Loading...
1862 HICKORY LN ROOF22-0052 . , fBuilding Permit Updated 10/9/18 e �_ C�uofAtlantic Beach Bui|dinQC>�p�rtrn�nt ^~4uxvpoewxTmw 8OOSeminole R0ad, Atlantic L �2��� *�*uaxTco/mGRAY , . _ Phone: /gO4\ 247'5876Email: BuiliiDg-Dent� ~Qa�lUs ! IS REQUIRED. �__— __ Job Address: 3223r. Permit Number:ROC/k- 2 Z ::,,� Legal Description ---_/ ��� _-___ -__`_ �� Raw_____ Valuation of Work(ReplacemenCost)$ Heated/Cooled SF Non-Heated/Cooled _ • Class of Work: ONew OAd itiom OAlteration 0Repair Okxwve ODemo [Pool OvNndmw/Dn , • Use of existing/proposestructure(s): OCmnmpoial *Residential • If an existing structure,is a fire sprinkler system installed?: OYes ONo • Will tree(s)be removed in association with proposed project?FlYes(must submit separate free Removal Permit) LIwo Describe in detail the type of work to be performed: Florida Product Approval w _ _�� ,..c apptovaJ (onn for multiple products use product approval form Property Owner Information Name Address 1862 Hickory La:,.- - City ' _ __ State FL Zip s2238 Phone E-Mail Owner or Agent(It Agent,Power of Attorney or Agency Letter Required) ' Contractor Information Name of Company I. ',nzCurm�"W:lis�;"tnftRr,cf)nnc:,r�c$ Qualifying Agent �_��� L����J ��,,`k 01- _________ Address'..1',,38() 1iml,per8n* J City_ �Mvi' State lZip__‘ , Office Phone �� -gn4''8� Job Site Contact mumher -1'4 �ate�rU/�mion/nexiu,x«ionoE-Mail Architect Name&Phone# Engineer's Name&Phone U Vi Workers Compensation Insurer OGExempt m Expiration Date Application is hereby made to obtain a permit to do the work and installations as indicated.I ce-tify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction.I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS,POOLS,FURNACES,BOILERS,HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE:In addition to the requirements of this permit,there may beadditional restrictions applicable tothis property that may hefound inthe public records ofthis countv'and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S AFFIDAVIT:I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicablelaws regulatingcun�ruc��nandzuoin� 4 ��� .,� WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE F*R IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING, CONSU WITH YOUR LENDER OR AN ATTORNEY BEFORE REll �W �� ' {�P�KAEN[EPN�P�T. " �� ae i)la 4,,i � �411P" — A� -- r ` � AMP ' VIP .. o (Signa .reo,Owner,t ,pn,> (Sig �� nammofc"noactm) ' �� ' ���� „ Signed and sworn tp tor affirmed)uefo n� Signed and (orbeh� this of fe. Z.,94. __'1Q, ~, ^ ih,°)44_,_ ~, °^ (Signature of Notary 64:mature of Notary),,`•, Bonded Thru Troy Fain Insurance 800-385-7019 -,-.,(ype,svnu||vxnmwnox � cmuceumeotmcauov.� e9�aommwwm4�i�� �u�~�� ^o,mevoncauon� _ L..................... .~.. � 'A .)) PRODUCT APPROVAL INFORMATION SHEET FOR THE CITY OF ATLANTIC BEACH, FLORIDA (*REQUIRED) *Project Address: 1862 Hickory Lane, Atlantic Beach, FL 32233 Permit#: *Owner/Project Name: David Shelton As required by Florida Statute 553.842 and Florida Administrative Code Rule 61G20-3, please provide the information and product approval number(s) for the building components listed below as applicable to the building construction project for the permit number listed above. You should contact your product supplier if you do not know the product approval number for any of the applicable listed products. Information regarding statewide product approval may be obtained at: Category/Subcategory Manufacturer Product Description Limitation of Use State# Local# A. EXTERIOR DOORS 1. Swinging 2. Sliding 3. Sectional 4. Garage Roll-Up 5. Automatic 6. Other B.WINDOWS 1. Single hung 2. Horizontal slider 3. Casement 4. Double hung 5. Fixed 6. Awning 7. Pass-through 8. Projected 9. Mullion 10. Wind breaker 11. Dual action 12. Other Page 1 of 4 Updated 06/21/21 Category/Subcategory Manufacturer Product Description Limitation of Use State# Local# C. PANEL WALL 1. Siding 2. Soffits 3. EIFS 4. Storefronts 5. Curtain walls 6. Wall louvers 7. Glass block 8. Membrane 9. Greenhouse 10. Synthetic stucco 11. Other D. ROOFING PRODUCTS 1. Asphalt shingles GAF Timberline HDZ FL10124.1 2. Underlayments GAF, Tarco FeltBuster, Roof LeakBarrier high/low sloped roof areas FL18686R3, FL10450.1 3. Roofing fasteners 4. Nonstructural metal roof 5. Built-up roofing 6. Modified bitumen Certainteed GTA FL2533R17 7, Single ply roofing 8. Roofing tiles 9. Roofing insulation 10. Waterproofing 11. Wood shingles/shakes 12. Roofing slate 13. Liquid applied roofing 14. Cement-adhesive coats 15. Roof tile adhesive 16. Spray applied polyurethane roof 17. Other Page 2 of 4 Updated 06/21/21 Category/Subcategory Manufacturer Product Description Limitation of Use State# Local# E.SHUTTERS 1. Accordion 2. Bahama 3. Storm panels 4. Colonial 5. Roll-up 6. Equipment 7. Other F. STRUCTURAL COMPONENTS 1. Wood connector/anchor 2.Truss plates 3. Engineered lumber 4. Railing 5. Coolers-freezers 6. Concrete admixtures 7. Material 8. Insulation forms 9. Plastics 10. Deck-roof 11. Wall 12. Sheds 13. Other G. SKYLIGHTS 1. Skylight 2. Other H. NEW EXTERIOR ENVELOPE PRODUCTS 1. 