Loading...
10-02-15 Gate Gas Station 535 Atlantic Blvd.Part 1GAT UM IRIA wl LWJ tials LIDA I •ATLANTIC B ACH n� its 1 i■ 541 ATmLAFqTIC BLVD RE 170672�oiod P It , & IL ff., L% "a LD I = a il 5 0TL111111111111kNTIC BLVD 1. 1111 VICINITY MAP PROSSER TM Community - Management - Energy - Relationships 13901 Sutton Park Drive South, Suite 200 Jacksonville, Florida 32224-0229 p 904.739.3555 If - 904.730.3413 e- info@prosswhalbdcwm Fla. Certificate of Authorization No.: 00004050 ENGINEER OF RECORD: � 62576 Iz 1 1S" NTS � 91 OMNTR M_ T1 I NOT A PROSSER WORK PRODUCT L-1 LANDSCAPE PLAN IR -1 IRRIGATION PLAN PHOTOMETRIC PLAN ISSUED: OCTOBER 12, 2015 No. COVER SHEET Revision SURVEY C1.0 GENERAL NOTES C2.0 EXIST. CONDITIONS/DEMOLITION PLAN C3.0 SITE LAYOUT PLAN C4.0 PAVING, GRADING AND DRAINAGE PLAN C5.0 UTILITY PLAN C6.1—C6.2 GRADING AND DRAINAGE DETAILS C7.1—C7.11 UTILITY DETAILS C8.0 EROSION AND SEDIMENT CONTROL DETAILS C9.0 STORMWATER POLLUTION PREVENTION PLAN C10.0 STORMWATER POLLUTION PREVENTION PLAN —CONTRACTORS CERTIFICATION NOT A PROSSER WORK PRODUCT L-1 LANDSCAPE PLAN IR -1 IRRIGATION PLAN PHOTOMETRIC PLAN ISSUED: OCTOBER 12, 2015 No. Date Revision 1 10-12-15 CITY OF ATLANTIC BEACH Prosser No. 114001.01 C -A14 N E_.) Date.v � _n L a SCANNED L ct _.� Date: LL, c U � w C) 00 c� Cz C Ed C [a U ,V, E 1= O U OCT „ ? 2015 91 N I FND 1/2" 1 NO ID 1 I FIRST AMERICAN TITLE INSURANCE COMPANY FILE NUMBER 2080-3202172 EFFECTIVE DATE: JULY 10, 2014 SCHEDULE B - SECTION 2 EXCEPTION RECORDED RIGHT OF WAY P.B. = DESCRIPTION COMMENTS NUMBER DOCUMENT IRON ROD CLF = CHAIN LINK FENCE CONC = 9 DEED BOOK 827,A 90 RESTRICTIVE AGREEMENT DOES NOT AFFECT FOUND WBF = WOOD BOARD FENCE BLANKETS LOTS 789, 790, 793, 794, 798, 803, BACKFLOW PREVENTER BGV = BELOW GROUND VAULT 805, 807, 808 & 809; 5' PERPETUAL EASEMENT FIBER OPTIC CABLE CB = CATCH BASIN ON LOTS 789, 790, 793, 794, 798, 808 & 809 ACTUAL P = PLAT SHOWN HEREON 10 O.R.B. 3472, PG. 821 GUARD POST RESOLUTION REMOVES 5' PERPETUAL EASEMENT QS = SANITARY SEWER MANHOLE [103.8] = PERPENDICULAR BUILDING TIE FROM LOTS 803, 805 & 807 11 O.R.B. 4513, PG. 364 1 JEASEMENT FOR DRAINAGE AND UTILITIES SHOWN ON LOTS 805 & 806 13 PLAT BOOK 10, PAGE MATTERS SHOWN ON RECORDED PLAT BLANKETS SITE 14 O.R.B. 13362, PG. 4 ASSIGNMENT I BLANKETS SITE JOB No. 2014-315 CONC WALK a c Map Showing a Boundary Survey LOTS 788 THROUGH 799 AND 803 THROUGH 809, INCLUSIVE, AS SHOWN ON THE PLAT OF SECTION NO. 1, SALTAIR, RECORDED 1N PLAT BOOK 10, PAGE 8 OF THE CURRENT PUBLIC RECORDS OF DUVAL COUNTY, FLORIDA. FOR: GATE PETROLEUM COMPANY ROGERS TOWERS PA FIRST AMERICAN TITLE INSURANCE COMPANY LSREF2 CHALK REO, LLC ASPHALT GENERAL NOTES STURDIVANT AVENUE (50' R/W) ATLANTIC BOULEVARD (105' R/W) 1. BEARINGS SHOWN HEREON ARE BASED ON NORTHERLY R/W LINE OF ATLANTIC BOULEVARD AS N89'25'12"E PER STATE PLANE COORDINATE SYSTEM, FLORIDA EAST ZONE, NORTH AMERICAN DATUM 1983/1990 NGS ADJUSTMENT. 2. INTERIOR IMPROVEMENTS NOT LOCATED EXCEPT AS SHOWN. 3. THIS SURVEY ONLY SHOWS IMPROVEMENTS/STRUCTURES SITUATED ABOVE GROUND. BELOW GROUND IMPROVEMENTS/STRUCTURES, IF ANY, ARE NOT SHOWN OR LOCATED. 4. THE LANDS SHOWN HEREON LIE WITHIN ZONE "X" (AREA DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODP'LAIN), AS SHOWN ON FLOOD INSURANCE RATE MAP 0409H, COMMUNITY NO. 120075 DATED JUNE 3, 2013. HOWEVER, THE FLOOD INSURANCE RATE MAPS ARE SUBJECT TO CHANGE. 5. THIS DRAWING MAY HAVE BEEN ENLARGED OR REDUCED FROM THE ORIGINAL. UTILIZE THE GRAPHIC SCALE AS SHOWN. 6. SITE SHOWN HEREON CONTAINS 64,974 SQUARE FEET (1.492 ACRES). PARTY CHIEF: HENDERSON F.B. 805L ,Pg. 50-53 CAD FILE: 2014-315.DWG CHECKEED BY:�� h ASPHALT ASPHALT LEGEND R/W = RIGHT OF WAY P.B. = PLAT BOOK IP = IRON PIPE IR = IRON ROD CLF = CHAIN LINK FENCE CONC = CONCRETE OHU = OVERHEAD UTILITY FND = FOUND WBF = WOOD BOARD FENCE BFP = BACKFLOW PREVENTER BGV = BELOW GROUND VAULT FOC = FIBER OPTIC CABLE CB = CATCH BASIN A = ACTUAL P = PLAT 4 = MAILBOX ® = GUARD POST = LIGHT POLE QS = SANITARY SEWER MANHOLE [103.8] = PERPENDICULAR BUILDING TIE ® = NUMBER OF REGULAR PARKING SPACES = HANDICAP PARKING SPACE -�= SIGN - ® = CLEAN OUT m = PROPANE TANK = WATER VALVE COVER E-� = WATER METER 0 = TELEPHONE PEDESTAL R2, = POWER POLE X = FOUND X -CUT = FOUND 1/2" IRON PIPE - NO ID (UNLESS NOTED OTHERWISE) Q = SET 1/2" IRON PIPE "CLARY ASSOC" Z� >to V) ❑HU GRAPHIC SCALE 20 0 10 20 40 8( Ell DATE: 8-14-14 ( IN FEET ) 1 inch = 20 ft. 11-03-14 JRS N/A REVISED TO SHOW ACREAGE, NO FIELD WORK THIS DATE. REMSI0N DATE DRAFTER WORK ORDER N0. REASON FOR REVISION THIS MAP OR SURVEY MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, IN CHAPTER 5J-17, FLORIDA ADMINISTRATIVE CODE, PURSUANT TO SECTION 472.027, FLORIDA STATUTES, UNLESS OTHERWISE SHOWN AND STATED HEREON. THIS DRAWING, SKET04 PLAT OR VAP IS NOT VALID UNLESS IT BEARS 1` i GNa:r K -ANk—r D THE ORIGINAL Clar Y&Associates 1R RAISED SEAL n A ,IDA LICENSSURVEYOR AND MAPPERAP11R J-17, FLORIDA A 1MIFIISTRAIIVE CODE). PROFESSIONAL SURVEYORS & MAPPERS ol LB NO. 3731 3830 CROWN POINT ROAD JACKSONVILLE, FLORIDA 32257 (904) 280-2703 WWW.CLARYASSOC.COM GREGOo `ldK-�; F.S. —GE 77 FILE No.SS-305:,b Map Showin a Topographic Survey of LOTS 784 THR GH 799 AND 802 THROUGH 809, INCLUSIVE, AS SHOWN ON THE PLAT OF TION N0. 1, SALTAIR, RECORDED IN PLAT BOOK 10, PAGE 8 OF TH RRENT PUBLIC RECORDS OF DUVAL COUNTY, FLORIDA. 