741 SHERRY DR ROW22-0012 COAB Permit Form with ConditionsOWNER:ADDRESS:CITY:STATE:ZIP:
BLOODWORTH CHARLES H
III 741 SHERRY DR ATLANTIC BEACH FL 32233
COMPANY:ADDRESS:CITY:STATE:ZIP:
JEA 21 WEST CHURCH ST JACKSONVILLE FL 32202
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
169947 0000 SHERRY TERRACE R/P
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
741 SHERRY DR RIGHT OF WAY SINGLE OR TWO
FAMILY RIGHT OF WAY
RIGHT OF WAY for JEA
OVERHEAD 25KVA $0.00
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
1 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL
Notes:
Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container
cannot be placed on City right-of-way.
2 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL
Notes:
Full right-of-way restoration, including sod, is required.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF
COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 2Issued Date: 4/14/2022
PERMIT NUMBER
ROW22-0012
ISSUED: 4/14/2022
EXPIRES: 7/13/2022
RIGHT OF WAY PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
TOTAL:
3 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL
Notes:
Any damage done to infrastructure must be repaired by Contractor.
4 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL
Notes:
Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is
needed, call 247-5878. Any digging requires calling 811 to have ALL public utilities located.
2 of 2Issued Date: 4/14/2022
PERMIT NUMBER
ROW22-0012
ISSUED: 4/14/2022
EXPIRES: 7/13/2022
RIGHT OF WAY PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
ØØØØ
Ø
ØØDDDD626262626262;<62;<62#*
#*
#*
#*
#*
#*
#*
"
®
®"$T$T
$T$T$TT1 /0T
1 /0 T
1/0T
2 /0P1/0T1/0T
1 /0T
2/0P
1/0T
1/0T
1/0T50B50C
729
25C
15B801 38125C723
6 9 9
65T
8TH ST
SHERRY DR
7 T H ST
__________________
ORACLE
PROJECT #:52040 ________________________PERMIT
N.O.:8007216 __________________
MAXIMO
WO #:30806011 _______________
DATE REL
CONST:03/31/22
____________________________________________________SUB-STA:NEPTUNE BEACH __________
CIR.
N.O.:563
____________________________________________________ENGINEER:Robert Simpson _______________
CELL
N.O.:N/A
__________
PHONE
N.O.:665-7793____________________________________________________
CUSTOMER/
LOCATION:723 SHERRY DR../ SET 25KVA 563 __________________SVC
CENTER:SSSC
__________
TREE TRIMMING
REQ'D:YES
__________________ZIP CODE:N/A
ENGINEERING DESIGN
P# 723 SHERRY DR./ SET 25KVA.
***** FOR NEW HOME BUILD *****
***** TREE TRIMMING REQUIRED *****
P# 723
ROW22-0012
By Dan Arlington at 5:47 pm, Apr 12, 2022
REVIEWED FOR CODE COMPLIANCE
ROW22-0012
ROW22-0012
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version:By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
Cost Estimate
Materials JEA Contractor
1. New Material Cost (w/ sales tax)$547.19 $547.19
2. Transformer Cost (w/ sales tax)$1,340.18 $1,340.18
3. Returned Material Salvage Value $0.00 $0.00
Labor
4. Crew Time $546.56 $2,325.59
5. Extraordinary Costs $0.00 $0.00
JEA Overhead
6. Fringe Benefits (45.01% of lines 4 & 7)$314.77 $140.89
7. Engineering Costs (Variable % of line 4)$152.76 $313.02
8. Project Equipment Costs (40% of total equipment costs)$338.29 $0.00
9. Material Handling (7.18% of lines 1 & 2)$135.51 $135.51
10. Inspection (6.84% of line 4)$0.00 $159.07
11. Total Cost of Project $3,375.25 $4,961.45
12. Work Order Estimate (Line 11 minus line 8, 9, & 10)$2,901.45 $4,825.94
