Loading...
1466 Marsh View RES21-0269 Roof and Floor Layout and Truss Approved2x42x42x4511.333.5"NOTECONVENTIONAL FRAMING, ERECTION AND/OR PERMANENT BRACING ISNOT THE RESPONSIBILITY OF THE TRUSS DESIGNER, PLATEMANUFACTURER, OR TRUSS MANUFACTURER. PERSONS ERECTINGTRUSSES ARE CAUTIONED TO SEEK PROFESSIONAL ADVICEREGARDING ERECTION BRACING WHICH IS ALWAYS REQUIRED TOPREVENT TOPPLING AND DOMINOING DURING ERECTION; ANDPERMANENT BRACING WHICH MAY BE REQUIRED IN SPECIFICAPPLICATIONS. SEE "BRACING WOOD TRUSSES COMMENTARY ANDRECOMMENDATIONS" (HIB-91) FOR FURTHER INFORMATION.TRUSSES SHALL BE INSTALLED IN A STRAIGHT AND PLUMBPOSITION. WHERE NO SHEATHING IS APPLIED DIRECTLY TO TOPAND/OR BOTTOM CHORDS, THEY SHALL BE BRACED AS SPECIFIEDON THE ENGINEERED DESIGN. TRUSSES SHALL BE HANDLED WITHREASONABLE CARE DURING ERECTION TO PREVENT DAMAGE ORPERSONAL INJURY.WARNINGCONDITIONS. ACCEPTANCE OF THIS LAYOUT ASSUMESTOTAL RESPONSIBILITY. THE TRUSSES WILL BE BUILTPITCHES, OVERHANGS, ELEVATIONS, & BEARING"APPROVAL OF THIS TRUSS LAYOUT IS NECESSARYBEFORE FABRICATION CAN BEGIN. VERIFY SPANS,APPROVED BY:IN ACCORDANCE WITH THIS LAYOUT"DATE:ATTENTIONDURATION FACTORWIND SPEEDLOADING CRITERIATOP CHORD LIVE LOADTOTAL LOADBOTTOM CHORD DEAD LOADTOP CHORD DEAD LOADp.s.f.m.p.h.p.s.f.p.s.f.p.s.f.BOTTOM CHORD LIVE LOADp.s.f.BUILDING EXPOSUREWIND LOAD TYPEBUILDING TYPECUSTOMERLOT/BLK/SUBDIVJOB NAMEDATE DRAWN BYJOB NUMBERSCALECUSTOMERLOT/BLK/SUBDIVJOB NAMEDATE DRAWN BYJOB NUMBERSCALEROOF FLOORBUILDING CODEWIND STANDARDIT IS THE RESPONSIBILITY OF THE BUILDING DESIGNER ORARCHITECT TO PROVIDE AN APPROPRIATE CONNECTION FOR TRUSSESTO SUPPORTING STRUCTURE PER REACTIONS SHOWN ON TRUSSENGINEERING. SPECIAL CONSIDERATIONS FOR MECHANICAL EQUIPMENTAND/OR PLUMBING (AND THEIR CONNECTIONS) IN TRUSS SPACEMUST BE DIAGRAMMED BY BUILDER ON APPROVED TRUSS LAYOUTPRIOR TO FABRICATION.THIS COMPANY IS A TRUSS MANUFACTURER WHOSERESPONSIBILITIES ARE LIMITED TO THOSE DESCRIBED IN WTCA1-1995 "DESIGN RESPONSIBILITIES". ACCORDINGLY, IT DISCLAIMSANY RESPONSIBILITIES AND/OR LIABILITY FOR THE CONSTRUCTIONDESIGN, DRAWINGS, DOCUMENTS INCLUDING THE INSTALLATION ANDBRACING OF TRUSSES MANUFACTURED BY THIS COMPANY.WIND USAGE2010010401.25MWFRS w/C&C Reactio130ClosedD4010010601.00FBC 7th Ed. 2020 Res.ASCE 7-16Residential - CAT IIBuilders First SourceMarsh View Roof1466 Marsh View ,Atlantic Beach,FL,BH9602-28/10/20212'3'30'35'33'8"10'4"5'20'4"9'8"6'6"4'6"15'4"8'9'8"44'G1T1G2T2G3T4G1T5J1J3H1H2H3H4H5H5H4H7J1J3CJ7H6H8J1J3J1J3CJ7T3T6J5J5Depth of gable truss beto 5.5" less than T3 foroutlooker.Depth of gable trussbe to 5.5" less than T2for outlooker.SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTSSHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTSBy Mike Jones at 4:15 pm, Sep 01, 2021 NOTECONVENTIONAL FRAMING, ERECTION AND/OR PERMANENT BRACING ISNOT THE RESPONSIBILITY OF THE TRUSS DESIGNER, PLATEMANUFACTURER, OR TRUSS MANUFACTURER. PERSONS ERECTINGTRUSSES ARE CAUTIONED TO SEEK PROFESSIONAL ADVICEREGARDING ERECTION BRACING WHICH IS ALWAYS REQUIRED TOPREVENT TOPPLING AND DOMINOING DURING ERECTION; ANDPERMANENT BRACING WHICH MAY BE REQUIRED IN SPECIFICAPPLICATIONS. SEE "BRACING WOOD TRUSSES COMMENTARY ANDRECOMMENDATIONS" (HIB-91) FOR FURTHER INFORMATION.TRUSSES SHALL BE INSTALLED IN A STRAIGHT AND PLUMBPOSITION. WHERE NO SHEATHING IS APPLIED DIRECTLY TO TOPAND/OR BOTTOM CHORDS, THEY SHALL BE BRACED AS SPECIFIEDON THE ENGINEERED DESIGN. TRUSSES SHALL BE HANDLED WITHREASONABLE CARE DURING ERECTION TO PREVENT DAMAGE ORPERSONAL INJURY.WARNINGCONDITIONS. ACCEPTANCE OF THIS LAYOUT ASSUMESTOTAL RESPONSIBILITY. THE TRUSSES WILL BE BUILTPITCHES, OVERHANGS, ELEVATIONS, & BEARING"APPROVAL OF THIS TRUSS LAYOUT IS NECESSARYBEFORE FABRICATION CAN BEGIN. VERIFY SPANS,APPROVED BY:IN ACCORDANCE WITH THIS LAYOUT"DATE:ATTENTIONDURATION FACTORWIND SPEEDLOADING CRITERIATOP CHORD LIVE LOADTOTAL LOADBOTTOM CHORD DEAD LOADTOP CHORD DEAD LOADp.s.f.m.p.h.p.s.f.p.s.f.p.s.f.BOTTOM CHORD LIVE LOADp.s.f.BUILDING EXPOSUREWIND LOAD TYPEBUILDING TYPECUSTOMERLOT/BLK/SUBDIVJOB NAMEDATE DRAWN BYJOB NUMBERSCALECUSTOMERLOT/BLK/SUBDIVJOB NAMEDATE DRAWN BYJOB NUMBERSCALEROOF FLOORBUILDING CODEWIND STANDARDIT IS THE RESPONSIBILITY OF THE BUILDING DESIGNER ORARCHITECT TO PROVIDE AN APPROPRIATE CONNECTION FOR TRUSSESTO SUPPORTING STRUCTURE PER REACTIONS SHOWN ON TRUSSENGINEERING. SPECIAL CONSIDERATIONS FOR MECHANICAL EQUIPMENTAND/OR PLUMBING (AND THEIR CONNECTIONS) IN TRUSS SPACEMUST BE DIAGRAMMED BY BUILDER ON APPROVED TRUSS LAYOUTPRIOR TO FABRICATION.THIS COMPANY IS A TRUSS MANUFACTURER WHOSERESPONSIBILITIES ARE LIMITED TO THOSE DESCRIBED IN WTCA1-1995 "DESIGN RESPONSIBILITIES". ACCORDINGLY, IT DISCLAIMSANY RESPONSIBILITIES AND/OR LIABILITY FOR THE CONSTRUCTIONDESIGN, DRAWINGS, DOCUMENTS INCLUDING THE INSTALLATION ANDBRACING OF TRUSSES MANUFACTURED BY THIS COMPANY.WIND USAGE2010010401.25MWFRS w/C&C Reactio140PartialB4010010601.00FBC 7th Ed. 2020 Res.ASCE 7-16Residential - CAT IIBuilders First SourceMarsh View Floor1466 Marsh View ,Atlantic Beach,FL,BH9602-18/10/20215'30'35'33'8"10'4"5'20'4"9'8"11'15'4"8'9'8"44'B1B2B3G1G2F1F2F3F4G3F5F6G4F7F8F9F10F104X21'4"3.5"(2)ply 16"lvl(2)ply 16"lvl(2)ply 16"lvlSHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTSSHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTSBy Toni Gindlesperger at 4:52 pm, Aug 24, 2021 Alpine, an ITW company 514 Earth City Expressway Suite 242 Earth City, MO 63045 Phone: (800)326-4102 (314)344-9121 alpineitw.com Site Information:Page 1: Customer: Trussco, LLC Job Number: 9602-2 Job Description: Marsh View Roof Address: 1466 Marsh View , Atlantic Beach, FL Job Engineering Criteria: Design Code: FBC 7th Ed. 2020 Res IntelliVIEW Version: 20.02.01D JRef #: 1X7T96160004 Wind Standard: ASCE 7-16 Wind Speed (mph): 130 Design Loading (psf): 40.00, 60.00 Building Type: Closed, Partial This package contains general notes pages, 21 truss drawing(s) and 3 detail(s). Item Drawing Number Truss Item Drawing Number Truss 1 221.21.1327.04970 T6 2 221.21.1327.10210 H5 3 221.21.1327.14907 H4 4 221.21.1327.20067 H8 5 221.21.1327.23903 H3 6 221.21.1327.29340 H7 7 221.21.1327.34360 H2 8 221.21.1327.46973 H6 9 221.21.1328.03520 H1 10 221.21.1328.18617 T1 11 221.21.1328.31113 T5 12 221.21.1328.34757 G1 13 221.21.1328.38650 T3 14 221.21.1328.41450 G3 15 221.21.1328.44430 T2 16 221.21.1328.47750 G2 17 221.21.1328.51630 T4 18 221.21.1328.54257 J5 19 221.21.1328.56437 J3 20 221.21.1329.02127 J1 21 221.21.1329.08980 CJ7 22 A16030ENC160118 23 GBLLETIN0118 24 A16015ENC160118 Florida Certificate of Product Approval #FL1999 Printed 8/9/2021 1:29:18 PM 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 This item has been electronically signed and sealed by David J. Rothweiler on the date adjacent to the seal using a SHA authentication code. Printed copies of this document are not considered signed and sealed and the SHA authentication code must be verified on any electronic copies. SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS General Notes Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities: The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1, Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to independently verify the accuracy or completeness of the information provided by others and may rely on that information without liability. The responsibility for verification of that information remains with others neither employed nor controlled by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component designs and not for the technical information furnished by others which technical information and consequences thereof remain their sole responsibility. The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and loads for each truss component match those required by the plans and by the actual use of the individual component, and for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any additional factors required in the particular application. Truss components using metal connector plates with integral teeth shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to exceed 19% and/or cause corrosion of connector plates and other metal fasteners. The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss component design loads, inspection of the truss components before or after installation, the design of temporary or permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports, installation of the truss components, observation of the truss component installation process, review of truss assembly procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in the installation of the truss components and/or its connections. This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request. Temporary Lateral Restraint and Bracing: Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2, B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to and may not be relied upon for the temporary stability of the truss components during their installation. Permanent Lateral Restraint and Bracing: The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional. These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building Designer. Connector Plate Information: Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations, gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60. Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at www.icc-es.org. Fire Retardant Treated Lumber: Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special handling care must be taken to prevent breakage during all handling activities. Page 1 of 3 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS General Notes (continued) Key to Terms: Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be found in calculation sheets available upon written request. BCDL = Bottom Chord standard design Dead Load in pounds per square foot. BCLL = Bottom Chord standard design Live Load in pounds per square foot. CL = Certified lumber. Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot. FRT = Fire Retardant Treated lumber. FRT-DB = D-Blaze Fire Retardant Treated lumber. FRT-DC = Dricon Fire Retardant Treated lumber. FRT-FP = FirePRO Fire Retardant Treated lumber. FRT-FL = FlamePRO Fire Retardant Treated lumber. FRT-FT = FlameTech Fire Retardant Treated lumber. FRT-PG = PYRO-GUARD Fire Retardant Treated lumber. g = green lumber. HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches. HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep adjustment. HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds. Ic = Incised lumber. FJ = Finger Jointed lumber. L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value. L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the referenced panel point. Reported as 999 if greater than or equal to 999. Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection. Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases. Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases. Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases. NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot. PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds. PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds. PP = Panel Point. R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc). -R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc). Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the indicated location (Loc). RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the indicated location (Loc). Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the identified location (Loc). TCDL = Top Chord standard design Dead Load in pounds per square foot. TCLL = Top Chord standard design Live Load in pounds per square foot. U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the indicated location (Loc). VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in inches. VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment. VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load. VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment. W = Width of non-hanger bearing, in inches. Refer to ASCE-7 for Wind and Seismic abbreviations. Uppercase Acronyms not explained above are as defined in TPI 1. Page 2 of 3 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS References: 1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org. 2. ICC: International Code Council; www.iccsafe.org. 3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO 63045; www.alpineitw.com. 4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org. 5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcindustry.com. Page 3 of 3 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #1 Dense; Webs: 2x4 SP #3; Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1805 /- /-/715 /498 /202 F 1805 /- /-/715 /498 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.8 F Brg Width = 5.5 Min Req =1.8 Bearings B & F are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 709 -3184 C - D 671 -2927 Chords Tens.Comp. D - E 671 -2927 E - F 709 -3184 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - J 2880 -512 J - I 1942 -251 Chords Tens.Comp. I - H 1942 -251 H - F 2880 -523 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - J 294 -424 J - D 1133 -159 Webs Tens.Comp. D - H 1133 -159 H - E 294 -424 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:20.00 BCDL:10.00 Des Ld:60.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 19.02 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.188 J 999 240 VERT(CL):0.284 J 999 180 HORZ(LL):0.057 H - - HORZ(TL):0.086 H - - Creep Factor: 2.0 Max TC CSI:0.797 Max BC CSI:0.982 Max Web CSI:0.432 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T6 Ply: 1 Qty:8 SEQN:208001 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T13 DrwNo:221.21.1327.04970 /NDW 08/09/2021 28' 7'3"14 7'3"14 14' 6'8"2 20'8"2 6'8"2 28' 7'3"14 9'6"10 9'6"10 14' 4'5"6 18'5"6 4'5"6 28' 9'6"102'2' 4"16'2"16'11"4A B C D E F GHIJ 5 12 3X8(A1) 1.5X3 3X5 4X5 H0308 3X5 1.5X3 3X8(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #1 Dense; Webs: 2x4 SP #3; Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1805 /- /-/715 /498 /202 F 1805 /- /-/715 /498 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.8 F Brg Width = 5.5 Min Req =1.8 Bearings B & F are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 709 -3184 C - D 671 -2927 Chords Tens.Comp. D - E 671 -2927 E - F 709 -3184 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - J 2880 -512 J - I 1942 -251 Chords Tens.Comp. I - H 1942 -251 H - F 2880 -523 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - J 294 -424 J - D 1133 -159 Webs Tens.Comp. D - H 1133 -159 H - E 294 -424 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:20.00 BCDL:10.00 Des Ld:60.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 19.02 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.188 J 999 240 VERT(CL):0.284 J 999 180 HORZ(LL):0.057 H - - HORZ(TL):0.086 H - - Creep Factor: 2.0 Max TC CSI:0.797 Max BC CSI:0.982 Max Web CSI:0.432 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T6 Ply: 1 Qty:8 SEQN:208001 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T13 DrwNo:221.21.1327.04970 /NDW 08/09/2021 28' 7'3"14 7'3"14 14' 6'8"2 20'8"2 6'8"2 28' 7'3"14 9'6"10 9'6"10 14' 4'5"6 18'5"6 4'5"6 28' 9'6"102'2' 4"16'2"16'11"4A B C D E F GHIJ 5 12 3X8(A1) 1.5X3 3X5 4X5 H0308 3X5 1.5X3 3X8(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1245 /- /-/721 /535 /191 G 1245 /- /-/721 /535 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 G Brg Width = 5.5 Min Req =1.5 Bearings B & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 792 -2218 C - D 693 -1624 D - E 696 -1419 Chords Tens.Comp. E - F 691 -1616 F - G 791 -2218 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - L 1982 -593 L - K 1978 -596K - J 1416 -365 Chords Tens.Comp. J - I 1978 -606 I - G 1982 -604 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 255 -607 Webs Tens.Comp. J - F 255 -612 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 18.82 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.112 K 999 240 VERT(CL):0.219 K 999 180 HORZ(LL):0.044 I - - HORZ(TL):0.085 I - - Creep Factor: 2.0 Max TC CSI:0.417 Max BC CSI:0.573 Max Web CSI:0.519 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H5 Ply: 1 Qty:2 SEQN:207954 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T12 DrwNo:221.21.1327.10210 /NDW 08/09/2021 28' 6'11"10 6'11"10 13' 6'0"6 15' 2' 21'0"6 6'0"6 28' 6'11"10 6'9"14 6'9"14 12'8"8 5'10"10 15'1"12 2'5"4 21'2"2 6'0"6 28' 6'9"142'2' 4"15'9"16'6"4A B C D E F G HIJKL 5 12 3X6(A1)1.5X3 3X4 3X4 4X5 4X5 5X7 3X4 1.5X3 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1245 /- /-/721 /535 /191 G 1245 /- /-/721 /535 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 G Brg Width = 5.5 Min Req =1.5 Bearings B & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 792 -2218 C - D 693 -1624 D - E 696 -1419 Chords Tens.Comp. E - F 691 -1616 F - G 791 -2218 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - L 1982 -593 L - K 1978 -596K - J 1416 -365 Chords Tens.Comp. J - I 1978 -606 I - G 1982 -604 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 255 -607 Webs Tens.Comp. J - F 255 -612 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 18.82 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.112 K 999 240 VERT(CL):0.219 K 999 180 HORZ(LL):0.044 I - - HORZ(TL):0.085 I - - Creep Factor: 2.0 Max TC CSI:0.417 Max BC CSI:0.573 Max Web CSI:0.519 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H5 Ply: 1 Qty:2 SEQN:207954 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T12 DrwNo:221.21.1327.10210 /NDW 08/09/2021 28' 6'11"10 6'11"10 13' 6'0"6 15' 2' 21'0"6 6'0"6 28' 6'11"10 6'9"14 6'9"14 12'8"8 5'10"10 15'1"12 2'5"4 21'2"2 6'0"6 28' 6'9"142'2' 4"15'9"16'6"4A B C D E F G HIJKL 5 12 3X6(A1)1.5X3 3X4 3X4 4X5 4X5 5X7 3X4 1.5X3 3X6(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1250 /- /-/730 /614 /149 G 1115 /- /-/618 /465 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 G Brg Width = 5.5 Min Req =1.5 Bearings B & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1016 -2257 C - D 973 -1833 D - E 954 -1635 Chords Tens.Comp. E - F 967 -1831 F - G 1038 -2304 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - K 2024 -880 K - J 2021 -883J - I 1628 -742 Chords Tens.Comp. I - H 2069 -885 H - G 2072 -883 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - J 158 -420 J - D 387 -8 Webs Tens.Comp. E - I 390 -28 I - F 190 -474 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 18.40 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.112 J 999 240 VERT(CL):0.222 J 999 180 HORZ(LL):0.044 H - - HORZ(TL):0.086 H - - Creep Factor: 2.0 Max TC CSI:0.458 Max BC CSI:0.576 Max Web CSI:0.284 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H4 Ply: 1 Qty:2 SEQN:207935 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T10 DrwNo:221.21.1327.14907 /NDW 08/09/2021 28' 5'11"10 5'11"10 11' 5'0"6 17' 6' 22'0"6 5'0"6 28' 5'11"10 5'9"14 5'9"14 10'8"8 4'10"10 17'1"12 6'5"4 22'2"2 5'0"6 28' 5'9"142' 4"14'11"15'8"4A B C D E F G HIJK 5 12 3X6(A1)1.5X3 3X4 3X4 4X6 4X6 5X6 3X4 1.5X3 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1250 /- /-/730 /614 /149 G 1115 /- /-/618 /465 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 G Brg Width = 5.5 Min Req =1.5 Bearings B & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1016 -2257 C - D 973 -1833 D - E 954 -1635 Chords Tens.Comp. E - F 967 -1831 F - G 1038 -2304 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - K 2024 -880 K - J 2021 -883J - I 1628 -742 Chords Tens.Comp. I - H 2069 -885 H - G 2072 -883 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - J 158 -420 J - D 387 -8 Webs Tens.Comp. E - I 390 -28 I - F 190 -474 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 18.40 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.112 J 999 240 VERT(CL):0.222 J 999 180 HORZ(LL):0.044 H - - HORZ(TL):0.086 H - - Creep Factor: 2.0 Max TC CSI:0.458 Max BC CSI:0.576 Max Web CSI:0.284 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H4 Ply: 1 Qty:2 SEQN:207935 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T10 DrwNo:221.21.1327.14907 /NDW 08/09/2021 28' 5'11"10 5'11"10 11' 5'0"6 17' 6' 22'0"6 5'0"6 28' 5'11"10 5'9"14 5'9"14 10'8"8 4'10"10 17'1"12 6'5"4 22'2"2 5'0"6 28' 5'9"142' 4"14'11"15'8"4A B C D E F G HIJK 5 12 3X6(A1)1.5X3 3X4 3X4 4X6 4X6 5X6 3X4 1.5X3 3X6(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 413 /- /-/271 /159 /128 K 1421 /- /-/715 /875 /- H 635 /- /-/395 /247 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 K Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearings B & K are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 514 -325 D - E 540 -333 Chords Tens.Comp. F - G 437 -820 G - H 556 -1138 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. J - I 689 -255 Chords Tens.Comp. I - H 1018 -451 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 287 -441D - K 357 -402 K - E 815 -1018 Webs Tens.Comp. J - F 223 -507F - I 395 -7 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.98 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.027 I 999 240 VERT(CL):0.056 I 999 180 HORZ(LL):0.009 I - - HORZ(TL):0.019 K - - Creep Factor: 2.0 Max TC CSI:0.435 Max BC CSI:0.735 Max Web CSI:0.580 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H8 Ply: 1 Qty:1 SEQN:207991 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T17 DrwNo:221.21.1327.20067 /NDW 08/09/2021 9'10"12 18'1"4 4'9"14 4'9"14 9' 4'2"2 13'10"4 4'10"4 19' 5'1"12 23'2"2 4'2"2 28' 4'9"14 9'10"12 9'10"12 14'1"12 4'3" 19'3"8 5'1"12 28' 8'8"82' 4"14'1"14'10"4A B C D E F G H IJK 5 12 3X4(A1) 1.5X3 4X4 4X8 3X4 5X5 4X5 3X4 1.5X3 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 413 /- /-/271 /159 /128 K 1421 /- /-/715 /875 /- H 635 /- /-/395 /247 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 K Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearings B & K are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 514 -325 D - E 540 -333 Chords Tens.Comp. F - G 437 -820 G - H 556 -1138 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. J - I 689 -255 Chords Tens.Comp. I - H 1018 -451 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 287 -441D - K 357 -402 K - E 815 -1018 Webs Tens.Comp. J - F 223 -507F - I 395 -7 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.98 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.027 I 999 240 VERT(CL):0.056 I 999 180 HORZ(LL):0.009 I - - HORZ(TL):0.019 K - - Creep Factor: 2.0 Max TC CSI:0.435 Max BC CSI:0.735 Max Web CSI:0.580 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H8 Ply: 1 Qty:1 SEQN:207991 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T17 DrwNo:221.21.1327.20067 /NDW 08/09/2021 9'10"12 18'1"4 4'9"14 4'9"14 9' 4'2"2 13'10"4 4'10"4 19' 5'1"12 23'2"2 4'2"2 28' 4'9"14 9'10"12 9'10"12 14'1"12 4'3" 19'3"8 5'1"12 28' 8'8"82' 4"14'1"14'10"4A B C D E F G H IJK 5 12 3X4(A1) 1.5X3 4X4 4X8 3X4 5X5 4X5 3X4 1.5X3 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1251 /- /-/734 /694 /128 H 1114 /- /-/621 /548 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1273 -2266 C - D 1197 -2015 D - E 1422 -2122 Chords Tens.Comp. E - F 1422 -2122 F - G 1204 -2040 G - H 1299 -2320 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - K 2041 -1122 K - J 1810 -987 Chords Tens.Comp. J - I 1828 -970 I - H 2101 -1132 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. D - J 386 -381 Webs Tens.Comp. E - J 445 -366 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.98 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.134 E 999 240 VERT(CL):0.264 E 999 180 HORZ(LL):0.044 I - - HORZ(TL):0.088 I - - Creep Factor: 2.0 Max TC CSI:0.543 Max BC CSI:0.771 Max Web CSI:0.285 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H3 Ply: 1 Qty:1 SEQN:207945 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T8 DrwNo:221.21.1327.23903 /NDW 