Loading...
587 TIMBER BRIDGE ROW22-0027 COAB Permit Form with ConditionsOWNER:ADDRESS:CITY:STATE:ZIP: PUJADAS WILLIAM AND JOY 1051 N. SEASIDE DR JACKSONVILLE FL 32250 COMPANY:ADDRESS:CITY:STATE:ZIP: TECO Peoples Gas 4040 Phillips Highway Jacksonville FL 32207 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169505 2070 ATLANTIC BEACH COUNTRY CLUB UNIT 02 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 587 TIMBER BRIDGE LN RIGHT OF WAY SINGLE OR TWO FAMILY RIGHT OF WAY ROW RUN NATURAL GAS LINE TO RESIDENCE $0.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 1Issued Date: 6/22/2022 PERMIT NUMBER ROW22-0027 ISSUED: 6/22/2022 EXPIRES: 9/20/2022 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 9/23/20212:40:48 PMREVISIONDESCRIPTION: REVISION LAST ofSTANDARD PLANS FY 2022-23 SHEETINDEX ROAD WORK END PRESENT WHEN WORKERS DOUBLED SPEEDING FINES AHEAD WORK ROAD CLOSED SHOULDER RIGHT ROAD WORK END PRESENT WHEN WORKERS DOUBLED SPEEDING FINES AHEAD WORK ROAD ROAD WORK END AHEAD WORK ROAD ROAD WORK END AHEAD WORK ROAD CLOSED SHOULDER RIGHT 102-602 1 211/01/21 TWO-LANE AND MULTILANE, WORK ON SHOULDER 6" White (See Note 7) BL/3 L/3 NOTE: of the "Shoulder Closed" sign (W21-5a). "Worker" sign (W21-1) may be used instead 9. When there is no paved shoulder, the distances for work on the median. with associated work zone sign spacing 8. Omit "Shoulder Closed" signs (W21-5a) along place for 3 days or less. omitted when the work operation is in 7. Temporary pavement markings may be hours or less. work operation is in place for 24 distances may be omitted when the associated work zone sign spacing Work” Signs (G20-2) along with the Present” signs (MOT-13-06) and “End Road 6. The “Speeding Fines Doubled When Workers use a lane closure. and work zone speed is greater than 45 MPH, 5. For work less than 2' from the traveled way egress. to accommodate work vehicle ingress and work area), use a flagger or lane closure (excluding establishing and terminating the through traffic lanes in a one hour period 4. When four or more work vehicles enter the or less. devices for work operations 60 minutes Engineer may omit signs and channelizing 15' from the edge of traveled way, the 3. Where work activities are between 2' and channelizing device spacing values. See Index 102-600 for “L”, “X”, "B", and B = Buffer Length X = Work Zone Sign Spacing 2. L = Taper Length shoulder. of divided roadways, with work on the and Multilane Roadways, including Medians 1. This Index applies to Two-Lane, Two-Way XXX 10' Min. X X X XXX SYMBOLS: Work Zone Sign Work Area Channelizing Device (See Index 102-600) Lane Identification and Direction of Traffic W21-5a W20-1F W20-1F W21-5a W20-1F (See Note 6) MOT-13-06 (See Note 6) G20-2 WITH WORK ZONE SPEED OF 45 MPH OR LESS SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY TWO-LANE ROADWAY (See Note 6) G20-2 (See Note 6) MOT-13-06 SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY TWO-LANE ROADWAY (See Note 6) G20-2 (See Note 6) G20-2 W20-1F 9/23/20212:40:49 PMREVISIONDESCRIPTION: REVISION LAST ofSTANDARD PLANS FY 2022-23 SHEETINDEX CLOSED SHOULDER RIGHT PRESENT WHEN WORKERS DOUBLED SPEEDING FINES AHEAD WORK ROAD ROAD WORK END CLOSED SHOULDER RIGHT AHEAD WORK ROAD ROAD WORK END 102-602 2 211/01/20 TWO-LANE AND MULTILANE, WORK ON SHOULDER 6" White (See Note 7) Median Median BL/3 L/3 10' Min. X XX X XX X SYMBOLS: Work Zone Sign Work Area Channelizing Device (See Index 102-600) Lane Identification and Direction of Traffic (See Note 8) W21-5a (See Note 8) W21-5a WITH WORK ZONE SPEED OF 45 MPH OR LESS SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY MULTILANE ROADWAY SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY MULTILANE ROADWAY W20-1F (See Note 6) MOT-13-06 (See Note 6) G20-2 W20-1F (See Note 6) G20-2