13. Billable Equipment Depreciation (60% of total equipment costs)$507.43 $0.00
14. Billing Estimate (Including Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7))$4,334.86 $5,163.85
15. Billing Estimate (W/O Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7) - Line 2)$2,994.69 $3,823.68
_________________________________________________________________________________________
Time Estimate
Crew Hours Total Manhours3.45 13.81
-----------------------------------------------------------------------------------------------------------------------------------
ROW22-0012
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version: By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
CU Detail
StationStation:01 723 SHERRY DR. ADD OH 25KVA
Build Transfer Remain in Place Remove
DGAC*25 1
DHLC*2 1
G1W*2 1
RUBUP 4
S20ES*2/0-1/0 1
SEVF 1
RUBDOWN 4
_____________________________________________________________________________________________________________________________
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version: By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
Conductor, Conduit and Pipe Detail
Quantities
From Station To Station CU Build Transfer Remain Remove
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version: By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
Material Summary
Item Quantity Item Number Item Description
1 ARRLI003 ARRESTER, LIGHTNING, 18 KV, DISTRIBUTION CLASS AND RISER
POLE (MOV) WITHOUT MOUNTING BRACKET, 15.2/26.4Y NOMINAL
VOLTAGE
1 BKTAC009 BRACKET, ARRESTER AND CUTOUT, FIBERGLASS WITH RAYCHEM
MATERIAL OVER ROD TYPE: SINGLE PHASE
2 BOLMS020 BOLT, MACHINE, 5/8" X 14", SQUARE HEAD GALVANIZED STEEL,
W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX
QUANTITIES OF 50 EACH)
2 BOLMS035 BOLT, MACHINE, 3/4" X 12", SQUARE HEAD GALVANIZED STEEL,
W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX
QUANTITIES OF 25 EACH)
1 CLAGR001 CLAMP, GROUND ROD, 5/8" - 4SOL "HAMMERLOCK"
1 CLAHL001 CLAMP, HOT LINE, 6-1/0-MAIN, 6-1/0-TAP
1 CLASR003 CLAMP, STRAIN RELIEF WEDGE MESSENGER, SIZE: #6 - 2/0
1 CLATG001 CLAMP, TRANSFORMER TANK GROUND, "BRONZE" 6 SOL - 1 STR.
2 CNNCP002 CONNECTOR, #2, 6-2 MAIN, 2-1/0 TAP, ALUMINUM COMPRESSION,
PARALLEL TAP,
2 CNNCP004 CONNECTOR, #4, 1/0-2/0 MAIN, 1/0-3/0 TAP COMPRESSION,
PARALLEL TAP, ALUMINUM,
1 CNNCP005 CONNECTOR, #3, 6-2 MAIN, 2/0-3/0 TAP, COMPRESSION, PARALLEL
TAP, ALUMINUM,
2 CNNGR002 COUPLING, GROUND ROD, "THREADLESS" REMARKS: FOR
THREADLESS GROUND RODS
3 CNNTS009 CONNECTOR, CONTAMINATED ENVIRONMENT, TRANSFORMER
SECONDARY SET SCREW TYPE WITH INHIBITOR, 1/2" STUD, RANGE:
12-350, 6-PORTS.
3 CNNVG003 CONNECTOR, 6-2 SOL/10-2 SOL, VISE GRIP PARALLEL, BRONZE
23 COBCO028 CONDUCTOR, #4 SOLID, SOFT DRAWN, BARE COPPER, 200', 25#, ON
PLASTIC REEL, 4" X 11.5" W/ 2" HOLE
70 COBCW014 CONDUCTOR, #4, TYPE 40 DSA, COPPERWELD & COPPERWELD-
COPPER .204" DIAMETER 1480# BREAKING STRENGTH ( 50# COIL -
427' )
4 COVIC002 COVER, "D" DIE, INSULATING, 2-1/2"
1 CUTOT006 CUTOUT, CONTAMINATED ENVIRONMENT, 26" LEAKAGE DISTANCE
TO GROUND, 100A, 27 KV, 170 KV BIL (54 EA PER PALLET)
1 FUSOH022 FUSE, OVERHEAD DISTRIBUTION, 1.6 AMP, TRANSFORMER
1 GUAGW001 GUARD, GROUND WIRE, 1/2" X 1/2" X 96", GRAY PLASTIC
2 NUTSL003 NUT, LOCK, SQUARE, 5/8" HOLE SIZE, HOT DIPPED GALVANIZED
2 NUTSL004 NUT, LOCK, SQUARE, 3/4" BOLT SIZE, HOT DIPPED GALVANIZED
3 RODGR003 ROD, GROUND, THREADLESS, 5/8" X 8', SHIP ON OPEN FLATBED
ONLY!