08/09/2021 28' 4'9"14 4'9"14 9' 4'2"2 14' 5' 19' 5' 23'2"2 4'2"2 28' 4'9"14 8'8"8 8'8"8 14' 5'3"8 19'3"8 5'3"8 28' 8'8"82' 4"14'1"14'10"4A B C D E F G H IJK 5 12 3X6(A1) 1.5X3 3X4 4X5 1.5X3 5X6 4X5 3X4 1.5X3 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1251 /- /-/734 /694 /128 H 1114 /- /-/621 /548 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1273 -2266 C - D 1197 -2015 D - E 1422 -2122 Chords Tens.Comp. E - F 1422 -2122 F - G 1204 -2040 G - H 1299 -2320 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - K 2041 -1122 K - J 1810 -987 Chords Tens.Comp. J - I 1828 -970 I - H 2101 -1132 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. D - J 386 -381 Webs Tens.Comp. E - J 445 -366 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.98 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.134 E 999 240 VERT(CL):0.264 E 999 180 HORZ(LL):0.044 I - - HORZ(TL):0.088 I - - Creep Factor: 2.0 Max TC CSI:0.543 Max BC CSI:0.771 Max Web CSI:0.285 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H3 Ply: 1 Qty:1 SEQN:207945 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T8 DrwNo:221.21.1327.23903 /NDW 08/09/2021 28' 4'9"14 4'9"14 9' 4'2"2 14' 5' 19' 5' 23'2"2 4'2"2 28' 4'9"14 8'8"8 8'8"8 14' 5'3"8 19'3"8 5'3"8 28' 8'8"82' 4"14'1"14'10"4A B C D E F G H IJK 5 12 3X6(A1) 1.5X3 3X4 4X5 1.5X3 5X6 4X5 3X4 1.5X3 3X6(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 470 /- /-/290 /212 /106 I 1311 /- /-/684 /873 /- F 653 /- /-/390 /310 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 I Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearings B & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 546 -361 D - E 506 -562 Chords Tens.Comp. E - F 650 -1135 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. I - H 530 -366H - G 984 -518 Chords Tens.Comp. G - F 993 -514 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - I 445 -720 I - D 1040 -1321 Webs Tens.Comp. D - H 380 0 H - E 198 -479 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.57 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.033 G 999 240 VERT(CL):0.065 G 999 180 HORZ(LL):0.012 G - - HORZ(TL):0.023 G - - Creep Factor: 2.0 Max TC CSI:0.793 Max BC CSI:0.513 Max Web CSI:0.656 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H7 Ply: 1 Qty:1 SEQN:207950 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T16 DrwNo:221.21.1327.29340 /NDW 08/09/2021 9'10"12 18'1"4 7' 7' 13'10"4 6'10"4 21' 7'1"12 28' 7' 6'10"4 6'10"4 9'10"12 3'0"8 14'1"12 4'3" 21'1"12 7' 28' 6'10"42' 4"13'3"14'0"4A B C D E F GHIJ 5 12 3X4(A1)1.5X3 4X4 4X4 3X5 5X5 5X5 1.5X3 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 470 /- /-/290 /212 /106 I 1311 /- /-/684 /873 /- F 653 /- /-/390 /310 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 I Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearings B & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 546 -361 D - E 506 -562 Chords Tens.Comp. E - F 650 -1135 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. I - H 530 -366H - G 984 -518 Chords Tens.Comp. G - F 993 -514 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - I 445 -720 I - D 1040 -1321 Webs Tens.Comp. D - H 380 0 H - E 198 -479 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.57 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.033 G 999 240 VERT(CL):0.065 G 999 180 HORZ(LL):0.012 G - - HORZ(TL):0.023 G - - Creep Factor: 2.0 Max TC CSI:0.793 Max BC CSI:0.513 Max Web CSI:0.656 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H7 Ply: 1 Qty:1 SEQN:207950 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T16 DrwNo:221.21.1327.29340 /NDW 08/09/2021 9'10"12 18'1"4 7' 7' 13'10"4 6'10"4 21' 7'1"12 28' 7' 6'10"4 6'10"4 9'10"12 3'0"8 14'1"12 4'3" 21'1"12 7' 28' 6'10"42' 4"13'3"14'0"4A B C D E F GHIJ 5 12 3X4(A1)1.5X3 4X4 4X4 3X5 5X5 5X5 1.5X3 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2; T2 2x4 SP #2 Dense;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1278 /- /-/782 /346 /47 F 1137 /- /-/704 /288 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 628 -2317 C - D 861 -3027 Chords Tens.Comp. D - E 861 -3027 E - F 647 -2358 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - I 2078 -525 I - H 2071 -529 Chords Tens.Comp. H - G 2113 -533 G - F 2121 -529 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - H 1046 -282 D - H 288 -642 Webs Tens.Comp. H - E 1019 -262 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:115 mph Enclosure: Part. Enc. Risk Category: II EXP: B Kzt: NA Mean Height: 17.57 ft TCDL: 4.8 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.55 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 20.0 Ct: 1.1 CAT: II Pf: 15.4 Ce: 1.0 Lu: -Cs: 1.00 Snow Duration: 1.15 Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.175 D 999 240 VERT(CL):0.374 D 888 180 HORZ(LL):0.046 G - - HORZ(TL):0.093 G - - Creep Factor: 2.0 Max TC CSI:0.895 Max BC CSI:0.718 Max Web CSI:0.433 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H2 Ply: 1 Qty:1 SEQN:207956 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T3 DrwNo:221.21.1327.34360 /NDW 08/09/2021 T2 28' 7' 7' 14' 7' 21' 7' 28' 7' 6'10"4 6'10"4 14' 7'1"12 21'1"12 7'1"12 28' 6'10"42' 4"13'3"14'0"4A B C D E F GHI 5 12 3X6(A1)1.5X3 5X6 1.5X3 5X10 5X6 1.5X3 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2; T2 2x4 SP #2 Dense;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 1278 /- /-/782 /346 /47 F 1137 /- /-/704 /288 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 F Brg Width = -Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 628 -2317 C - D 861 -3027 Chords Tens.Comp. D - E 861 -3027 E - F 647 -2358 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - I 2078 -525 I - H 2071 -529 Chords Tens.Comp. H - G 2113 -533 G - F 2121 -529 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - H 1046 -282 D - H 288 -642 Webs Tens.Comp. H - E 1019 -262 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.15 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:115 mph Enclosure: Part. Enc. Risk Category: II EXP: B Kzt: NA Mean Height: 17.57 ft TCDL: 4.8 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.55 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: 20.0 Ct: 1.1 CAT: II Pf: 15.4 Ce: 1.0 Lu: -Cs: 1.00 Snow Duration: 1.15 Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.175 D 999 240 VERT(CL):0.374 D 888 180 HORZ(LL):0.046 G - - HORZ(TL):0.093 G - - Creep Factor: 2.0 Max TC CSI:0.895 Max BC CSI:0.718 Max Web CSI:0.433 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H2 Ply: 1 Qty:1 SEQN:207956 HIPS FROM: bh Cust: R9616 JRef:1X7T96160004 T3 DrwNo:221.21.1327.34360 /NDW 08/09/2021 T2 28' 7' 7' 14' 7' 21' 7' 28' 7' 6'10"4 6'10"4 14' 7'1"12 21'1"12 7'1"12 28' 6'10"42' 4"13'3"14'0"4A B C D E F GHI 5 12 3X6(A1)1.5X3 5X6 1.5X3 5X10 5X6 1.5X3 3X6(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #2; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 5.00TC: From 30 plf at 5.00 to 30 plf at 28.00BC: From 4 plf at -2.00 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.03BC: From 10 plf at 5.03 to 10 plf at 28.00TC: 188 lb Conc. Load at 5.03TC: 116 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06BC: 208 lb Conc. Load at 5.03BC: 86 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06 Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical exposed to wind pressure. Deflection meets L/180. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M 540 /- /- /-/191 /- N 2421 /- /0 /-/703 /0 H 1145 /- /- /-/334 /- Wind reactions based on MWFRS M Brg Width = 3.5 Min Req =1.5 N Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearings M & N are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 448 -128 D - E 302 -1035 Chords Tens.Comp. E - F 302 -1035 F - G 335 -1170 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. L - K 400 -111 Chords Tens.Comp. J - I 1205 -360 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 194 -634K - D 303 -749 D - J 1447 -404 Webs Tens.Comp. I - G 1213 -344G - H 179 -497 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.15 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.063 E 999 240 VERT(CL):0.125 E 999 180 HORZ(LL):-0.008 G - - HORZ(TL):0.017 G - - Creep Factor: 2.0 Max TC CSI:0.439 Max BC CSI:0.640 Max Web CSI:0.551 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H6 Ply: 2 Qty:1 SEQN:207996 HIPM FROM: bh Cust: R9616 JRef:1X7T96160004 T2 DrwNo:221.21.1327.46973 /NDW 08/09/2021 2 Complete Trusses Required 9'10"12 18'1"4 5' 5' 10'9" 5'9" 16'4"4 5'7"4 21'11"8 5'7"4 28' 6'0"8 4'10"4 4'10"4 10'5"8 5'7"4 16'4"4 5'10"12 22'3" 5'10"12 28' 5'9"2' 4"1 2'3"72'5"13'2"4A B C D E F G HIJKLMN 5 12 3X4(A1)1.5X3 4X4 3X4 3X6 5X5 7X10 3X4 3X5 4X4 3X8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #2; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 5.00TC: From 30 plf at 5.00 to 30 plf at 28.00BC: From 4 plf at -2.00 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.03BC: From 10 plf at 5.03 to 10 plf at 28.00TC: 188 lb Conc. Load at 5.03TC: 116 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06BC: 208 lb Conc. Load at 5.03BC: 86 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06 Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical exposed to wind pressure. Deflection meets L/180. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M 540 /- /- /-/191 /- N 2421 /- /0 /-/703 /0 H 1145 /- /- /-/334 /- Wind reactions based on MWFRS M Brg Width = 3.5 Min Req =1.5 N Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearings M & N are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 448 -128 D - E 302 -1035 Chords Tens.Comp. E - F 302 -1035 F - G 335 -1170 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. L - K 400 -111 Chords Tens.Comp. J - I 1205 -360 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 194 -634K - D 303 -749 D - J 1447 -404 Webs Tens.Comp. I - G 1213 -344G - H 179 -497 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.15 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.063 E 999 240 VERT(CL):0.125 E 999 180 HORZ(LL):-0.008 G - - HORZ(TL):0.017 G - - Creep Factor: 2.0 Max TC CSI:0.439 Max BC CSI:0.640 Max Web CSI:0.551 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H6 Ply: 2 Qty:1 SEQN:207996 HIPM FROM: bh Cust: R9616 JRef:1X7T96160004 T2 DrwNo:221.21.1327.46973 /NDW 08/09/2021 2 Complete Trusses Required 9'10"12 18'1"4 5' 5' 10'9" 5'9" 16'4"4 5'7"4 21'11"8 5'7"4 28' 6'0"8 4'10"4 4'10"4 10'5"8 5'7"4 16'4"4 5'10"12 22'3" 5'10"12 28' 5'9"2' 4"1 2'3"72'5"13'2"4A B C D E F G HIJKLMN 5 12 3X4(A1)1.5X3 4X4 3X4 3X6 5X5 7X10 3X4 3X5 4X4 3X8 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #2; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 5.00TC: From 30 plf at 5.00 to 30 plf at 28.00BC: From 4 plf at -2.00 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.03BC: From 10 plf at 5.03 to 10 plf at 28.00TC: 188 lb Conc. Load at 5.03TC: 116 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06BC: 208 lb Conc. Load at 5.03BC: 86 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06 Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical exposed to wind pressure. Deflection meets L/180. