Loading...
Resolution No. 22-13RESOLUTION NO. 22-13 A RESOLUTION OF THE CITY OF ATLANTIC BEACH, FLORIDA, APPROVING ENGINEERING SERVICES TO UPGRADE THE WASTEWATER TREATMENT FACILITY HEADWORKS HYDRAULICS AND PIPING, AUTHORIZING THE CITY MANAGER TO EXECUTE CONTRACTS AND PURCHASE ORDERS IN ACCORDANCE WITH AND AS NECESSARY TO EFFECTUATE THE PROVISIONS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, on January 13, 2022, staff received a proposal from Jones Edmunds Engineering, in the amount of $63,599.00 to provide professional engineering services for the relocation of the RAS piping and replacement of the headworks screen manifold discharge pipe; and WHEREAS, the wastewater treatment plant piping system between the static screens and the headworks of the plant has a history of becoming hydraulically overloaded during wet, high-flow conditions; and WHEREAS, the wastewater has backed up in the piping and into the collection pans beneath the screens causing them to overflow; and WHEREAS, Jones Edmunds Engineering visited the wastewater treatment facility and agreed that relocating the RAS flow connection point was the preferred alternative and should be implemented; and WHEREAS, the tasks included in the proposal include permitting, design, bidding assistance and performance of construction administration; and Jones Edmunds will include a temporary bypass plan and maintenance of plant operation in the design. WHEREAS, the City has a Professional Engineering Services Agreement with Jones Edmunds Engineering, and this scope of work would be Task Authorization No. III under said agreement; and WHEREAS, funds for this design are budgeted in the infrastructure account 410-5508-535- 6300 under project number AR2208; and NOW THEREFORE, be it resolved by the City Commission of the City of Atlantic Beach as follows: SECTION 1. The City Commission hereby authorizes the City Manager to execute Task Authorization No. III, with Jones Edmunds Engineering, in the amount of $63,599.00 for Engineering Services related to Wastewater Treatment Facility Headworks Hydraulics and Piping as described in Jones Edmunds Engineering proposal dated January 13, 2022, and; SECTION 2. The City Commission hereby authorizes the City Manager to approve a Purchase Order to Jones Edmunds Engineering, in the amount of $63,599.00 for said Task Authorization No. III. SECTION 3. This Resolution shall take effect immediately upon its passage and adoption. Resolution No. 22-13 Page 1 of 2 PASSED AND ADOPTED by the City of Atlantic Beach, this 14th day of February, 2022. Ellen Glasser, Mayor Attest: Ao'h'� �p Vzoltz— Donna L. Bartle, City Clerk Approved as to form and correctness: B enna en, City Attorney Resolution No. 22-13 Page 2 of 2