ave, Atlantic Beach, FL 32233-5937 Customer Mailing Address: 1936 Beach Avenue, Atlantic Beach, FL 32233 Email: jerry@beacheswoodcrafts.com Contract Date: 4/20/2021 Purchase Price Your purchase price, including the cost of the Powerwall(s): $49,075.00 List of any credits, incentives or rebates included in the above purchase price: $100.00 *NOTE: Not everyone is eligible for credits, incentives or rebates or can fully use them. Consult your tax professional or legal professional for further information. Payment Schedule Amount you owe Provider at Contract signing: $0.00 Amount you owe Provider at the commencement of installation: $24,537.50 Amount you owe Provider following building inspection: $24,537.50 Financing Your system: Financing of System is UNKNOWN to Provider NOTE: If your System is financed, carefully read any agreements and/or disclosure forms provided by your lender. This statement does not contain the terms of your financing agreement. If you have any questions about your financing arrangement, contact your finance provider and read all financing disclosures before signing a Contract. Installation Timing Approximate Start Date: 7-90 days from the date the Agreement is signed. Approximate Completion Date: 7-90 days from the day installation begins. Interconnection Approval PROVIDER is responsible for submitting a System interconnection application. Site & Design Assumptions for your Purchase The estimated size of your System is: 12.24 kW DC Estimated gross annual electricity production in kilowatt-hours (kWh) from your System in Year 1: 17,225 kWh Estimated System Lifetime: 30 years Estimated annual electricity production decrease due to natural aging of the System: 0.5% C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Solar Purchase Disclosure v. 2021 5468340 System location on your property: rooftop Connectivity: The System WILL be connected to the electric grid. At the time of installation, your local utility WILL credit you for excess energy your System generates. The rules applying to such credit are set by your jurisdiction. Your utility is offering new solar customers net energy metering or providing bill credit for electricity from the solar system. Your utility may alter their rates and policies associated with solar at any time, and you may have no recourse. Changes in net energy metering policy or changes in utility rates or rate structures during the life of the system may result in lower utility bill savings than estimated or none at all; Tesla Energy will not be responsible for reassessing the contract rate. Your 3 Powerwall system has an initial storage capacity of 40.50 kWh and contains an integrated storage inverter/charger capable of providing a combined 15.00 kW of continuous power and 21.00 kW of surge power. System Maintenance & Repairs System maintenance IS included for 20 years from the Installer. You are required to perform the following system maintenance: Shade Management: Shading on your solar display dramatically reduces electricity production. Keep trees or other tall plants trimmed to prevent shade on your system. Panel Cleaning: Cleaning your panels of debris can improve your system performance. Flushing the panels from the ground with a water hose can let more sunlight penetrate through the glass cover. “System repairs” refers to actions needed to fix your System if it is malfunctioning. System repairs ARE provided by the Installer. If System repairs ARE included, the coverage periods for each hardware component of your System (in years) are: Solar Panels: at least 12 years Inverter: at least 10 years Powerwall: 10 years Please check the Manufacturer’s warranty for the coverage period of other hardware components. If System repairs ARE included, the coverage periods for the labor/workmanship for each component of your System (in years) are: 20 years Powerwall System: 4 years Please review your Contract for additional information about any warranties on the System installation and equipment. Note that equipment warranties for hardware are not required to include labor/workmanship. Your Provider may assign or subcontract any of its rights or obligations under this Agreement to any affiliate, successor, partner or purchaser. If such a transfer occurs, you will be notified if this will change the address or phone number to use for system maintenance or repair requests. Roof Warranty Your roof IS warranted against leaks from the system installation for the first 10 years by the Provider. Performance or Production Guarantee Provider is not providing you with a performance or production guarantee. Taxes You are responsible for property taxes on property you own. Consult a tax professional to understand any tax liability that may result from entering the Contract. Utility and Electricity Usage/Savings Assumptions C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy Solar Purchase Disclosure v. 2021 5468340 You HAVE NOT been provided with a savings estimate based on your purchase. If provided, the savings estimate was calculated based on: System size. The savings estimate to you assumes the following: Your system will last: 30 years It is important to understand that electricity rates are estimates only. Your actual current and future utility rates and utility rate increases may vary. Provider IS NOT guaranteeing these savings. Cooling Off Period/ Right to Cancel In addition to any rights you have under state or local law, you HAVE the right to terminate this agreement without penalty within three (3) business days or within five (5) business days (for CA Customers only) of 4/22/2021 12:21:32 PM +00:00{{_es_signer2_date}} by notifying Provider in writing at the above address. SEIA Solar Business Code Provider DOES abide by and agrees to be bound by SEIA’s Solar Business Code and its complaint resolution process. For more information about the SEIA Solar Business Code and complaint resolution process, please visit http://www.seia.org/consumers Additional Disclosures or Terms Powerwall System The Powerwall will draw 100% of its charge from the Solar Array. In backup mode, the Powerwall will provide automatic backup power to the circuits to which it is connected. In self-powered mode, the Powerwall will capture excess solar energy during the day to power your Home at night. Final determination of eligible circuits will be made prior to installation. Eligible circuits must be located in the same electrical panel used to connect the Solar Array at the time we install. If we cannot install a Powerwall so as to provide backup energy to at least eight (8) circuits that you request due to access or electrical constraints, you may cancel the Powerwall, and either opt to have a solar-only system installed, or cancel this Agreement entirely. Customer’s Initials here G H C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy Energy Products Purchase & Home Improvement Agreement V9.1, 4/2/2021 Tesla, Inc. 5468340 Tesla Energy Products Purchase & Home Improvement Agreement This “Agreement” is between you and the Tesla entity (“Tesla”, “we” “us” or “our”) identified below. It consists of (1) the below Price Sheet and (2) the attached terms & conditions, and is effective on the date you agree to this Agreement (by electronic acceptance, signature or e-mail) and shall supersede all prior existing agreements between you and Tesla for the Tesla Energy Products described below. Price Sheet Your information Gerald Hoey 1936 Beach Ave Atlantic Beach, FL 32233-5937 9045911032 Tesla entity / Provider Tesla, Inc. of 3500 Deer Creek Road, Palo Alto, CA, 94304 888-765-2489 Installer Tesla Energy Operations, Inc. of 901 Page Avenue, Fremont, CA 94538 FL EC13006226/ CCC1331559 Energy Products and Contract Price Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed Solar System $24,600.00 12.24 kW DC Solar Panels $5,904.00 Inverter(s) & Balance of System $3,444.00 Mounting Hardware $1,230.00 Installation, Permitting, and Other Fees $14,022.00 Powerwall $24,500.00 3 x Powerwall(s) (Includes integrated or separate System communication device) $24,500.00 Powerwall Installation $2,500.00 Powerwall + Solar Discount ($2,500.00) System Price $49,100.00 Taxes $75.00 Contract Price $49,175.00 C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Energy Products Purchase & Home Improvement Agreement V9.1, 4/2/2021 Tesla, Inc. 5468340 Credit for Order Payment ($100.00) Credit for Rebate Value ($0.00) Amount Due $49,075.00 Customer’s Initials: G H Schedule of Payments Paid at Order $100.00 Due When Installation Begins $24,537.50 Due Within Five (5) Days of Inspection $24,537.50 The schedule of progress payments must specifically describe each phase of work, including the type and amount of work or services scheduled to be supplied in each phase, along with the amount of each proposed progress payment. IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT PAYMENT FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET DELIVERED. HOWEVER, A CONTRACTOR MAY REQUIRE A DOWNPAYMENT. The pricing in this Agreement is valid for 30 days after 4/20/2021. If you don’t sign this Agreement and return it to us on or prior to 30 days after 4/20/2021, Tesla reserves the right to reject this Agreement unless you agree to our then current pricing. You, the buyer, may cancel this transaction at any time prior to midnight of the third business day or fifth business day (CA Customers only) after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. If you are financing your System through one of our financing partners, the timing and amount of your payments (and any applicable interest accrued) will be subject to the terms and conditions of your agreement with your financier. If your financier fails to make payment on your behalf, or your financing is terminated by you or your financier, you will remain obligated to make payment under the terms of this Agreement. Estimated First Year Production (not guaranteed) 17,225 kWh Approximate Installation Start Date 7-90 days from contract signing Approximate Completion Date 7-90 days from the day installation begins Signed by C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Energy Products Purchase & Home Improvement Agreement V9.1, 4/2/2021 Tesla, Inc. 5468340 Your signature Gerald Hoey Name: Gerald Hoey Date: 4/22/2021 12:21:32 PM +00:00 You are entitled to a completely filled in copy of this Agreement, signed by both you and Tesla, before any work may be started. C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Tesla, Inc. N_ame: RJ Johnson T1Ue : Senior Director, Energy Solar Purchase Disclosure v. 2021 5468340 SOLAR PURCHASE DISCLOSURE This disclosure is designed to help you understand the key terms of your purchase of a solar electric system (“System”). It is not a substitute for your purchase contract (“Contract”), loan or any other documents associated with this transaction. Information presented below is subject to the terms of your Contract. Read all documents carefully so you fully understand the transaction. For more information on becoming a smart solar consumer please visit www.seia.org/consumers. Provider: Tesla, Inc. Address: 3500 Deer Creek Road Palo Alto, CA 94304 Tel.: 888-518-3752 License # (if applicable): Not Applicable Email: energycustomersupport@tesla.com Installer: Tesla Energy Operations, Inc. Address: 901 Page Avenue Fremont, CA 94538 Tel.: 888-765-2489 State/County Contractor License #: FL EC13006226/ CCC1331559 Email: energycustomersupport@tesla.com Customer: Gerald Hoey System Installation Address: 1936 Beach Ave, Atlantic Beach, FL 32233-5937 Customer Mailing Address: 1936 Beach Avenue, Atlantic Beach, FL 32233 Email: jerry@beacheswoodcrafts.com Contract Date: 4/20/2021 Purchase Price Your purchase price, including the cost of the Powerwall(s): $49,075.00 List of any credits, incentives or rebates included in the above purchase price: $100.00 *NOTE: Not everyone is eligible for credits, incentives or rebates or can fully use them. Consult your tax professional or legal professional for further information. Payment Schedule Amount you owe Provider at Contract signing: $0.00 Amount you owe Provider at the commencement of installation: $24,537.50 Amount you owe Provider following building inspection: $24,537.50 Financing Your system: Financing of System is UNKNOWN to Provider NOTE: If your System is financed, carefully read any agreements and/or disclosure forms provided by your lender. This statement does not contain the terms of your financing agreement. If you have any questions about your financing arrangement, contact your finance provider and read all financing disclosures before signing a Contract. Installation Timing Approximate Start Date: 7-90 days from the date the Agreement is signed. Approximate Completion Date: 7-90 days from the day installation begins. Interconnection Approval PROVIDER is responsible for submitting a System interconnection application. Site & Design Assumptions for your Purchase The estimated size of your System is: 12.24 kW DC Estimated gross annual electricity production in kilowatt-hours (kWh) from your System in Year 1: 17,225 kWh Estimated System Lifetime: 30 years Estimated annual electricity production decrease due to natural aging of the System: 0.5% C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Solar Purchase Disclosure v. 2021 5468340 System location on your property: rooftop Connectivity: The System WILL be connected to the electric grid. At the time of installation, your local utility WILL credit you for excess energy your System generates. The rules applying to such credit are set by your jurisdiction. Your utility is offering new solar customers net energy metering or providing bill credit for electricity from the solar system. Your utility may alter their rates and policies associated with solar at any time, and you may have no recourse. Changes in net energy metering policy or changes in utility rates or rate structures during the life of the system may result in lower utility bill savings than estimated or none at all; Tesla Energy will not be responsible for reassessing the contract rate. Your 3 Powerwall system has an initial storage capacity of 40.50 kWh and contains an integrated storage inverter/charger capable of providing a combined 15.00 kW of continuous power and 21.00 kW of surge power. System Maintenance & Repairs System maintenance IS included for 20 years from the Installer. You are required to perform the following system maintenance: Shade Management: Shading on your solar display dramatically reduces electricity production. Keep trees or other tall plants trimmed to prevent shade on your system. Panel Cleaning: Cleaning your panels of debris can improve your system performance. Flushing the panels from the ground with a water hose can let more sunlight penetrate through the glass cover. “System repairs” refers to actions needed to fix your System if it is malfunctioning. System repairs ARE provided by the Installer. If System repairs ARE included, the coverage periods for each hardware component of your System (in years) are: Solar Panels: at least 12 years Inverter: at least 10 years Powerwall: 10 years Please check the Manufacturer’s warranty for the coverage period of other hardware components. If System repairs ARE included, the coverage periods for the labor/workmanship for each component of your System (in years) are: 20 years Powerwall System: 4 years Please review your Contract for additional information about any warranties on the System installation and equipment. Note