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M 2078 /- /- /-/648 /- H 1992 /- /- /-/580 /- Wind reactions based on MWFRS M Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing M is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 687 -2327 C - D 1004 -3449 D - E 1034 -3555 Chords Tens.Comp. E - F 1034 -3555 F - G 700 -2428 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - L 2143 -628 L - K 2130 -630 Chords Tens.Comp. K - J 3497 -1031 J - I 2525 -743 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 1401 -397J - F 1088 -307 F - I 283 -646 Webs Tens.Comp. I - G 2535 -728G - H 301 -916 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.15 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.285 E 999 240 VERT(CL):0.566 E 590 180 HORZ(LL):0.047 C - - HORZ(TL):0.094 C - - Creep Factor: 2.0 Max TC CSI:0.665 Max BC CSI:0.751 Max Web CSI:0.966 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H1 Ply: 2 Qty:1 SEQN:207976 HIPM FROM: bh Cust: R9616 JRef:1X7T96160004 T11 DrwNo:221.21.1328.03520 /NDW 08/09/2021 2 Complete Trusses Required 28' 5' 5' 10'9" 5'9" 16'4"4 5'7"4 21'11"8 5'7"4 27'7" 5'7"8 28' 5" 4'10"4 4'10"4 10'5"8 5'7"4 16'4"4 5'10"12 22'4"8 6'0"4 28' 5'7"82' 4"1 2'3"72'5"13'2"4A B C D E F G HIJKLM 5 12 3X6(A1)1.5X3 4X8 3X6 3X4 5X5 7X8 3X5 4X10 4X10 3X8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #2; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 5.00TC: From 30 plf at 5.00 to 30 plf at 28.00BC: From 4 plf at -2.00 to 4 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.03BC: From 10 plf at 5.03 to 10 plf at 28.00TC: 188 lb Conc. Load at 5.03TC: 116 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06BC: 208 lb Conc. Load at 5.03BC: 86 lb Conc. Load at 7.06, 9.06,11.06,13.0615.06,17.06,19.06,21.06,23.06,25.06,27.06 Hangers / Ties (J) Hanger Support Required, by others Purlins In lieu of structural panels use purlins to brace all flatTC @ 24" oc. Wind Wind loads and reactions based on MWFRS. Right end vertical exposed to wind pressure. Deflection meets L/180. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M 2078 /- /- /-/648 /- H 1992 /- /- /-/580 /- Wind reactions based on MWFRS M Brg Width = 5.5 Min Req =1.5 H Brg Width = -Min Req =- Bearing M is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 687 -2327 C - D 1004 -3449 D - E 1034 -3555 Chords Tens.Comp. E - F 1034 -3555 F - G 700 -2428 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - L 2143 -628 L - K 2130 -630 Chords Tens.Comp. K - J 3497 -1031 J - I 2525 -743 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - K 1401 -397J - F 1088 -307 F - I 283 -646 Webs Tens.Comp. I - G 2535 -728G - H 301 -916 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.15 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.285 E 999 240 VERT(CL):0.566 E 590 180 HORZ(LL):0.047 C - - HORZ(TL):0.094 C - - Creep Factor: 2.0 Max TC CSI:0.665 Max BC CSI:0.751 Max Web CSI:0.966 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:H1 Ply: 2 Qty:1 SEQN:207976 HIPM FROM: bh Cust: R9616 JRef:1X7T96160004 T11 DrwNo:221.21.1328.03520 /NDW 08/09/2021 2 Complete Trusses Required 28' 5' 5' 10'9" 5'9" 16'4"4 5'7"4 21'11"8 5'7"4 27'7" 5'7"8 28' 5" 4'10"4 4'10"4 10'5"8 5'7"4 16'4"4 5'10"12 22'4"8 6'0"4 28' 5'7"82' 4"1 2'3"72'5"13'2"4A B C D E F G HIJKLM 5 12 3X6(A1)1.5X3 4X8 3X6 3X4 5X5 7X8 3X5 4X10 4X10 3X8 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #1; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 3.75" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 13.00BC: From 4 plf at -2.00 to 4 plf at 0.00BC: From 20 plf at 0.00 to 20 plf at 5.13 BC: From 10 plf at 5.13 to 10 plf at 11.00BC: From 4 plf at 11.00 to 4 plf at 13.00BC: 1992 lb Conc. Load at 5.13BC: 1137 lb Conc. Load at 7.06BC: 1114 lb Conc. Load at 9.06 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Use Simpson Hangers installed per manufacturer'sspecs., sized for magnitude and angle of tie-in loadand to fit carrying/tie-in member depth and/or width. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL G 2205 /- /- /-/582 /- D 3110 /- /- /-/749 /- Wind reactions based on MWFRS G Brg Width = 5.5 Min Req =1.5 D Brg Width = 5.5 Min Req =1.8 Bearings G & D are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 570 -2449 Chords Tens.Comp. C - D 568 -2437 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - F 2239 -513 Chords Tens.Comp. F - D 2239 -513 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - F 1683 -341 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.25 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.048 F 999 240 VERT(CL):0.093 F 999 180 HORZ(LL):0.012 F - - HORZ(TL):0.023 F - - Creep Factor: 2.0 Max TC CSI:0.553 Max BC CSI:0.851 Max Web CSI:0.641 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T1 Ply: 2 Qty:1 SEQN:207978 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T22 DrwNo:221.21.1328.18617 /NDW 08/09/2021 2 Complete Trusses Required 11' 5'6" 5'6" 11' 5'6" 5'6" 5'6" 11' 5'6"2'2' 4"12'7"93'4"12A B C D EFG 5 12 3X6(A1) 4X4 3X10 3X6(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #1; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 3.75" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 13.00BC: From 4 plf at -2.00 to 4 plf at 0.00BC: From 20 plf at 0.00 to 20 plf at 5.13 BC: From 10 plf at 5.13 to 10 plf at 11.00BC: From 4 plf at 11.00 to 4 plf at 13.00BC: 1992 lb Conc. Load at 5.13BC: 1137 lb Conc. Load at 7.06BC: 1114 lb Conc. Load at 9.06 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Use Simpson Hangers installed per manufacturer'sspecs., sized for magnitude and angle of tie-in loadand to fit carrying/tie-in member depth and/or width. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL G 2205 /- /- /-/582 /- D 3110 /- /- /-/749 /- Wind reactions based on MWFRS G Brg Width = 5.5 Min Req =1.5 D Brg Width = 5.5 Min Req =1.8 Bearings G & D are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 570 -2449 Chords Tens.Comp. C - D 568 -2437 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - F 2239 -513 Chords Tens.Comp. F - D 2239 -513 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - F 1683 -341 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.25 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.048 F 999 240 VERT(CL):0.093 F 999 180 HORZ(LL):0.012 F - - HORZ(TL):0.023 F - - Creep Factor: 2.0 Max TC CSI:0.553 Max BC CSI:0.851 Max Web CSI:0.641 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T1 Ply: 2 Qty:1 SEQN:207978 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T22 DrwNo:221.21.1328.18617 /NDW 08/09/2021 2 Complete Trusses Required 11' 5'6" 5'6" 11' 5'6" 5'6" 5'6" 11' 5'6"2'2' 4"12'7"93'4"12A B C D EFG 5 12 3X6(A1) 4X4 3X10 3X6(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #2; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 6.50" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 13.00BC: From 4 plf at -2.00 to 4 plf at 0.00BC: From 20 plf at 0.00 to 20 plf at 5.12 BC: From 10 plf at 5.12 to 10 plf at 11.00BC: From 4 plf at 11.00 to 4 plf at 13.00BC: 1145 lb Conc. Load at 5.12BC: 653 lb Conc. Load at 7.06BC: 635 lb Conc. Load at 9.06 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Use Simpson Hangers installed per manufacturer'sspecs., sized for magnitude and angle of tie-in loadand to fit carrying/tie-in member depth and/or width. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL G 1500 /- /- /-/452 /- D 2005 /- /- /-/570 /- Wind reactions based on MWFRS G Brg Width = 5.5 Min Req =1.5 D Brg Width = 5.5 Min Req =1.5 Bearings G & D are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 417 -1529 Chords Tens.Comp. C - D 415 -1521 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - F 1389 -372 Chords Tens.Comp. F - D 1389 -372 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - F 989 -225 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.25 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.031 F 999 240 VERT(CL):0.060 F 999 180 HORZ(LL):0.008 F - - HORZ(TL):0.016 F - - Creep Factor: 2.0 Max TC CSI:0.335 Max BC CSI:0.691 Max Web CSI:0.377 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T5 Ply: 2 Qty:1 SEQN:207997 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T15 DrwNo:221.21.1328.31113 /NDW 08/09/2021 2 Complete Trusses Required 11' 5'6" 5'6" 11' 5'6" 5'6" 5'6" 11' 5'6"2'2' 4"12'7"93'4"12A B C D EFG 5 12 3X4(A1) 4X4 3X8 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP #2; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @ 6.50" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 60 plf at -2.00 to 60 plf at 13.00BC: From 4 plf at -2.00 to 4 plf at 0.00BC: From 20 plf at 0.00 to 20 plf at 5.12 BC: From 10 plf at 5.12 to 10 plf at 11.00BC: From 4 plf at 11.00 to 4 plf at 13.00BC: 1145 lb Conc. Load at 5.12BC: 653 lb Conc. Load at 7.06BC: 635 lb Conc. Load at 9.06 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Use Simpson Hangers installed per manufacturer'sspecs., sized for magnitude and angle of tie-in loadand to fit carrying/tie-in member depth and/or width. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL G 1500 /- /- /-/452 /- D 2005 /- /- /-/570 /- Wind reactions based on MWFRS G Brg Width = 5.5 Min Req =1.5 D Brg Width = 5.5 Min Req =1.5 Bearings G & D are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 417 -1529 Chords Tens.Comp. C - D 415 -1521 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - F 1389 -372 Chords Tens.Comp. F - D 1389 -372 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - F 989 -225 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.25 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.031 F 999 240 VERT(CL):0.060 F 999 180 HORZ(LL):0.008 F - - HORZ(TL):0.016 F - - Creep Factor: 2.0 Max TC CSI:0.335 Max BC CSI:0.691 Max Web CSI:0.377 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T5 Ply: 2 Qty:1 SEQN:207997 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T15 DrwNo:221.21.1328.31113 /NDW 08/09/2021 2 Complete Trusses Required 11' 5'6" 5'6" 11' 5'6" 5'6" 5'6" 11' 5'6"2'2' 4"12'7"93'4"12A B C D EFG 5 12 3X4(A1) 4X4 3X8 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X3 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A16030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL I*74 /- /-/35 /56 /4 Wind reactions based on C&C I Brg Width = 132 Min Req =- Bearing I is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.41 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 F 999 240 VERT(CL):0.006 F 999 180 HORZ(LL):-0.001 F - - HORZ(TL):0.002 F - - Creep Factor: 2.0 Max TC CSI:0.115 Max BC CSI:0.059 Max Web CSI:0.081 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:G1 Ply: 1 Qty:2 SEQN:207995 GABL FROM: bh Cust: R9616 JRef:1X7T96160004 T9 DrwNo:221.21.1328.34757 /NDW 08/09/2021 10'7"6 3'6" 2' (TYP) 4"10 4"10 5'6" 5'1"6 10'7"6 5'1"6 11' 4"10 4"10 4"10 10'7"6 10'2"13 11' 4"102'1"9A C E I 5 12 3X4(D1) 4X4 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X3 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A16030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL I*74 /- /-/35 /56 /4 Wind reactions based on C&C I Brg Width = 132 Min Req =- Bearing I is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.41 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 F 999 240 VERT(CL):0.006 F 999 180 HORZ(LL):-0.001 F - - HORZ(TL):0.002 F - - Creep Factor: 2.0 Max TC CSI:0.115 Max BC CSI:0.059 Max Web CSI:0.081 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:G1 Ply: 1 Qty:2 SEQN:207995 GABL FROM: bh Cust: R9616 JRef:1X7T96160004 T9 DrwNo:221.21.1328.34757 /NDW 08/09/2021 10'7"6 3'6" 2' (TYP) 4"10 4"10 5'6" 5'1"6 10'7"6 5'1"6 11' 4"10 4"10 4"10 10'7"6 10'2"13 11' 4"102'1"9A C E I 5 12 3X4(D1) 4X4 3X4(D1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 445 /- /-/305 /593 /93 D 445 /- /-/190 /593 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 D Brg Width = 3.5 Min Req =1.5 Bearings B & D are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.007 999 240 VERT(CL):0.018 999 180 HORZ(LL):-0.003 - - HORZ(TL):0.008 - - Creep Factor: 2.0 Max TC CSI:0.587 Max BC CSI:0.369 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T3 Ply: 1 Qty:2 SEQN:207948 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T5 DrwNo:221.21.1328.38650 /NDW 08/09/2021 8' 4' 4' 8' 4' 8' 8'2'2' 4"12'0"12'9"4A B C D E 5 12 3X4(A1) 3X4 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 445 /- /-/305 /593 /93 D 445 /- /-/190 /593 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 D Brg Width = 3.5 Min Req =1.5 Bearings B & D are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.007 999 240 VERT(CL):0.018 999 180 HORZ(LL):-0.003 - - HORZ(TL):0.008 - - Creep Factor: 2.0 Max TC CSI:0.587 Max BC CSI:0.369 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T3 