'FOR: GATE PETROLEUM COMPANY i PHALT 0 INV SW= -2.57 by TOP=5:99 INV=2.14 BENCHMARK h ELEV=6.01 (NAVD88) PK NAIL AND CLARY ELEVA11ON DISK IN CONCRETE DRIVEWAY TOP=5.85N INV SW=3.03 S71WIVAN'P AVENUE I P (50' R/W) Q ASPHALT / o J RIM=6.11 4G / H NOT F USE 6.59 646 8.65 ^iy / � +6.77 718 g 0g 6 $4 661 RIA 7 LL TR WATER I / INV NE= -1.40 \ BOTTOM STRUCUTE=3.62 I THROAT=5.11 INV E=0.00 INV W=2.73 INV E-2.74 / RIM=7.61 � 8" .PVC oy o� I INV=3.05 10" PVC INV W=-1.35 373.78 INV W=9��7 UNABLE TO OPEN Q-SS-SS-9S-SS-SS--SS-SS SS SS SS SS SS 6 SS SS $ SS SS SS SS SS SS SS SS SS SS SS SS SS / SS INV 5=3.04 8" PVC 6.33 6J9 EP 6.28 6.39 S SS SS SS --- 6. 0 EP 6. 0 a 6.50 .2 6.31 .29 6.32 64,72 6.58 E.48 6.41 8+3 8.38 g,2+ 6.2 s•W` FOR DIRECTION ONLY c 6.11 5 6 1 _ .45 6'28 g,.R4 �44 FOR TO NOT BE IN USE, NO 6.51 6.46 8.83 ASPHALT otic =._fir 6.41 CONIC 6.1 25 + CONIC DRIVE 8.38 CONIC DRIVE 8.45 g,0+ +5.9 �_ MANHOLE FOUND TO THE SOUTH 8.68 6.7 6.80 6.89 8.88 6.8 6.4 6 6.58 INV NE53 81 6 + C(b--qHu ❑Hu qHu qHu 6.89 Wil-_ 6 nq[l6.65 i91./1�5 74nw, -nwll6.96 7.0 qHU OHU qHU 7.10 589'24'20"W L76' WgF A� s.7o S89'24'20"W 49.85' 7.08 .12I 6.52 Ii O 7.16�-_ I I7+ 7+2 ®® CNC FLUME I 6 573 49.73' A I 8.88 I6.91 8.81 I ASPHALT OBJ6.7 7127 1CONICTRANSFORMER PAD M,d. 6.89 7.06 6.717 ELEV-8.08 i I f i +7.67 o I -DUMPGTER AREA RIM=6.90 II 7 06 RIM=8.8 +6.58.63 6 99 L 7.1+ D FU O OF WA E 7 04 FUNLOLT I WATER x 6.317.3 7. 6 7.121 I i BOTTOM STRUCU =4.56 B 0 CUTE®4 70 �LO a C^Qo-qHU qHU qHU DHU- 7 7.32 I I 6' 8.25 WBF I I I O 1 j � I 59.8' I r; l O ,�O I 9 I .87 I I CONIC A/C PAD ID GRASS p 1= 1 z I G 7.02 j ELEV=7.20 j ip VERHANG I t 1-:I CONCRETE PARKING AREA 801 w v I 1 1 AND 2 STORY BLOCK AND STUCCO I � � 1 .28 I I I a I I ASPHALT 8 � I I I I I CN I I I i I i i I I I I I I I 7+0 7.06 7.251 i I I I I I GRASS CONIC BLOCK WALL I I I I I I 7.24 1 8.6' I 14.5' 29 FFE=8.29 I I I 8.71J..772 7.301 8.15 8{25 r (AT DOOR) FFE=7.987.41 I I 3 `D 1 (AT DOOR) (AT DOOR) 7.32 7.61 8.08 1 8.22 ,4.3' 1 43.9' 0.4' 7.64 98 7.69g71 77 5 7135 V CLF BIKE RACK 113' 7'77 2ND STORY COVERED WALKWAY, COVE ED CONIC WALK BELOW 1 9.3E 9-3---------7.4 ----------- XIX -x --x- -- °3-------- ------------------ I -------------r--------- '7-- x'Tx-:f"�'X.,�X`�-'_X_ tp 'r----- -I--- `-----I------------- T ------------- I I I I w 8.25 7.69 92.9' 7.5 I I I IL m 7.63 0 .44 I I I 7 I .24 I i^ I Cd aj g - I I I II 1 z m I1!IIIII III U I1I �II�II III III j Oi � 70 fO I ao C4 TC=9S 7.50 1 AND 2 STORY COQUINA 7 R SHAFT EP=7 1II J/ 0�I N (TYP®I7C.'A FFE=9.62 ' �g, (TYPICAL) O I 11 1 1 v I 5TAIRiI ) 6 1748 STAIR iI g' ygF .39 .59 7.5 1 7.5 5 7.9 46 7 0 I 7� o 1 7.42 7.02 .03 7+4 NO PARKUNG II TOP=6.89 I I I II I I I I ISL I I I 7+0 1 1 0 I I I I/ �UNABLEDTO ETDINVERTS� I ASP ALT I 9.42 9.30 ;; 14 I � 1 6' WBF I I I Q�V I I I I A I 9.3 8.18 8.31 I I ASPHALT pp I I I I W I II I I I I I I I 8 32 .19 Q I I 7.7 I I pao I I i I I I v I 7 7.80 I i I I I I I I I I I PLASTIC A/C PAD CI I �i 02�44788 J/ 9 1 I 79 1 793781 782 783 fR � 784 785 7 790 I I 7D4 79 I I8 0; 7.51 7.66 7.165 7. 7. 7.54 pp0 7.55 1 7 5 1 9 7.461 1 7,631 7.01 0 3 h I 1 I.5 C3�G I ONC CONC 7.7.2 I 7.34 7.317 I 7.491 o GOA 1 1 1 7.74 7.73 •6 7.61 141.2' 7.60 7.63 I 4 7.61 7.64 j ASPHALT 7.50 DATUM 1983/1990 NGS ADJUSTMENT. i CONC A/C PAD i FIBERGLASS A/C PAD ELEV=7.90 CONC A/C PAD 1 PLASTIC A/C PAD I ELEV-7.85 7.59 71179 I ELEV=7.90 I ELEV=7.43 I I i 1 IT IS A TOPOGRAPHIC SURVEY FOR I 8 2 i 803 18.30 I I ; 804 i 805 i 806 i 807 I 1.35 I 3. INTERIOR IMPROVEMENTS NOT LOCATED EXCEPT AS SH 1'I I I I I I 1 I ASPHALT I 1 1 4. THIS SURVEY ONLY SHOWS IMPROVEMENTS/ STRUCTUR I I I I I I W- 1 GROUND IMPROVEMENTS/ STRUCTURES, IF ANY, ARE NT I I I I v I 1 1 AND 2 STORY BLOCK AND STUCCO I � � 1 .28 I I I a I I ASPHALT 8 � I I I I I CN I I I i I i i I I I I I I I 7+0 7.06 7.251 i I I I I I GRASS CONIC BLOCK WALL I I I I I I 7.24 1 8.6' I 14.5' 29 FFE=8.29 I I I 8.71J..772 7.301 8.15 8{25 r (AT DOOR) FFE=7.987.41 I I 3 `D 1 (AT DOOR) (AT DOOR) 7.32 7.61 8.08 1 8.22 ,4.3' 1 43.9' 0.4' 7.64 98 7.69g71 77 5 7135 V CLF BIKE RACK 113' 7'77 2ND STORY COVERED WALKWAY, COVE ED CONIC WALK BELOW 1 9.3E 9-3---------7.4 ----------- XIX -x --x- -- °3-------- ------------------ I -------------r--------- '7-- x'Tx-:f"�'X.,�X`�-'_X_ tp 'r----- -I--- `-----I------------- T ------------- I I I I w 8.25 7.69 92.9' 7.5 I I I IL m 7.63 0 .44 I I I 7 I .24 I i^ I Cd aj g - I I I II 1 z m I1!IIIII III U I1I �II�II III III j Oi � 70 fO I ao C4 TC=9S 7.50 1 AND 2 STORY COQUINA 7 R SHAFT EP=7 1II J/ 0�I N (TYP®I7C.'A FFE=9.62 ' �g, (TYPICAL) O I 11 1 1 v I 5TAIRiI ) 6 1748 STAIR iI g' ygF .39 .59 7.5 1 7.5 5 7.9 46 7 0 I 7� o 1 7.42 7.02 .03 7+4 NO PARKUNG II TOP=6.89 I I I II I I I I ISL I I I 7+0 1 1 0 I I I I/ �UNABLEDTO ETDINVERTS� I ASP ALT I 9.42 9.30 ;; 14 I � 1 6' WBF I I I Q�V I I I I A I 9.3 8.18 8.31 I I ASPHALT pp I I I I W I II I I I I I I I 8 32 .19 Q I I 7.7 I I pao I I i I I I v I 7 7.80 I i I I I I I I I I I PLASTIC A/C PAD CI I �i 02�44788 J/ 9 1 I 79 1 793781 782 783 fR � 784 785 7 790 I I 7D4 79 I I8 0; 7.51 J 3'� PVC 0, 1 0 3 h W LINE OF ATLANTIC BOULEVARD INV = INVERT )0 RIDA EAST ZONE, NORTH AMERICAN I1i 1iII 16 IIIII IIIII DATUM 1983/1990 NGS ADJUSTMENT. 29.6' 8.13 2. THIS MAP DOES NOT REPRESENT A BOUNDARY SUR 1 IT IS A TOPOGRAPHIC SURVEY FOR ID = IDENTIFICATION 18.30 IIII IIIiI OP r I Ii 796 3. INTERIOR IMPROVEMENTS NOT LOCATED EXCEPT AS SH 1'I I I 9Q 1 STORY' S1t7CCO AND WOOD FRZ29 `o OyG 0.8 1 4. THIS SURVEY ONLY SHOWS IMPROVEMENTS/ STRUCTUR 8.2 4r GROUND IMPROVEMENTS/ STRUCTURES, IF ANY, ARE NT OWN OR LOCATED. 7.82) EDGE OF PAVEMENT z CONCRETE I PARKING AREA (NAVD '88) AND ARE REFERENCED TO A FOUND NAIL, EL B I S HOi I I I I 1 I I i 7.63 7•;39 2 $TORY STUCCO AND I WOOD I I I I 16 I I I I GRAPHIC SCALE AS SHOWN. 