that equipment warranties for hardware are not required to include labor/workmanship. Your Provider may assign or subcontract any of its rights or obligations under this Agreement to any affiliate, successor, partner or purchaser. If such a transfer occurs, you will be notified if this will change the address or phone number to use for system maintenance or repair requests. Roof Warranty Your roof IS warranted against leaks from the system installation for the first 10 years by the Provider. Performance or Production Guarantee Provider is not providing you with a performance or production guarantee. Taxes You are responsible for property taxes on property you own. Consult a tax professional to understand any tax liability that may result from entering the Contract. Utility and Electricity Usage/Savings Assumptions C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy Solar Purchase Disclosure v. 2021 5468340 You HAVE NOT been provided with a savings estimate based on your purchase. If provided, the savings estimate was calculated based on: System size. The savings estimate to you assumes the following: Your system will last: 30 years It is important to understand that electricity rates are estimates only. Your actual current and future utility rates and utility rate increases may vary. Provider IS NOT guaranteeing these savings. Cooling Off Period/ Right to Cancel In addition to any rights you have under state or local law, you HAVE the right to terminate this agreement without penalty within three (3) business days or within five (5) business days (for CA Customers only) of 4/22/2021 12:21:32 PM +00:00{{_es_signer2_date}} by notifying Provider in writing at the above address. SEIA Solar Business Code Provider DOES abide by and agrees to be bound by SEIA’s Solar Business Code and its complaint resolution process. For more information about the SEIA Solar Business Code and complaint resolution process, please visit http://www.seia.org/consumers Additional Disclosures or Terms Powerwall System The Powerwall will draw 100% of its charge from the Solar Array. In backup mode, the Powerwall will provide automatic backup power to the circuits to which it is connected. In self-powered mode, the Powerwall will capture excess solar energy during the day to power your Home at night. Final determination of eligible circuits will be made prior to installation. Eligible circuits must be located in the same electrical panel used to connect the Solar Array at the time we install. If we cannot install a Powerwall so as to provide backup energy to at least eight (8) circuits that you request due to access or electrical constraints, you may cancel the Powerwall, and either opt to have a solar-only system installed, or cancel this Agreement entirely. Customer’s Initials here G H C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy Energy Products Purchase & Home Improvement Agreement V9.1, 4/2/2021 Tesla, Inc. 5468340 Tesla Energy Products Purchase & Home Improvement Agreement This “Agreement” is between you and the Tesla entity (“Tesla”, “we” “us” or “our”) identified below. It consists of (1) the below Price Sheet and (2) the attached terms & conditions, and is effective on the date you agree to this Agreement (by electronic acceptance, signature or e-mail) and shall supersede all prior existing agreements between you and Tesla for the Tesla Energy Products described below. Price Sheet Your information Gerald Hoey 1936 Beach Ave Atlantic Beach, FL 32233-5937 9045911032 Tesla entity / Provider Tesla, Inc. of 3500 Deer Creek Road, Palo Alto, CA, 94304 888-765-2489 Installer Tesla Energy Operations, Inc. of 901 Page Avenue, Fremont, CA 94538 FL EC13006226/ CCC1331559 Energy Products and Contract Price Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed Solar System $24,600.00 12.24 kW DC Solar Panels $5,904.00 Inverter(s) & Balance of System $3,444.00 Mounting Hardware $1,230.00 Installation, Permitting, and Other Fees $14,022.00 Powerwall $24,500.00 3 x Powerwall(s) (Includes integrated or separate System communication device) $24,500.00 Powerwall Installation $2,500.00 Powerwall + Solar Discount ($2,500.00) System Price $49,100.00 Taxes $75.00 Contract Price $49,175.00 C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Energy Products Purchase & Home Improvement Agreement V9.1, 4/2/2021 Tesla, Inc. 5468340 Credit for Order Payment ($100.00) Credit for Rebate Value ($0.00) Amount Due $49,075.00 Customer’s Initials: G H Schedule of Payments Paid at Order $100.00 Due When Installation Begins $24,537.50 Due Within Five (5) Days of Inspection $24,537.50 The schedule of progress payments must specifically describe each phase of work, including the type and amount of work or services scheduled to be supplied in each phase, along with the amount of each proposed progress payment. IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT PAYMENT FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET DELIVERED. HOWEVER, A CONTRACTOR MAY REQUIRE A DOWNPAYMENT. The pricing in this Agreement is valid for 30 days after 4/20/2021. If you don’t sign this Agreement and return it to us on or prior to 30 days after 4/20/2021, Tesla reserves the right to reject this Agreement unless you agree to our then current pricing. You, the buyer, may cancel this transaction at any time prior to midnight of the third business day or fifth business day (CA Customers only) after the date of this transaction. See the attached notice of cancellation form for an explanation of this right. If you are financing your System through one of our financing partners, the timing and amount of your payments (and any applicable interest accrued) will be subject to the terms and conditions of your agreement with your financier. If your financier fails to make payment on your behalf, or your financing is terminated by you or your financier, you will remain obligated to make payment under the terms of this Agreement. Estimated First Year Production (not guaranteed) 17,225 kWh Approximate Installation Start Date 7-90 days from contract signing Approximate Completion Date 7-90 days from the day installation begins Signed by C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Energy Products Purchase & Home Improvement Agreement V9.1, 4/2/2021 Tesla, Inc. 5468340 Your signature Gerald Hoey Name: Gerald Hoey Date: 4/22/2021 12:21:32 PM +00:00 You are entitled to a completely filled in copy of this Agreement, signed by both you and Tesla, before any work may be started. C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y C o p y Copy Copy Copy Copy Copy Copy Copy Copy Copy Copy T Tesla, Inc. N_ame: RJ Johnson T1Ue : Senior Director, Energy From:JEA Distributed Generation To:Cliff Shiferdek; Donivan Williams; Ricky Smith Cc:Interconnection.FL; Jeremy Maldonado; jerry@beacheswoodcrafts.com; Lundeen, Timothy M. - Manager System Analysis; Gutierrez, Edgar A. - Associate Program Manager; JEA Distributed Generation Subject:JEA Solar Permit Approval - DER+Battery #11257 - 1936 BEACH AVE - 32233 - HOEY,JERRY W - Tesla Energy Operations Date:Monday, November 29, 2021 8:56:26 AM This customer’s PV system as submitted meets JEA’s Distributed Generation (DG) system requirements. This project includes a battery system for energy storage. This project will be connected to JEA’s grid in compliance with JEA’s Distributed Generation (DG) policy. PV credits for kWh JEA receives from your solar system will be calculated using JEA’s fuel rate. This message is not a statement that the application document package is complete and approved. Note; Premises HOEY,JERRY W (904) 591-1032 1936 BEACH AVE Phone () - JACKSONVILLE 32233 PV System Information From Application 36 panels 12.240 kWdc 2 inverter(s) Tesla Battery 21.00 kWdc 40.50 kWh