1 STICO001 STIRRUP, COMPRESSION, 2-1/0, ALUMINUM BODIES, COPPER BAIL,
BAIL SIZE- 2-SOL
1 TRACO001 TRANSFORMER, 25 KVA, 14760/25565Y VOLT PRIMARY, 120/240 VOLT
SECONDARY, SINGLE PHASE, CONTAMINATED ENVIRONMENT
2 WASRD004 WASHER, ROUND, 5/8" BOLT SIZE X 1 3/4" DIAMETER, GALVANIZED, (
650 EA P/BOX)
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version: By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
4 WASRD005 WASHER, ROUND, 3/4" BOLT SIZE X 2" DIAMETER, GALVANIZED, ***
500 EACH PER BOX ***
2 WASSF003 WASHER, SQUARE FLAT, 3" SQ X 1/4", 5/8" X 3/4" BOLT SIZE,
GALVANIZED, MUST BE SHIPPED IN BOXES OF 100.
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version: By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
CU Summary
BUILD
CU Name Quantity Description
DGAC*25 1 TRANS; CI, 26.4KV 120/240 25KVA
DHLC*2 1 #2 AL. HOT-LINE CLAMP
G1W*2 1 WOOD POLE - EQUIPMENT GROUND
RUBUP 4 LINE RUBBER INSTALLATION, PER SECT.
S20ES*2/0-1/0 1 S20ES*2/0-1/0
SEVF 1 SEVERE CONDITION FOR FRAMING CREW
REMOVE
CU Name Quantity Description
RUBDOWN 4 LINE RUBBER REMOVAL, PER SECT.
CUE Reports
Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22
Estimate Version: By: SIMPRB
MWO#/Task: 30806011 Required Date:
Oracle Project #: 8007216 Estimated On: 03/30/2022
_________________________________________________________________________________________
CU's with Zero for Contractor
CU Name Workfunction Quantity
RUBDOWN REMOVE 4
ØØØØ
Ø
ØØDDDD626262626262;<62;<62#*
#*
#*
#*
#*
#*
#*
"
®
®"$T$T
$T$T$TT1 /0T
1 /0 T
1/0T
2 /0P1/0T1/0T
1 /0T
2/0P
1/0T
1/0T
1/0T50B50C
729
25C
15B801 38125C723
6 9 9
65T
8TH ST
SHERRY DR
7 T H ST
__________________
ORACLE
PROJECT #:52040 ________________________PERMIT
N.O.:8007216 __________________
MAXIMO
WO #:30806011 _______________
DATE REL
CONST:03/31/22
____________________________________________________SUB-STA:NEPTUNE BEACH __________
CIR.
N.O.:563
____________________________________________________ENGINEER:Robert Simpson _______________
CELL
N.O.:N/A
__________
PHONE
N.O.:665-7793____________________________________________________
CUSTOMER/
LOCATION:723 SHERRY DR../ SET 25KVA 563 __________________SVC
CENTER:SSSC
__________
TREE TRIMMING
REQ'D:YES
__________________ZIP CODE:N/A
ENGINEERING DESIGN
P# 723 SHERRY DR./ SET 25KVA.
***** FOR NEW HOME BUILD *****
***** TREE TRIMMING REQUIRED *****
P# 723
ROW22-0012