Loading...
61 EAST COAST DR RESO22-0030 FL13223_R1_II_Install - hardiepanel revision 8-25-22Florida Product Approval HardiePanel® Siding  For use inside HVHZ: o HardiePanel Siding fastener types, fastening schedule, and installation shall be in accordance with the Miami-Dade County Florida NOA 07- 0418.04. Consult the HardiePanel product installation instructions on the follow pages for all other installation requirements.  For use outside of HVHZ, o HardiePanel Siding fastener types, fastening schedule, and installation shall be in accordance with Engineering Evaluation Report RIO-2297-11. Consult the HardiePanel product installation instructions on the follow pages for all other installation requirements. By Toni Gindlesperger at 1:23 pm, Aug 25, 2022 By Mike Jones at 3:16 pm, Aug 25, 2022 HS0919-P1/2 3/10 GENERAL REQUIREMENTS: INSTALLATION:Fastener RequirementsPosition fasteners 3/8" from panel edges and no closer than 2" away from corners. Do not nail into corners. HardiePanel Vertical Siding Installation• Framing must be provided at horizontal and vertical edges for nailing.• HardiePanel vertical siding must be joined on stud. • Double stud may be required to maintain minimum edge nailing distances. Figure 2 Caulk Joint leave appropriate gap betweenpanels, then caulk* water-resistive barrier 2 x 4 stud “H” Joint water-resistive barrier 2 x 4 stud Batten Joint water-resistive barrier 2 x 4 stud SMOOTH CEDARMILL© SELECT SIERRA 8 STUCCO Figure 1 James Hardie® products contain respirable crystalline silica, which is known to the State of California to cause cancer and is considered by IARC and NIOSH to be a cause of cancer from some occupational sources. Breathing excessive amounts of respirable silica dust can also cause a disabling and potentially fatal lung disease called silicosis, and has been linked with other diseases. Some studies suggest smoking may increase these risks. During installation or handling: (1) work in outdoor areas with ample ventilation; (2) use fiber cement shears for cutting or, where not feasible, use a HardieBlade® saw blade and dust-reducing circular saw attached to a HEPA vacuum; (3) warn others in the immediate area; (4) wear a properly-fitted, NIOSH-approved dust mask or respirator (e.g. N-95) in accordance with applicable government regulations and manufacturer instructions to further limit respirable silica exposures. During clean-up, use HEPA vacuums or wet cleanup methods - never dry sweep. For further information, refer to our installation instructions and Material Safety Data Sheet available at www.jameshardie.com or by calling 1-800-9HARDIE (1-800-942-7343). FAILURE TO ADHERE TO OUR WARNINGS, MSDS, AND INSTALLATION INSTRUCTIONS MAY LEAD TO SERIOUS PERSONAL INJURY OR DEATH. SD050905 • HardiePanel® vertical siding can be installed over braced wood or steel studs spaced a maximum of 24" o.c. Irregularities in framing and sheathing can mirror through the finished application.• HardiePanel vertical siding can also be installed over foam insulation/sheathing up to 1" thick. When using foam insulation/sheathing, avoid over-driving nails (fasteners),which can result in dimpling of the siding due to the compressible nature of the foam insulation/sheathing. Extra caution is necessary if power-driven nails (fasteners) are used for attaching siding over foam insulation/sheathing.• A water-resistive barrier is required in accordance with local building code requirements. The water-resistive barrier must be appropriately installed with penetration and junction flashing in accordance with local building code requirements. James Hardie will assume no responsibility for water infiltration. James Hardie does manufacture HardieWrap™ Weather Barrier, a non-woven non-perforated housewrap1, which complies with building code requirements.• When installing James Hardie products all clearance details in figs. 5,6,7,8,9,10&11 must be followed.• Adjacent finished grade must slope away from the building in accordance with local building codes - typically a minimum of 6" in the first 10'. • Do not install James Hardie products, such that they may remain in contact with standing water.• HardiePanel vertical siding may be installed on vertical wall applications only.• For larger projects, including commercial and multi-family projects, where the span of the wall is significant in length, the designer and/or architect should take into consideration the coefficient of thermal expansion and moisture movement of the product in their design. These values can be found in the Technical Bulletin “Expansion Characteristics of James Hardie® Siding Products” at www.JamesHardie.com.