Contractor Tesla Energy Operations Tesla Enegy Operations Inc; 6611 Las Vegas Blvd S, Las Vegas, NV; 89119; (888) 765-2489 interconnection@tesla.com; F. 866-819-7858 Jeremy Maldonado; jermaldonado@tesla.com Project Specialist, Residential Customer Operations 6569 S. Las Vegas Blvd., Las Vegas, NV 89119 Ashley Johnson <asjohnson@tesla.com> Dennis Fleming; JEA DSM Coordinator 21 West Church St. T-12; Jacksonville, FL 32202-3139 distgen@JEA.com INDEX ABBREVIATIONS ELECTRICAL NOTES VICINITY MAP JURISDICTION NOTES REV BY DATE COMMENTS REV A JC 11/23/21 Added note about disconnect to TLD **** **** **** **** LICENSE GENERAL NOTES A AMPERE AC AL TERNA TING CURRENT BLDG BUILDING CONC CONCRETE DC DIRECT CURRENT EGC EQUIPMENT GROUNDING CONDUCTOR (E} EXISTING EMT ELECTRICAL METALLIC TUBING FSB FIRE SET-BACK GALV GALVANIZED GEC GROUNDING ELECTRODE CONDUCTOR GND GROUND HDG HOT DIPPED GALVANIZED I CURRENT Imp CURRENT AT MAX POWER lsc SHORT CIRCUIT CURRENT kVA KILOVOLT AMPERE kW Kl LOWA TT LBW LOAD BEARING WALL MIN MINIMUM (N) NEW NEUT NEUTRAL NTS NOT TO SCALE OC ON CENTER PL PROPERTY LINE POI POINT OF INTERCONNECTION PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER Voe VOLTAGE AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT MODULE GROUNDING METHOD: ZEP SOLAR AHJ: Atlantic Beach UTILITY: Jacksonville Electric Authority (FL) 1. THIS SYSTEM IS GRID-INTERTIED VIA A UL-LISTED POWER-CONDITIONING INVERTER. 2. A NATIONALLY -RECOGNIZED TESTING LABORATORY SHALL LIST ALL EQUIPMENT IN COMPLIANCE WITH ART. 110.3. 3. WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, A SIGN WILL BE PROVIDED WARNING OF THE HAZARDS PER ART. 690.17. 4. EACH UNGROUNDED CONDUCTOR OF THE MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY PHASE AND SYSTEM PER ART. 210.5. 5. CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH ART. 250.97, 250.92(8). 6. DC CONDUCTORS EITHER DO NOT ENTER BUILDING OR ARE RUN IN METALLIC RACEWAYS OR ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER ART. 690.31(E). 7. ALL WIRES SHALL BE PROVIDED WITH STRAIN RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY UL LISTING. 8. MODULE FRAMES SHALL BE GROUNDED AT THE UL -LISTED LOCATION PROVIDED BY THE MANUFACTURER USING UL LISTED GROUNDING HARDWARE. 9. MODULE FRAMES, RAIL. AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS. 1. ALL WORK SHALL COMPLY WITH THE 2020 FLORIDA BUILDING CODE (7TH EDITION), FLORIDA FIRE PREVENTION CODE (7TH EDITION). 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2017 NATIONAL ELECTRIC CODE. CONFIDENTIAL -lHE INFOIIJA~ HEREIN m NUIID· J B 3 2 2 o 6 6 o o CUSTOIIER: cONTAINED SHALL NoT eE usm roo lHE · -Gerald Hoey BEtEFlT Of AN~E EXCEPT mLA INC., NOR .,_IOI_NTII_G_Sl'SlEll_: _______________ -J 91ALL IT BE DISCLOSED IN WHlli ~ IN ZS Com V4 w Flashin -Insert 1936 Beach Ave PART 10 OlHERS OOlSlllE lHE REClPENTS Atl t 8 h FL ~GANIZAll~. EXCEPT IN CONNECTION WITH IIXlll.ES: an ic eac , 32233 THE SALE ANO USE a, THE RESPECll\'E 36 Hanwho Q-CELLS a.Peak DUO BU<-G6+ 340 lESI.A EQUIPMENT, 'MlHOUT THE 'MllTIEN ll\'ERTfR: PERMISSION or lESlA INC. Multi le Inverters 9045911032 Sheet 1 COVER SHEET Sheet 2 SITE PLAN Sheet 3 STRUCTURAL VIEWS Sheet 4 UPLIFT CALCULATIO NS Sheet 5 THR EE LINE DIAGRAM Sheet 6 THR EE LINE DIAGRAM CON T. Cutsheets Atta ched DESIGN: 12.24 KW PV ARRAY 40.5 KWH ENERGY STORAGE SYSTEM Jesslyn Cobero T ---SLi=i PMl:NMIE: HET: REY: DAl[; COVER SHEET a 11/23/2021 (E) DRIVEWAY Front Of House SV SV SV 12" SB 1 2 " S B 12" SB 1 2 " S B 1 2 " S B 12" SB 1 2 " S B 12" SB 1 2 " S B 12" SB 1 2 " S B 12" SB P i t c h 3 / 1 2 M P 1 Pi t c h 2/ 1 2 MP2 Pi t c h 3/ 1 2 MP3 Scale: 1/8" = 1' SITE PLAN 0 1'8'16' LEGEND MP3 13° (3:12) 179 13° (3:12) 179 Comp Shingle 2 Stories MP2 11° (2:12) 179 11° (2:12) 179 Comp Shingle 2 Stories MP1 13° (3:12) 359 13° (3:12) 359 Comp Shingle 2 Stories #SSTAMPFL #ESTAMPFL 0 0 0 ,--------------7 1 0 ~----. I I 0 I I I I I ~--1----4--l----------ir----ii I 1----1----4-1----1--------11 I L _________ _ ~------4=--:=-=:b--=~-=-=-=='==-==----=1] I L __ ---------- ------0 7 I I I I I .L...._ __ __,__ __ _.__-t--_ _J CONFIDENTIAL -lHE INFORMA~ HEREIN .ai NUIIIR· J B 3 2 2 O 6 6 O O CUSTOIIER: cONTAINED SHALL NoT eE usm FOO lHE ___ · __ -_____________ ___. Gerald Hoey DESCRIPllON: 12.24 KW PV ARRAY -CD t,.I O'> CIJ ('D Cl n ::::r BEtEflT OF AN'lttlE EXCEPT mLA 1Nc., NOR 10JN111G Sl'SlEII: 1936 Beach Ave SHALL n BE DISCLOSED IN WHll..E OR IN ZS C V4 Fl h" I rt PART 10 OlHERS OUlSIDE lHE RECIPENTS om w as in -nse Atl t· B h FL 32233 40.5 KWH ENERGY STORAGE SYSTEM ORGAN I Zit ll<W, EXCEPT IN CONNECTION WllH IIXlll.ES: a n IC e a C ' lliE SALE AND USE Of lliE RESPECll\£ 36 Hanwha Q-CELLS a.Peak DUO BU<-G6+ 340 lESLA EQUIPMENT, 'MlHOUT TiiE WITTEN ll\m!IR: PERMISSION or mu INC. Multi le Inverters 9045911032 PM£ NMIE: SITE PLAN PITCH: ARRAY PI TCH: AZIMUTH: AR RAY AZIMUTH: MATERIAL: STORY: PITCH: ARRAY PITCH: AZIMUTH: AR RAY AZIMUTH: MATERIAL: STORY: PITCH: ARRAY PITCH: AZIMUTH: ARRAY AZIMUTH: MATERIAL: STORY: ~ (E) UllLITY METER & WARNING LABEL ~ INVERTER W/ INTEGRATED DC DISCO & WARNING LABELS ,~, AUTOMATIC RELAY ~ DC DISCONNECT & WARNING LABELS ~ AC DISCONNECT & WARNING LABELS [ill] DC JUNCllON/COMBINER BOX & LABELS ~ ENERGY STORAGE SYSTEM FOR STAND ALONE OPERATION ~ DISTRIBUTION PANEL & LABELS [@] LOAD CENTER &: WARNING LABELS 0 DEDICATED PV SYSTEM METER ~ RAPID SHUTDOWN 0 STANDOFF LOCATIONS -CONDUIT RUN ON EXTERIOR ---CONDUIT RUN ON INTERIOR 0 GATE/FENCE HEAT PRODUCING VENTS ARE RED r ,--;., 1, \1 INTERIOR EQUIPMENT IS DASHED L'::/.J ■--■-- DESIGN: Jesslyn Cabero T ---SLi=i HET: REY: DAl[; 2 a 11/23/2021 NTS TYPICAL PV SIDE VIEWSV Scale: 1 1/2" = 1' STANDOFFS1 #SSTAMPFL (N) PV MODULE (E) MOUNTING PLANE (MP) PV MODULE 5/16.xl.5" BOLT WITH 5/16" FLAT WASHER ZEP LEVELING FOOT ZEP ARRAY SKIRT INSTALLATION ORDER LOCATE RAFTER, MARK HOLE LOCATION, AND DRILL PILOT HOLE. ZEP MOUNTING BLOCK ATTACH FLASHING INSERT 10 (2) MOUNTING BLOCK AND ATTACH ZEP FLASHING INSERT TO RAFTER USING LAG SCREW. (E) COMP. SHINGLE __..J~~~~~~:::;~_2~~~~=S"i?"_,,,... INJECT SEALANT INTO FLASHING (E) ROOF DECKING 5/16" DIA STAINLESS STEEL LAG SCREW LOWEST MODULE SUBSEQUENT MODULES 01----- (3) INSERT PORT, WHICH SPREADS SEALANT EVENLY OVER THE ROOF PENETRATION. INSTALL LEVELING FOOT ON TOP (4) OF MOUNTING BLOCK & SE CU RELY FASTEN WITH BOLT. cONnDENTIAL -lHE 1NrORMA~ HEREIN ._.ai_Nu_lllR_:_J_B_-_3_2_2_0_6_6 __ 0_0 _______ ---1 cuGSTOIIER:erald Hoey CONTAINED SHALL NOT BE USED FOO lHE BEtEflT OF AN'lttlE EXCEPT mLA 1Nc., NOR 10JN111G Sl'SlEII: 1936 Beach Ave SHALL IT BE DISCLOSED IN WHll..E ~ IN ZS Com V4 w Flashin -Insert ~~t~~~x:1;1~ i:N~~~~i IDIIUS: Atlantic Beach, FL 32233 lliE SALE AND USE Of lliE RESPECll\£ 36 Hanwha Q-CELLS a.Peak DUO BLK-G6+ 340 lESI.A EQUIPMENT, 'MlHOUT TiiE 'MllTTEN 11\ef!IR: 9045911032 PERMISSION or mu INC. Multi le Inverters DESCRIPllON: DESIGN: 12.24 KW PV ARRAY 40.5 KWH ENERGY STORAGE SYSTEM Jesslyn Cabero T:SLi=i PM£ NMIE: HET: REY: DA'([; STRUCTURAL VIEWS 3 a 11/23/2021 #SSTAMPFL Jobsite Specific Design Criteria Design Code ASCE 7-16 Risk Category II Table 1.5-1 Ultimate Wind Speed V-Ult 130 Fig. 1609A Exposure Category C Section 26. 