Loading...
Environmental Stewardship Committee (ESC) - 09 Feb 2022 - Agenda - PdfCity of Atlantic Beach Agenda Environmental Stewardship Committee (ESC) Meeting Wednesday, February 9, 2022 - 6:00 p.m. Commission Chamber City Hall, 800 Seminole Road Page(s) 1. CALL TO ORDER AND ROLL CALL 2. APPROVAL OF MINUTES 2.A. Approve minutes of the January 12, 2022 regular Environmental Stewardship Committee meeting. Environmental Stewardship Committee (ESC) - 12 Jan 2022 - Minutes - Pdf 3-7 3. CHAIR'S REMARKS 3.A. 2022 ESC Priorities 2022 Priorites Final 3.B. Individual member priorities 9 4. COURTESY OF THE FLOOR (5 MINS.) 5. REPORTS 5.A. Tree subcommittee Environmental Stewardship Committee Tree Subcommittee - 08 Dec 2021 - Minutes - Pdf 5.B. Outreach subcommittee 5.C. LEED subcommittee 11 - 12 6. MAYORS AND/OR STAFF REPORT 6.A. Commission Priority Setting 13 - 24 Priority Setting Meeting - 25 Jan 2022 - Agenda - Pdf 6.B. Royal Palms adopt -a -tree mailer 7. OLD BUSINESS 7.A. COAB Parks Assessment Plan 25 - 30 City of Atlantic Beach Parks Assessment Plan 7.B. Tree Removal Certification (formerly known as Tree Trimmer Guide) Page 1 of 30 Environmental Stewardship Committee (ESC) - 09 Feb 2022 7.C. Steward of the Environment 8. NEW BUSINESS 8.A. Pesticides 8.B. What ABout 9. ADJOURNMENT Any person wishing to speak to the Environmental Stewardship Committee on any matter at this meeting should submit a Comment Card located at the entrance to Commission Chamber prior to the start of the meeting. This meeting will be live -streamed and videotaped. To access live or recorded videos, click on the Meeting Videos tab on the city's home page at www.coab.us. In accordance with the American with Disabilities Act and Section 286.26 of the Florida Statutes, persons with disabilities needing special accommodations to participate in this meeting should contact City Clerk Donna Bartle at 247-5809 or at City Hall, 800 Seminole Road, Atlantic Beach, Florida not less than three (3) days prior to the date of this meeting. Page 2 of 30 Agenda Item #2.A. 09 Feb 2022 MINUTES Environmental Stewardship Committee (ESC) Meeting Wednesday, January 12, 2022 - 6:00 PM Commission Chamber Present: Amy Palmer, At -Large Member, ESC Linda Chipperfield, At -Large Member, ESC Mark Gabrynowicz, ESC Chair, District 1307 Member Christopher McHan, At -Large Member, ESC Daniele Giovannucci, Vice Chair, At -Large Member, ESC Romy Vann, At -Large Member, ESC Sarah Boren, District 1306 Member, ESC Absent: Bruce Andrews, At -Large Member, ESC Barbie Brooksher, District 1312 Member, ESC Also Present: 1. CALL TO ORDER AND ROLL CALL • Mark Gabrynowicz called the meeting to order. • Linda Chipperfield called the roll. 2. APPROVAL OF MINUTES A. Approve minutes of the December 8, 2021 regular Environmental Stewardship Committee meeting. MOTION: to approve the December 8, 2021 meeting minutes Motion: Romy Vann Second: Daniele Giovannucci Daniele Giovannucci (Seconded By) For Romy Vann (Moved By) For Amy Palmer For Linda Chipperfield For Mark Gabrynowicz For Christopher McHan For Sarah Boren For Motion passed 7 to 0. 3. COURTESY OF THE FLOOR (5 MINS.) Environmental Stewardship Committee (ESC) January 12, 2022 Page 1 of 5 Page 3 of 30 Agenda Item #2.A. 09 Feb 2022 4. CHAIR'S REMARKS A. Responsibilities of ESC chair and vice -chair • Mark Gabrynowicz reviewed Roberts Rules of Order and responsibility of the chair and vice -chair. B. Responsibilities of subcommittee chairs • Mark Gabrynowicz reviewed Roberts Rules of Order and responsibility of subcommittee chairs and subcommittee members. • Members discussed meeting times and subcommittee size. 5. ELECTIONS A. Election of ESC chair • Mark Gabrynowicz asked for volunteers or nominations for ESC Chair. • Mark Gabrynowicz volunteered for ESC Chair. No other nominations were made. A motion was not made and a vote was not recorded. B. Election of ESC vice -chair • Mark Gabrynowicz asked for volunteers or nominations for ESC Vice -Chair. • Daniele Giovannucci volunteered for ESC Vice -Chair. No other nominations were made. A motion was not made and a vote was not recorded. C. Election of ESC secretary • Mark Gabrynowicz asked for volunteers or nominations for ESC Secretary. • Linda Chipperfield volunteered for ESC Secretary. No other nominations were made. A motion was not made and a vote was not recorded. D. Election of Tree subcommittee chair • Mark Gabrynowicz nominated Bruce Andrews for Tree Subcommittee Chair. He suggested they wait to make the decision since he was absent from the meeting. • Romy Vann asked if Daniele Giovannucci, Mark Gabrynowicz, and Bruce Andrews were the members of the tree subcommittee. • Daniele Giovannucci responded and said he would like to remain as the alternate. • Mark Gabrynowicz volunteered Romy Vann to be the third member. She had no opposition to this nomination. A motion was not made and a vote was not recorded. E. Election of Outreach subcommittee chair • Mark Gabrynowicz asked former Outreach Chair, Amy Palmer, if she had any nominations. She suggested Linda Chipperfield for the role. Linda Chipperfield declined the position and stated she cannot commit the time. • Chris McHan said he recently started an MBA and does not know if can commit the time. Environmental Stewardship Committee (ESC) January 12, 2022 Page 2 of 5 Page 4 of 30 Agenda Item #2.A. 09 Feb 2022 • Members discussed nominating Barbie Brooksher, who was absent. • Amy Palmer said she will not be able to attend the next Outreach subcommittee meeting so someone will need to step in as chair. • Mark Gabrynowicz expressed his concern about waiting to elect a chair for the subcommittee with Arbor Day events occurring the next week. • Sarah Boren offered to step in as chair for the next subcommittee meeting. • Chris McHan asked if they could defer the vote until next month. • Mark Gabrynowicz said they could do that. He asked who would be on the subcommittee. Amy Palmer, Chris McHan, and Linda Chipperfield said they would remain on the subcommittee. • Chris McHan asked Amy Palmer to explain the administrative duties of the chair which Amy Palmer reviewed. Chris McHan said he was confident in his administrative skills and would be the chair if that meant he could draw back from the busy work. There was no dissent. A motion was not made and a vote was not recorded. • Mark Gabrynowicz said he would remain on the subcommittee. F. Election of LEED subcommittee chair • Romy Vann nominated Sarah Boren as the chair. Sarah Boren accepted the nomination to remain as chair. A motion was not made and a vote was not recorded. • Mark Gabrynowicz, Linda Chipperfield, Barbie Brooksher, and Romy Vann said they will remain on the subcommittee. • Sarah Boren suggested the chairs write a short description of the subcommittees for incoming