Loading...
310 Plaza DEMO21-0037 Demo HouseOWNER:ADDRESS:CITY:STATE:ZIP: MARQUES JASON M 1747 OCEAN GROVE DR ATLANTIC BEACH FL 32233 COMPANY:ADDRESS:CITY:STATE:ZIP: CHESAPEAKE CUSTOM BUILDERS LLC 610 N WILDERNESS TRAIL PONTE VEDRA BEACH FL 32082 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169954 0000 ATLANTIC BEACH JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 310 PLAZA DEMO COMPLETE DEMO HOUSE $13000.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. 2 PUBLIC UTILITIES DISCONNECT AND CAP INFORMATIONAL Notes: Disconnect and cap water and sewer lines. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 3Issued Date: 1/24/2022 PERMIT NUMBER DEMO21-0037 ISSUED: 1/24/2022 EXPIRES: 7/23/2022 DEMO PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 3 PUBLIC UTILITIES INSPECTION PRIOR TO DEMOLITION INFORMATIONAL Notes: MUST CALL 247-5814 FOR A PRE DEMO INSPECTION OF THE DISCONNECTED AND CAPPED WATER AND SEWER LINES PRIOR TO DEMOLITION. 4 PUBLIC UTILITIES ADDITIONAL COMMENTS PUBLIC UTILITIES INFORMATIONAL Notes: All water & sewer utility connections must be inspected prior to cover up. Please call the inspection line at 247-5814 to schedule inspections 24 hours in advance. Failure to do so will result in future failed inspections and additional fees. 5 BUILDING BUILDING OFFICIAL NOTES INFORMATIONAL Notes: BUILDING OFFICIAL NOTES Permit approved, subject to the requirements in attached Demolition Bulletin 6 PUBLIC WORKS EROSION CONTROL INSTALLATION INFORMATIONAL Notes: Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247- 5814) to request an Erosion and Sediment Control Inspection prior to start of construction. 7 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL Notes: All runoff must remain on-site during construction. 8 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container cannot be placed on City right-of-way. 9 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 10 PUBLIC WORKS RUNOFF INFORMATIONAL Notes: All runoff must remain on-site. Cannot raise lot elevation. 11 PUBLIC WORKS DOCUMENT IMPERVIOUS AREA INFORMATIONAL Notes: Strongly suggest thorough documentation of impervious areas be recorded. 12 PUBLIC WORKS SLAB DRIVEWAY REMOVAL INFORMATIONAL Notes: Slab and driveway to be fully removed. 13 PUBLIC WORKS FENCING REMOVED INFORMATIONAL Notes: All old fencing and debris must be removed from job site by Contractor. 2 of 3Issued Date: 1/24/2022 PERMIT NUMBER DEMO21-0037 ISSUED: 1/24/2022 EXPIRES: 7/23/2022 DEMO PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00 DEMOLITION 455-0000-322-1000 0 $100.00 PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.25 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $179.25 14 PUBLIC WORKS DECKING REMOVED INFORMATIONAL Notes: All old decking and debris must be removed from job site by Contractor. 3 of 3Issued Date: 1/24/2022 PERMIT NUMBER DEMO21-0037 ISSUED: 1/24/2022 EXPIRES: 7/23/2022 DEMO PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $179.25 DEMO21-0037 Address: 310 PLAZA APN: 169954 0000 $179.25 BLDG SUBSEQUENT PLAN REVIEW FEES $50.00 BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00 BUILDING $100.00 DEMOLITION 455-0000-322-1000 0 $100.00 PUBLIC WORKS PLAN REVIEW $25.00 PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00 STATE SURCHARGES $4.25 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.25 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R18562 $179.25 Printed: Monday, January 24, 2022 1:11 PM Date Paid: Monday, January 24, 2022 Paid By: CHESAPEAKE CUSTOM BUILDERS LLC Pay Method: CREDIT CARD 578297767 1 of 1 Cashier: CG Cash Register Receipt City of Atlantic Beach Receipt Number R18562 Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION 1 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 BULLETIN 4-18 To: All Permit Applicants. From: Dan Arlington, CBO City Building Official Date: October 30, 2018 Re: DEMOLITION OF STRUCTURES. Please use the general Building Permit Application Form for Demo Permits and include a Site Management Plan, showing all structures to be demolished and to remain, erosion and sediment control plans with installation details, proposed use of the right-of-way and parking; a property survey; and the contractor’s documents needed to obtain a building permit. 1. It is the responsibility of the contractor to: a. Contact JEA to disconnect electric power. b. Disconnect and cap off water, sewer, and gas lines. The contractor must call to schedule an inspection of the disconnected and capped water and sewer lines prior to demolition. c. Start a Construction Water Account. (See Items 8 – 11 on Page 2) 2. The demolition contractor must provide written notice to the owners of all adjacent properties, not less than 10 Days prior to start of demolition, per FBC-EB, Section 1502. Adjacent properties must be protected from damage during excavation, demolition, and construction activities. 3. Silt fences must be in place and approved by Public Works before beginning demolition. 4. All underground tanks, concrete slabs and foundations must be removed with the buildings, unless otherwise approved by the City. The site should be left graded and clean for Final Inspection. 5. Removal of any trees requires a separate Tree Removal Permit, per COAB Code Of Ordinances, Section 23-21. 2 6. Protection of trees and vegetation during construction is required, per COAB Code Of Ordinances, Section 23-32. 