741 SHERRY DR ROW22-0012 COAB Permit Form with ConditionsOWNER:ADDRESS:CITY:STATE:ZIP: BLOODWORTH CHARLES H III 741 SHERRY DR ATLANTIC BEACH FL 32233 COMPANY:ADDRESS:CITY:STATE:ZIP: JEA 21 WEST CHURCH ST JACKSONVILLE FL 32202 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169947 0000 SHERRY TERRACE R/P JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 741 SHERRY DR RIGHT OF WAY SINGLE OR TWO FAMILY RIGHT OF WAY RIGHT OF WAY for JEA OVERHEAD 25KVA $0.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC WORKS ROLL OFF CONTAINER INFORMATIONAL Notes: Roll off container company must be on City approved list. Approved list can be obtained at the Building Department at City Hall. Roll off container cannot be placed on City right-of-way. 2 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 4/14/2022 PERMIT NUMBER ROW22-0012 ISSUED: 4/14/2022 EXPIRES: 7/13/2022 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: 3 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 4 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. Any digging requires calling 811 to have ALL public utilities located. 2 of 2Issued Date: 4/14/2022 PERMIT NUMBER ROW22-0012 ISSUED: 4/14/2022 EXPIRES: 7/13/2022 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 ØØØØ Ø ØØDDDD626262626262;<62;<62#* #* #* #* #* #* #* " ® ®"$T$T $T$T$TT1 /0T 1 /0 T 1/0T 2 /0P1/0T1/0T 1 /0T 2/0P 1/0T 1/0T 1/0T50B50C 729 25C 15B801 38125C723 6 9 9 65T 8TH ST SHERRY DR 7 T H ST __________________ ORACLE PROJECT #:52040 ________________________PERMIT N.O.:8007216 __________________ MAXIMO WO #:30806011 _______________ DATE REL CONST:03/31/22 ____________________________________________________SUB-STA:NEPTUNE BEACH __________ CIR. N.O.:563 ____________________________________________________ENGINEER:Robert Simpson _______________ CELL N.O.:N/A __________ PHONE N.O.:665-7793____________________________________________________ CUSTOMER/ LOCATION:723 SHERRY DR../ SET 25KVA 563 __________________SVC CENTER:SSSC __________ TREE TRIMMING REQ'D:YES __________________ZIP CODE:N/A ENGINEERING DESIGN P# 723 SHERRY DR./ SET 25KVA. ***** FOR NEW HOME BUILD ***** ***** TREE TRIMMING REQUIRED ***** P# 723 ROW22-0012 By Dan Arlington at 5:47 pm, Apr 12, 2022 REVIEWED FOR CODE COMPLIANCE ROW22-0012 ROW22-0012 CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version:By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ Cost Estimate Materials JEA Contractor 1. New Material Cost (w/ sales tax)$547.19 $547.19 2. Transformer Cost (w/ sales tax)$1,340.18 $1,340.18 3. Returned Material Salvage Value $0.00 $0.00 Labor 4. Crew Time $546.56 $2,325.59 5. Extraordinary Costs $0.00 $0.00 JEA Overhead 6. Fringe Benefits (45.01% of lines 4 & 7)$314.77 $140.89 7. Engineering Costs (Variable % of line 4)$152.76 $313.02 8. Project Equipment Costs (40% of total equipment costs)$338.29 $0.00 9. Material Handling (7.18% of lines 1 & 2)$135.51 $135.51 10. Inspection (6.84% of line 4)$0.00 $159.07 11. Total Cost of Project $3,375.25 $4,961.45 12. Work Order Estimate (Line 11 minus line 8, 9, & 10)$2,901.45 $4,825.94 13. Billable Equipment Depreciation (60% of total equipment costs)$507.43 $0.00 14. Billing Estimate (Including Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7))$4,334.86 $5,163.85 15. Billing Estimate (W/O Transformer Cost) (Lines 11 + 13 + (64.66% of 4 & 7) - Line 2)$2,994.69 $3,823.68 _________________________________________________________________________________________ Time Estimate Crew Hours Total Manhours3.45 13.81 ----------------------------------------------------------------------------------------------------------------------------------- ROW22-0012 CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version: By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ CU Detail StationStation:01 723 SHERRY DR. ADD OH 25KVA Build Transfer Remain in Place Remove DGAC*25 1 DHLC*2 1 G1W*2 1 RUBUP 4 S20ES*2/0-1/0 1 SEVF 1 RUBDOWN 4 _____________________________________________________________________________________________________________________________ CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version: By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ Conductor, Conduit and Pipe Detail Quantities From Station To Station CU Build Transfer Remain Remove CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version: By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ Material Summary Item Quantity Item Number Item Description 1 ARRLI003 ARRESTER, LIGHTNING, 18 KV, DISTRIBUTION CLASS AND RISER POLE (MOV) WITHOUT MOUNTING BRACKET, 15.2/26.4Y NOMINAL VOLTAGE 1 BKTAC009 BRACKET, ARRESTER AND CUTOUT, FIBERGLASS WITH RAYCHEM MATERIAL OVER ROD TYPE: SINGLE PHASE 2 BOLMS020 BOLT, MACHINE, 5/8" X 14", SQUARE HEAD GALVANIZED STEEL, W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 50 EACH) 2 BOLMS035 BOLT, MACHINE, 3/4" X 12", SQUARE HEAD GALVANIZED STEEL, W/SQUARE NUT ATTACHED, (MUST BE SHIPPED IN STD. BOX QUANTITIES OF 25 EACH) 1 CLAGR001 CLAMP, GROUND ROD, 5/8" - 4SOL "HAMMERLOCK" 1 CLAHL001 CLAMP, HOT LINE, 6-1/0-MAIN, 6-1/0-TAP 1 CLASR003 CLAMP, STRAIN RELIEF WEDGE MESSENGER, SIZE: #6 - 2/0 1 CLATG001 CLAMP, TRANSFORMER TANK GROUND, "BRONZE" 6 SOL - 1 STR. 2 CNNCP002 CONNECTOR, #2, 6-2 MAIN, 2-1/0 TAP, ALUMINUM COMPRESSION, PARALLEL TAP, 2 CNNCP004 CONNECTOR, #4, 1/0-2/0 MAIN, 1/0-3/0 TAP COMPRESSION, PARALLEL TAP, ALUMINUM, 1 CNNCP005 CONNECTOR, #3, 6-2 MAIN, 2/0-3/0 TAP, COMPRESSION, PARALLEL TAP, ALUMINUM, 2 CNNGR002 COUPLING, GROUND ROD, "THREADLESS" REMARKS: FOR THREADLESS GROUND RODS 3 CNNTS009 CONNECTOR, CONTAMINATED ENVIRONMENT, TRANSFORMER SECONDARY SET SCREW TYPE WITH INHIBITOR, 1/2" STUD, RANGE: 12-350, 6-PORTS. 