• DO NOT use stain on James Hardie® products. Figure 4 Recommendation: When installing Sierra 8, provide a double stud at panel joints to avoid nailing through grooves. Figure 3 moderate contact keep fasteners 2"away from corners plate keep nails3/8" min.from paneledges water-resistivebarrier stud HardiePanelvertical siding 3/8" sheathing upper panel 1/4" gap Z-flashing Do notCaulk lowerpanel upper panel 1/4" gap Z-flashing Do notCaulk lowerpanel decorativeband board water-resistive barrier water-resistive barrier (Not applicable to ColorPlus® Finish) *Apply caulk in accordance with caulk manufacturer’s written application instructions. Joint Treatment • Vertical Joints - Install panels in moderate contact (fig. 1), alternatively joints may also be covered with battens, PVC or metal jointers or caulked (Not applicable to ColorPlus® Finish) (fig. 2). • Horizontal Joints - Provide Z-flashing at all horizontal joints (fig. 3). 1 For additional information on HardieWrap™ Weather Barrier, consult James Hardie at 1-866-4Hardie or www.hardiewrap.com INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS® PRODUCTS Visit www.jameshardie.com for the most recent version. Vertical Siding EFFECTIVE APRIL 2009 Store flat and keep dry and covered prior to installation. Installing siding wet or saturated may result in shrinkage at butt joints. Carry product on edge. Protect edges and corners from breakage. James Hardie is not responsible for damage caused by improper storage and handling of the product. OUTDOORS1. Position cutting station so that wind will blow dust away from user and others in working area.2. Use one of the following methods: a. Best: i. Score and snap ii. Shears (manual, electric or pneumatic) b. Better: i. Dust reducing circular saw equipped with a HardieBlade® saw blade and HEPA vacuum extraction c. Good: i. Dust reducing circular saw with a HardieBlade saw blade (only use for low to moderate cutting) INDOORS 1. Cut only using score and snap, or shears (manual, electric or pneumatic). 2. Position cutting station in well-ventilated area - NEVER use a power saw indoors - NEVER use a circular saw blade that does not carry the HardieBlade saw blade trademark- NEVER dry sweep – Use wet suppression or HEPA Vacuum Important Note: For maximum protection (lowest respirable dust production), James Hardie recommends always using “Best”-level cutting methods where feasible. NIOSH-approved respirators can be used in conjunction with above cutting practices to further reduce dust exposures. Additional exposure information is available at www.jameshardie.com to help you determine the most appropriate cutting method for your job requirements. If concern still exists about exposure levels or you do not comply with the above practices, you should always consult a qualified industrial hygienist or contact James Hardie for further information. SD083105 CUTTING INSTRUCTIONSSTORAGE & HANDLING: IMPORTANT: FAILURE TO INSTALL AND FINISH THIS PRODUCT IN ACCORDANCE WITH APPLICABLE BUILDING CODES AND JAMES HARDIE WRITTEN APPLICATION INSTRUCTIONS MAY LEAD TO PERSONAL INJURY, AFFECT SYSTEM PERFORMANCE, VIOLATE LOCAL BUILDING CODES, AND VOID THE PRODUCT ONLY WARRANTY. BEFORE INSTALLATION, CONFIRM THAT YOU ARE USING THE CORRECT HARDIEZONE INSTRUCTIONS. INSTALLATION OF HZ10™ PRODUCTS OUTSIDE AN HZ10™ LOCATION WILL VOID YOUR WARRANTY. TO DETERMINE WHICH HARDIEZONE APPLIES TO YOUR LOCATION, VISIT WWW.HARDIEZONE.COM OR CALL 1-866-942-7343 (866 9HARDIE) © 2010 James Hardie Technology Limited. All rights reserved. TM, SM, and ® denote trademarks or registered trademarks of James Hardie Technology Limited. is a registered trademark of James Hardie Technology Limited. HS0919-P2/2 3/10 * The illustration (figure 11) was reprinted with permission of THE JOURNAL OF LIGHT CONSTRUCTION. For subscription information, visit www.jlconline.com. RECOGNITION: In accordance with ICC-ES Legacy Report NER-405, HardiePanel® vertical siding is recognized as a suitable alternate to that specified in: the BOCA National Building Code/1999, the 1997 Standard Building Code, the 1997 Uniform Building Code, the 1998 International One- and Two-Family Dwelling Code, the 2003 International Building Code, and the 2003 International Residential Code for One-and Two-Family Dwellings. HardiePanel vertical siding is also recognized for application in the following: City of Los Angeles Research Report No. 24862, State of Florida listing FL#889, Dade County, Florida NOA No. 02-0729.02, U.S. Dept. of HUD Materials Release 1263c, Texas Department