Ply: 1 Qty:2 SEQN:207948 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T5 DrwNo:221.21.1328.38650 /NDW 08/09/2021 8' 4' 4' 8' 4' 8' 8'2'2' 4"12'0"12'9"4A B C D E 5 12 3X4(A1) 3X4 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X3 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A16015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL F*111 /- /-/51 /138 /12 Wind reactions based on C&C F Brg Width = 96.0 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 H 999 240 VERT(CL):-0.002 J 999 180 HORZ(LL):-0.001 H - - HORZ(TL):0.001 H - - Creep Factor: 2.0 Max TC CSI:0.587 Max BC CSI:0.133 Max Web CSI:0.056 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:G3 Ply: 1 Qty:1 SEQN:207941 GABL FROM: bh Cust: R9616 JRef:1X7T96160004 T6 DrwNo:221.21.1328.41450 /NDW 08/09/2021 8' 2' (TYP) 4' 4' 8' 4' 8' 8'2'2' 4"12'0"12'9"4A B D F G 5 12 3X4(A1) 4X4 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 1.5X3 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A16015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL F*111 /- /-/51 /138 /12 Wind reactions based on C&C F Brg Width = 96.0 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 H 999 240 VERT(CL):-0.002 J 999 180 HORZ(LL):-0.001 H - - HORZ(TL):0.001 H - - Creep Factor: 2.0 Max TC CSI:0.587 Max BC CSI:0.133 Max Web CSI:0.056 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:G3 Ply: 1 Qty:1 SEQN:207941 GABL FROM: bh Cust: R9616 JRef:1X7T96160004 T6 DrwNo:221.21.1328.41450 /NDW 08/09/2021 8' 2' (TYP) 4' 4' 8' 4' 8' 8'2'2' 4"12'0"12'9"4A B D F G 5 12 3X4(A1) 4X4 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 262 /- /-/188 /435 /57 D 262 /- /-/109 /435 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 D Brg Width = 3.5 Min Req =1.5 Bearings B & D are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 999 240 VERT(CL):0.003 999 180 HORZ(LL):0.001 - - HORZ(TL):0.001 - - Creep Factor: 2.0 Max TC CSI:0.304 Max BC CSI:0.100 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T2 Ply: 1 Qty:1 SEQN:207951 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T1 DrwNo:221.21.1328.44430 /NDW 08/09/2021 4'6" 2'3" 2'3" 4'6" 2'3" 4'6" 4'6"1'4"1'4" 4"11'3"51'9"2A B C D E 5 12 3X4(A1) 3X4 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 262 /- /-/188 /435 /57 D 262 /- /-/109 /435 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 D Brg Width = 3.5 Min Req =1.5 Bearings B & D are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 999 240 VERT(CL):0.003 999 180 HORZ(LL):0.001 - - HORZ(TL):0.001 - - Creep Factor: 2.0 Max TC CSI:0.304 Max BC CSI:0.100 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T2 Ply: 1 Qty:1 SEQN:207951 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T1 DrwNo:221.21.1328.44430 /NDW 08/09/2021 4'6" 2'3" 2'3" 4'6" 2'3" 4'6" 4'6"1'4"1'4" 4"11'3"51'9"2A B C D E 5 12 3X4(A1) 3X4 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 3X4(A1) except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A16015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL D*117 /- /-/53 /184 /13 Wind reactions based on C&C D Brg Width = 54.0 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 F 999 240 VERT(CL):0.001 F 999 180 HORZ(LL):-0.000 F - - HORZ(TL):0.001 F - - Creep Factor: 2.0 Max TC CSI:0.296 Max BC CSI:0.043 Max Web CSI:0.028 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:G2 Ply: 1 Qty:1 SEQN:207960 GABL FROM: bh Cust: R9616 JRef:1X7T96160004 T4 DrwNo:221.21.1328.47750 /NDW 08/09/2021 4'6" 2'3" 2'3" 4'6" 2'3" 4'6" 4'6"1'4"1'4" 4"11'3"51'9"2A B C D E 5 12 4X4 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 3X4(A1) except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A16015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL D*117 /- /-/53 /184 /13 Wind reactions based on C&C D Brg Width = 54.0 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 F 999 240 VERT(CL):0.001 F 999 180 HORZ(LL):-0.000 F - - HORZ(TL):0.001 F - - Creep Factor: 2.0 Max TC CSI:0.296 Max BC CSI:0.043 Max Web CSI:0.028 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:G2 Ply: 1 Qty:1 SEQN:207960 GABL FROM: bh Cust: R9616 JRef:1X7T96160004 T4 DrwNo:221.21.1328.47750 /NDW 08/09/2021 4'6" 2'3" 2'3" 4'6" 2'3" 4'6" 4'6"1'4"1'4" 4"11'3"51'9"2A B C D E 5 12 4X4 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Slider: 2x6 SP #2; block length = 1.500' Wind Wind loads based on MWFRS with additional C&C member design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 419 /- /-/286 /634 /177 E 239 /- /-/130 /266 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 E Brg Width = -Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.004 F 999 240 VERT(CL):0.006 F 999 180 HORZ(LL):0.002 D - - HORZ(TL):0.003 F - - Creep Factor: 2.0 Max TC CSI:0.641 Max BC CSI:0.125 Max Web CSI:0.069 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T4 Ply: 1 Qty:1 SEQN:207938 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T7 DrwNo:221.21.1328.51630 /NDW 08/09/2021 6'8" 4' 4' 6'8" 2'8" 4' 4' 6'8" 2'8"2' 4"1 10"112'0"12'9"4A B C D E F 5 12 3X4(A1) 4X4 1.5X3 3X4 3X8(E5) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Slider: 2x6 SP #2; block length = 1.500' Wind Wind loads based on MWFRS with additional C&C member design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 419 /- /-/286 /634 /177 E 239 /- /-/130 /266 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 E Brg Width = -Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 15.00 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.004 F 999 240 VERT(CL):0.006 F 999 180 HORZ(LL):0.002 D - - HORZ(TL):0.003 F - - Creep Factor: 2.0 Max TC CSI:0.641 Max BC CSI:0.125 Max Web CSI:0.069 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:T4 Ply: 1 Qty:1 SEQN:207938 COMN FROM: bh Cust: R9616 JRef:1X7T96160004 T7 DrwNo:221.21.1328.51630 /NDW 08/09/2021 6'8" 4' 4' 6'8" 2'8" 4' 4' 6'8" 2'8"2' 4"1 10"112'0"12'9"4A B C D E F 5 12 3X4(A1) 4X4 1.5X3 3X4 3X8(E5) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 360 /- /-/262 /368 /258 D 86 /- /-/47 /- /- C 116 /- /-/62 /195 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.15 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 D - - HORZ(TL):0.007 D - - Creep Factor: 2.0 Max TC CSI:0.470 Max BC CSI:0.216 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:J5 Ply: 1 Qty:24 SEQN:207929 EJAC FROM: bh Cust: R9616 JRef:1X7T96160004 T25 DrwNo:221.21.1328.54257 /NDW 08/09/2021 5' 5'2' 4"1 2'5"13'2"4A B C D 5 12 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 360 /- /-/262 /368 /258 D 86 /- /-/47 /- /- C 116 /- /-/62 /195 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.15 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 D - - HORZ(TL):0.007 D - - Creep Factor: 2.0 Max TC CSI:0.470 Max BC CSI:0.216 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:J5 Ply: 1 Qty:24 SEQN:207929 EJAC FROM: bh Cust: R9616 JRef:1X7T96160004 T25 DrwNo:221.21.1328.54257 /NDW 08/09/2021 5' 5'2' 4"1 2'5"13'2"4A B C D 5 12 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 300 /- /-/231 /365 /216 D 45 /- /-/40 /2 /- C 48 /- /-/26 /126 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 16.73 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.001 D - - HORZ(TL):0.002 D - - Creep Factor: 2.0 Max TC CSI:0.468 Max BC CSI:0.115 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:J3 Ply: 1 Qty:4 SEQN:207942 JACK FROM: bh Cust: R9616 JRef:1X7T96160004 T26 DrwNo:221.21.1328.56437 /NDW 08/09/2021 2'11"11 2'11"112' 4"1 1'6"152'4"2A B C D 5 12 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 300 /- /-/231 /365 /216 D 45 /- /-/40 /2 /- C 48 /- /-/26 /126 /- Wind reactions based on C&C B Brg Width = 3.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 16.73 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.001 D - - HORZ(TL):0.002 D - - Creep Factor: 2.0 Max TC CSI:0.468 Max BC CSI:0.115 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:J3 Ply: 1 Qty:4 SEQN:207942 JACK FROM: bh Cust: R9616 JRef:1X7T96160004 T26 DrwNo:221.21.1328.56437 /NDW 08/09/2021 2'11"11 2'11"112' 4"1 1'6"152'4"2A B C D 5 12 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 340 /- /-/294 /810 /186 D -/-38 /-/130 /37 /- C -/-98 /-/293 /98 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 16.31 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.000 D - - HORZ(TL):0.001 D - - Creep Factor: 2.0 Max TC CSI:0.709 Max BC CSI:0.083 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:J1 Ply: 1 Qty:4 SEQN:207933 JACK FROM: bh Cust: R9616 JRef:1X7T96160004 T24 DrwNo:221.21.1329.02127 /NDW 08/09/2021 11"11 11"112' 4"1 8"151'6"2A B C D 5 12 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Wind Wind loads based on MWFRS with additional C&Cmember design & reactions. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 340 /- /-/294 /810 /186 D -/-38 /-/130 /37 /- C -/-98 /-/293 /98 /- Wind reactions based on C&C B Brg Width = 5.5 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 16.31 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.000 D - - HORZ(TL):0.001 D - - Creep Factor: 2.0 Max TC CSI:0.709 Max BC CSI:0.083 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:J1 Ply: 1 Qty:4 SEQN:207933 JACK FROM: bh Cust: R9616 JRef:1X7T96160004 T24 DrwNo:221.21.1329.02127 /NDW 08/09/2021 11"11 11"112' 4"1 8"151'6"2A B C D 5 12 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 0 plf at -2.83 to 60 plf at 0.00TC: From 2 plf at 0.00 to 2 plf at 7.07 BC: From 0 plf at -2.83 to 4 plf at 0.00BC: From 2 plf at 0.00 to 2 plf at 7.07TC: -71 lb Conc. Load at 1.44TC: 96 lb Conc. Load at 4.27BC: -9 lb Conc. Load at 1.44 BC: 89 lb Conc. Load at 4.27 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 299 /- /- /-/297 /- D 121 /- /- /-/25 /- C 71 /- /- /-/53 /- Wind reactions based on MWFRS B Brg Width = 7.8 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.13 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.020 D - - HORZ(TL):0.021 D - - Creep Factor: 2.0 Max TC CSI:0.437 Max BC CSI:0.454 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:CJ7 Ply: 1 Qty:2 SEQN:207975 HIP_ FROM: bh Cust: R9616 JRef:1X7T96160004 T14 DrwNo:221.21.1329.08980 /NDW 08/09/2021 7'0"14 7'0"142'9"15 3"13 2'4"133'2"6A B C D 3.54 12 3X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 0 plf at -2.83 to 60 plf at 0.00TC: From 2 plf at 0.00 to 2 plf at 7.07 BC: From 0 plf at -2.83 to 4 plf at 0.00BC: From 2 plf at 0.00 to 2 plf at 7.07TC: -71 lb Conc. Load at 1.44TC: 96 lb Conc. Load at 4.27BC: -9 lb Conc. Load at 1.44 BC: 89 lb Conc. Load at 4.27 Wind Wind loads and reactions based on MWFRS. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL B 299 /- /- /-/297 /- D 121 /- /- /-/25 /- C 71 /- /- /-/53 /- Wind reactions based on MWFRS B Brg Width = 7.8 Min Req =1.5 D Brg Width = 1.5 Min Req =- C Brg Width = 1.5 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: D Kzt: NA Mean Height: 17.13 ft TCDL: 6.0 psf BCDL: 6.