7 Ground Snow Load pg 0 Tobie 7-1 Edge Zone Width a 4.6 ft Fig. 30.3-2A to I MP Specific Design Information MP Name MP1 MP2 MP3 Roofing Comp Shingle Comp Shingle Comp Shingle Standoff ZS Comp V4 w ZS Comp V4 w ZS Comp V4 w Flash in g-lnsert Flashing-Insert Flashing-Insert Pitch 13 11 13 SL/RLL: PV 0.0 0.0 0.0 SL/RLL: Non-PV 20.0 20.0 20.0 Standoff Spacing and Layou t MP Name MP1 MP2 MP3 Landscape X-Spacing 48 48 48 Landscape 20 20 20 X-Cantilever Landscape Y-Spacing 41 41 41 Landscape Y-Cantilever --- Portrait X-Spacing 32 32 32 Portrait X-Cantilever 12 12 12 Portrait Y-Spacing 69 69 69 Portrait Y-Contilever --- Layout Staggered Staggered Staggered X and Y are maximums that ore always relative to the structure framing that supports the PV. X is across rafters and Y is along raft ers. CONFIDENTIAL -lHE INFORM A~ HEREIN .al NUIIIR: JB-322066 00 CUSTOIIER: 0£SCRIP110N: DESIGN: CONTAINED SHALL NOT BE USED FOO lHE Gerald Hoey 12.24 KW PV ARRAY Jesslyn Cabero T -SLi=i BEtEflT Of AN'lttlE EXCEPT mLA INC., NOR IOINTIIG Sl'SlEII: -SHALL IT BE DISCLOSED IN WHll..E OR IN ZS Comp V4 w Flashing-Insert 1936 Beach Ave 40.5 KWH ENERGY STORAGE SYSTEM -PART TO OlHERS OUlSIDE lHE RECIPENTS Atlantic Beach, FL 32233 ORGAN I Zit ll<W, EXCEPT IN CONNECTION WllH IIXlll.ES: lliE SALE AND USE Of lliE RESPECll\£ (36) Hanwha Q-CELLS # Q.Peak DUO BU<-G6+ 340 HET: REY: DA1£: lESI.A EQUIPMENT, 'MlHOUT TiiE 'MllTTEN PM£ NMIE: 11\ef!ER: 9045911032 PERMISSION or mu INC. Multiole Inverters UPLIFT CALCULATIONS 4 a 11/23/2021 LICENSEGENERAL NOTESMAIN PANEL SPECSGROUND SPECS AC N A B GEC GNDGND Z Y 10 N EGC L2 L18 W N EGC L2 L18 W N EGC L2 L18 W Z Y X W 8 9 10 X9 #ESTAMPFL a BOND (N) AWG f6 TO (E) GROUND ROD Panel Number: AT PANEL Vfllli IRREVERSIBLE CRIIAP Mater Number: Underground Service Entrance (E) 2O0A f.lAIN SERVlCE PANEL (E) 2O0A/2P MAIN CIRCUIT BREAKER 200A r I I I I I I I I z I~ ---E~ ---J TO 120/240V SINQ..E PHASE UTILITY SERVICE I I I I I I - Plocord to be on Backup Gateway: "PCS Controlled Current Setting: 32A --------... I I I I I I I I I ---1...._ The maximum output current from this system towards the m oin panel is controlled electron i coll y. Refer to manufacturer's instructions for more information." • TESLA BACKUP GATEWAY LJ I (N) 225A LOAD CENTER u TO NEW SOLAR ... ~QA 2P .,_ TO NEW I l-'l'-'l'----+--1 SOLAR ~--,-,-,-,-----: e~p n , .... ~e-+----'l'l'-..---,-rl ----,1 ENERGY 1 1 ~, _ -1 I STORAGE SYSTEM I,. ---_.., _ __._ ___ ....J : ~~#_~P r1 : ~~--+~:....,_"Tu--,---, 1 ENERGY I I STORAGE SYSTEM r,-,-,-----u _ __._ ___ ~ : ~OA 2P () I .... i--+~~.---,'T'"J ---,I ENERGY I I STORAGE ~"' r,... -=~ t-B~LQC __ ,., _ I SYSTEM LOADS _________ :Jtn TO (E) LO~S . I ESS DISCONNECT: PW BREAKERS ACCESSIBLE LOCATED OUTSIDE PV DISCONNECT: MSP MAIN BREAKER ACCESSIBLE LOCATED OUTSIDE _A_ _A_ .A. A • A A _A_ .A. _.A. _.A._ _/",.., _,,A.. ..A.._ ..A..__ L__J--(1) GraundjN111t:ral Kit: 20DA C.,eral, Heavy Duty {DC. OH). NEMA 1, 3R - ( 1 ) Di&Ca1nact: 20DA, 2.'10Vac, Nm-F111ibla, NEMA 3R - -(1 )Tasia f 12:52100-00-E Back-up Gatawa~ 2.0 NA for AC PW 2.0 --(1) Load Centr,225A bu1,Con't'lftible,NEMAJR.2011p/40ct',120'l/240v,10kAJC.SUrfac1 -- ( 1 ) Breaker: 40A/2P. 2 SpGcea - ( 3 ) Breaker; YJA/'lP, 2 Spaces ---i..,_ (3)1092170-05-J __j TESL.A AC POWERWAI.L 2..D; Harne Enargy storage,1J.5IOIH, stackcmle, 5.8kVA cONnDENTIAL -lHE 1NrORMA~ HEREIN ._.ai_Nu_lllR_:_J_B_-_3_2_2_0_6_6 __ 0_0 _______ ---1 cuGSTOIIER:erald Hoey CONTAINED SHAil NOT BE USED FOO lHE BEtEflT OF AN'lttlE EXCEPT mLA 1Nc., NOR 10JN111G Sl'SlEII: 1936 Beach Ave SHALL IT BE DISCLOSED IN WHll..E ~ IN ZS Comp V4 w Flashing-Insert ~~t~~~x:1;1~ i:N~~~~i IDIIUS: Atlantic Beach, FL 32233 THE SALE AND USE Of THE RESPECll\£ .(36} Hanwha Q-CELLS # a.Peak DUO BU<-G6+ 340 TESI.A EQUIPMENT, 'MTHOUT ll£ 'MllTTEN 11\ef!ER: 9045911032 PERMISSION or mu INC. Multiole Inverters I\ 0£SCRIP110N: DESIGN: 12.24 KW PV ARRAY Jesslyn Cabero 40.5 KWH ENERGY STORAGE SYSTEM PM£ NMIE: HET: REY: DA1£: THREE LINE DIAGRAM 5 a 11/23/2021 T ---SLi=i LICENSEMODULE SPECS INV 1 INVERTER SPECSGENERAL NOTESMAIN PANEL SPECSGROUND SPECS INV 2 INV 3 AC DC L2 L1 EGC/ GEC GND 240V Inverter 1 IND EGC DC- DC+ DC- DC+ EGC DC- DC+ EGC DC- DC+ MP 1: 1x9 MP 2: 1x3 GD L2 L1 EGC/ GEC GND 240V Inverter 2 IND EGC DC- DC+ DC- DC+ DC- DC+ DC- DC+ EGC DC- DC+ EGC DC- DC+ MP 2: 1x5 MP 3: 1x7 MP 3: 1x12 GD PV 1 Voc* = VDC Isc = ADC Vmp = VDC Imp= ADC1 2 Voc* = VDC Isc = ADC Vmp = VDC Imp= ADC2 3 Voc* = VDC Isc = ADC Vmp = VDC Imp= ADC3 4 Voc* = VDC Isc = ADC Vmp = VDC Imp= ADC4 5 Voc* = VDC Isc = ADC 6 Vmp = VAC Imp= AAC 6 7 Vmp = VAC Imp= AAC 7 #ESTAMPFL BOND (N) #fi GEC TO (N) GROUND ROD Panel Number: Nolabel Inv 1: DC Ungrounded -(1) 3.8 kW Tea a nc 1534000-00-E (240V) -(36) Haiwha Q-CfilS # 0.Pedc DUO 81.J(-GB+ J40 AT PANEL Wllll IRREVERSIBLE CRIMP Meter Number: Inv 2: DC Ungrounded L--- PV Module: 340W, 318.1 PTC. -IOMII, Blade Fr, Mc-4. ZEP. 1000V Underground Service Entrance -(1) 7.6 kW Tesla nc 153!!000-00-E (240V) L---Voe. 40.66 \lpmax: 33.94 lsc AND Imp ARE SHO'I.N IN lllE DC STRINGS IDENTIFIER ~E~ 200A MAIN SERVICE PANEL E 200A/2P MAIN CIRCUIT BREAKER 3.8 kW Tesla Inc 1534000-00-E (240V) 0 • D 1J m TO MAIN PANEL i--------------------l ---------------_____ J AND ENERGY --,.. STORAGE SYSlEM -.,... I _J m ------ - - ------ - ------- ------ - - ------------ - - ----------, 19'" l I l ~ ' -t:::::J ,.. .l... "V ............... -------____________________________________________ j ( 1 )Conduit K1t; J/4" EMT . 7.6 kW Tesla Inc 1538000-00-E (2401 D Q • m D ,...,, ~ --,.. ~----------------------c:;x;?--__ , _____________ j TO MAIN PANEL -_r --AND ENERGY -,.. Ill •• ffi STORAGE SYSlEM -.,.. A -v i::=:::::;~ I ------ - - ------ - ------- ------ - - ------------ - - ---------, .---. TT ~ ' -t::::S ,.. ~ ~-I .... - ----1---; ..... - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -J .... ( 1 )Conduit K1t; 1" EIIT - Voe* = MAX VOC AT MIN TEMP -Plaaae sea MCI w~ng datal page for men nfarmatlcn -OJ)Tesla 11a, soov, 1lA - 0 i ( 1 ) Awe #10. THWN-2. Bladl 0 i(2)PV WR. AWG 10. Block 132.19 10.52 -( 1 )Awe #10. llilN-2, Rad (1 )AM. f10, lliHN/TH'IIN-2. Green EGC 101.82 10.02 (1 )Awe #10. THIN-2, Green EGC 240 16 ________ ~ 1_)_!:!Jl)d_u!t _ ~It; _ J/4: µIT._ ____________________ . _______________ -~ 1 ) Canel.lit Kit· 3/4" EMT ....... ' 1}Awi:" ;a: w..:.2.-eicick ..................................... 0 i(~~~M:Yf~'A:H~'.}n:~2, Green EGC ~:~ ~g:~ 0 i<1 )Awe f8, lHWN-2, Rad ________ ~l_)_C!)l)d_u[t.~lt; _3/.4: QIT. _ . _. ____ . _. __________ . ______ . ________ (1)AWG f10, THWN-2, Green EGC 240 32 ______ .-:(1_)_~~!t-~lt; _3/.f _El)IT ______ ................................ 0 i(~~:VWG ~•A=H~irn:~2, Green EGC ::~: rn:~ ________ p_)_C!")d_u[l.~it; _3/_( _E)_,IT._ . ___________________ . _______________ Oi(~~~1eio,A:H~%:~2. ~ EGC ~:~ ~g:~ ,(!)Conduit Kit, Ji4• EMT CONFIDENTIAL -THE INFORM A~ HEREIN .al NUIIIR: JB-322066 00 CUSTOIIER: 0£SCRIP110N: DESIGN: CONTAINED SHAil NOT BE USED FOO THE Gerald Hoey 12.24 KW PV ARRAY Jesslyn Cabero T -s Li=i BEtEflT Of AN'lttlE EXCEPT mLA INC., NOR IOINTIIG Sl'SlEII: -SHALL IT BE DISCLOSED IN WHll..E OR IN ZS Comp V4 w Flashinci-lnsert 1936 Beach Ave 40.5 KWH ENERGY STORAGE SYSTEM -PART TO OTHERS OUTSIDE lliE RECIPENTS Atlantic Beach, FL 32233 ORGAN I Zit ll<W, EXCEPT IN CONNECTION WITH IIXlll.ES: lliE SALE AND USE Of lliE RESPECll\£ (36J Hanwha Q-CELLS # Q.Peak DUO BU<-G6+ 340 TESI.A EQUIPIIENT, 'MTHOUT THE WITTEN 11\ef!IR: PM£ NMIE: HET: REY: DA1£: PERMISSION or mu INC. Multiole Inverters 9045911032 THREE LINE DIAGRAM CONT. 6 a 11/23/2021 SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN OPERATING VOLTAGE = Address: 240 JB-322066-00 1936 Beach Ave TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PY SYSTEM AND REDUCE SHOCK HAZARD IN THE ARRAY UTILITY SERVICE"- PROPOSED EQUIPMENT LOCATION CONFIDENTIAL -lHE INFORMA~ HEREIN .ai NUIIIR· J B 3 2 2 O 6 6 O O CUSTOIIER: cONTAINED SHALL NoT eE usm FOO lHE ___ · __ -____________ ___. Gerald Hoey BEtEflT OF AN'lttlE EXCEPT mLA 1Nc., NOR 101N111G Sl'SlEII: 1936 Beach Ave SHALL n BE DISCLOSED IN WHll..E OR IN ZS C .. , V4 Fl h" , " I rt PART TO OlHERS OUlSIDE THE RECIPENTS omf' w as in'l-nse Atl t· B h FL 32233 ORGAN I Zit ll<W, EXCEPT IN CONNECTION WllH IIXlll.ES: a n IC e a C ' lliE SALE ANO USE Of lliE RESPECll\£ (36J Hanwha Q-CELLS # a.Peak DUO BU<-G6+ 340 TESI.A EQUIPMENT, 'MlHOUT TiiE WITTEN 11\ef!ER: PERMISSION or mu INC. Multiole