members. Members supported this idea. 6. REPORTS A. Tree subcommittee • The tree subcommittee did not meet in January 2022. B. Outreach subcommittee • Amy Palmer gave the Outreach subcommittee report. She reviewed plans for Arbor Day, 2022 Earth Day events, and the Adopt -A -Tree program. • Sarah Boren asked if the gator bags on the COJ trees were reusable. Brian Broedell said they are. Members suggested providing gator bags for the trees planted through the Adopt -A -Tree program. Brian Broedell said he would look into the cost to provide gator bags. MOTION: to approve the Outreach subcommittee report Motion: Daniele Giovannucci Second: Christopher McHan Christopher McHan (Seconded By) Daniele Giovannucci (Moved By) For For Environmental Stewardship Committee (ESC) January 12, 2022 Page 3 of 5 Page 5 of 30 Agenda Item #2.A. 09 Feb 2022 Amy Palmer For Linda Chipperfield For Mark Gabrynowicz For Romy Vann For Sarah Boren For Motion passed 7 to 0. C. LEED subcommittee • Sarah Boren gave the LEED subcommittee report. She said staff has submitted the LEED certification for preliminary review and received comments back. They expect to submit documentation for pre -review in the next couple of weeks. • Sarah Boren said she would like to re -open the Community Action Plan survey. Daniele Giovanucci suggested contacting a statistically representative sample directly to complete the survey. Sarah Boren was in support of the request and asked Daniele Giovannucci to help develop that sample. Discussion ensued. 7. MAYORS AND/OR STAFF REPORT A. Adoption of Complete Streets Policy • Brian Broedell stated Commission adopted the Complete Streets policy and gave a summary of the policy. Members asked questions about the policy. B. Arbor Day Schedule 8. OLD BUSINESS A. ESC 2022 goals/priorities • Mark Gabrynowicz asked those member who have not submitted their priorities to send them to Amanda Askew by January 21st. • Sarah Boren proposed the ESC provide their priorities to Commission before their priority setting meeting on January 25th. Mark Gabrynowicz volunteered to prepare a document to provide Commission. Members discussed voting for priorities. • Members discussed Heritage Tree incentives, tree canopy assessment, and commercial tree trimmer training with Commissioner Kelly. • Romy Vann proposed the Commissioners come up with their individual priorities for the ESC. Romy asked Mark to reach out to the Commission members with the request. B. Tree Permit Training • Linda Chipperfield said the training is mostly complete and she is working out the final details. • Mark Gabrynowicz reviewed the training Linda Chipperfield has created. He said it will be the contractor's responsibility to notify the city when they have completed the training, and at that time the company's name will be posted on Environmental Stewardship Committee (ESC) January 12, 2022 Page 4 of 5 Page 6 of 30 Agenda Item #2.A. 09 Feb 2022 the city website to show they have knowledge of Chapter 23. He said the city will not be endorsing the individual companies. • Sarah Boren asked who within the companies need to complete the training. Amy Palmer said that is one of the details that is being worked out.. • Daniele Giovannucci said he drafted a document establishing penalties for those who violate the tree code. Mark Gabrynowicz suggested the Tree subcommittee review at the next meeting. Sarah Boren asked Daniele Giovannucci to send the document to Brian Broedell to distribute to all members. • Members discussed informing relators of the tree code. Romy Vann and Linda Chipperfield volunteered to reach out to local relators. Discussion ensued. • Chris McHan proposed holding a "kickoff' event for relators, arborists, and tree trimmers once the tree trimmer training is complete. Members discussed the idea. Sarah Boren suggested limiting the attendees to realtors for a "lunch and learn" to address the tree canopy in Atlantic Beach. 9. NEW BUSINESS A. Park Assessments Plans • Mark Gabrynowicz reviewed the draft Park Assessments Plan. He said he would complete the draft for next meeting and asked members to send Amanda Askew any feedback they may have. 10. ADJOURNMENT There being no further discussion, Mark Gabrynowicz declared the meeting adjourned at 8:05 p.m. Attest: Amanda Askew Mark Gabrynowicz Environmental Stewardship Committee (ESC) January 12, 2022 Page 5 of 5 Page 7 of 30 Page 8 of 30 Agenda Item #3.A. 09 Feb 2022 Environmental Stewardship Committee's Priorities The ESC's process for establishing priorities consisted of specifying priorities for: Individual members The ESC collectively The City Commission Each member was asked to submit a single priority for each of the above categories. The priorities (not in any specific order) for the Commission are as follows: 1. Tighten Chapter 23 to prevent the removal of trees/understory without a reason. 2. Get a baseline survey of the city's tree canopy that is regularly updated; 3. Approve a tree canopy mapping software to track net loss gain of canopy; 4. Improve processes to make sustainability/reliability truly a core tenant of the city's missions; 5. Finalize a tree canopy survey for AB; 6. Integrate ESC perspectives (LEED, trees versus swales etc.) into other committees 7. Engage public works with key ESC members to; a. do some targeted capacity building b. establish an informal review process for technical questions that can be addressed by ESC members or referenced 8. Pursue specific goals to improve the city's LEED silver certified community performance scores Page 9 of 30 Page 10 of 30 Agenda Item #5.A. 09 Feb 2022 MINUTES Environmental Stewardship Committee Tree Subcommittee Meeting Wednesday, December 8, 2021 - 12:00 AM Commission Chamber Present: Absent: Bruce Andrews, At -Large Member, ESC Mark Gabrynowicz, ESC Chair, District 1307 Member Daniele Giovannucci, Vice Chair, At -Large Member, ESC Sarah Andrews Dark, At -Large Member, ESC Also Present: 1. CALL TO ORDER AND ROLL CALL 2. COURTESY OF THE FLOOR 3. APPROVAL OF MINUTES A. Approve minutes of the November 10th ESC Tree Subcommittee meeting. Quorum not met 4. REPORTS 5. OLD BUSINESS A. Tree Conservation Fund plantings Discussion of the continued need for tree plantings in the Royal Palms neighborhood. 