8.50 cc _ 1. ,m \ FRAME6 o I I I I I 8.33 7+7 f*6 to 8.41 8.41 Cd FFE=8.48 I Z 8. +7.38 DENOTES SPOT ELEVATION ON ASPH, CONC, I. 49.0a g 1 I I I 8.27 1 8.1 I 1772769 11I III 1III i1III go .83 I i 0 JOB No. 2014-318 D k 6.22-31 �6' II .36 8.52 VI YL GATE 8.54 7.7258. 574 I a ,� CONIC SM N$9'25'12"E BElMABSI1II ASPHALT [�173 8.10 (NAVD88) ELEV=ASPHALTINN89-26►12E K NAIL AND CLARY ELEVATION DISK I I SIG 50.x(P&A) J0.00' (P&A) " 1 N892512E IN ASPHALT PARKINGI LOT 300.08' 8.53 854 -P- CONIC SWK CONIC SWK 07 8.11 30.4' 8.4 2 CONC SWK 7.96 8.06 300.08' 8.2 8 8.57 8.40 8.29 CONC SW CONC DRIVE 8.34 8.18 8.02 CONIC DRIVE 8.10 CONIC SWK 8.08 pip 8.12 8.09 8.G9-__/ - - CONIC DRIVE CONIC DRIVE CONIC SWK 8 8 24 8 3 814 7.99 CONIC DRIVE 7.94 / 7.96 2 8.30 qHU qHU qHU-----qHU U qHU qHU 1 EP 2.0' CONC CURB 8.60 845 8.14 ASPHALT 8.77 8.44+ 8.37 8.97, EP GRASS ISLAND BFp 7 ASPHALT GRAPHIC SCALE PARTY CHIEF: HENDERSON TO� oz I #a EP -7.38 INV=4.211 I0 v I I I TOf *95 INV N=4.13 INV S-3.72 I I Ii IW h�v I I I CI� TOFT.41 INV N=3.54 D F.B. 805IL ,Pg. 50-53 qHU qHU qHU qHU 8.09 qHU 7+5 7.457.50 7.29 t7.8 7 Q 08 W m E0 7.95 809 7+3 6.2 6.9+ + I I v 6.9 7+0 I pppmp 'OD 7.3+ 7.55 7.93 I tq Chi 7+2 I®o O 6.93 7,29 I Z 7• 7.89 1 7+5 6.92 i 7.04 7.06 7.62 7.59 J 71 iI 7. 4 �SPHALT Q a- � � 7.68 h 1 O I � LO I 7.9 8.22 � Lo i I 8.296' 6' W8F I I 8.0A. I I 134' 3' 8.30 co GENERAL NOTES:f J 3'� PVC 0, 1 INFO = INFORMATION 1. BEARINGS SHOWN HEREON ARE BASED ON NORTHERLY W LINE OF ATLANTIC BOULEVARD INV = INVERT AS N89`25'12"E PER STATE PLANE COORDINATE SYSTEM, RIDA EAST ZONE, NORTH AMERICAN BFP = BACK FLOW PREVENTER DATUM 1983/1990 NGS ADJUSTMENT. i 8.13 2. THIS MAP DOES NOT REPRESENT A BOUNDARY SUR 1 IT IS A TOPOGRAPHIC SURVEY FOR ID = IDENTIFICATION BOUNDARY SURVEY, SEE CLARY & ASSOCIATES FILE NO. -3059, SS -3060, SS -3061. 796 3. INTERIOR IMPROVEMENTS NOT LOCATED EXCEPT AS SH 1'I I I 9Q 1 STORY' S1t7CCO AND WOOD FRZ29 `o OyG PROFESSIONAL SURVEYORS & MAPPERS LB NO. 3731 1 4. THIS SURVEY ONLY SHOWS IMPROVEMENTS/ STRUCTUR SITUATED ABOVE GROUND. BELOW CONIC = CONCRETE GROUND IMPROVEMENTS/ STRUCTURES, IF ANY, ARE NT OWN OR LOCATED. 7.82) EDGE OF PAVEMENT 5. ELEVATIONS SHOWN HEREON ARE BASED UPON N�R AMERICAN VERI1CAL DATUM 1988 FFE = FINISHED FLOOR ELEVA77ON (NAVD '88) AND ARE REFERENCED TO A FOUND NAIL, EL TION=8.41 (NAVD '88) -SET ON THE c�0 TOP OF CURB ON THE SOUTH SME OF ATLANTIC BLVD, IN E K -MART PARKING LOT. DIA DIAMETER 7.63 7•;39 --x-x-x- = FENCE SIZE,TYPE AS NOTED ( ) 6. THIS DRAWING MAY HAVE BEEN ENLARGED OR RECU FROM THE ORIGINAL. UTILIZE THE GRAPHIC SCALE AS SHOWN. 8.50 cc _ 1. ,m \ Cn i 8.5 45 1 8.3 7.98 7. +7.3 DENOTES SPOT ELEVATION ON GROUND. to 8.41 8.41 Cd I I I M �>, I 'OVEREQ CONIC ^i 7.82 Z 8. +7.38 DENOTES SPOT ELEVATION ON ASPH, CONC, I. 49.0a 1 8.27 1 8.1 LL -v- I o 7.90 i go .83 I i 0 JOB No. 2014-318 D k ING: GCC .36 8.52 8.57 8.51 ® .^* a o �, CONIC DRIVE o �� CONIC SWK - R_nA 8.54 „ CONC DRIVE a ,� CONIC SM 8.60 845 8.14 ASPHALT 8.77 8.44+ 8.37 8.97, EP GRASS ISLAND BFp 7 ASPHALT GRAPHIC SCALE PARTY CHIEF: HENDERSON TO� oz I #a EP -7.38 INV=4.211 I0 v I I I TOf *95 INV N=4.13 INV S-3.72 I I Ii IW h�v I I I CI� TOFT.41 INV N=3.54 D F.B. 805IL ,Pg. 50-53 qHU qHU qHU qHU 8.09 qHU 7+5 7.457.50 7.29 t7.8 7 Q 08 W m E0 7.95 809 7+3 6.2 6.9+ + I I v 6.9 7+0 I pppmp 'OD 7.3+ 7.55 7.93 I tq Chi 7+2 I®o O 6.93 7,29 I Z 7• 7.89 1 7+5 6.92 i 7.04 7.06 7.62 7.59 J 71 iI 7. 4 �SPHALT Q a- � � 7.68 h 1 O I � LO I 7.9 8.22 � Lo i I 8.296' 6' W8F I I 8.0A. I I 134' 3' 8.30 co 844 821 8H36 ASPHALT 8+41 EP 8.03 1.5' CONC CURB' GRASS ISLAND LEGEND J 3'� PVC 0, 1 INFO = INFORMATION ELEV = ELEVATION 7.92 .02 }� 22.2' INV = INVERT SQ = SQUARE PVC = POLYVINYL CHLORIDE PIPE BFP = BACK FLOW PREVENTER 1 i 8.13 1 o ID = IDENTIFICATION I i A/C = AIR CONDITIONER 796 1 797 I I 9Q 1 STORY' S1t7CCO AND WOOD FRZ29 `o OyG PROFESSIONAL SURVEYORS & MAPPERS LB NO. 3731 EP = EDGE OF PAVEMENT FFE=8.401 N CONIC = CONCRETE I b, co I 7.82) EDGE OF PAVEMENT I I I m to z OSG FFE = FINISHED FLOOR ELEVA77ON (TYPICAL, UNLES NOTED � co 0 OTHERWISE) FNC = FENCE 7.95 DIA DIAMETER 7.63 7•;39 --x-x-x- = FENCE SIZE,TYPE AS NOTED ( ) i I' to • 09G a I 32.5' 8.521 Ss = SANITARY SEWER 8.50 cc _ 1. ,m \ CHECKED BY:(��, A-vNj i 8.5 45 1 8.3 7.98 to 8.41 8.41 Cd I I I M �>, I 'OVEREQ CONIC ^i 7.82 M I I. 49.0a 1 8.27 1 8.1 ,0 i O -v- I o 7.90 i go .83 I i 0 8.00 .36 8.52 8.57 8.51 ® .^* a o �, CONIC DRIVE o �� CONIC SWK - R_nA 8.54 „ CONC DRIVE a ,� CONIC SM 844 821 8H36 ASPHALT 8+41 EP 8.03 1.5' CONC CURB' GRASS ISLAND LEGEND R/W = RIGHT OF WAY INFO = INFORMATION ELEV = ELEVATION ELEC = ELECTRIC INV = INVERT SQ = SQUARE PVC = POLYVINYL CHLORIDE PIPE BFP = BACK FLOW PREVENTER RCP = REINFORCED CONCRETE PIPE NO. = NUMBER C.B. = CATCH BASIN I.P. = IRON PIPE C.I. = CURB INLET ID = IDENTIFICATION M.H.. = MANHOLE TC = TOP OF CURB A/C = AIR CONDITIONER __. CP = CONCRETE PAVEMENT W/ =WITH FL = FLOWLINE PROFESSIONAL SURVEYORS & MAPPERS LB NO. 3731 EP = EDGE OF PAVEMENT 8,01) BACK OF CURB CONIC = CONCRETE 7.72 } = FLOW LINE CLF' = CHAIN LINK FENCE 7.82) EDGE OF PAVEMENT WBF = WOOD BOARD FENCE FFE = FINISHED FLOOR ELEVA77ON (TYPICAL, UNLES NOTED BLDG = BUILDING OTHERWISE) FNC = FENCE DIA DIAMETER BGV = BELOW GROUND VAULT --x-x-x- = FENCE SIZE,TYPE AS NOTED ( ) FOC = FIBER OPTIC CABLE qHu = OVERHEAD UTILITY LINES Ss = SANITARY SEWER CAD FILE: 2014-318 TOPO.dwg CHECKED BY:(��, A-vNj ASPHALT �7 = MAILBOX m = PROPANE TANK t = LIGHT POLE ® = GUARD POST QD = STORM DRAINAGE MANHOLE SQ = SANITARY SEWER MANHOLE ® = CLEANOUT 119 = SANITARY SEWER VALVE ® = WATER