Inverters 9045911032 0£SCRIP110N: DESIGN: 12.24 KW PV ARRAY 40.5 KWH ENERGY STORAGE SYSTEM Jesslyn Cabero T:SLi=i PM£ NMIE: HET: REY: DAl[; SITE PLAN PLACARD 7 a 11/23/2021 LB-130089-10X Per Code: NEC 690.31.G.3 Label Location: (C)(CB)(JB) LB-050081-10X Per Code: NEC 690.13.B Label Location: (DC) (INV) LB-030042-10X Per Code: NEC 690.53 Label Location: (DC) (INV) LB-070004-10X Per Code: 690.41.B Label Location: (DC) (INV) LB-010001-10X Per Code: CEC 690.13.B Label Location: (DC) (CB) LB-050082-10X Per Code: NEC 690.13.B Label Location: (AC) (POI) LB-040007-10X Per Code: NEC 690.54 Label Location: (AC) (POI) LB-070005-10X Per Code: NEC 690.13.B Label Location: (AC)(POI) LB-070039-10X Per Code: NEC 705.12.B.2.3.b Label Location: (POI) LB_040108_10X Per Code: NEC 690.56.C.3 Label Location: (INV) LB-040008-10X Per Code: NEC 690.64.B.4 Label Location: (D) (POI) LB-040009-10X Per Code: NEC 705.12.B.3 Label Location: (POI) LB-060046-10X Per Code: CEC 690.13.B Label Location: (POI) LB-070016-10X Label Location: (DC) (INV) LB-250002-34X Per Code: 690.56(C)(1)(a) Label Location: SolarEdge and,Delta M-Series and,Telsa Inverter (POI): Point of Interconnection (M): Utility Meter (LC): Load Center (INV): Inverter With Integrated DC Disconnect (IC): Interior Run Conduit (DC): DC Disconnect (D): Distribution Panel (CB): Combiner Box (C): Conduit (AC): AC Disconnect Label Set WARNING : PHOTOVOLTAIC POWER SOURCE PHOTOVOLTAIC DC DISCONNECT WARNING ELECTRIC SHOCK HAZARD IF A GROUND FAULT IS INDICATED NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED WARNING ELECTRICAL SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT PHOTOVOLTAIC AC DISCONNECT MAXIMUMAC -OPERATING CURRENT A MAXIMUMAC - OPERATING VOLTAGE V WARNING ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS TERMINALS ON BOTH LINE AND LOAD S IDES MAY BE ENERGIZED IN THE OPEN POSITION WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN CAUT ION PHOTOVOLTAIC SYSTEM CIRCUIT IS BACKFED CAUTION DUAL POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM WARNING ELECTRIC SHOCK HAZARD THE DC CONDUCTORS OF THIS PHOTOVOLTAIC SYSTEM ARE UNGROUNDED AND MAY BE ENERGIZED SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURNR.wl 9«ITtl swmlt TO THE "Off" POSln()ijTO SHUT IIO'Nlf PV SV'ST£M AtlD R£ro:£ SHOCK HA2ARO THEARAA't, LB-040137-10X Per Code: NEC 408.4 Label Location: (BLC) LB-040144-10X Per Code: NEC 220 Label Location: (BLC) LB-200025-10X Per Code: NEC 312.8.A(3) Label Location: (MSP) LB-030142-10X Per Code: NEC 705.12(B)(3) Label Location: (MSP) LB-040141-10X Per Code: Label Location: (MSP) LB-040139-10X Per Code: Label Location: (MSP) LB-040140-10X Per Code: Label Location: (MSP) LB-040138-10X Per Code: Label Location: (MSP) LB-200011-10X Per Code: NEC 705.12(B)(3) Label Location: (MSP) LB_200127_10X Per Code: NEC 705.12.B.2.3.c Label Location: (MSP) LB-200110-10X Per Code: Per 706.7(D) label to be marked in field Label Location: (MSP) (MSP): Main Service Panel (BLC): Backup Load Center (AC): AC Disconnect Label Set BACKUP LOAD CENTER CAUTION DO NOT ADD NEW LOADS ENERGY STORAGE SYSTEM ON SITE LO CATED W ITHIN LINE OF SIGHT ENERGY STORAGE SYSTEM ON SITE LOCATED ON ADJACENT WALL ENERGY STORAGE SYSTEM ON SITE LOCATED ON OPPOS ITE WALL ENERGY STORAGE SYSTEM ON SITE LOCATED I NS IDE CA UTION TRI POWER SOURCE SECOND SOURCE IS PHOTOVOLTAIC SYSTEM THIRD SOURCE IS EN ERGY STORAGE SYSTEM TESLA.COM/ENERGY POWERWALL Tesla Powerwall is a fully-integrated AC battery system for residential or light commercial use. Its rechargeable lithium-ion battery pack provides energy storage for solar self-consumption, time-based control, and backup. Powerwall’s electrical interface provides a simple connection to any home or building. Its revolutionary compact design achieves market-leading energy density and is easy to install, enabling owners to quickly realize the benefits of reliable, clean power. PERFORMANCE SPECIFICATIONS AC Voltage (Nominal)120/240 V Feed-In Type Split Phase Grid Frequency 60 Hz Total Energy1 14 kWh Usable Energy1 13.5 kWh Real Power, max continuous 5 kW (charge and discharge) Real Power, peak (10 s, off-grid/backup)7 kW (charge and discharge) Apparent Power, max continuous 5.8 kVA (charge and discharge) Apparent Power, peak (10 s, off-grid/backup)7.2 kVA (charge and discharge) Load Start Capability 106 A LRA for each Powerwall Maximum Supply Fault Current 10 kA Maximum Output Fault Current 32 A Overcurrent Protection Device 30 A Imbalance for Split-Phase Loads 100% Power Factor Output Range +/– 1.0 adjustable Power Factor Range (full-rated power)+/– 0.85 Internal Battery DC Voltage 50 V Round Trip Efficiency1,2 90% Warranty 10 years ENVIRONMENTAL SPECIFICATIONS Operating Temperature –20°C to 50°C (–4°F to 122°F) Recommended Temperature 0°C to 30°C (32°F to 86°F) Operating Humidity (RH)Up to 100%, condensing Storage Conditions –20°C to 30°C (–4°F to 86°F) Up to 95% RH, non-condensing State of Energy (SoE): 25% initial Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Type NEMA 3R Ingress Rating IP67 (Battery & Power Electronics) IP56 (Wiring Compartment) Wet Location Rating Yes Noise Level @ 1m < 40 dBA at 30°C (86°F) MECHANICAL SPECIFICATIONS Dimensions3 1150 mm x 753 mm x 147 mm (45.3 in x 29.6 in x 5.75 in) Weight3 114 kg (251.3 lbs) Mounting options Floor or wall mount 1 Values provided for 25°C (77°F), 3.3 kW charge/discharge power. 2 AC to battery to AC, at beginning of life. COMPLIANCE INFORMATION Certifications UL 1642, UL 1741, UL 1973, UL 9540, IEEE 1547, UN 38.3 Grid Connection Worldwide Compatibility Emissions FCC Part 15 Class B, ICES 003 Environmental RoHS Directive 2011/65/EU Seismic AC156, IEEE 693-2005 (high) 753 mm (29.6 in) 147 mm (5.75 in) 1150 mm (45.3 in) 3Dimensions and weight differ slightly if manufactured before March 2019. Contact Tesla for additional information. TESLA.COM/ENERGY TYPICAL SYSTEM LAYOUTS PARTIAL HOME BACKUP WHOLE HOME BACKUP Main panelSub panel Solar Home loads Solar inverter Utility meter GridBackup Gateway Powerwall Backup loads Optional NA - BACKUP - 2021-06-01 Utility meter GridBackup Gateway including service disconnect Main panel Solar Whole home backup Solar inverter Powerwall Optional ,....,, w I [Z] ,EJJ -a -l[ru -□-® T:SLi=i T: SL;=; TESLA.COM/ENERGY Backup Gateway 2 POWERWALL 660 411 149 The Backup Gateway 2 for Tesla Powerwall provides energy management and monitoring for solar self-consumption, time-based control, and backup. The Backup Gateway 2 controls connection to the grid, automatically detecting outages and providing a seamless transition to backup power. When equipped with a main circuit breaker, the Backup Gateway 2 can be installed at the service entrance. When the optional internal panelboard is installed, the Backup Gateway 2 can also function as a load center. The Backup Gateway 2 communicates directly with Powerwall, allowing you to monitor energy use and manage backup energy reserves from any mobile device with the Tesla app. ENVIRONMENTAL SPECIFICATIONS Operating Temperature –20°C to 50°C (–4°F to 122°F) Operating Humidity (RH)Up to 100%, condensing Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Type NEMA 3R PERFORMANCE SPECIFICATIONS Model Number 1232100-xx-y AC Voltage (Nominal)120/240V Feed-In Type Split Phase Grid Frequency 60 Hz Current Rating 200 A Maximum Input Short Circuit Current 10 kA1 Overcurrent Protection Device 100-200A; Service Entrance Rated1 Overvoltage Category Category IV AC Meter Revenue accurate (+/– 0.2 %) Primary Connectivity Ethernet, Wi-Fi Secondary Connectivity Cellular (3G, LTE/4G)2 User Interface Tesla App Operating Modes Support for solar self-consumption, time-based control, and backup Backup Transition Automatic disconnect for seamless backup Modularity Supports up to 10 AC-coupled Powerwalls Optional Internal Panelboard 200A 6-space / 12 circuit Eaton BR Circuit Breakers Warranty 10 years COMPLIANCE INFORMATION Certifications UL 67, UL 869A, UL 916, UL 1741 PCS CSA 22.2 0.19, CSA 22.2 205 Emissions FCC Part 15, ICES 003 NA 2020-09-16 1 When protected by Class J fuses, Backup Gateway 2 is suitable for use in circuits capable of delivering not more than 22kA symmetrical amperes. 