6. NEW BUSINESS A. Adopt -a -Tree • Discussion of about the types of trees to plant. Consensus to remove the Ligustrum and Japanese Loquat. Bruce Andrewes agreed to call the tree company to find additional types of native trees. • Look into getting watering bags and mulch for trees. Also make sure dirt is mounded around tree. 7. ADJOURNMENT Discussion ended at the start of the regular ESC meeting. Attest: Environmental Stewardship Committee Tree Subcommittee December 8, 2021 Page 1 of 2 Page 11 of 30 Agenda Item #5.A. 09 Feb 2022 Amanda Askew Bruce Andrews Environmental Stewardship Committee Tree Subcommittee December 8, 2021 Page 2 of 2 Page 12 of 30 Agenda Item #6.A. 09 Feb 2022 City of Atlantic Beach Agenda Priority Setting Meeting Tuesday, January 25, 2022 - 5:00 p.m. Commission Chamber City Hall, 800 Seminole Road, Atlantic Beach, Florida Page(s) 1 CALL TO ORDER 2 WELCOME (MAYOR ELLEN GLASSER) 3 PUBLIC COMMENT 4 REVIEW OF 2021 PRIORITIES AND THEIR STATUS DID THE PROCESS WORK (SHANE CORBIN, CITY MANAGER) 4A. Priorities 2021 5 VISION STATEMENT REVIEW (KEVIN HOGENCAMP, ASST. CITY MANAGER) 5A. Vision Statement 3-4 5 6 OVERVIEW OF NOMINAL GROUP PROCESS, URGENT/IMPORTANT MATRIX SMART FRAMEWORK (LINDA LANIER, FACILITATOR) 7 REVIEW AND DISCUSSION OF RESPONSES FROM COMMISSIONERS ACCORDING TO SUBJECT AREAS (LINDA LANIER AND GROUP) Commissioners will vote for their personal priorities in each subject area 7A. Planning and Budgeting 7B. Infrastructure PU 10 -Yr CIP - 2022-2031- 09-02-21 PW 10 -Yr CIP - 2022-2031 - 09-02-21 7C. Public safety 7D. Quality of life 7E. Environment 7F. City services 7G. Arts and Recreation 7H. Other 7-12 Page 1 of 12 Page 13 of 30 Agenda Item #6.A. 09 Feb 2022 Priority Setting Meeting - 25 Jan 2022 8 BREAK 9 DISCUSSION AND SECOND ROUND OF VOTING TO WORK THROUGH PRIORITIES IN EACH SUBJECT AREA AND GENERATE COLLECTIVE, AGREED UPON GOALS FOR 2022 (LINDA LANIER AND GROUP) 10 NEXT STEPS AND ADJOURNMENT (SHANE CORBIN) This meeting will be live -streamed and videotaped. To access live or recorded videos, click on the Meeting Videos tab on the city's home page at www.coab.us. Any person wishing to speak to the City Commission on any matter at this meeting should submit a request to the City Clerk. For your convenience, forms for this purpose are available at the entrance to the Commission Chamber. In accordance with the Americans with Disabilities Act and Section 286.26, Florida Statutes, persons with disabilities needing special accommodation to participate in this meeting should contact the City Clerk's Office by 5:00 PM, the Friday prior to the meeting. Page 2 of 12 Page 14 of 30 Agenda Item #6.A. 09 Feb 2022 Page 15 of 30 Agenda Item #4A. 25 Jan 2022 Resolution No. 21-11 - ExhibitA ATLANTIC BEACH CITY COMMISSION PRIORITIES ESTABLISHED JANUARY 21, 2021; RATIFIED FEBRUARY 22, 2021 LIVABILITY An initiative to improve health, education, housing conditions, culture and leisure, and other quality - of -life indicators via: • Taking part in the assessment of City of Jacksonville's prospective participation in Blue Zones, a comprehensive communitywide well-being improvement initiative to help make healthy choices easier for everyone • Providing support to local nonprofits that provide health, wellness, education, recreation and affordable housing services to youth, senior citizens, low-income residents, and others. ■ Promoting equity and neighborhood identity. ■ Advocating/lobbying for workforce housing. ■ Solidifying AB's status as a military- and veteran -friendly community through partnerships and programming, and by serving as an information resource. ENVIRONMENTAL LEADERSHIP An initiative validating COAB's commitment to ecological integrity, resiliency and sustainability via: ■ Advocating a no -net -loss of the tree canopy by planting trees and updating the tree -protection code. ■ Establishing a City policy requiring departments to use proven techniques to prevent waste, maximize recycling and decrease the amount of plastic pollution generated by City government. ■ Establishing plastic -reduction, reuse and recycling standards for individuals and groups utilizing City facilities and venues. ■ Continuing efforts to understand the potential impacts of local sea level rise and work towards improving community resilience. ■ Improving the City's LEED silver -certified community performance score across the five categories -- energy, water, waste, transportation, and human experience. PLANNING & BUDGETING A financial and infrastructure planning initiative to prepare future needs via: ■ Updating/adopting long-term capital improvement plans for the following, and incorporate them into the City's budgeting process: o Public Utilities • Potable water treatment and distribution ■ Sewer collection and treatment. o Public Works ■ Stormwater management ■ Adaptation and resiliency • Streets and sidewalks • Parks • Facilities • Ensuring that spending and programming is equitable throughout the entire community. • Consider impacts of spending decisions in terms of debt management and pension liability. Page 1 of 2 Page 3 of 12 Page 15 of 30 Agenda Item #6.A. 09 Feb 2022 Page 16 of 30 Agenda Item #4A. 25 Jan 2022 Resolution No. 21-11 - ExhibitA MAYPORT ROAD CORRIDOR An initiative to improve neighborhood identity, safety, and business and cultural opportunities via: ■ Exploring the development of a community redevelopment plan and the viability of utilizing tax - increment financing to address the unique needs of the Mayport Road corridor. Exploring community interest and the viability in extending Atlantic Beach's northwest boundary. ■ Partnering with the Florida Department of Transportation to enhance safety by adding bike lanes along Mayport Road from Atlantic Boulevard to Dutton Island Road. ■ Enriching the physical environment by partnering with ArtRepublic and local artists, and providing art grants to landowners and businesses. MOBILITY & PARKING An initiative to provide safe, convenient and efficient travel ways and parking via: ■ Developing a connectivity plan that connects people to places. • Developing a complete -streets policy that promotes safe automobile, bicycle and pedestrian travel ways. • Procuring a traffic engineer, as needed. • Refining street -by -street reviews of challenges and opportunities associated with parking citywide. ■ Improving public confidence in the North Beaches Parking Program. ■ Exploring the viability and community acceptance of a fee program to address parking congestion near beach accesses. CITY SERVICES An initiative to develop and improve systems to equip and motivate employees to provide high quality customer service to residents, businesses, contractors, and stakeholders via: ■ Support public safety efforts that promote personal safety, secure neighborhoods, road safety, public trust, and officer well-being. ■ Complete an audit of the City's permitting systems to delineate opportunities for improved efficiencies and service. • Continuing to foster the City's relationships with small businesses by developing and implementing a land -use and zoning -regulations education outreach initiative. ■ Developing and instituting a formal employee welcome, recognition and appreciation program. ■ Implementing the City's new online human resources portal to improve efficiencies and outcomes in recruiting, hiring, equity and