VALVE <3 = WATER METER El = TELEPHONE WIRING BOX -a- = INFORMATION SIGN POST cla.) = U1ILITY POLE = FIRE HYDRANT O = NUMBER OF REGULAR PARKING SPACES = HANDICAPPED PARKING SPACE DATE: 08-10-2014 8.20 8.73 8.09 ATLANUC BOMVAM (105' R/W) ASPHALT REVISION DATE DRAFTER WORK QRDER N0. REASON FOR REVISION THIS MAP OR SURVEY MEETS THE MINIMUM TECHNICAL STANDARDS SET FORTH BY THE FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES, IN CHAPTER 5J-17, FLORIDA ADMINISTRATIVE CODE, PURSUANT TO SECTION 472.027, FLORIDA STATUTES, UNLESS OTHERNASE SHOWN AND STATED HEREON. THIS DRAWING 5(E7C3°__,� x`�.,..aT' OR MAP IS NOT VAUDUNLESS IT RAISED SEA OW A FLORIDAXUCRN " SDS SURVEYOR E�I��_ cia]rY Q� q &Assoc�i tes AND MAPPERtAPTER�-17-FLORID ADMINISTRATIVE CGDE). %� PROFESSIONAL SURVEYORS & MAPPERS LB NO. 3731 3830 CROWN POINT ROAD �j� JACKSONVILLE, FLORIDA 32257 (904) 260-2703 -- +-•� WWW.CLARYASSOC.COM GREGOR"i ��Cl Y, P.S.M. CE� O. 3377 BILE No.SS-3061 1. GENERAL NOTES: Topographic boundary su y eluding property lines, legal description, existing utilities, site 18. Contractor to coordinate all work with other utility installations not covered in these plans (Electric, topography with spot elev to outstanding physical features and existing structure locations Telephone, Gas, Cable, etc.) and allow for their operations and construction to be performed. was provided by CLARY A OCIATES. 19. Cut and fill slopes shall not exceed 4H:1V unless otherwise noted. 2. Prosser, Inc., Planners and 'f neers and its associates will not be held responsible for 20. Contractor shall repair or replace in-kind any damage that occurs as result of his work. the accuracy of survey or esign errors or omissions resulting from survey inaccuracies. 21. All soils test reports shall be submitted to the Engineer for review and approval. 3. All phases of site work fp project shall meet or exceed the City of Atlantic Beach site 22. For all trench excavations which exceed five feet (utilities and storm), the following shall be adhered work specifications. to: a. Contractor shall follow OSHA Standard 29 CFR, section 1926.650 subpart P, which is now a part of 4. The contractor shall be h d lely responsible for and shall take all precautions necessary Laws of Florida Chapter 90-96. to avoid property damago jacent properties during the construction phases of this b. The Contractor shall provide written assurance of compliance with this law. project. c. A separate price item shall be included in their base bid identifying the cost of compliance 5• Warranty /Disclaimer: Th gns represented in these plans are in accordance with d. A trench safety system shall be designed by the Contractor. established practices of it ineerin for the design functions. Neither the Engineer nor 9 9 9 g 23. All areas show n to be filled shall be cleared and grubbed in accordance with City Standards and shall its personnel can or do r � these designs or plans as constructed except in the specific be filled with clean structural fill compacted and tested in accordance with the geotechnical report. cases where the Engineern 9 is and controls the physical construction on a contemporary PY P ry 24• basis at the site. All debris resulting from all activities shall be disposed of off-site by the Contractor. 6• For boundary, roadway an ding geometry information see engineering site plan. It shall 25. All existing trees to remain shall be protected and preserved. be the Contractor's respon i to verify that the building dimensions shown on the engineering plan agrees w th a dimensions shown on the architectural plan. If any 26. The Contractor shall coordinate connection of proposod piping with all existing piping. dimensions do not agree, 'th rchitect, engineer and owner shall be notified and the 27. dimensions adjusted prior to mmencing with construction. All drainage structures shall be constructed to conform to 9 Ci requirements and shall be constructed to City q 7. The contractor shall notify al tility companies prior to construction for verification and conform to curbing and low points as shown on plans. location of all utilities. 28. Contractor shall ensure that all new and existing drainage structures, pipes, etc. are clean and 8. Contractor shall furnish s p rawings to Engineer indicating materials and manner of functioning properly at time of acceptance. installation for all compo n construction. f the project prior to purchase of materials and 29. Burning of trees, brush and other material shall not be permitted on property. 9. These engineering drawing required to complete con u not show all of the City of Atlantic Beach standard details n of this project. It shall be the contractor's responsibility 30. All inverts in drainage structures to be precast or brick wilh layer of mortar between each layer of that the construction, out a ity of Atlantic Beach right of way be in accordance with all brick, or reddi-mix concrete with X57 stone. current City of Atlantic B� c tandard Details and Specifications. 31. The Contractor shall restore all culverts, headwalls and storm drain inlets removed or disturbed b the y 10. The contractor shall furni ified "as-builts" ,see As Requirements on this sheet. construction operation. The cost of these items shall be included in the price bid for furnishing and installing any new item causing such damage. 