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.25 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):-0.020 D - - HORZ(TL):0.021 D - - Creep Factor: 2.0 Max TC CSI:0.437 Max BC CSI:0.454 Max Web CSI:0.000 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-2 Marsh View Roof Truss Label:CJ7 Ply: 1 Qty:2 SEQN:207975 HIP_ FROM: bh Cust: R9616 JRef:1X7T96160004 T14 DrwNo:221.21.1329.08980 /NDW 08/09/2021 7'0"14 7'0"142'9"15 3"13 2'4"133'2"6A B C D 3.54 12 3X4(A1) 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS 514 Earth City Expressway Suite 242 Earth City, MO 63045 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS 514 Earth City Expressway Suite 242 Earth City, MO 63045 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS 514 Earth City Expressway Suite 242 Earth City, MO 63045 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS Alpine, an ITW company 514 Earth City Expressway Suite 242 Earth City, MO 63045 Phone: (800)326-4102 (314)344-9121 alpineitw.com Site Information:Page 1: Customer: Trussco, LLC Job Number: 9602-1 Job Description: Marsh View Floor Address: 1466 Marsh View , Atlantic Beach, FL Job Engineering Criteria: Design Code: FBC 7th Ed. 2020 Res IntelliVIEW Version: 20.02.01D JRef #: 1X7T96160005 Wind Standard: ASCE716 Wind Speed (mph): 0 Design Loading (psf): 60.00 Building Type: This package contains general notes pages, 14 truss drawing(s) and 1 detail(s). Item Drawing Number Truss Item Drawing Number Truss 1 221.21.1312.11100 F6 2 221.21.1313.14297 F5 3 221.21.1313.20097 G3 4 221.21.1313.25677 F7 5 221.21.1313.30323 G4 6 221.21.1313.36857 F8 7 221.21.1313.43443 F1 8 221.21.1313.46433 G1 9 221.21.1313.51873 F2 10 221.21.1313.59387 F4 11 221.21.1314.05227 G2 12 221.21.1314.10203 F3 13 221.21.1314.15030 F9 14 221.21.1314.23687 F10 15 STRBRIBR1014 Florida Certificate of Product Approval #FL1999 Printed 8/9/2021 1:14:27 PM 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 This item has been electronically signed and sealed by David J. Rothweiler on the date adjacent to the seal using a SHA authentication code. Printed copies of this document are not considered signed and sealed and the SHA authentication code must be verified on any electronic copies. SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS General Notes Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities: The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1, Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to independently verify the accuracy or completeness of the information provided by others and may rely on that information without liability. The responsibility for verification of that information remains with others neither employed nor controlled by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component designs and not for the technical information furnished by others which technical information and consequences thereof remain their sole responsibility. The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and loads for each truss component match those required by the plans and by the actual use of the individual component, and for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any additional factors required in the particular application. Truss components using metal connector plates with integral teeth shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to exceed 19% and/or cause corrosion of connector plates and other metal fasteners. The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss component design loads, inspection of the truss components before or after installation, the design of temporary or permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports, installation of the truss components, observation of the truss component installation process, review of truss assembly procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in the installation of the truss components and/or its connections. This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request. Temporary Lateral Restraint and Bracing: Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2, B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to and may not be relied upon for the temporary stability of the truss components during their installation. Permanent Lateral Restraint and Bracing: The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional. These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building Designer. Connector Plate Information: Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations, gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60. Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at www.icc-es.org. Fire Retardant Treated Lumber: Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special handling care must be taken to prevent breakage during all handling activities. Page 1 of 3 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS General Notes (continued) Key to Terms: Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be found in calculation sheets available upon written request. BCDL = Bottom Chord standard design Dead Load in pounds per square foot. BCLL = Bottom Chord standard design Live Load in pounds per square foot. CL = Certified lumber. Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot. FRT = Fire Retardant Treated lumber. FRT-DB = D-Blaze Fire Retardant Treated lumber. FRT-DC = Dricon Fire Retardant Treated lumber. FRT-FP = FirePRO Fire Retardant Treated lumber. FRT-FL = FlamePRO Fire Retardant Treated lumber. FRT-FT = FlameTech Fire Retardant Treated lumber. FRT-PG = PYRO-GUARD Fire Retardant Treated lumber. g = green lumber. HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches. HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep adjustment. HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds. Ic = Incised lumber. FJ = Finger Jointed lumber. L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value. L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the referenced panel point. Reported as 999 if greater than or equal to 999. Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection. Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases. Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases. Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases. NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot. PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds. PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds. PP = Panel Point. R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc). -R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc). Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the indicated location (Loc). RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the indicated location (Loc). Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the identified location (Loc). TCDL = Top Chord standard design Dead Load in pounds per square foot. TCLL = Top Chord standard design Live Load in pounds per square foot. U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the indicated location (Loc). VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in inches. VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment. VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load. VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment. W = Width of non-hanger bearing, in inches. Refer to ASCE-7 for Wind and Seismic abbreviations. Uppercase Acronyms not explained above are as defined in TPI 1. Page 2 of 3 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS References: 1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org. 2. ICC: International Code Council; www.iccsafe.org. 3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO 63045; www.alpineitw.com. 4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org. 5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www.sbcindustry.com. Page 3 of 3 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2 Dense;Bot chord: 4x2 SP #2 Dense; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Plating Notes All plates are 1.5X3 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL V 730 /- /- /- /- /- K 727 /- /- /- /- /- V Brg Width = 5.5 Min Req =1.5 K Brg Width = 1.5 Min Req =1.5 Bearings V & K are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1299 C - D 0 -2194 D - E 0 -2194 E - F 0 -2618 Chords Tens.Comp. F - G 0 -2692 G - H 0 -2476 H - I 0 -1828 I - J 0 -770 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. V - U 743 0 U - T 1815 0T - S 2496 0 S - R 2693 0 R - Q 2692 0 Chords Tens.Comp. Q - P 2688 0 P - O 2250 0O - N 2250 0 N - M 1395 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. V - B 0 -1011 B - U 772 0 U - C 0 -718 C - T 516 0 T - E 0 -410 G - P 0 -402 Webs Tens.Comp. H - N 0 -574 N - I 602 0 I - M 0 -869 M - J 959 0 J - K 7 -849 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.174 F 999 360 VERT(CL):0.261 F 831 240 HORZ(LL):0.032 B - - HORZ(TL):0.048 B - - Creep Factor: 2.0 Max TC CSI:0.371 Max BC CSI:0.761 Max Web CSI:0.457 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F6 Ply: 1 Qty:20 SEQN:208055 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T7 DrwNo:221.21.1312.11100 /NDW 08/09/2021 3"8 18'4" 3"2'6" (TYP) 1'3"12 1'3"12 2'6"12 2'6"12 3" 9'3" 9'3" 10'4" 1'1" 18'4" 8'1'4"5"8 10"8 + A B C D E F G H I J K LMNOPQRSTUV 1.5X3 3X5 3X5 3X5 3X3 3X5 3X3 3X3 3X3 3X3 3X3 3X4 3X4 3X4 4X5 4X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2 Dense;Bot chord: 4x2 SP #2 Dense; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Plating Notes All plates are 1.5X3 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL V 730 /- /- /- /- /- K 727 /- /- /- /- /- V Brg Width = 5.5 Min Req =1.5 K Brg Width = 1.5 Min Req =1.5 Bearings V & K are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1299 C - D 0 -2194 D - E 0 -2194 E - F 0 -2618 Chords Tens.Comp. F - G 0 -2692 G - H 0 -2476 H - I 0 -1828 I - J 0 -770 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. V - U 743 0 U - T 1815 0T - S 2496 0 S - R 2693 0 R - Q 2692 0 Chords Tens.Comp. Q - P 2688 0 P - O 2250 0O - N 2250 0 N - M 1395 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. V - B 0 -1011 B - U 772 0 U - C 0 -718 C - T 516 0 T - E 0 -410 G - P 0 -402 Webs Tens.Comp. H - N 0 -574 N - I 602 0 I - M 0 -869 M - J 959 0 J - K 7 -849 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.174 F 999 360 VERT(CL):0.261 F 831 240 HORZ(LL):0.032 B - - HORZ(TL):0.048 B - - Creep Factor: 2.0 Max TC CSI:0.371 Max BC CSI:0.761 Max Web CSI:0.457 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F6 Ply: 1 Qty:20 SEQN:208055 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T7 DrwNo:221.21.1312.11100 /NDW 08/09/2021 3"8 18'4" 3"2'6" (TYP) 1'3"12 1'3"12 2'6"12 2'6"12 3" 9'3" 9'3" 10'4" 1'1" 18'4" 8'1'4"5"8 10"8 + A B C D E F G H I J K LMNOPQRSTUV 1.5X3 3X5 3X5 3X5 3X3 3X5 3X3 3X3 3X3 3X3 3X3 3X4 3X4 3X4 4X5 4X6 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2 Dense;Bot chord: 4x2 SP #2 Dense; Webs: 4x2 SP #3; Plating Notes All plates are 3X5 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL U 708 /- /- /- /- /- N 704 /- /- /- /- /- U Brg Width = 5.5 Min Req =1.5 N Brg Width = 1.7 Min Req =1.5 Bearings U & N are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1251 C - D 0 -2104 D - E 0 -2104 E - F 0 -2511 F - G 0 -2517 Chords Tens.Comp. G - H 0 -2511 H - I 0 -2113 I - J 0 -2113 J - K 0 -1274 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. U - T 719 0T - S 1744 0 S - R 2356 0 R - Q 2517 0 Chords Tens.Comp. Q - P 2362 0P - O 1760 0 O - N 731 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. U - B 0 -978 B - T 740 0 T - C 0 -685 C - S 490 0 E - R 403 -23 Webs Tens.Comp. Q - H 397 -29 P - J 480 0 J - O 0 -675 O - K 755 0 K - N 0 -994 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.149 G 999 360 VERT(CL):0.209 G 999 240 HORZ(LL):0.029 N - - HORZ(TL):0.043 N - - Creep Factor: 2.0 Max TC CSI:0.496 Max BC CSI:0.647 Max Web CSI:0.360 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F5 Ply: 1 Qty:4 SEQN:208056 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T3 DrwNo:221.21.1313.14297 /NDW 08/09/2021 3"8 17'10"4 3" 1'3" 2'6"1'3"12 (TYP)2'6"1'3" 3" 8' 8' 9'10"4 1'10"4 17'10"4 8'1'4"+ A B C D E F G H I J K L NOPQRSTU 1.5X31.5X3 3X3 1.5X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 1.5X3 3X3 1.5X31.