retention. ■ Continuing to foster productive partnerships with neighboring municipalities, state and local governmental agencies, and legislators. Page 2 of 2 Page 4 of 12 Page 16 of 30 PROPOSED VISION STATEMENT Dec. 13, 2021 In Atlantic Beach, we have a strong sense of belonging and safety. Our citizens and government care deeply about community character, and we understand that unified support is required to preserve it. We are graced with the functional beauty of our beach, our marsh and our tree canopy. Our shady streets and multi -use paths connect our welcoming neighborhoods. Our city supports our diverse, multigenerational, socially linked community with green spaces, active lifestyles, parks and programming. mili r1 r Vii. p1 1 s� Agenda Item #6.A. 09 Feb 2022 Page 6 of 12 Page 18 of 30 Public Utilities Department - 10 Year Schedule of Capital Improvements - 2022 through 2031 Includes Projects Identified in the 2018 Stantec CIP, 2014 Potable Water MP, 2016 & 2021 Potable Water Model and 2021 Adaptation Plan PROJECT DESCRIPTION Project 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL FUNDING SOURCE POTABLE WATER -PRODUCTION Replace Flow Meters at Wells at WTPs (FY21 Carryover) $ 63,740 W $ 63,740 WTP#1 Modernization - Construction (P2110 Carryover) PU2110 $ 1,400,000 W $ 1,400,000 Well #3@ WTP #2 & Well #3W @ WTP #3: Acid Cleaning & Casing Repair PU2201 $ 180,000 W $ 180,000 WTP #1 - Replace 2 Aerator Houses PU2202 $ 60,000 W $ 60,000 WTP #2- Replace 1 Aerator House 802203 $ 30,000 W $ 30,000 WTP #2 Modernization - Design & Eng AR2201 $ 175,000 W $ 175,000 WTP #2 -Clean & Paint GST PU2204 $ 90,000 W $ 90,000 Retrofit High Priority Wells Vulnerable to Flooding AR2202 $ 20,000 W $ 20,000 Replace Truck -Production $ 30,000 W $ 30,000 WTP #4 -Decommission PU2205 $ 100,000 W $ 100,000 Completion of 4 -Log Virus Inactivity P02206 $ 10,000 W $ 10,000 WTP #2 Modernization -Construction $ 1,300,000 W $ 1,300,000 Retrofit Medium Priority Wells Vulnerable to Flooding $ 140,000 W $ 140,000 WTP #2 - New GST $ 500,000 W $ 500,000 WTP #3 Modernization- Dsn, Eng & Construction $ 850,000 W $ 850,000 Well #5@ WTP #2 - Video logging $ 35,000 W $ 35,000 POTABLE WATER -DISTRIBUTION Construct 250 LF of 12" PVC WM - Mayport Rd @ AMA (PU2101 Carryover) PU2101 $ 150,000 W $ 150,000 Construct 110 LF 0612" PVC WM - Mariner's Village to 16" WM on Mayport Rd (PU2101 Carryover) PU2101 $ 100,000 W $ 100,000 Service Line & Valve Replacements (various) PU2207 $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 100,000 W $ 1,000,000 Replace Truck - Distribution (Truck P-29) $ 30,000 W $ 30,000 Replace Truck -Distribution $ 40,000 W $ 40,000 Construct 850 18 of 12" PVC WM -Ocean Walk 10" WM to Sherry Dr Cutoff AR2203 $ 128,000 W $ 128,000 Construct 1,850 LF 0812" PVC WM - Sherry Dr Cutoff to Pioneer Dr AR2204 $ 278,000 W $ 278,000 Construct 1,300 LF of 12" PVC WM - Pioneer Dr to Wonderwood Dr AR2205 $ 195,000 W $ 195,000 Purchase Existing JEA 20" HDPE WM on Wonderwood Dr $ 1,000,000 W $ 1,000,000 Tie in JEA 20" WM to existing @Renault & Sherry Dr, Install 2 Isolation valves on 20" WM PU2208 $ 100,000 W $ 100,000 Cavallo- Install New Long Side Service Connections (PU2101 Carryover) P02101 $ 40,000 W $ 40,000 Construct 950 LF of 12"PVC WM- Sherry Dr Cutoff (Mayport Rd to Sherry Dr ROW) $ 143,000 W $ 143,000 Construct 55 LF of 12" PVC WM - Navy CDC West to Navy CDC East, Install 2 new hydrants $ 105,000 W $ 105,000 Construct 280 LF of 12" PVC WM -1089 Atlantic Blvd to 1075 Atlantic Blvd $ 71,500 W $ 71,500 Construct 470 LF of 12"PVC WM- Atlantic Ct to Aquatic Dr $ 120,000 W $ 120,000 Construct 160 LF of 12" PVC WM -Atlantic Blvd @ Aquatic Dr to Fire Hydrant @ Wells Fargo $ 41,000 W $ 41,000 Construct 1,080 LF of 12" PVC WM -Atlantic Blvd @ Aquatic Dr to Pizza Hut, NE to existing WM $ 276,000 W $ 276,000 Construct 2,700 LF of 6" WM in Marsh Oaks plus services $ 200,000 W $ 200,000 W $ 400,000 Replace 6" AC WM with 12" PVC WM on Sailfish from Cavallo Rd, tie into Atlantic Blvd (750 LF) $ 150,000 W $ 150,000 Replace 4,200 LF 056" PVC WM with 12" PVC WM on Dutton Island Rd - Mayport Rd to Paradise Cir $ 672,000 W $ 672,000 Replace 3,200 LF 088" WM with 12" PVC WM Loop on Mayport Rd/A1A from Assisi 414 to Quad Ct $ 552,000 W $ 552,000 Replace 5,000 LF 088" AC with 12" PVC - SR A18 from Mayport Rd to Wonderwood Dr $ 800,000 W $ 800,000 Replace 4,000 LF 088"CI/AC with 12" PVC -Seminole Rd from Selva Marina Dr to Saturiba $ 640,000 W $ 640,000 Replace 3,500 LF 058" PVC with 12" PVC - Seminole Rd from Saturiba to 0ceanwalk $ 560,000 W $ 560,000 Replace 3,500 LF 056" AC with 8" PVC- Oak Harbor- Year 1 $ 226,000 W $ 226,000 Replace 3,500 LF 056" AC with 8"PVC - Oak Harbor -Year 2 $ 226,000 W $ 226,000 Replace 1,000 LF 10" CI (1955) With 12" PVC -Seminole Rd - Selva Marina Dr to 5 -Way $ 288,000 W $ 288,000 Replace 4,000 LF 086" AC WM with 12" PVC WM- Selva Marina Dr from Saturiba to Seminole $ 640,000 W $ 640,000 Replace 2,400 LF 064" AC WM with 8" PVC WM - Park Terrace E $ 390,000 $ 390,000 Replace 4,300 LF 098" AC WM with 12" PVC WM - Plaza from Seminole to Mayport Rd $ 688,000 W $ 688,000 Replace 2,200 LF of 4" AC WM with 8"PVC - Seat oats Drive and services $ 600,000 W $ 600,000 Replace 3,300 LF of 8" CI with 12" PVC -Seminole Rd from 5 -Way to Atlantic Blvd $ 528,000 W $ 528,000 WASTEWATER - TREATMENT Page 1 of 2 PU Staff PU Staff 2014 PW MP PU Staff PU Staff PU Staff PU Staff Adaptation Plan PU Staff 2018 Stantec CIP 2014 PW MP PU Staff Adaptation Plan PU Staff PU Staff 2014 PW MP 2014 PW MP 2021 PW Model Update 2021 PW Model Update PU Staff PU Staff 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update PU Staff 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update 2021 PW Model Update Septic to Sewer Program 2016 PW Madel 2016 PW Model 2016 PW Model 2014 PW MP 2014 PW MP 2014 PW MP 2014 PW MP 2018 Stantec CIP 2014 PW MP 2014 PW MP 2014 PW MP 2018 Stantec CIP 2014 PW MP 2014 PW MP OJ Uq rD N 0 0 - h IN O OJ Oq (D c0 0 1-- ‘ Public Utilities Department - 10 Year Schedule of Capital Improvements - 2022 through 2031 Includes Projects Identified in the 2018 Stantec CIP, 2014 Potable Water MP, 2016 & 2021 Potable Water Model and 2021 Adaptation Plan PROJECT DESCRIPTION Project 0 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL FUNDING SOURCE OutfaII 0-001 Repair- WWTF to Outfall (P52109 Carryover) PU2109 $ 325,227 S $ 325,227 Replace Digester Catwalk PU2210 $ 200,000 5 $ 200,000 Upsize headworks line to influent Basin AR2208 $ 350,000 5 $ 350,000 Blower Buildings: improve ventilation at blower buildings PU2211 $ 15,000 5 $ 15,000 5E164Compliance - Engineering Study to Determine Options for Removing River Discharge AR2209 $ 100,000 5 $ 100,000 Install pumps in effluent pond to feed filters at low flows and increase