7. Prior approval, from the Building Department, is required before blocking any part of the right-of-way or side walk. Dust and wind-borne debris generated from the demolition of a structure is considered unsafe and a hazard to the public health, safety, and welfare of residents in the surrounding areas. When demolishing a structure, the following steps are required to ensure that the minimum dust and debris leaves the property: 8. At least two hoses, with nozzles, capable of reaching to all areas of the property must be on site with an adequate water supply. 9. The structure must be sprayed with water for one hour before demolition begins. 10. The hoses must be used continuously during demolition, wetting down the structure, the debris pile, and truck beds when being filled. ASBESTOS. 11. All roofing and siding made from asbestos containing materials (ACM) are considered friable and must be removed from the structure, following NESHAP Guidelines, before demolition begins. This includes all commercial and one and two family residential dwellings. Please call for a Pre-Demolition Inspection, before demolition begins, and a Final Inspection, when demolition is complete. NOTES. 1. A construction water account can be obtained at the Water Department in City Hall. 2. Any new residence using the original building sewer piping shall be internally examined to verify correct size, slope, is not broken or obstructed, and a clean out at the property line with an RT-1 concrete cover is required to comply with current City requirements. 10/30/18, 12/28/18, 10/23/2020 PUBLIC UTILITIES PLAN REVIEW COMMENTS APPLICATION TRACKING COMMENTS Check Box to Add Comment Check Box to Print Underground Water Sewer Utilities Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878.   Meter Boxes Sewer Cleanout Ensure all meter boxes, sewer cleanouts and valve covers are set to grade and visible.   RT1 Sewer Cleanout A sewer cleanout must be installed at the property line. Cleanout must be covered with an RT1 concrete box with metal lid. Cleanout to be set to grade and visible.   RPZ Backflow A reduced pressure zone backflow preventer must be installed if irrigation will be provided or if there is a private well on the property. Backflow preventer must be tested by a certified tester and a copy of the results sent to Public Utilities.   Sensus Touch-Read Meter Plans note the building will be unsprinkled. If plans change, any fire line installed must be metered with a Sensus touch-read meter in a properly sized vault and an appropriate backflow preventer installed. Backflow preventer must be tested by a certified tester and a copy of the results sent to Public Utilities.   Fire Sprinkler Backflow Requirement If fire sprinkler system is provided, call 247-5878 for backflow requirements. At a minimum, will require a double check backflow preventer.   Fire Line Meter Fire lines must be metered with a Sensus touch-read meter. Meters larger than 2” must be installed in a vault as noted in JEA specifications.   Utility Map See attached Utility Map.   Disconnect & Cap Disconnect and cap water and sewer lines.   Inspection Prior MUST call the Inspection Line at 247-5814 to request an inspection of the disconnected and capped water and sewer lines PRIOR to demolition.   Utility Inspections All water & sewer utility connections must be inspected prior to cover up. Please call the inspection line at 247-5814 to schedule inspections 24 hours in advance. Failure to schedule utility connections may result in failed inspections and additional fees, and delays in utility services.   System Development Fees All fees must be paid for water & sewer connections before meters will be set. Please call the finance department customer service line 247-5816 to coordinate payment of fees.     13,000 DEMO21-0037 D E M O 2 1 - 0 0 3 7 D E M O 2 1 - 0 0 3 7 Date of Survey: SURVEY NOT VALID WITHOUT EMBOSSED SURVEYOR'S SEALWILLIAM D. PINKSTONProfessional Surveyor and Mapper No. 6793, State of Florida I hereby certify that this survey, performed under my responsible directionmeets the standards of practice for Land Surveyors in accordance withChapter 5J-17, Florida Administrative Code (Pursuant to Section 472.027,Florida Statutes), and further certify that there are no visible encroachmentsupon the subject property except as shown.Survey Scale:Drafted By:Reviewed By:Field Bk/Pg:Project No.MAY 25, 20211"=20'946/62 LZMWDP21-058Crew Chief:M.M. MAP SHOWING BOUNDARY, TOPOGRAPHIC AND TREE SURVEY OF LOT 5, BLOCK 10 AS SHOWN ON MAP OF SUBDIVISION A ATLANTIC BEACH - Proudly Surveying in Jacksonville and Northeast Florida since 1952 - Surveyed and Prepared By: Professional Surveyors and Mappers1643 Naldo Avenue, Jacksonville, FL 32207Phone: 904.396.2623 Website: clarsonfl.com RICHARD P. CLARSON AND ASSOCIATES, INC. D E M O 2 1 - 0 0 3 7 Date of Survey: SURVEY NOT VALID WITHOUT EMBOSSED SURVEYOR'S SEAL WILLIAM D. PINKSTON Professional Surveyor and Mapper No. 6793, State of Florida I hereby certify that this survey, performed under my responsible direction meets the standards of practice for Land Surveyors in accordance with Chapter 5J-17, Florida Administrative Code (Pursuant to Section 472.027, Florida Statutes), and further certify that there are no visible encroachments upon the subject property except as shown. Survey Scale: Drafted By: Reviewed By: Field Bk/Pg:Project No. MAY 25, 2021 1"=20' 946/62 LZM WDP 21-058 Crew Chief:M.M. MAP SHOWING BOUNDARY, TOPOGRAPHIC AND TREE SURVEY OF LOT 5, BLOCK 10 AS SHOWN ON MAP OF SUBDIVISION A ATLANTIC BEACH - Proudly Surveying in Jacksonville and Northeast Florida since 1952 - Surveyed and Prepared By: Professional Surveyors and Mappers 1643 Naldo Avenue, Jacksonville, FL 32207 Phone: 904.396.2623 Website: clarsonfl.com RICHARD P. CLARSON AND ASSOCIATES, INC.