11. Contractor shall verify and, p act all existing trees and natural vegetation that are to 32. Should the surface or subsurface conditions differ from what is shown on these plans, the remain undisturbed. The r indicated for construction shall be cleared and grubbed to contractor shall immediately contact the engineer. remove all roots and mist II from damage during cong u ous vegetation except specific trees that shall be protected n with the use of tree barriers. 33. Corrugated Polyethylene Pipe (CPP), shall be per AASHTO M252 or 294 with smooth inner lining Type S with bell and spigot, silt -tight, rubber-gasketed joints. 12. All work shall be perform a safe manner. All safety rules and guidelines of OSHA 34. Inlet grate sizes shown on plans. All concrete boxes and yard drain structures shall be shall be followed. The C t or shall be solely responsible for any injuries of his sized by contractor. employees, and any dama a private property or persons during the course of this project. All costs associated with co yang with OSHA regulations and the Florida Trench Safety Act shall be included in the Con ctors bid. 13. All improvements shown shall a warranted by the Contractor to the Owner for a period of one year from date of ac a nce by the Owner. If the work is in the City Right -Of -Way or easement, the Contract r' ne year warranty shall extend to the City of Atlantic Beach. 14. The Contractor shall contra ct testing and soil testing in a ith an independent testing laboratory to perform materials rdance with the City requirement and the recommendations 1. WATER NOTES: The contractor shall obtain all permits required to complete the construction. outlined in the geotechnic I ort. This shall include density testing in all pavement areas and in the utility trenches,loi ed in pavement areas, concrete testing and all other 2. Contractor shall coordinate the construction of water facilities with all other construction. materials testing. 15. The Contractor shall beresp required for the project. for obtaining all necessary permits and insurance 3. .rials. Contractor shall furnish shop drawings to the engineer for approval prior to beginning construction and purchasing materials. 16. The Contractor shall provi a less than 6 inch clearance between all utilities other than water mains, which sholl a City Health Department permit conditions. 17. These plans do not stand j b hemselves. Bid documents, COAB water and sewer standards 4. All workmanship and materials shall conform to latest COMB Standards and details & materials, City of ntic Beach standard specifications & details and any other Specifications and applicable AWWA Standards. standards, listed or refere cl are included in the project documents. 5. The existing utility facilities and locations shown on the drawings are taken from readily available is. The contractor shall notify' ff City of Atlantic Beach O 247-5814 a minimum of 24 hours information. The actual locations of the utility facilities may and there may be utility facilities existing that are not shown vary somewhat from the locations shown or indicated on the drawings. The prior to starting construction contractor shall contact all agencies with utility facilities in the vicinity of the work and shall locate 19• All work in the right-of-vya j equires Maintenance of Traffic (MOT) per FDOT index 603. all underground facilities before beginning work. The contractor shall protect all utility facilities and Contractor shall not work lin I ie ROW from 7:00am to 9:00am and from 4:00pm to 7:00pm. repair any damages resulting from their work. in conformance if with the contract documents and Work in the ROW shall onjIy I cur during daylight hours. specifications and relocate required at no cost to the otwner. 6• Water lines shall have a minimum of 36" cover from finished grade. Maximum cover 1. Contractor shall verify axis in j levations at connection points prior to construction and shall be 60". notify Engineer of any dis re cies. 2. See geotechnical report for preparation requirements. - AMEC Environment and 7. Water lines are designed to finished grade and shall be protected until finish work is Infrastructure, INC. dated Oct r 14, 2014 complete. 3. The contractor shall cool the grading and drainage construction with all other 8. All water mains 3" and larger shall be AWWA C900, DR25 PVC. Water mains 2" and construction. smaller shall be polyethylene pipe with couplings may be used and with NSF -PW approval. 4. The Contractor shall submit E p drawings to the Engineer and the city, if required, on all materials, for review and apr val, prior to purchase or fabrication of any utility pipe or 9. Restrained joints are required where water mains are terminated and at all bends, in structure. accordance with COAB standard details and specifications. 5. All construction and material 'th hall conform with all City of Atlantic Beach standards. 10. All gate valves 2" and larger shall be non -rising stem tyFie and shall be suitable for 6• The contractor shall stake 'c form sewer system and the sanitary sewer system and shall 200 psi non -shock working pressure. Gate valves shall be mechanical joint, iron body, notify the Engineer of any licts prior to installation of any pipe. resilient seat, 2" square operating nut, Mueller or equal. Vlalve boxes with screw extensions 7. The existing utility facilitie a locations shown on the drawings are taken from readily shall be provided for each buried gate valve. Boxes shall �be of cast iron construction, available information. T ual locations of the utility facilities may vary somewhat 3/8" minimum wall thickness and shall be non -tacky for enamel coated. The word from the locations shownjl in indicated on the drawing here may be utility