reuse $ 300,000 5 $ 300,000 Construct new headworks (includes design, eng & permitting) $ 1,500,000 S $ 1,500,000 Construct hypochlorite/sulfur dioxide building & convert from Cl2 gas to HOCL $ 250,000 5 $ 250,000 Improve aeration tank include a structural integrity study, new drains and sand blasting $ 250,000 5 $ 250,000 Install second centrifuge $ 300,000 5 $ 300,000 Pre-treatment: replace existing eccentric plug wives $ 40,000 5 $ 40,000 Influent wetwell replacement/expansion $ 450,000 5 $ 450,000 Chlorination: add motor operators to the chlorine contact chamber sluice gates (7 total) $ 90,000 5 $ 90,000 Construct new operations building $ 900,000 S $ 900,000 WASTEWATER - COLIBCTION Selva Marina LS Forcemain Extension (P02104 Carryover) PU2104 $ 170,000 S $ 170,000 Puckett Creek FM Crossing @ Oak Harbor Baptist (P02103 Carryover) PU2103 $ 110,000 5 $ 110,000 Odor Control for Buccaneer LS $ 100,000 5 $ 100,000 Odor Control for Selva Marina LS $ 80,000 5 $ 80,000 15 Influent Line Replacement (3 LS) PU2209 $ 300,000 5 $ 300,000 Replacement of Clay Service 10es for Selva Marina, Oak Harbor and Park Terrace and services AR2206 $ 200,000 5 $ 200,000 5 $ 200,000 9 $ 200,000 S $ 800,000 Retrofit 14 High Priority LS Vulnerable to Flooding AR2207 $ 275,000 5 $ 275,000 5 $ 550,000 Upgrade LS Water Services $ 100,000 5 1 100,000 Retrofit 18 Medium Priority LS Vulnerable to Flooding $ 150,000 5 $ 150,000 L5 Wetwell and Suction Pipes Repair $ 50,000 5 $ 50,000 Replace 2,400 LF of 8" effluent FM from Selva Marina L5 (L5 D) $ 320,000 5 $ 320,000 Replace 4,330 LF 098" effluent FM from Cavalla LS (L5 F) $ 559,000 5 $ 559,000 Replace 5,490 LF 008" effluent FM from Mayport Landing LS $ 708,000 S $ 708,000 Replace 2,270 LF 006" effluent FM from Mimosa Cove L5 $ 275,000 5 $ 275,000 Standardize all electric generator connections at all Lys $ 75,000 5 $ 75,000 5 $ 150,000 Septic to Sewer 14 homes w Marsh Oaks (Begonia, Tulip) $ 350,000 5 $ 350,000 Septic to Sewer Remainder of Marsh Oaks (W Plaza, Carnation, Gladiola & Lilly) $ 350,000 S $ 350,000 Install screens/comminutor and pump replacements at Buccaneer 1.5 $ 400,000 5 $ 400,000 Water Utility Fund - W Sewer Utility Fund = 5 Linked to PW CIP Project $ 6,544,967 $ 3,784,000 $ 2,662,500 $ 1,852,000 $ 2,300,000 $ 1,606,000 $ 1,898,000 $ 2,078,000 $ 2,081,000 $ 1,947,000 $ 26,753,467 $ 4,319,740 $ 1,994,000 $ 1,787,500 $ 852,000 $ 450,000 $ 1,606,000 $ 998,000 $ 660,000 $ 1,716,000 $ 1,388,000 $ 15,771,240 $ 2,225,227 $ 1,790,000 $ 875,000 $ 1,000,000 $ 1,850,000 $ - $ 900,000 $ 1,028,000 $ 365,000 $ 559,000 $ 10,592,227 Page 2 oft Donner Rd Rebuild PU Staff PU Staff 2018 Stantec CIP PU Staff 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP PU Staff 2018 Stantec CIP 2018 Stantec CIP PU Staff PU Staff PU Staff PU Staff PU Staff 2018 Stantec CIP Adaptation Plan PU Staff Adaptation Plan PU Staff 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP 2018 Stantec CIP Public Works Department -10 Year Schedule of Capital Improvements - 2022 through 2031 Includes Projects Identified in the 2018 SWMP, 2030 Parks MP, 2021 Connectivity Plan & 2021 Adaptation Plan PROJECT DESCRIPTION Project 0 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL FUNDING SOURCE PARKS & BEACH ACCESSES Park Maintenance & Miscellaneous Zero Turn Mower for Ball Fields $ 6,000 GF $ 6,000 Air Compressor $ 1,500 GF $ 1,500 2 New Trucks to Replace #59 & #P3 $ 56,000 GF $ 56,000 Polaris Ranger 1000 $ 27,500 GF $ 27,500 500 Gallon Water Wagon $ 5,000 GF $ 5,000 Ride -On Spreader for Ball Fields 9 4,500 GF $ 4,500. Mobile Stage $ 8,000 GF $ 8,000 Beach Accesses Reconstruct 16th St Walkover PR2205 $ 250,000 BJP $ 250,000 Rehab 20th St Walkover PR2001 $ 184,635 BJP $ 184,635 Reduce/Consolidate/Uniform Signage (Alli $ 63,000 BIP $ 63,000 New Walkovers, Locations TBD $ 140,000 B1P $ 140,000 81P $ 140,000 BIP $ 140,000 BIP $ 140,000 GF $ 700,000 Landscaping Improvements(Various( $ 25,000 BJP $ 26,000 010 $ 25,000 81P $ 26,000 BIP $ 100,000 Remove Landscaping that Hides Public Property $ 10,000 BJP $ 10,000 Aquatic Dog Park Littoral Planting $ 5,000 $ 5,000 Mural on western edge of park $ 10,000 BJP $ 10,000 Walking Trail & Obstacle Course Bull Park $ Misc.- Remove Berm, Bike Racks, Multi -Purpose Stage $ 20,000 BIP =MN $ 20,000 Relocate Postal Drop -Off Box, Add Parking $ 35,000 GF $ 35,000 East Coast, Ocean & 7th Safety Improvements $ 25,000 010 $ 25,000 7th- Relocate Curb for On -Street Parking Improvements $ 100,000 BJP $ 100,000 Tennis Court Lighting $ 60,000 BJP $ 60,000 Tennis Court Rehab $ 100,000 BJP $ 100,000 Donner Park Nom George St Parking Improvements & Splash Pad PW2206 $ 371,500 BJP $ 371,500 $100,000 CDBG LED Lighting @ Baseball Field $ 25,000 BIP $ 25,000 Bike Safety Course $ 85,000 BJP $ 85,000 Path Along Perimeter $ 100,000 BIP $ 100,000 Likely CMG Shade Structures @ Pickleball Courts $ 20,000 BIP $ 20,000 Improve Dudley St Entrance $ 15,000 BJP $ 15,000 Misc. - Bottle Station, Murals, Landscaping $ 13,000 BIP $ 13,000 Dutton Island Dutton Island Rd Bridge Rehab -Construction PR2204 $ 300,000 BJP $ 300,000 Dutton Island Rd Drainage Improvements AR2212 $ 70,000 SW $ 70,000 Overlook Dock Repairs PR2202 $ 20,000 BJP $ 20,000 N Fishing Pier Rehab PR2203 $ 80,000 BJP $ 80,000 Bat Boxes $ 3,000 GF $ 3,000 Overlook Seating & Shade $ 5,000 BIP $ 5,000 Replace/Rehab Causeway Bridge $ 700,000 BIP $ 700,000 Dead Tree Removal $ 75,000 GF $ 20,000 BIP $ 20,000 GF $ 115,000 Trailhead Wayfinding $ 15,000 BJP $ 15,000 Improve/Add Interpretive Signage along Trails $ 20,000 BJP $ 20,000 Bike Racks @ Entrance & Fishing Piers $ 2,000 BJP $ 2,000 Recycle Bins, Butt & Fishing Line Receptacles $ 1,500 GF $ 1,500 Dog Friendly Amenities - waste bags, fountain, etc. $ 3,500 BJP $ 3,500 Trash Bins @ Trail Entrances $ 2,500 BIP $ 2,500 Install Trail/Surface Edging $ 20,000 BJP $ 20,000 Stabilise Trail Surface in Wet Areas $ 15,000 BJP $ 15,000 Restroom Skylights $ 4,000 &IP $ 4,000 Fairways Villa Park T Sign & Entrance Feature $ 3,000 B1P $ 3,000 Xeriscaping $ 10,000 B1P $ 10,000 Howell Park Turtle Pond Bodge Replacement I P02201 I$ 30,000 I BIP I I I 1 1 1 1 1 1 1 $ 30,000 Page 1 00 4 PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff 2030 Parks MP Commission Priority PW Staff 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP PW Staff PW Staff 2030 Parks MP Commission Priority PW Staff 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP PW Staff PW Staff PW Staff PW Staff 2030 Parks MP 2030 Parks MP Commission Priority PW Staff PW Staff 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP PW Staff ZT JO OT aged Public Works Department -10 Year Schedule of Capital Improvements - 2022 through 2031 Includes Projects Identified in the 2018 SWMP, 2030 Parks MP, 2021 Connectivity Plan & 2021 Adaptation Plan PROJECT