3 CNNVG003 CONNECTOR, 6-2 SOL/10-2 SOL, VISE GRIP PARALLEL, BRONZE 23 COBCO028 CONDUCTOR, #4 SOLID, SOFT DRAWN, BARE COPPER, 200', 25#, ON PLASTIC REEL, 4" X 11.5" W/ 2" HOLE 70 COBCW014 CONDUCTOR, #4, TYPE 40 DSA, COPPERWELD & COPPERWELD- COPPER .204" DIAMETER 1480# BREAKING STRENGTH ( 50# COIL - 427' ) 4 COVIC002 COVER, "D" DIE, INSULATING, 2-1/2" 1 CUTOT006 CUTOUT, CONTAMINATED ENVIRONMENT, 26" LEAKAGE DISTANCE TO GROUND, 100A, 27 KV, 170 KV BIL (54 EA PER PALLET) 1 FUSOH022 FUSE, OVERHEAD DISTRIBUTION, 1.6 AMP, TRANSFORMER 1 GUAGW001 GUARD, GROUND WIRE, 1/2" X 1/2" X 96", GRAY PLASTIC 2 NUTSL003 NUT, LOCK, SQUARE, 5/8" HOLE SIZE, HOT DIPPED GALVANIZED 2 NUTSL004 NUT, LOCK, SQUARE, 3/4" BOLT SIZE, HOT DIPPED GALVANIZED 3 RODGR003 ROD, GROUND, THREADLESS, 5/8" X 8', SHIP ON OPEN FLATBED ONLY! 1 STICO001 STIRRUP, COMPRESSION, 2-1/0, ALUMINUM BODIES, COPPER BAIL, BAIL SIZE- 2-SOL 1 TRACO001 TRANSFORMER, 25 KVA, 14760/25565Y VOLT PRIMARY, 120/240 VOLT SECONDARY, SINGLE PHASE, CONTAMINATED ENVIRONMENT 2 WASRD004 WASHER, ROUND, 5/8" BOLT SIZE X 1 3/4" DIAMETER, GALVANIZED, ( 650 EA P/BOX) CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version: By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ 4 WASRD005 WASHER, ROUND, 3/4" BOLT SIZE X 2" DIAMETER, GALVANIZED, *** 500 EACH PER BOX *** 2 WASSF003 WASHER, SQUARE FLAT, 3" SQ X 1/4", 5/8" X 3/4" BOLT SIZE, GALVANIZED, MUST BE SHIPPED IN BOXES OF 100. CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version: By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ CU Summary BUILD CU Name Quantity Description DGAC*25 1 TRANS; CI, 26.4KV 120/240 25KVA DHLC*2 1 #2 AL. HOT-LINE CLAMP G1W*2 1 WOOD POLE - EQUIPMENT GROUND RUBUP 4 LINE RUBBER INSTALLATION, PER SECT. S20ES*2/0-1/0 1 S20ES*2/0-1/0 SEVF 1 SEVERE CONDITION FOR FRAMING CREW REMOVE CU Name Quantity Description RUBDOWN 4 LINE RUBBER REMOVAL, PER SECT. CUE Reports Estimate Number: 52040 723 SHERRY DR./ ADD 25KVA Estimate Type: SR Contract: 069-19-SPE OH FY22 Estimate Version: By: SIMPRB MWO#/Task: 30806011 Required Date: Oracle Project #: 8007216 Estimated On: 03/30/2022 _________________________________________________________________________________________ CU's with Zero for Contractor CU Name Workfunction Quantity RUBDOWN REMOVE 4 ØØØØ Ø ØØDDDD626262626262;<62;<62#* #* #* #* #* #* #* " ® ®"$T$T $T$T$TT1 /0T 1 /0 T 1/0T 2 /0P1/0T1/0T 1 /0T 2/0P 1/0T 1/0T 1/0T50B50C 729 25C 15B801 38125C723 6 9 9 65T 8TH ST SHERRY DR 7 T H ST __________________ ORACLE PROJECT #:52040 ________________________PERMIT N.O.:8007216 __________________ MAXIMO WO #:30806011 _______________ DATE REL CONST:03/31/22 ____________________________________________________SUB-STA:NEPTUNE BEACH __________ CIR. N.O.:563 ____________________________________________________ENGINEER:Robert Simpson _______________ CELL N.O.:N/A __________ PHONE N.O.:665-7793____________________________________________________ CUSTOMER/ LOCATION:723 SHERRY DR../ SET 25KVA 563 __________________SVC CENTER:SSSC __________ TREE TRIMMING REQ'D:YES __________________ZIP CODE:N/A ENGINEERING DESIGN P# 723 SHERRY DR./ SET 25KVA. ***** FOR NEW HOME BUILD ***** ***** TREE TRIMMING REQUIRED ***** P# 723 ROW22-0012