facilities existing that are not shown or contractor shall contact all agencies with utility facilities in "water" shall be cast in cover. All gate valves installed shall when viewed from the stem. open by turning to the left (counterclockwise) the vicinity of the worka all locate all underground facilities before beginning work. The contractor shall protutility facilities and repair any damages resulting from their 12. Class B, Type I bedding shall be used for this project unless indicated otherwise on the work in conformance with thi ontract documents and specifications and relocate if drawings or directed by the engineer. required at no cost to the oi er. 13. Unsuitable materials under water pipe shall be removed and replaced with selected 8• All underground utilities shall ie Installed prior to preparation of subgrade for pavement. backfill properly compacted. The material shall exhibit moisture contents within +/- 2 percent of the modified proctor optimum moisture content (ASTM D1557) during 9. Pavement subgrade shall hav, all unsuitable material removed to a depth of 3.0 feet below the compaction operations. Compaction shall continue until densities of at least subgrade and 2.5 feet beyon back of curb. Backfill with suitable material per the 95 percent of the modified proctor maximum dry density (ASTM D 1557) have been geotechnical report. achieved. 10. Any unsuitable material enco tered shall be removed from the site. The contractor shall 14. Backfilling shall be made with clean backfill which shall be thoroughly compacted in be responsible for the remov of all unsuitable material and replacement with structural 6" lifts. Compaction shall be a minimum of 95% of max. density at +/- 2.0% of the fill. Excess suitable fill mate I shall be moved to Owner specified location. See modified proctor geotechnical report. 15. Where water mains are laid under ditches, culverts, pipelines, or obstructions without fittings, 11. The contractor shall be resp ible for all subgrade, limerock and asphalt testing as the maximum deflection of any joint shall not exceed 50% of the maximum recommended by required by the project speci ations. the pipe manufacturer. 12. One row of sod shall be ins led along all edges of pavement. All disturbed areas shall 16• No connection to existing potable water system will be allowed until all proposed water receive sod. **See lands a plans for other requirements. lines have been flushed, pressure tested, disinfected, and cleared for service by the Florida Department of Environmental Protection. 13. Stormwater Collection Syst m esign is based on the 5 -year return frequency storm 17. Contractor shall notify utility company a minimum of _two days prior to connection of water (Rational Method). mains to existing lines. All new work must be inspected by the engineer. No tests shall be scheduled for weekends. Any change from the technical requirements must be reviewed and approved by the engineer and owner. 14. All RCP pipe shall meet t e uirements of ASTM C-76 and shall be Class III, Wall B. 15. All labeled pipe lengths a e proximate and measured to the center of structure or 18. Hydrostatic and leakage testing of the water mains installe�t shall be performed in mitered end section. Actual ngths may vary and no added compensation will be made accordance with AWWA standard specifications. A representative of the utility company for variations or the engineer must be present during the tests. Pressure tests shall be conducted at 16. The contractor shall provide qualified soils laboratory representative on site during 150 psi for 2 hours for water mains and 200 psi for 2 Mears test after limerock is installed. for fire mains. Pressure excavating to determine the tability of the existing sub -grade and existing on-site material prior to beginning filling operation. 17. Contractor shall take all dval 61e precautions to control dust. Contractor shall control dust by sprinkling, or by other r I,hods as directed by Engineer at no additional cost to the owner. WATER NOTES (CONT'D): 19. The contractor shall coordinate all water main flushing with COAB Utility Department. Flushing and disinfection procedures shall comply with AWWA C-651 for main disinfection. 20. Upon completion of water main flushing, bacteriological samples shall be taken. Samples shall be taken for 2 consecutive days. 21. Sample points for bacteriological sampling shall be located as follows: 1. Every 1000 feet and/or every dead end on a water main. 2. Point of tie-in to existing water system. 3. Water main stubs more than 40 feet in length. 22. Fire hydrants shall meet COAB standards. 23. New or relocated, underground water mains included in this project shall be laid to provide a horizontal distance of at least three feet between the outside of the water main and the outside of any existing or proposed vacuum -type sanitary sewer, storm sewer, stormwater force main, or pipeline conveying reclaimed water regulated under Part III of Chapter 62-610, F.A.C.; a horizontal distance of at least six feet between the outside of the water main and the outside of any existing or proposed gravity -type sanitary sewer (or a horizontal distance of at least three feet between the outside of the water main and the outside of any existing or proposed gravity -type sanitary sewer if the bottom of the water main will be laid at least six inches above the top of the sewer); a horizontal distance of at least six feet between the outside of the water main and the outside of any existing or proposed pressure-type