DESCRIPTION Project 4 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL FUNDING SOURCE ADA Parking Space @ Palm Ave $ 5,000 BIP $ 5,000 Creek Restoration Pilot Project AR2211 $ 50,000 BIP $ 50,000 Update Educational Signage. $ 2,500 BIP $ 2,500 Install Gazebo for Special Events $ 15,000 BIP $ 15,000 Bike Racks at Entrances $ 2,000 BIP $ 2,000 Landscaping @ Lif[Station $ 1,000 BIP $ 1,000 Wayfinding Signage $ 3,000 BIP $ 3,000 Pervious Pavement- Russell Park to Bull Park $ 10,000 BJP $ 10,000 Johansen Park Refurbish Memorial Planter $ 4,000 BJP $ 4,000 Public Art @ South End $ 20,000 SIP $ 20,000 Entrance Sign - Saturiba Dr $ 2,000 BIP $ 2,000 Signage & Path Park Terrace East Entrance $ 5,000 BIP $ 5,000 3,000' Pervious Trail along Drainage Swale $ 120,000 BIP $ 120,000 New Bridges $ 12,000 SIP $ 12,000 Wayfinding & Educational Signage $ 10,000 BIP $ 10,000 Dog Waste Bag Stations $ 2,000 BJP $ 2,000 Picnic Tables/Benches, Trash Cans $ 7,000 BIP $ 7,000 Butterfly Garden $ 30,000 BIP $ 30,000 Native Plant Planting $ 7,500 RIP $ 7,500 BJP $ 15,000 Educational Signage for Trees/Plants $ 8,000 BIP $ 8,000 Bat Boxes $ 1,000 BIP $ 1,000 Bike Racks - Seminole Rd $ 1,800 BIP $ 1,800 Jordan Park 11.11 Mr Angled parking on N. Side of Park $ 100,000 BIP $ 100,000 Parallel Parking along Jordan 5t $ 60,000 BJP $ 60,000 Install/Improve Lighting $ 100,000 BIP $ 100,000 Walking Path along Perimeter $ 150,000 BIP $ 150,000 Stage for Events $ 50,000 BJP $ 50,000 Muhiuse Path through Park $ 50,000 BJP $ 50,000 Exercise Equipment $ 30,000 BJP $ 30,000 Bike Racks $ 3,000 BIP $ 3,000 Jordan 5t Entrance Enhancements $ 15,000 BJP $ 15,000 Marvin Gardens Signage, Fencing, etc. $ 5,000 RIP $ 5,000 Upgrade Play Equipment $ 30,000 B1P $ 30,000 Riverbranch Preserve Educational Signage @ W. 6th 5t $ 6,000 BJP $ 6,000 Update Kayak Route Signage $ 5,000 BJP $ 5,000 Rose Park Benches $ 2,000 BIP $ 50,000 Playground Equipment $ 60,000 BIP $ 50,000 Field Lighting (If neighbors not opposed) $ 70,000 BIP $ 50,000 Bat Boxes $ 1,000 BJP $ 50,000 Water/Bottle Filling Station $ 1,200 BJP $ 50,000 Dog Washing Station $ 1,000 BIP $ 50,000 Public Art Refurbish Skateboard Park (Minor followed by Major) $ 20,000 BIP $ 50,000 $ 25,000 BJP $ 120,000 BJP $ 145,000 Repurpose One RaquetballCourt & Exercise Equipment $ 250,000 BJP $ 250,000 New Baseball Field Lighting (3 fields @ $65,000 each) $ 65,000 BIP $ 65,000 BIP $ 130,000 Add Permeable Surface @ NE Corner of Park $ 5,000 BIP $ 5,000 Install Community Garden $ 15,000 BIP $ 15,000 New Play Set $ 180,000 HP $ 180,000 Rain Gardens & Biaswale along Ditch $ 45,000 BIP $ 45,000 Widen Sidewalks along Plaza to 8' $ 50,000 BIP $ 50,000 Bike Racks $ 3;500 BIP $ 3,500 Low -Light, Low -Level Lighting along Paths $ 90,000 BIP $ 90,000 Page 2 of 4 2030 Parks MP Commission Priority PW Staff 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP Commission Priority Commission Priority PW Staff Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP PW Staff 2030 Parks MP PW Staff Commission Priority 2030 Parks MP Commission Priority PW Staff 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP ZT JO TT aged Public Works Department -10 Year Schedule of Capital Improvements - 2022 through 2031 Includes Projects Identified in the 2018 SWMP, 2030 Parks MP, 2021 Connectivity Plan & 2021 Adaptation Plan PROJECT DESCRIPTION Project 4 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL FUNDING SOURCE Benches by Basketball Court $ 2,000 BJP $ 2,000 Water Bottle Filling Stations $ 2,400 BJP $ 2,400 Replace Mural on Raquetball Court $ 5,000 BJP $ 5,000 TldevIews Park 1 New Decking & Handrail Sunset Pier $ 200,000 CPF $ 200,000 Bat Boxes $ 3,000 GO $ 3,000 Rehabiliate Bathrooms $ 15,000 BJP $ 15,000 Walkway Restoration $ 10,000 BIP $ 10,000 BIP $ 10,000 81P $ 10,000 BIP $ 10,000 B1P $ 10,000 BIP 5 10,000 BIP $ 200,000 BJP $ 270,000 Kayak Launch Replacement $ 40,000 BJP $ 40,000 Signage at Kayak Launches Showing Trails $ 10,000 BJP $ 10,000 Connection to Atlantic Blvd $ 15,000 BIP $ 15,000 Bike Racks$ 3,000 B1P $ 3,000 Seating/Shade at Each Entrance $ 30,000 B1P $ 30,000 Pervious Walking Path around Pond $ 50,000 BJP $ 50,000 Wayfinding Signage @ Tailheads $ 10,000 BJP $ 10,000 Add/Maintain Interpretive Signage $ 5,000 BJP $ 5,000 Fishing Line Recycling Din $ 1,500 BJP $ 1,500 Entrance Sign on Camelia 5t $ 2,000 B1P $ 2,000 ADA Access to Sunset Pier $ 15,000 B1P $ 15,000 Path from Camelia to Drainage Pond Path $ 30,000 BJP $ 30,000 Veteran's Park Wrap Electrical Box w/ U5 Flag or Similar $ 3,000 GF $ 3,000 Shade Trees for Visitors $ 5,000 BIP $ 5,000 Grade Lawn to Slope - Emulate Stadium $ 50,000 BJP $ 50,000 Bushes/Fencing around Substation $ 3,000 BIP $ 3,000 Signage for Parking Areas $ 5,000 BIP $ 5,000 Pavillion & Grill $ 30,000 BIP $ 30,000 Interpretive Signage about Park $ 5,000 BIP $ 5,000 Bike Racks @ Entrance $ 3,000 $ 3,000 Park Signs @ Mayport Rd Entrance $ 2,000 BIP $ 2,000 Waters Park Turf Block Parking $ 50,000 GF $ 50,000 ROADS & STREETS , Street Maintenance - Milling and Paving PW2204 $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 325,000 GAS $ 3,250,000 Donner Road -Improvements. PW2004 $ 2,759,669 CPF $ 2,759,669 Clam Truck )Kenworth) $ 150,000 SF $ 150,000 Genie 2-45 Articulating Boom Lift $ 90,000 GF $ 90,000 2 -Zero Turn Mowers $ 16,000 GF $ 16,000 Tilt Trailer for Excavator & Skid Steer $ 12,500 GF $ 12,500 2021 Chevy Double Cab 4X4 $ 28,000 GF $ 28,000 2021 Chevy w/ Dump Bed $ 72,000 GF $ 72,000 Sidewalk -Ahern - East Coast to Ocean Blvd (In current budget under $2001( Seminole Sidewalk) PW2202 $ 160,000 B113 $ 160,000 Sidewalk -Seminole Rd 00 Country Club Ln (In current budget under 520002 Seminole Sidewalk) PW2201 $ 40,000 B113 $ 40,000 ROW Parking Pads w/ Turf Block )Sturdivant) PW2203 $ 50,000 BIP $ 50,000 Sidewalks -Throughout City as needed PW2205 $ 125,000 BJP $ 125,000 811' 5 125,000 BJP $ 125,000 BJP $ 125,000 B113 $ 125,000 BJP $ 125,000 BIP $ 125,000 BIP $ 125,000 GAS $ 125,000 GF $ 1,250,000 Levy Road - Multiuse Path $ 100,000 GF $ 100,000 5100,000 CDBG Ride -On Blower Billy Goat $ 11,080 BJP $ 11,080 Royal Palms- Replace broken curbs and gutters throughout $ 500,000 BJP $ 500,000 BIP $ 1,000,000 CONNECTIVITY PLAN Sturdivant - Seminole to East Coast - 8' Multiuse Path 0 Bike $ 290,000 GAS $ 290,000 Main St - Tide Views to Dutton - 8' Multiuse Path 0 Bike Lane $ 260,000 BIP $ 260,000 Sandpiper- 5' Path $ 90,000 B1P $ 90,000 Dutton Island Rd - Francis to Mayport- 8' Multiuse Path $ 90,000 BJP $ 90,000 Dutton Island Rd - Mayport to George -8' Multiuse Path t 5' Sidewalk (C01 Side) $ 216,000 GAS $ 216,000 Dutton Island Rd - George 5t to Mao 5t-8' Multiuse Path $ 272,000 BP $ 272,000 Sailfish Dr - 8' Multiuse Path $ 330,000 GAS $ 330,000 W Plaza - North Side - 8' Multiuse Path $ 