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2 Dense;Bot chord: 4x2 SP #2 Dense; Webs: 4x2 SP #3; Plating Notes All plates are 3X5 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL U 708 /- /- /- /- /- N 704 /- /- /- /- /- U Brg Width = 5.5 Min Req =1.5 N Brg Width = 1.7 Min Req =1.5 Bearings U & N are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1251 C - D 0 -2104 D - E 0 -2104 E - F 0 -2511 F - G 0 -2517 Chords Tens.Comp. G - H 0 -2511 H - I 0 -2113 I - J 0 -2113 J - K 0 -1274 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. U - T 719 0T - S 1744 0 S - R 2356 0 R - Q 2517 0 Chords Tens.Comp. Q - P 2362 0P - O 1760 0 O - N 731 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. U - B 0 -978 B - T 740 0 T - C 0 -685 C - S 490 0 E - R 403 -23 Webs Tens.Comp. Q - H 397 -29 P - J 480 0 J - O 0 -675 O - K 755 0 K - N 0 -994 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.149 G 999 360 VERT(CL):0.209 G 999 240 HORZ(LL):0.029 N - - HORZ(TL):0.043 N - - Creep Factor: 2.0 Max TC CSI:0.496 Max BC CSI:0.647 Max Web CSI:0.360 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F5 Ply: 1 Qty:4 SEQN:208056 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T3 DrwNo:221.21.1313.14297 /NDW 08/09/2021 3"8 17'10"4 3" 1'3" 2'6"1'3"12 (TYP)2'6"1'3" 3" 8' 8' 9'10"4 1'10"4 17'10"4 8'1'4"+ A B C D E F G H I J K L NOPQRSTU 1.5X31.5X3 3X3 1.5X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 1.5X3 3X3 1.5X31.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2 Dense;Bot chord: 4x2 SP #2 Dense; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes Deflection estimate assumes composite action with single layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL Q*79 /- /- /- /- /- Q Brg Width = 214 Min Req =- Bearing AE is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 C 999 360 VERT(CL):0.000 C 999 240 HORZ(LL):0.000 O - - HORZ(TL):0.000 O - - Creep Factor: 2.0 Max TC CSI:0.048 Max BC CSI:0.010 Max Web CSI:0.021 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G3 Ply: 1 Qty:1 SEQN:208057 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T4 DrwNo:221.21.1313.20097 /NDW 08/09/2021 3"8 17'10"4 9"10 1'4" (TYP)1'4"A O QAE 1.5X3 2X3 2X3 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2 Dense;Bot chord: 4x2 SP #2 Dense; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes Deflection estimate assumes composite action with single layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL Q*79 /- /- /- /- /- Q Brg Width = 214 Min Req =- Bearing AE is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 C 999 360 VERT(CL):0.000 C 999 240 HORZ(LL):0.000 O - - HORZ(TL):0.000 O - - Creep Factor: 2.0 Max TC CSI:0.048 Max BC CSI:0.010 Max Web CSI:0.021 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G3 Ply: 1 Qty:1 SEQN:208057 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T4 DrwNo:221.21.1313.20097 /NDW 08/09/2021 3"8 17'10"4 9"10 1'4" (TYP)1'4"A O QAE 1.5X3 2X3 2X3 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL O 479 /- /- /- /- /- J 476 /- /- /- /- /- O Brg Width = 5.5 Min Req =1.5 J Brg Width = 1.8 Min Req =1.5 Bearings O & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -769 C - D 0 -1136 D - E 0 -1140 Chords Tens.Comp. E - F 0 -1136 F - G 0 -782 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. O - N 473 0 N - M 1025 0 M - L 1140 0 Chords Tens.Comp. L - K 1032 0 K - J 480 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. O - B 0 -643B - N 412 0 Webs Tens.Comp. K - G 421 0G - J 0 -652 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.040 E 999 360 VERT(CL):0.063 E 999 240 HORZ(LL):0.010 J - - HORZ(TL):0.016 B - - Creep Factor: 2.0 Max TC CSI:0.254 Max BC CSI:0.347 Max Web CSI:0.200 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F7 Ply: 1 Qty:4 SEQN:208058 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T20 DrwNo:221.21.1313.25677 /NDW 08/09/2021 3"8 12'1"12 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 6'9"4 1'4"12 12'1"12 5'4"8 1'4"+ A B C D E F G H JKLMNO 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL O 479 /- /- /- /- /- J 476 /- /- /- /- /- O Brg Width = 5.5 Min Req =1.5 J Brg Width = 1.8 Min Req =1.5 Bearings O & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -769 C - D 0 -1136 D - E 0 -1140 Chords Tens.Comp. E - F 0 -1136 F - G 0 -782 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. O - N 473 0 N - M 1025 0 M - L 1140 0 Chords Tens.Comp. L - K 1032 0 K - J 480 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. O - B 0 -643B - N 412 0 Webs Tens.Comp. K - G 421 0G - J 0 -652 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.040 E 999 360 VERT(CL):0.063 E 999 240 HORZ(LL):0.010 J - - HORZ(TL):0.016 B - - Creep Factor: 2.0 Max TC CSI:0.254 Max BC CSI:0.347 Max Web CSI:0.200 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F7 Ply: 1 Qty:4 SEQN:208058 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T20 DrwNo:221.21.1313.25677 /NDW 08/09/2021 3"8 12'1"12 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 6'9"4 1'4"12 12'1"12 5'4"8 1'4"+ A B C D E F G H JKLMNO 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M*79 /- /- /- /- /- M Brg Width = 145 Min Req =- Bearing W is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 I 999 360 VERT(CL):0.000 C 999 240 HORZ(LL):0.000 K - - HORZ(TL):0.000 K - - Creep Factor: 2.0 Max TC CSI:0.053 Max BC CSI:0.011 Max Web CSI:0.021 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G4 Ply: 1 Qty:1 SEQN:208059 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T21 DrwNo:221.21.1313.30323 /NDW 08/09/2021 3"8 12'1"12 7"6 1'4" (TYP)1'4"A K MW 1.5X3 2X3 2X3 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M*79 /- /- /- /- /- M Brg Width = 145 Min Req =- Bearing W is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 I 999 360 VERT(CL):0.000 C 999 240 HORZ(LL):0.000 K - - HORZ(TL):0.000 K - - Creep Factor: 2.0 Max TC CSI:0.053 Max BC CSI:0.011 Max Web CSI:0.021 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G4 Ply: 1 Qty:1 SEQN:208059 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T21 DrwNo:221.21.1313.30323 /NDW 08/09/2021 3"8 12'1"12 7"6 1'4" (TYP)1'4"A K MW 1.5X3 2X3 2X3 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 452 /- /- /- /- /- H 448 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 H Brg Width = 1.5 Min Req =1.5 Bearings N & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -715 C - D 0 -990 D - E 0 -993 Chords Tens.Comp. E - F 0 -985 F - G 0 -433 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 444 0 M - L 935 0 Chords Tens.Comp. L - K 993 0 K - J 772 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -604 B - M 377 0F - J 0 -472 Webs Tens.Comp. J - G 520 0 G - H 14 -630 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.050 D 999 360 VERT(CL):0.088 D 999 240 HORZ(LL):0.012 B - - HORZ(TL):0.022 B - - Creep Factor: 2.0 Max TC CSI:0.475 Max BC CSI:0.420 Max Web CSI:0.248 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F8 Ply: 1 Qty:4 SEQN:208060 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T17 DrwNo:221.21.1313.36857 /NDW 08/09/2021 3"8 11'4"8 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 7'3" 1'10"8 11'4"8 4'1"8 1'4"5"8 10"8 A B C D E F G H IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X5 1.5X31.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 452 /- /- /- /- /- H 448 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 H Brg Width = 1.5 Min Req =1.5 Bearings N & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -715 C - D 0 -990 D - E 0 -993 Chords Tens.Comp. E - F 0 -985 F - G 0 -433 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 444 0 M - L 935 0 Chords Tens.Comp. L - K 993 0 K - J 772 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -604 B - M 377 0F - J 0 -472 Webs Tens.Comp. J - G 520 0 G - H 14 -630 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.050 D 999 360 VERT(CL):0.088 D 999 240 HORZ(LL):0.012 B - - HORZ(TL):0.022 B - - Creep Factor: 2.0 Max TC CSI:0.475 Max BC CSI:0.420 Max Web CSI:0.248 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F8 Ply: 1 Qty:4 SEQN:208060 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T17 DrwNo:221.21.1313.36857 /NDW 08/09/2021 3"8 11'4"8 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 7'3" 1'10"8 11'4"8 4'1"8 1'4"5"8 10"8 A B C D E F G H IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X5 1.5X31.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 432 /- /- /- /- /- I 432 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 I Brg Width = 5.5 Min Req =1.5 Bearings N & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -672 C - D 0 -909 Chords Tens.Comp. D - E 0 -910 E - F 0 -670 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 422 0 M - L 874 0 L - K 910 0 Chords Tens.Comp. K - J 908 0 J - I 415 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -574 Webs Tens.Comp. F - I 0 -564 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.038 D 999 360 VERT(CL):0.069 D 999 240 HORZ(LL):0.010 B - - HORZ(TL):0.017 B - - Creep Factor: 2.0 Max TC CSI:0.328 Max BC CSI:0.432 Max Web CSI:0.169 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F1 Ply: 1 Qty:4 SEQN:208061 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T1 DrwNo:221.21.1313.43443 /NDW 08/09/2021 3"8 11' 3"2'6" (TYP) 1'3"12 3" 5'4"8 5'4"8 6'10"8 1'6" 11' 4'1"8 1'4"A B C D E F G IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 432 /- /- /- /- /- I 432 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 I Brg Width = 5.5 Min Req =1.5 Bearings N & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -672 C - D 0 -909 Chords Tens.Comp. D - E 0 -910 E - F 0 -670 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 422 0 M - L 874 0 L - K 910 0 Chords Tens.Comp. K - J 908 0 J - I 415 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -574 Webs Tens.Comp. F - I 0 -564 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.038 D 999 360 VERT(CL):0.069 D 999 240 HORZ(LL):0.010 B - - HORZ(TL):0.017 B - - Creep Factor: 2.0 Max TC CSI:0.328 Max BC CSI:0.432 Max Web CSI:0.169 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F1 Ply: 1 Qty:4 SEQN:208061 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T1 DrwNo:221.21.1313.43443 /NDW 08/09/2021 3"8 11' 3"2'6" (TYP) 1'3"12 3" 5'4"8 5'4"8 6'10"8 1'6" 11' 4'1"8 1'4"A B C D E F G IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes Deflection estimate assumes composite action with single layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL K*78 /- /- /- /- /- K Brg Width = 132 Min Req =- Bearing S is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 B 999 360 VERT(CL):0.000 B 999 240 HORZ(LL):-0.000 S - - HORZ(TL):0.000 S - - Creep Factor: 2.0 Max TC CSI:0.069 Max BC CSI:0.011 Max Web CSI:0.023 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G1 Ply: 1 Qty:1 SEQN:208062 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T2 DrwNo:221.21.1313.46433 /NDW 08/09/2021 3"8 11' 1'4"8 1'4" (TYP)1'4"A I KS 1.5X3 2X3 2X3 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes Deflection estimate assumes composite action with single layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL K*78 /- /- /- /- /- K Brg Width = 132 Min Req =- Bearing S is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 B 999 360 VERT(CL):0.000 B 999 240 HORZ(LL):-0.000 S - - HORZ(TL):0.000 S - - Creep Factor: 2.0 Max TC CSI:0.069 Max BC CSI:0.011 Max Web CSI:0.023 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G1 Ply: 1 Qty:1 SEQN:208062 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T2 DrwNo:221.21.1313.46433 /NDW 08/09/2021 3"8 11' 1'4"8 1'4" (TYP)1'4"A I KS 1.5X3 2X3 2X3 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 425 /- /- /- /- /- I 425 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 I Brg Width = 3.5 Min Req =1.5 Bearings N & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -657 C - D 0 -883 Chords Tens.Comp. D - E 0 -884 E - F 0 -656 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 414 0 M - L 853 0 L - K 884 0 Chords Tens.Comp. K - J 882 0 J - I 409 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -564 Webs Tens.Comp. F - I 0 -556 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.034 D 999 360 VERT(CL):0.060 D 999 240 HORZ(LL):0.009 B - - HORZ(TL):0.015 B - - Creep Factor: 2.0 Max TC CSI:0.288 Max BC CSI:0.400 Max Web CSI:0.163 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F2 Ply: 1 Qty:6 SEQN:208063 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T12 DrwNo:221.21.1313.51873 /NDW 08/09/2021 3"8 10'10" 3"2'6" (TYP) 1'3"12 3" 5'4"8 5'4"8 6'8"8 1'4" 10'10" 