sanitary sewer, wastewater force main, or pipeline conveying reclaimed water not regulated under Part III of Chapter 62-610, F.A.C.; and a horizontal distance of at least ten feet between the outside of the water main and all parts of any existing or proposed "on-site sewage treatment and disposal system." [FAC 62-555.314(1); exceptions allowed under FAC 62-555.314(5)] 24• New or relocated, underground water mains that are included in this project and that will cross any existing or proposed gravity- or vacuum -type sanitary sewer or storm sewer shall be laid so the outside of the water main is at least six inches above the other pipeline or at least 12 inches below the other pipeline; and new or relocated, underground water mains that are included in this project and that will cross any existing or proposed pressure-type sanitary sewer, wastewater or stormwater force main, or pipeline conveying reclaimed water shall be laid so the outside of the water main is at least 12 inches above or below the other pipeline. [FAC 62-555.314(2); exceptions allowed under FAC 62-555.314(5)] 25• At the utility crossings described in Part II.C.i.w, above, one full length of water pipe shall be centered above or below the other pipelines so the water main joints will be as for as possible from the other pipeline or the pipes will be arranged so that all water main joints are at least three feet from all joints in vacuum -type sanitary sewers, storm sewers, stormwater force mains, or pipelines conveying reclaimed water regulated under Part III of Chapter 62-610, F.A.C., and at least six feet from all joints in gravity- or pressure-type sanitary sewers, wastewater force mains, or pipelines conveying reclaimed water not regulated under Part III of Chapter 62-610, F.A.C. [FAC 62-555.314(2); exceptions allowed under FAC 62-555.314(5)] 26• When a water main crosses a storm drainage line, a minimum of 18" vertical separation shall be required. 27. All water and sewer construction shall be accomplished by an underground utility contractor licensed under the provisions of Chapter 489 Florida Statutes. 28. All water mains shall terminate approximately 5 feet outside the building unless otherwise noted. The end of these service lines shall be tightly plugged or capped and marked until such time as connection is made inside the building. 29. The contractor shall make application to utility company for the project water meter and shall pay for all meter fees. 30. The contractor shall be responsible to provide mitigating construction measures in all cases where a minimum of 18 inches of vertical clearance between water and sewer (including storm) lines is not possible. 31. The contractor shall be responsible for providing water for construction use during entire course of project if necessary. 32. Pressure pipe and fittings requiring restraint shall be braced with restrained joints per COAG Standards. 33. if dewatering capacity requires a consumptive use permit it shall be the Contractor's responsibility to obtain the permit through the St. Johns River Water Management District. 34. If solvent contamination is found in the pipe trench, work shall be stopped and the proper authorities notified. With approval of the permitting agency, ductile iron pipe, fittings, and solvent resistant gasket material such as fluorocarbon shall be used in the contaminated area. The ductile iron pipe shall extend at least 100 feet beyond any solvent noted. Any contaminated soil that is excavated shall be placed on an impermeable mat and covered with a waterproof covering. The proper authorities shall be notified and the contaminated soil held for proper disposal. 35. All backflow preventers shall be in accordance with COAB cross connection program. Backflow preventers must be tested after installation by a certified tester and annually thereafter. COAB contact: Bill Pound O 665-5787. Backflow preventers on fire lines or backflow preventers on fire lines or combinations fire/potable mains shall have freeze protection. SANITARY SEWER NOTES: 1. The contractor shall obtain all permits required to complete the construction. 2. Contractor shall coordinate the construction of sewer facilities with all other construction. 3. Contractor shall furnish shop drawings to the Engineer for approval before ordering materials and beginning construction. 4. All gravity sewer construction shall conform to the latest COAB standards and specifications. 5. The existing utility facilities and locations shown on the drawings are taken from readily available information. The actual locations of the utility facilities may vary somewhat from the locations shown and there may be utility facilities existing that are not shown or indicated on the drawings. The contractor shall contact all agencies with utility facilities in the vicinity of the work and shall locate all underground facilities before beginning work. The contractor shall protect all utility facilities and repair any damages resulting from their work in conformance with the contract documents and specifications and relocate if required at no cost to the owner. 6. The contractor shall stake the sanitary sewer system and the storm sewer system and shall notify the Engineer of any conflicts prior to installation of any pipe. 7. Manholes shall be in conformance with COAB Standards. 8. Type B bedding shall be used for this project unless indicated otherwise on the drawings. 9. Backfilling shall be made with clean backfill which shall be thoroughly compacted in 6" lifts. Compaction shall be a minimum of 95% max density at +/- 2% of the modified proctor optimum moisture content. 