32,000 610 $ 32,000 1st St W- Tide Views to Veterans Park -Sharrow $ 400 BIP $ 400 Page 3 of 4 2030 Parks MP 2030 Parks MP Commission Priority 2030 Parks MP PW Staff 2030 Parks MP Commission Priority Commission Priority PW Staff PW Staff 2030 Parks MP Commission Priority 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP 2030 Parks MP PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan ZT JO ZT a$ed Public Works Department -10 Year Schedule of Capital Improvements - 2022 through 2031 Includes Projects Identified in the 2018 SWMP, 2030 Parks MP, 2021 Connectivity Plan & 2021 Adaptation Plan PROJECT DESCRIPTION Project g 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 TOTAL FUNDING SOURCE Selva Marina Dr- 8' Multiuse Path $ 124,000 B1P $ 124,000 Orchid St- Rose to Tide View- 6' Path $ 216,000 GAS $ 216,000 Seminole Rd - Missing Link 8' Multiuse Path - Saturiba to Garden Ln (1,900 LF) $ 430,000 GAS $ 430,000 Seminole Rd - Missing Link 8' Multiuse Path - 17th 5t to Saturiba 11,100 LF) $ 250,000 GAS $ 250,000 Sexspray-Sailfish to AB Elementary -8' Multiuse Path $ 330,000 GAS $ 330,000 FACILRIES City Hall - Reroof(Chambers included) $ 200,000 GO $ 200,000 3 New A/C Units- Locations TBD $ 22,500 GF $ 22,500 Public Works Building Rehabilitation - Construction w/, Security $ 950,000 BJP $ 950,000 Public Works Building Replacement -Design $ - CityHall-Solar Panels $ 75,000 GF $ 75,000 Adele Grape -Outside Rehab $ 30,000 BJP $ 30,000 Gail Baker Center -Expansion $ 250,000 CPF $ 250,000 STORMWATER MANAGEMENT Aquatic Gardens- Phase l (Carry Over) PU2001 $ 2,365,938 SW $ 2,365,938 HMGP, State Approp. Seminole Rd - Re -Establish Ditch Bank AR2210 $ 7,000 SW $ 7,000 Easements $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 5,000 SW $ 50,000 Aquatic Gardens- Phase 11 $ 2,500,000 CPF $ 2,500,000 CPF $ 1,500,000 BIP $ 2,000,000 BJP $ 8,500,000 HMGP, State Approp. Aquatic Gardens - Phase 11 $ 1,000,000 SW $ 1,000,000 SW Sherman Creek Culvert Replacement- Seminole, Plaza, & 11th St $ 1,200,000 SW $ 1,200,000 Howell Park& Sherman Creek- Dredging for Flow Restoration $ 2,000,000 CPF $ 2,000,000 HMGP, [NG -MIT -GIP 9th/10th/11th/12th Streets- Phase 1 $ 1,100,000 SW $ 1,100,000 Ahern, 1st, 2nd & 3rd St - Drainage System & Roadway Rehab $ 2,000,000 CPF $ 2,000,000 4th & 5th St- Drainage System & Roadway Rehab $ 1,000,000 SW $ 1,000,000 fith,7th&8th 5t- Drainage System & Roadway Rehab $ 1,000,000 SW $ 500,000 BIP $ 1,500,000 Plaza East Coast to 5 -Way) - Drainage System, Curb & Roadway Rehab $ 1,000,000 81P $ 1,000,000 9th/loth/11th/12th Streets- Phase 11 $ 1,200,000 SW $ 1,200,000 Johansen Park- Culvert Replacement $ 450,000 81P $ 450,000 Stanley Rd Am- Enlarge Existing 5tonn Sewer $ 650,000 8JP $ 650,000 HMGP Mary St&Stewart St - Improvements $ 350,000 CPF $ 350,000 HMGP ADAPTATION & RESILIENCY Critical Public Facilities - High Exposure Evaluation $ 30,000 GF $ 30,000 Critical Public Facilities - High Exposure Improvements $ 50,000 GF $ 50,000 GF $ 50,000 GF $ 50,000 GF $ 200,000 CHtical Public Facilities - Medium Exposure Evaluation $ 25,000 GF $ 25,000 Critical Public Facilities - Medium Exposure Improvements $ 20,000 GF $ 20,000 GF $ 20,000 GO $ 20,000 GF $ 80,000 50 -Year Drainage Plan - Evaluate Major Drainageways & Projects $ 100,000 GF $ 100,000 25 -Yr Plan for SLR Protection - West of Mayport Rd $ 100,000 GO $ 100,000 Vulnerable Roadway Segments- Protect from SLR $ 1,000,000 GF $ 1,000,000 GF $ 1,500,000 SW $ 1,500,000 BIP $ 2,000,000 SW $ 7,000,000 inked to PU CIP Project General Fund -GF Gas Tax -Gas Half Cent Sales tax- BIP Capital Project Fund - CPF Sanitation Fund -SF Stormwater Utility Fund -SW $ 8,825,742 $ 6,983,680 $ 532,000 $ 483,000 $ 325,000 $ 615,000 $ 2,611,135 $ 1,822,680 $ 2,759,669 $ 3,050,000 $ 150,000 $ - $ 2,447,938 $ 1,005,000 $ 5,455,300 $ 5,800,500 $ 5,810,000 $ 4,908,400 $ 4,385,500 $ 4,655,000 $ 75,000 $ 145,000 $ 70,000 $ 1,020,000 $ 1,020,000 $ 20,000 $ 325,000 $ 541,000 $ 655,000 $ 575,000 $ 541,000 1 755,000 $ 1,850,300 $ 1,859,500 $ 1,480,000 $ 2,108,400 $ 1,819,500 $ 2,375,000 $ 2,000,000 $ 2,250,000 $ 2,500,000 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ 1,205,000 $ 1,005,000 $ 1,105,000 $ 1,205,000 $ 1,005,000 $ 1,505,000 Page 4 of 4 $ 3,205,000 $ 3,010,000 $ 51,233,922 $ - $ 350,000 $ 3,715,000 $ 450,000 $ 655,000 $ 5,437,000 $ 1,750,000 5 - $ 17,676,515 $ - $ - $ 12,559,669 $ - $ - $ 150,000 $ 1,005,000 $ 2,005,000 $ 13,492,938 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan 2021 Connectivity Plan PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff PW Staff SWMP .2018 PW Staff SWMP .2018 SWMP .2018 SWMP - 2018 SWMP-2018 SWMP - 2018 PW Staff PW Staff PW Staff PW Staff SWMP-2018 SWMP-2018 SWMP .2018 SWMP-2018 Adapation Plan - 2021 Adapation Plan - 2021 Adapation Plan - 2021 Adapation Plan - 2021 Adapation Plan - 2021 Adapation Plan - 2021 Adapation Plan - 2021 Agenda Item #7.A. 09 Feb 2022 City of Atlantic Beach Parks Assessment Plan Purpose The City of Atlantic Beach (COAB) recognizes the importance of maintaining the condition, accessibility, and safety of its parks. For residents and visitors alike, there is no other more visible indicator of how the City and the Community manage their natural resources and provide for the well-being of the community. Periodic reviews will provide a systematic and unbiased assessment of how well the city's parks are maintained and if the parks are providing for the needs of the community. The purpose and of this plan is to specify the process by which COAB's parks are assessed. Scope This plan applies to all parks and beach accesses operated by COAB as defined in the Parks Master Pan. Responsibilities The Environmental Stewardship Committee (ESC) under remit from Chapter 23 of the City Code is tasked with inter alia: 1. Developing and maintaining a long-range plan to protect, improve and beautify park spaces. 