4'1"8 1'4"A B C D E F G IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 425 /- /- /- /- /- I 425 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 I Brg Width = 3.5 Min Req =1.5 Bearings N & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -657 C - D 0 -883 Chords Tens.Comp. D - E 0 -884 E - F 0 -656 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 414 0 M - L 853 0 L - K 884 0 Chords Tens.Comp. K - J 882 0 J - I 409 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -564 Webs Tens.Comp. F - I 0 -556 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.034 D 999 360 VERT(CL):0.060 D 999 240 HORZ(LL):0.009 B - - HORZ(TL):0.015 B - - Creep Factor: 2.0 Max TC CSI:0.288 Max BC CSI:0.400 Max Web CSI:0.163 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F2 Ply: 1 Qty:6 SEQN:208063 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T12 DrwNo:221.21.1313.51873 /NDW 08/09/2021 3"8 10'10" 3"2'6" (TYP) 1'3"12 3" 5'4"8 5'4"8 6'8"8 1'4" 10'10" 4'1"8 1'4"A B C D E F G IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 423 /- /- /- /- /- I 423 /- /- /- /- /- N Brg Width = 3.5 Min Req =1.5 I Brg Width = 5.5 Min Req =1.5 Bearings N & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -654 C - D 0 -876 Chords Tens.Comp. D - E 0 -877 E - F 0 -652 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 412 0 M - L 848 0 L - K 877 0 Chords Tens.Comp. K - J 875 0 J - I 407 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -561 Webs Tens.Comp. F - I 0 -554 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.033 D 999 360 VERT(CL):0.058 D 999 240 HORZ(LL):0.008 B - - HORZ(TL):0.015 B - - Creep Factor: 2.0 Max TC CSI:0.282 Max BC CSI:0.392 Max Web CSI:0.162 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F4 Ply: 1 Qty:7 SEQN:208064 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T8 DrwNo:221.21.1313.59387 /NDW 08/09/2021 3"8 10'9"8 3"2'6" (TYP) 1'3"12 3" 5'4"8 5'4"8 6'8" 1'3"8 10'9"8 4'1"8 1'4"A B C D E F G IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 423 /- /- /- /- /- I 423 /- /- /- /- /- N Brg Width = 3.5 Min Req =1.5 I Brg Width = 5.5 Min Req =1.5 Bearings N & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -654 C - D 0 -876 Chords Tens.Comp. D - E 0 -877 E - F 0 -652 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 412 0 M - L 848 0 L - K 877 0 Chords Tens.Comp. K - J 875 0 J - I 407 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -561 Webs Tens.Comp. F - I 0 -554 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.033 D 999 360 VERT(CL):0.058 D 999 240 HORZ(LL):0.008 B - - HORZ(TL):0.015 B - - Creep Factor: 2.0 Max TC CSI:0.282 Max BC CSI:0.392 Max Web CSI:0.162 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F4 Ply: 1 Qty:7 SEQN:208064 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T8 DrwNo:221.21.1313.59387 /NDW 08/09/2021 3"8 10'9"8 3"2'6" (TYP) 1'3"12 3" 5'4"8 5'4"8 6'8" 1'3"8 10'9"8 4'1"8 1'4"A B C D E F G IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 1.5X3 3X5 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL S 45 /- /- /- /- /- S*75 /- /- /- /- /- K 54 /- /- /- /- /- S Brg Width = 3.5 Min Req =1.5 S Brg Width = 120 Min Req =- K Brg Width = 5.5 Min Req =1.5 Bearings S, S, & K are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 B 999 360 VERT(CL):0.000 H 999 240 HORZ(LL):0.000 I - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.061 Max BC CSI:0.010 Max Web CSI:0.022 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G2 Ply: 1 Qty:1 SEQN:208065 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T9 DrwNo:221.21.1314.05227 /NDW 08/09/2021 3"8 3"8 10'0"8 5"8 1'3"4 1'4" (TYP) 10'9"81'4"A I KS 1.5X3 2X3 2X3 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Fasten rated sheathing to one face of this frame. Plating Notes All plates are 1.5X3 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL S 45 /- /- /- /- /- S*75 /- /- /- /- /- K 54 /- /- /- /- /- S Brg Width = 3.5 Min Req =1.5 S Brg Width = 120 Min Req =- K Brg Width = 5.5 Min Req =1.5 Bearings S, S, & K are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:20(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 B 999 360 VERT(CL):0.000 H 999 240 HORZ(LL):0.000 I - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.061 Max BC CSI:0.010 Max Web CSI:0.022 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:G2 Ply: 1 Qty:1 SEQN:208065 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T9 DrwNo:221.21.1314.05227 /NDW 08/09/2021 3"8 3"8 10'0"8 5"8 1'3"4 1'4" (TYP) 10'9"81'4"A I KS 1.5X3 2X3 2X3 1.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 417 /- /- /- /- /- H 413 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 H Brg Width = 1.5 Min Req =1.5 Bearings N & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -640 C - D 0 -850 D - E 0 -851 Chords Tens.Comp. E - F 0 -846 F - G 0 -395 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 405 0 M - L 828 0 Chords Tens.Comp. L - K 851 0 K - J 695 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -551 F - J 0 -417 Webs Tens.Comp. J - G 473 0 G - H 10 -589 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.030 D 999 360 VERT(CL):0.044 D 999 240 HORZ(LL):0.008 B - - HORZ(TL):0.012 B - - Creep Factor: 2.0 Max TC CSI:0.232 Max BC CSI:0.304 Max Web CSI:0.228 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F3 Ply: 1 Qty:5 SEQN:208066 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T6 DrwNo:221.21.1314.10203 /NDW 08/09/2021 3"8 10'6" 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 6'4"8 1' 10'6" 4'1"8 1'4"5"8 10"8 A B C D E F G H IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X5 1.5X31.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes See detail STRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL N 417 /- /- /- /- /- H 413 /- /- /- /- /- N Brg Width = 5.5 Min Req =1.5 H Brg Width = 1.5 Min Req =1.5 Bearings N & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -640 C - D 0 -850 D - E 0 -851 Chords Tens.Comp. E - F 0 -846 F - G 0 -395 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 405 0 M - L 828 0 Chords Tens.Comp. L - K 851 0 K - J 695 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -551 F - J 0 -417 Webs Tens.Comp. J - G 473 0 G - H 10 -589 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.030 D 999 360 VERT(CL):0.044 D 999 240 HORZ(LL):0.008 B - - HORZ(TL):0.012 B - - Creep Factor: 2.0 Max TC CSI:0.232 Max BC CSI:0.304 Max Web CSI:0.228 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F3 Ply: 1 Qty:5 SEQN:208066 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T6 DrwNo:221.21.1314.10203 /NDW 08/09/2021 3"8 10'6" 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 6'4"8 1' 10'6" 4'1"8 1'4"5"8 10"8 A B C D E F G H IJKLMN 1.5X31.5X3 3X5 3X3 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X5 1.5X31.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M 372 /- /- /- /- /- G 368 /- /- /- /- /- M Brg Width = 5.5 Min Req =1.5 G Brg Width = 1.5 Min Req =1.5 Bearings M & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -541 C - D 0 -684 Chords Tens.Comp. D - E 0 -682 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. L - K 685 0 K - J 684 0 Chords Tens.Comp. J - I 595 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. M - B 0 -485 I - F 409 0 Webs Tens.Comp. F - G 9 -541 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.018 K 999 360 VERT(CL):0.029 K 999 240 HORZ(LL):0.005 B - - HORZ(TL):0.009 B - - Creep Factor: 2.0 Max TC CSI:0.200 Max BC CSI:0.259 Max Web CSI:0.213 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F9 Ply: 1 Qty:7 SEQN:208067 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T19 DrwNo:221.21.1314.15030 /NDW 08/09/2021 3"8 9'4"8 3"2'6" (TYP) 1'3"12 3" 4'1"8 4'1"8 5'3" 1'1"8 9'4"8 4'1"8 1'4"5"810"8A B C D E F G HIJKLM 1.5X31.5X3 3X5 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X4 1.5X31.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL M 372 /- /- /- /- /- G 368 /- /- /- /- /- M Brg Width = 5.5 Min Req =1.5 G Brg Width = 1.5 Min Req =1.5 Bearings M & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -541 C - D 0 -684 Chords Tens.Comp. D - E 0 -682 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. L - K 685 0 K - J 684 0 Chords Tens.Comp. J - I 595 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. M - B 0 -485 I - F 409 0 Webs Tens.Comp. F - G 9 -541 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.018 K 999 360 VERT(CL):0.029 K 999 240 HORZ(LL):0.005 B - - HORZ(TL):0.009 B - - Creep Factor: 2.0 Max TC CSI:0.200 Max BC CSI:0.259 Max Web CSI:0.213 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F9 Ply: 1 Qty:7 SEQN:208067 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T19 DrwNo:221.21.1314.15030 /NDW 08/09/2021 3"8 9'4"8 3"2'6" (TYP) 1'3"12 3" 4'1"8 4'1"8 5'3" 1'1"8 9'4"8 4'1"8 1'4"5"810"8A B C D E F G HIJKLM 1.5X31.5X3 3X5 3X3 3X3 3X3 1.5X3 1.5X3 3X3 3X3 3X3 3X4 1.5X31.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Lt Bearing Leg: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL P 180 /- /- /- /- /- L 359 /- /- /- /- /- H 208 /- /- /- /- /- P Brg Width = 1.5 Min Req =1.5 L Brg Width = 5.5 Min Req =1.5 H Brg Width = 1.5 Min Req =1.5 Bearings P, L, & H are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.005 F 999 360 VERT(CL):0.009 F 999 240 HORZ(LL):0.002 I - - HORZ(TL):0.004 A - - Creep Factor: 2.0 Max TC CSI:0.132 Max BC CSI:0.113 Max Web CSI:0.112 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F10 Ply: 1 Qty:5 SEQN:208068 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T14 DrwNo:221.21.1314.23687 /NDW 08/09/2021 4'1"4 4'11"12 3" 1'3"12 (TYP) 3" 9'1" 1'7"8 1'7"8 2'8" 1'0"8 5'6"8 2'10"8 7'5"8 1'11" 8'11"8 1'6" 9'1" 1"8 5"810"81'4"A B C D E F G H IJKLMNO P 3X4 1.5X31.5X3 3X3 1.5X3 1.5X3 3X3 1.5X3 3X4 3X3 1.5X3 1.5X3 3X3 3X4 1.5X31.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcindustry.com; ICC: iccsafe.org; AWC: awc.org 514 Earth City ExpresswaySuite 242Earth City, Missouri 63045 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3;Lt Bearing Leg: 4x2 SP #3;Rt Bearing Leg: 4x2 SP #3; Additional Notes Deflection estimate assumes composite action withsingle layer of the appropriate span rated glue-nailedwood sheathing. Truss must be installed as shown with top chord up. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R- / Rh / Rw / U / RL P 180 /- /- /- /- /- L 359 /- /- /- /- /- H 208 /- /- /- /- /- P Brg Width = 1.5 Min Req =1.5 L Brg Width = 5.5 Min Req =1.5 H Brg Width = 1.5 Min Req =1.5 Bearings P, L, & H are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:60.00 NCBCLL:0.00 Soffit:2.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT/PT:10(0)/10(0)/2(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.005 F 999 360 VERT(CL):0.009 F 999 240 HORZ(LL):0.002 I - - HORZ(TL):0.004 A - - Creep Factor: 2.0 Max TC CSI:0.132 Max BC CSI:0.113 Max Web CSI:0.112 VIEW Ver: 20.02.01D.0218.16 Job Number:9602-1 Marsh View Floor Truss Label:F10 Ply: 1 Qty:5 SEQN:208068 SY42 FROM: bh Cust: R9616 JRef:1X7T96160005 T14 DrwNo:221.21.1314.23687 /NDW 08/09/2021 4'1"4 4'11"12 3" 1'3"12 (TYP) 3" 9'1" 1'7"8 1'7"8 2'8" 1'0"8 5'6"8 2'10"8 7'5"8 1'11" 8'11"8 1'6" 9'1" 1"8 5"810"81'4"A B C D E F G H IJKLMNO P 3X4 1.5X31.5X3 3X3 1.5X3 1.5X3 3X3 1.5X3 3X4 3X3 1.5X3 1.5X3 3X3 3X4 1.5X31.5X3 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS 514 Earth City Expressway Suite 242 Earth City, MO 63045 08/09/2021 FL REQ# 278, David J. Rothweiler, FL PE# 88430 SHOP DRAWING / SUBMITTAL REVIEWSABO STRUCTURAL ENGINEERING LLC08/11/2021APPROVED AS NOTEDCHRISTOPHER SABOURIN SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITYAND GENERAL CONFORMANCE TO CONTRACTDOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLEFOR CONFIRMING AND CORRELATING DIMENSIONS ATJOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,FABRICATION PROCESSES AND TECHNIQUES OFCONSTRUCTION COORDINATION OF THEIR WORK WITHOTHER TRADES AND FULL COMPLIANCE WITH CONTRACTDOCUMENTS