10. Unsuitable materials under sewer pipe shall be removed to a depth of 18" below the bottom of pipe and replaced with selected backfill properly compacted in 6" lifts. The material shall exhibit moisture contents within +/- 2 percent of the modified proctor optimum moisture content (ASTM D1557) during the compaction operations. Compaction shall continue until densities of at least 95 percent of the modified proctor maximum dry density (ASTM D1557) have been achieved. 11. All sewer construction shall be accomplished by an underground utility contractor licensed under Chapter 489 F.S. 12. All pipe lengths are horizontal distances and are approximate. 13. All sanitary sewer laterals shall terminate approximately 5 feet outside the building at a minimum depth of 3' below grade unless otherwise noted. The end of these service lines shall be tightly plugged or capped and marked until such time as connection is made inside the building. 14• The Contractor shall perform a television inspection of the sewer system. Two full reports, including video tape, shall indicate conditions of the pipe, location, type of pipe, diameter, location of services, type of joint, distance between manholes and any irregularities in the pipeline. The television inspection shall include a deflection test with a 5% mandrel. The sewer lines shall be lamped as part of the final inspection. 15. The Contractor shall coordinate the location, size and invert elevations of sanitary sewer services with the approved plumbing plans for the building. 16. Contractor shall provide to the Engineer, a schedule of invert elevations of all sanitary manholes prior to the placement of the limerock base course. This schedule shall be provided by the registered land surveyor submitting the "as -built" drawings for this project. 17. All sewer mains shall be PVC (ASTM -3034) SDR -35 for depths to 12 feet, SDR -26 for depths 12 feet or deeper, or in easements unless otherwise noted. 18. Gravity sanitary sewer shall be low pressure air tested for leakage. Maximum allowable leakage rate is 50 gpd per inch of diameter per mile. ASTM C-828-86 or C-924. 19. All gravity sewers installed under this project shall be tested for leakage by the contractor to demonstrate that: 1) the leakage exfiltration or infiltration does not exceed 200 gallons per inch of pipe diameter per mile per day for any section of the system; 2) Exfiltration or infiltration tests shall be performed with a minimum positive head of 2 feet; and 3) Air test, as a minimum, conform to the test procedure described in ASTM C-828 for clay pipe, ASTM F-1417 for plastic pipe, and for other materials appropriate test procedure described in ASTM C-828 for clay pipe, ASTM F-1417 for plastic pipe, and for other materials appropriate text procedures are used per RSWF 33.93 33.94 and 33.95. AS -BUILT REQUIREMENTS Contractor shall provide complete as -built information to the Engineer in accordance with the following requirements: 1. As -built drawings shall be prepared in AutoCAD format by a registered land surveyor. One set of signed and sealed prints and a set of computer disks containing project AutoCAD files and PDF's of the prints shall be submitted to the Engineer for review and approval. Additional signed and sealed prints shall be provided to the Engineer as requested. 2. As -built drawings shall be in accordance with all authorities having jurisdiction. Contractor shall coordinate as -built submittals and approvals with jurisdictional agencies unless otherwise directed by the Engineer. 3. Provide building locations, finish floor elevations, pavement grades and all underground facilities. 4• Provide perimeter dimensions at top of bank and at bottom of pond. 5. Provide elevations at top of bank and bottom of pond. 6. Provide special detail drawings where installations were not as shown on contract drawings due to field conditions or where required for clarity. 7. Provide location, elevation and description of benchmark(s). 8. Locate and provide elevations of all structures. Location of all structures shall be from two (2) directions and include northing/easting coordinates at center of structure. 9. Locate all pipes and provide size, elevation, invert elevations, length and type. 10. Provide dimensions and elevations of the pond outfall structure(s). 11. Water as-builts shall indicate the location of bacteriological sample points. 12. The as-builts shall include a detail of every crossing of the new water main with gravity sewers, force mains and storm pipes clearly shown & indicating the vertical clearances of each crossing. Details shall be furnished for parallel runs where the horizontal separation is less than 10 feet. 13. The centering of uncut lengths of pipe of points of crossing shall be documented on the as-builts and all mitigating construction measures clearly depicted in cases where a minimum of 18" of vertical clearance between the water and sewer (including storm) lines is not possible. ; ■,i PROSSEIN TM Community - Management - Energy - Relationships 13901 Sutton Park Drive South, Suite 200 Jacksonville, Florida 32224-0229 Office 904.739.3655 Fax 904.730.3413 www.prosserinc.com Florida Certificate of Authorization Number: 00004050 AUTOMOBILE SERVIC, STATION • MINOR AUTOMOTIVE ` • ra VICE DATE : JULY. 2015 pROJECT N0.: 114001.01 DEQ BY : J B D DRAWN By: DPT $CALE : AS NOTED NQ Date Revie l •1,71a .� r •. GENERAL NOTES t``tptttttt t t t t t t t 4 t t,rggryr C1.0 e 0.62578 : �J