of Insurance Product Evaluation EC-23, City of New York MEA 223-93-M, and California DSA PA-019. These documents should also be consulted for additional information concerning the suitability of this product for specific applications. Additional Installation Information, Warranties, and Warnings are available at www.jameshardie.com Figure 5 6" min. bottom plate 1" - 2" Figure 7 Because of the volume of water that can pour down a sloped roof, one of the most critical flashing details occurs where a roof intersects a sidewall. The roof must be flashed with step flashing. Where the roof terminates, install a kickout to deflect water away from the siding. It is best to install a self-adhering membrane on the wall before the subfascia and trim boards are nailed in place, and then come back to install the kickout. Figure 11 KICKOUT FLASHING Figure 11, Kickout Flashing To prevent water from dumping behind the siding and the end of the roof intersection, install a "kickout" of sufficient length and angle to direct the water running down the roof away from the siding. Install siding and trim products in compliance with local building code requirements for clearance between the bottom edge of the siding and the adjacent finished grade. At the juncture of the roof and vertical surfaces, flashing and counterflashing shall be installed per the roofing manufacturer’s instructions. Provide a 1" - 2" clearance between the roofing and the bottom edge of the siding and trim. CLEARANCES Maintain a 1" - 2" clearance between James Hardie® products and paths, steps and driveways. Figure 6 siding 1/4" gap flashing Do notCaulk Figure 9 Maintain a 1/4" clearance between the bottom of James Hardie products and horizontal flashing. Do not caulk gap. Self-adheringmembrane Step flashing Housewrap Drip edge Kickoutflashing Self-adheringeaves membrane Maintain a minimum 1" gap between gutter end caps and siding & trim. joist 1" - 2" water resistive barrier siding flashing deck material ledger Maintain a 1" - 2" clearance between James Hardie products and decking material. Figure 8 1"-2" siding stud concretefoundation CAULKING PAINTING DO NOT use stain on James Hardie® products. James Hardie products must be painted within 180 days for primed product and 90 days for unprimed. 100% acrylic topcoats are recommended. Do not paint when wet. For application rates refer to paint manufacturers specifications. Back-rolling is recommended if the siding is sprayed. Fasteners must be corrosion resistant, galvanized, or stainless steel. Electro-galvanized are acceptable but may exhibit premature corrosion. James Hardie recommends the use of quality, hot-dipped galvanized nails. James Hardie is not responsible for the corrosion resistance of fasteners. Stainless steel fasteners are recommended when installing James Hardie® products near the ocean, large bodies of water, or in very humid climates. • Consult applicable code compliance report for correct fasteners type and placement to achieve specified design wind loads. • NOTE: Published wind loads may not be applicable to all areas where Local Building Codes have specific jurisdiction. Consult James Hardie Technical Services if you are unsure of applicable compliance documentation. • Drive fasteners perpendicular to siding and framing. • Fastener heads should fit snug against siding (no air space). (fig. A ) • Do not over-drive nail heads or drive nails at an angle. • If nail is countersunk, caulk nail hole and add a nail. (fig. B) • For wood framing, under driven nails should be hit flush to the plank with a hammer (For steel framing, remove and replace nail). • Do not use aluminum fasteners, staples, or clipped head nails. PNEUMATIC FASTENING GENERAL FASTENING REQUIREMENTS James Hardie products can be hand nailed or fastened with a pneumatic tool. Pneumatic fastening is highly recommended. Set air pressure so that the fastener is driven snug with the surface of the siding. A flush mount attachment on the pneumatic tool is recommended. This will help control the depth the nail is driven. If setting the nail depth proves difficult, choose a setting that under drives the nail. (Drive under driven nails snug with a smooth faced hammer - Does not apply for installation to steel framing). For best results use an Elastomeric Joint Sealant complying with ASTM C920 Grade NS, Class 25 or higher or a Latex Joint Sealant complying with ASTM C834. Caulking/Sealant must be applied in accordance with the caulking/sealant manufacturer’s written instructions or ASTM C1193. Figure A Figure B Figure 10 fascia siding 1" gutter and end cap