2. Improving access to and amenities for parks including disability accommodations, bike paths, parking, signage, and other user-friendly features. To accomplish the above, the ESC will manage the COAB Parks Assessment Plan by: - Establishing an assessment methodology to include a standardized assessment form, a records management method to track assessments and corrective actions; - Promulgation of an annual assessment schedule which includes all parks and beach accesses; - Solicitation and incorporation of interested residents to assist with assessments through the establishment of a Volunteers In the Park (VIP) program; - Solicitation and incorporation of interested COAB elected officials and staff with assessments and overall management Definitions Assessment: A structured inspection of parks performed by the ESC, VIPs, COAB elected officials and staff focused on the three broad features listed below. Some parks may require more than the minimum annual inspection as they vary in size and features. Assessments include the following: Page 25 of 30 Agenda Item #7.A. 09 Feb 2022 Structural Features: Walkways have uniform surfaces and are level with the ground and free of trip hazards, are free of litter and debris, free from standing water, and have unobstructed accessibility i.e., free from low and protruding limbs guide wires etc. At least one walkway meets ADA requirements Security lighting is functioning. Lighting electrical systems and components are operational and in compliance with building codes if there are timers verify they are properly set for specific hours of operation. There are no exposed electrical conduction wires; ensure ballast boxes and components are properly installed; security fixtures are adjusted to eliminate dark or blind spots. Fencing material is properly secured and properly connected; gates and latches are properly operational fencing is free of holes protrusions and catch points Ball court surfaces are smooth and level; well drained with no standing water the surface is free of large cracks and holes. Benches and tables have smooth a surfaces and are structurally sound; hardware is intact, nails, bolts and screws are flush with the surface; seats and backing are smooth with no protrusions and have no exposed sharp edges or pointed corners; are not trip hazards and free of litter and graffiti. Benches should be uniform throughout all parks. Buildings are clean, sanitary and free of graffiti; signage with reservation rules; information and emergency telephone numbers and placed in a noticeable location Grills are operational and free of rust and metal deterioration; racks are operational with the main body properly anchored to reduce hazards and prevent theft; underbrush, low limbs and debris are cleared away from picnic grill areas to reduce fire hazards Trash receptacles are free of graffiti, intact and are standard throughout all parks Park signage is secured and properly installed, placed in a visible location and standard in appearance throughout all parks; disabled parking signs are secure visible and meet codes; park rules signs are securely posted and standard in appearance throughout all parks. Paved Surfaces Drains, utility covers, stairs, retaining walls, hard pavements, should be free of structural deterioration such as rear chipping paint, missing segments, holes, cracks, protrusions, and uplifts Play Equipment All equipment in a park intended for use by children at play or recreational use by teenagers and adults should be checked for structural deterioration and usability Safety surfacing all materials under and around play equipment whose purpose is to protect against injuries due to falls should be checked for missing or protruding plugs, metal anchors with missing caps, and or any section that is damaged, worn or uplifted Page 26 of 30 Agenda Item #7.A. 09 Feb 2022 Cleanliness Features: Litter includes all refuse that has been discarded somewhere other than a proper receptacle; large quantities of natural debris or accumulated grime, bird or animal feces on structural features and health hazards such as syringes and dead animals. Glass includes broken glass found in or in the vicinity structural surfaces. Graffiti all spray paint, permanent markers stickers, and adhesive posters that have been illegally applied or fixed to any surface. Weeds includes any unwanted, unsightly vegetation in and around structural features; growth in ball courts and weeds coming through fences from non -parks property and through proper parks property Landscape Features: Trees Assessments should include notes on any tree requiring trimming or removal if it is a safety hazard, is infected or diseased. Assessments should also note any tree stumps that pose hazards or roots in walkways that may pose a trip hazard. Water bodies: All bodies of water bordering the park or in the park should be clear of all debris that is not naturally occurring. Wetlands: All wetlands should be undisturbed. Lawns: all areas not designated for active recreational use where grass shrubs or plantings do or should exist should be properly irrigated and mowed and should not be rutted uneven or weed infested Trails all unpaved paths in a natural area should not be rutted, eroded, subject to pooling water nor impassable because of the Page 27 of 30 Agenda Item #7.A. 09 Feb 2022 Page 28 of 30 Park Assessment Form Park Assessment Forms will contain the date and time of the assessment, the park or area assessed, the names of the individuals completing the assessment and any identified deficiencies. Once an identified deficiency is addressed it shall be noted in a Maintenance log. Prior to any subsequent assessment the Maintenance Log plus the previous assessments should be reviewed by the current assessment team Location Date Assessment Team1116 Illp Assessment Grading (tally grade by segments) Good 1 Needs Improvement: 0 Items --Oilrllb Grade , Issues Nil Date resolved Additional Action STRUCTURAL AIL walkways are uniform and level clear of debris. one walkway meets ADA requirements walkways are clear of standing water and displaced soil and or sand Park lighting is functional no electrical conducting wires or exposed, ballast Page 28 of 30 Agenda Item #7.A. 09 Feb 2022 Page 29 of 30 boxes and components are properly installed and secured fencing is free with holes protrusion and catch points play surfaces are smooth and leveled, with no standing water. the surface is free of large cracks holes and trip hazards. the surface is free of litter and debris gravel and graffiti 41Pdc Buildings are clean sanitary and free of graffiti Signs with reservation rules information and emergency telephone numbers are in a noticeable location bathroom facilities are clean and in working order. electrical plugs lights appliances and fans are in good condition dillb®_ ?"1* SEGMENT GRADE Is, CLEANLINESS Benches do not have any nails bolts or screws protruding. there are no exposed sharp edges or pointed corners. ventures are anchored Tables are clean and free Page 29 of 30 Agenda Item #7.A. 09 Feb 2022 Page 30 of 30 of graffiti table sheets and tops are smooth with no protrusions and have no exposed sharp edges or pointed corners tables are anchored Grills are operational and free of rust and metal deterioration are the main body are properly anchored to reduce hazards and prevent theft dc Trash receptacles are free of graffiti receptacles are anchored Park signage is secured and properly installed in the visible location; disabled parking signs secure visible and meet codes; parking rule signs are secure signs are clean and standard throughout all parks Liter is picked up throughout the park SEGMENT GRADE LANDSCAPE Page 30 of 30