2 The customer is expected to provide internet connectivity for Backup Gateway 2; cellular should not be used as the primary mode of connectivity. Cellular connectivity subject to network operator service coverage and signal strength. MECHANICAL SPECIFICATIONS Dimensions 660 mm x 411 mm x 149 mm (26 in x 16 in x 6 in) Weight 20.4 kg (45 lb) Mounting options Wall mount, Semi-flush mount T l: T!l!5Ll'I 0 - YIELD SECURITY ANTI PID TECHNOLOGY (APT) HOT-SPOT PROTECT (HSP) TRACEABLE QUALITY (TRA.QTM) ANTI LID TECHNOLOGY (ALT) Product and Performance Warranty Q.ANTUM TECHNOLOGY: LOW LEVELIZED COST OF ELECTRICITY Higher yield per surface area, lower BOS costs, higher power classes, and an efficiency rate of up to 19.5 %. INNOVATIVE ALL-WEATHER TECHNOLOGY Optimal yields, whatever the weather with excellent low-light and temperature behavior. ENDURING HIGH PERFORMANCE Long-term yield security with Anti LID and Anti PID Technology1, Hot-Spot Protect and Traceable Quality Tra.Q™. ZEP COMPATIBLETM FRAME DESIGN High-tech black Zep CompatibleTM frame, for improved aesthetics, easy installation and increased safety. A RELIABLE INVESTMENT Inclusive 25-year product warranty and 25-year linear performance warranty2. STATE OF THE ART MODULE TECHNOLOGY Q.ANTUM DUO combines cutting edge cell separation and innovative wiring with Q.ANTUM Technology. 1 APT test conditions according to IEC/TS 62804-1:2015, method B (−1500 V, 168 h) 2 See data sheet on rear for further information THE IDEAL SOLUTION FOR: Rooftop arrays on commercial and industrial buildings Q.PEAK DUO BLK-G6+ / SC 330-345 ENDURING HIGH PERFORMANCE Į [% / K] + 0.04 ȕ [% / K] − 0.27 Ȗ [% / K] − 0.36 NMOT [°F] 109 ± 5.4 (43 ± 3 °C) 330 335 340 345 [W]330 335 340 345 [A]10.41 10.47 10.52 10.58 [V]40.15 40.41 40.66 40.92 [A]9.91 9.97 10.02 10.07 [V]33.29 33.62 33.94 34.25 [%]≥ 18.4 ≥ 18.7 ≥ 19.0 ≥ 19.3 [W]247.0 250.7 254.5 258.2 [A]8.39 8.43 8.48 8.52 [V]37.86 38.10 38.34 38.59 [A]7.80 7.84 7.89 7.93 [V]31.66 31.97 32.27 32.57 [V] 1000 (IEC) / 1000 (UL)II [A DC] 20 C (IEC) / TYPE 2 (UL) [lbs / ft2] 50 (2400 Pa) / 50 (2400 Pa) − 40 °F up to + 185 °F (− 40 °C up to + 85 °C)[lbs / ft2] 75 (3600 Pa) / 75 (3600 Pa) 3 See Installation Manual Certified UL 1703 (254141) Hanwha Q CELLS America Inc. 400 Spectrum Center Drive, Suite 1400, Irvine, CA 92618, USA | TEL +1 949 748 59 96 | EMAIL inquiry@us.q-cells.com | WEB www.q-cells.us MECHANICAL SPECIFICATION Format 68.5 × 40.6 × 1.57 in (including frame) (1740 × 1030 × 40 mm) Weight 47.4 lbs (21.5 kg) Front Cover 0.13 in (3.2 mm) thermally pre-stressed glass with anti-reflection technology Back Cover Composite film Frame Black anodized aluminum Cell 6 × 20 monocrystalline Q.ANTUM solar half cells Junction Box 2.09-3.98 × 1.26-2.36 × 0.59-0.71 in (53-101 × 32-60 × 15-18 mm), Protection class IP67, with bypass diodes Cable 4 mm² Solar cable; (+) ≥ 43.3 in (1100 mm), (−) ≥ 43.3 in (1100 mm) Connector Stäubli MC4; IP68 Note: Installation instructions must be followed. See the installation and operating manual or contact our technical service department for further information on approved installation and use of this product. Sp e c i f i c a t i o n s s u b j e c t t o t e c h n i c a l c h a n g e s © Q C E L L S Q. P E A K D U O B L K - G 6 + / S C _ 3 3 0 - 3 4 5 _ 2 0 1 9 - 1 1 _ R e v 0 1 _ N A ELECTRICAL CHARACTERISTICS POWER CLASS MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS, STC1 (POWER TOLERANCE +5 W / −0 W) Mi n i m u m Power at MPP1 PMPP Short Circuit Current1 ISC Open Circuit Voltage1 VOC Current at MPP IMPP Voltage at MPP VMPP Efficiency1 Ș MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS, NMOT2 Mi n i m u m Power at MPP PMPP Short Circuit Current ISC Open Circuit Voltage VOC Current at MPP IMPP Voltage at MPP VMPP 1 Measurement tolerances PMPP ± 3 %; ISC; VOC ± 5 % at STC: 1000 W/m2, 25 ± 2 °C, AM 1.5 according to IEC 60904-3 • 2 800 W/m², NMOT, spectrum AM 1.5 Q CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE At least 98 % of nominal power during first year. Thereafter max. 0.54 % degradation per year. At least 93.1 % of nominal power up to 10 years. At least 85 % of nominal power up to 25 years. All data within measurement toleranc- es. Full warranties in accordance with the warranty terms of the Q CELLS sales organization of your respective country. Typical module performance under low irradiance conditions in comparison to STC conditions (25 °C, 1000 W/m²) TEMPERATURE COEFFICIENTS Temperature Coefficient of ISC Temperature Coefficient of VOC Temperature Coefficient of PMPP Normal Module Operating Temperature PROPERTIES FOR SYSTEM DESIGN Maximum System Voltage VSYS Protection Class Maximum Series Fuse Rating Fire Rating based on ANSI / UL 1703 Max. Design Load, Push / Pull (UL)3 Permitted Module Temperature on Continuous DutyMax. Test Load, Push / Pull (UL)3 QUALIFICATIONS AND CERTIFICATES UL 1703, CE-compliant, IEC 61215:2016, IEC 61730:2016, Application Class II, U.S. Patent No. 9,893,215 (solar cells) 200 400 600 800 1000 110 100 90 80 RE L A T I V E E F F I C I E N C Y [ % ] IRRADIANCE [W/m²] RE L A T I V E E F F I C I E N C Y CO M P A R E D T O N O M I N A L P O W E R [ % ] 100 95 90 85 80 75 1552520010 YEARS 98 Q CELLS Industry standard for tiered warranties* Industry standard for linear warranties* *Standard terms of guarantee for the 10 PV companies with the highest production capacity in 2014 (as at: September 2014) 37.4" (950 mm) 68.5" (1740 mm) 4 × Fastening points (DETAIL A) Frame 6.06" (154 mm) 40.55" (1030 mm) 38.6" (981 mm) 1.57" (40 mm) 8 × Drainage opening 0.14" × 3.1" (3.6 mm × 8 mm) 6 × Grounding points ø 0.16" (4 mm) Label DETAIL A 0,472" (12 mm) 0.354" (9 mm)1.063" (27 mm) 15.6“ (395 mm) 7.09" (180 mm) 4 × Drainage opening ≥ 43 . 3 " (11 00 m m) ≥ 43. 3" (11 00 m m) ~ t-t-r----- C9 ~ CE <ii· C US Engineered in Germany Q CELLS DC- DC+ 1 GD • • • • • DC1 GENERAL NOTES DRAWING OF STANDARD MCI WIRING DETAIL FOR ANY GIVEN STRING LENGTH IF INITIATED, RAPID SHUTDOWN OCCURS WITHIN 30 SECONDS OF ACTIVATION AND LIMITS VOLTAGE ON THE ROOF TO NO GREATER THAN 165V (690.12.B.2.1) MID CIRCUIT INTERRUPTER (MCI) IS A UL 1741 PVRSE CERTIFIED RAPID SHUTDOWN DEVICE (RSD) RETROFIT PV MODULES MCIS ARE LOCATED AT ROOF LEVEL, JUST UNDER THE PV MODULES IN ACCORDANCE WITH 690.12 REQUIREMENTS THE QUANTITY OF MCIS PER STRING IS DETERMINED BY STRING LENGTH -NUMBER OF MODULES BETWEEN MCI UNITS = 0-3 -MAXIMUM NUMBER OF MODULES PER MCI UNIT = 3 -MINIMUM NUMBER MCI UNITS = MODULE COUNT /3 *Exception: Tesla (Langi) modules installed in locations where the max Voe for 3 modules at low design temperature exceeds 165V shall be limited to 2 modules between MCls. PLEASE REFER TO MCI CUTSHEET AND PVRSA INSERT FOR MORE INFORMATION T:SLn J-BOX J-BOX J-BO X J-BOX J-BOX J-BOX J-BOX 0 D-(2) AWG , PV Wi r e, 60 0V, Black · · · · · DC1 DC- DC+ 1 GD GENERAL NOTES DRAWING OF STANDARD MCI WIRING DETAIL FOR ANY GIVEN STRING LENGTH IF INITIATED, RAPID SHUTDOWN OCCURS WITHIN 30 SECONDS OF ACTIVATION AND LIMITS VOLTAGE ON THE ROOF TO NO GREATER THAN 165V (690.12.B.2.1) MID CIRCUIT INTERRUPTER (MCI) IS A UL 1741 PVRSE CERTIFIED RAPID SHUTDOWN DEVICE (RSD) SOLAR ROOF TILES MCIS ARE LOCATED AT DECK LEVEL, JUST UNDER THE TILES IN ACCORDANCE WITH 690.12 REQUIREMENTS THE QUANTITY OF MCIS PER STRING IS DETERMINED BY STRING LENGTH -NUMBER OF TILES BETWEEN MCI UNITS = 0-10 -MAXIMUM NUMBER OF TILES PER MCI UNIT = 10 -MINIMUM NUMBER MCI UNITS = TILE COUNT /10 PLEASE REFER TO MCI CUTSHEET AND PVRSA INSERT FOR MORE INFORMATION T:SLFi □ 0 0--( 2) AWG, PV Wire, 600V, Black SOLAR INVERTER Tesla Solar Inverter completes the Tesla home solar system, converting DC power from solar to AC power for home consumption. Tesla's renowned expertise in power electronics has been combined with robust safety features and a simple installation process to produce an outstanding solar inverter that is compatible with both Solar Roof and traditional solar panels. Once installed, homeowners use the Tesla mobile app to manage their solar system and monitor energy consumption, resulting in a truly unique ecosystem experience. KEY FEATURES • Built on Powerwall 2 technology for exceptional efficiency and reliability • Wi-Fi, Ethernet, and cellular connectivity with easy over-the-air updates • Designed to integrate with Tesla Powerwall and Tesla App • 3.8 kW and 7.6 kW models available 3.8 kW | 7.6 kW TESLA.COM/ENERGY SOLAR INVERTER 411 mm 660 mm 158 mm Tesla Solar Inverter provides DC to AC conversion and integrates with the Tesla ecosystem, including Solar Panels, Solar Roof, Powerwall, and vehicle charging, to provide a seamless sustainable energy experience. KEY FEATURES • Integrated rapid shutdown, arc fault, and ground fault protection • No neutral wire simplifies installation • 2x the standard number of MPPTs for high production on complex roofs NA 2021-09-02 ENVIRONMENTAL SPECIFICATIONS Operating Temperature –30°C to 45°C (–22°F to 113°F)4 Operating Humidity (RH)Up to 100%, condensing Storage Temperature –30°C to 70°C (–22°F to 158°F) Maximum Elevation 3000 m (9843 ft) Environment Indoor and outdoor rated Enclosure Rating Type 3R Ingress Rating IP55 (Wiring compartment) Pollution Rating PD2 for power electronics and terminal wiring compartment, PD3 for all other components Operating Noise @ 1 m < 40 db(A) nominal, < 50 db(A) maximum ELECTRICAL SPECIFICATIONS MODEL NUMBER 1534000-xx-y 1538000-xx-y OUTPUT (AC)3.8 kW 7.6 kW Nominal Power 3,800 W 7,600 W Maximum Apparent Power 3,328 VA at 208 V 3,840 VA at 240 V 6,656 VA at 208 V 7,680 VA at 240 V Maximum Continuous Current 16 A 32 A Breaker (Overcurrent Protection)20 A 40 A Nominal Power Factor 1 - 0.9 (leading / lagging) THD (at Nominal Power)<5% INPUT (DC) MPPT 24 Input Connectors per MPPT 1-2 1-2-1-2 Maximum Input Voltage 600 VDC DC Input Voltage Range 60 - 550 VDC DC MPPT Voltage Range 60 - 480 VDC1 Maximum Current per MPPT (Imp)13 A Maximum Short Circuit Current per MPPT (Isc)15 A COMPLIANCE INFORMATION Grid Certifications UL 1741, UL 1741 SA, IEEE 1547, IEEE 1547.1 Safety Certifications UL 1741 PVRSS, UL 1699B, UL 1998 (US), UL 3741 Emissions EN 61000-6-3 (Residential), FCC 47CFR15.109 (a) MECHANICAL SPECIFICATIONS Dimensions 660 mm x 411 mm x 158 mm (26 in x 16 in x 6 in) Weight 52 lb3 Mounting options Wall mount (bracket) 3 Door and bracket can be removed for a mounting weight of 37 lb. 4 For the 7.6 kW Solar Inverter, performance may be de-rated to 6.2 kW at 240 V or 5.37 kW at 208 V when operating at temperatures greater than 45°C. 1 Maximum current. 2 Cellular connectivity subject to network operator service coverage and signal strength. PERFORMANCE SPECIFICATIONS Peak Efficiency 98% at 208 V 98.1% at 240 V 98.4% at 208 V 98.6% at 240 V CEC Efficiency 97.5% at 208 V 97.5% at 240 V 97.5% at 208 V 98.0% at 240 V Allowable DC/AC Ratio 1.7 Customer Interface Tesla Mobile App Internet Connectivity Wi-Fi (2.4 GHz, 802.11 b/g/n), Ethernet, Cellular (LTE/4G)2 AC Remote Metering Support Wi-Fi (2.4 GHz, 802.11 b/g/n), RS-485 Protections Integrated arc fault circuit interrupter (AFCI), Rapid Shutdown Supported Grid Types 60 Hz, 240 V Split Phase 60 Hz, 208 V Wye T CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD CJD 088 CJD TESLA.COM/ENERGY SOLAR SHUTDOWN DEVICE The Tesla Solar Shutdown Device is part of the PV system rapid shutdown (RSD) function in accordance with Article 690 of the applicable NEC. When paired with the Tesla Solar Inverter, solar array shutdown is initiated by any loss of AC power. 650 mm 150 mm 125 mm 250 mm M4 Screw M8 Bolt Nail / Wood Screw 22 mmENVIRONMENTAL SPECIFICATIONS Ambient Temperature -40°C to 50°C (-40°F to 122°F) Storage Temperature –30°C to 70°C (–22°F to 158°F) Enclosure Rating NEMA 4 / IP65 ELECTRICAL SPECIFICATIONS Nominal Input DC Current Rating (IMP)12 A Maximum Input Short Circuit Current (ISC)15 A Maximum System Voltage 600 V DC COMPLIANCE INFORMATION Certifications UL 1741 PVRSE, UL 3741, PVRSA (Photovoltaic Rapid Shutdown Array) RSD Initiation Method PV System AC Breaker or Switch Compatible Equipment See Compatibility Table below MECHANICAL SPECIFICATIONS Electrical Connections MC4 Connector Housing Plastic Dimensions 125 mm x 150 mm x 22 mm (5 in x 6 in x 1 in) Weight 350 g (0.77 lb) Mounting Options ZEP Home Run Clip M4 Screw (#10) M8 Bolt (5/16") Nail / Wood screw RSD MODULE PERFORMANCE Maximum Number of Devices per String 5 Control Power Line Excitation Passive State Normally open Maximum Power Consumption 7 W Warranty 25 years UL 3741 PV HAZARD CONTROL (AND PVRSA) COMPATIBILITY Tesla Solar Roof and Tesla/Zep ZS Arrays using the following modules are certified to UL 3741 and UL 1741 PVRSA when installed with the Tesla Solar Inverter and Solar Shutdown Devices. See the Tesla Solar Inverter Installation Manual for detailed instructions and for guidance on installing Tesla Solar Inverter and Solar Shutdown Devices with other modules. Brand Model Required Solar Shutdown Devices Tesla Solar Roof V3 1 Solar Shutdown Device per 10 modules Tesla Tesla TxxxS (where xxx = 405 to 450 W, increments of 5) 1 Solar Shutdown Device per 3 modules 1 Hanwha Q.PEAK DUO BLK-G5 1 Solar Shutdown Device per 3 modules Hanwha Q.PEAK DUO BLK-G6+1 Solar Shutdown Device per 3 modules NA 2021-09-02 1Exception: Tesla solar modules installed in locations where the max Voc for three modules at low design temperatures exceeds 165 V shall be limited to two modules between MCIs. T:SLFi FLASHING INSERT ZS COMP DATASHEET 2 Listed to UL 2703 and UL 2582 for Wind Driven Rain Part #850-1628 SPECIFICATIONS Designed for pitched roofs. Installs in portrait and landscape orientations. Engineered for spans up to 72” and cantilevers up to 24”. ZS Comp has a UL 1703 Class “A” Fire Rating when installed using modules from any manufacturer certified as “Type 1” or “Type 2”. Attachment method UL listed to UL 2582 for Wind Driven Rain. ZS Comp supports 50 psf (2400 Pa) front and up to 72 psf (3450 Pa) rear side design load rating for Portrait module orientation per UL 2703. ZS Comp supports 50 psf (2400 Pa) front side and up to 72 psf (3450 Pa) rear side design load rating for Landscape module orientation. Engineered for compliance with ASCE 7-05, 7-10, and 7-16 wind load requirements. Zep wire management products listed to UL 1565 for wire positioning devices. ZS Comp grounding products are listed to UL 2703 and UL 467. ZS Comp bonding products are listed to UL 2703. DESCRIPTION PV mounting solution for composition shingle roofs. Works with all Zep Compatible Modules. Auto bonding UL-listed hardware creates structural and electrical bond. ROOFING SYSTEM SPECIFICATIONS MOUNTING BLOCK CAPTURED WASHER LAG Listed to UL 2703 Part #850-1633 Part #850-1631-002 and #850-1631-004 ZS COMP DATASHEET 3 GROUND ZEP LEVELING FOOT DC WIRE CLIP HOME RUN CLIP Listed to UL 1565 Part #850-1510 ARRAY SKIRT END CAP Listed to UL 2703 Part #850-1511 Listed to UL 2703 Part #850-1613 Listed to UL 2703 Part #850-1608 Listed to UL 2703 Part #850-1606 Listed to UL 2703 Part #850-1586 (Left) Part #850-1588 (Right) INTERLOCKSKIRT GRIP Listed to UL 2703 Part #850-1397 Listed to UL 1565 Part #850-1509 Listed to UL 2703 Part #850-1281 HYBRID INTERLOCK TESL;=;