2. Page 3 of 4 Updated 06/21/21 In addition to completing the above list of manufacturers, product description and State approval number for the products used on this project, the Contractor shall maintain on the job site and available to the Inspector, a legible copy of each manufacturer's printed specifications and installation instructions along with this Product Approval Sheet. I certify that this product approval list is true and correct to the best of my knowledge. I further certify that use of different components other than the ones listed in this document must be approved by the Building Official. *Contractor Name (Print Name): -Tatem , *Contractor Signature: Company Name: ��C.x��/+�; l e��;�r uc;T-70 11,,\s, r •.�S *Mailing Address: 53 0 /Ii iSezitrvc bz(\/E *City: 1.70 C� )A1 Vj ( Ic *State: r iC) *Zip Code: :oza 7 7 *Telephone Number: *E-mail Address: I PN LoC i L Com cAt-S; tI c T Cell Phone Number: ?'04.-991-. GS Fax Number: Page 4 of 4 Updated 06/21/21 NOTICE OF COMMENCEMENT Permit No. Tax Folio No. 172070:.t456 State of FloridA_- Coun ty of ..DL'yal To whom it may concern: fir k The undersigned hereby informs you that improvements will be made to certain real property,and in accordance with Section 713 of the Florida Statutes,the following information is stated in this NOTICE OF COMMENCEMENT. `"' Legal description of property being improved: 37-29 09-7S-29E r Seiva Marin?Unit 1Z-4 Repiat lot 27. .._...... _.._.. ..____.. Address of property being improved: 1862 Hickory Lane General description of improvements: __remove replace.roottn¢. -__ S _�__._._ »_...,._._..___. .._-___��._..._...__.____._ .._ T_ _.._,....�..,.,� W Owner David Shelton —,_ iii Address 1862 Hickory.Lane.Ja4k�o2v_il1e`Rl_9223�_ _ '# Contractor Lockhart Construction and Roofing Services LLC t ' Address c,i w r Fax No .__._._. _._______.._—�__ t Phone No. 1904)994_3$65 Surety(if any) Address _... Amount of bond$ :',y t Phone No._._ .__.__. Fax No.__._•--__.—._._. .._._ _. 7:;"' 4.... fe Name and address of anymaking improvements: person a loan for the construction of the im rovements: a Y Name.__.._—.. .____— ' '"' Address_• __—___.�_ "'°" Phone No. �__.....Fax No. t Name of person within the State of Florida,other than himself or herself,designated by owner upon whom notices or other documents may be served: ek t`., Name .._.._.. _. Address w; , Phone No.• „__�_—__._-.___ _. _. _ __.._______.. __ Fax No. .__ _ _ , In addition to himself or herself,owner designates the following person to receive a copy of the Lienor's Notice as provided in Section 713.06(2)(b),Florida Statutes. (Fill in at Owner's option.) > ;i: Name _ _.____.. Address _.__..�.�..__ _..—. _ lois Phone No. Fax No, il Expiration date of Notice,of Commencement(the expiration date is one(1)year from the date of recording unless a different wO 1,” : date is specified): tr ''` THIS SPACE FOR RECORDER'S USE ONLY nw'FR or LE AL j •'E REPRESENTATIVES + n Signed: /1 , -- /-- I 1 __ _Date: 1'1 b.a l7� • Doc#2022241633,OR BK 20440 Page 453, ! Before me this-_-_ _ iy of__ r"_ _ Number Pages:1 i'�tthhe__County of ,. pli State o lorida,has personally appeared Recorded 09/20/2022 01:48 PM, i \lb — •••••---' herein by JODY PHILLIPS CLERK CIRCUIT COURT DUVAL himself/herself and affirms that all statements and declarations herein are COUNTY • true and accurate. RECORDING $10.00 (` —_—� Notary Public at Large,State of f rxtie ,County of My cornnission expires:_ .-- . ! .. __ Perso - • . , 41,, ._ or Produ i • i( r,.5 -.:.' .2 -... 2 c . ( . ',_ ;,4 Commission•illi 200186 •-el Broke'Deamnber 7,2025 o CertainTeed FLINTLI:ISTICO Application Handbook - Third Edition An educational program for professional roofing contractors FLINTL4ST7C APPLICATION SPECIALIST - aft*' „ • - _ , Aixt4 - „ • _ • CertainTeed SAINT-GOBAIN All roofs shall have an overflow system adjacent to drains or scuppers to collect and direct water off the roof should one or more water collection device fail. Overflows are required by most local building codes and should be incorporated into any roof design. Substrate Preparation All surfaces to which the Flintlastic modified bitumen is to be installed must be smooth, dry, free from dust or debris, free from settling or distortion, and free from cracks, knotholes, or other defects. Primer Concrete decks must be properly primed with suitable asphalt primer (meeting ASTM D-41) and the primer must be thoroughly dry. FlintPrime SA, water-based primer is recommended when installing self-adhering systems. Metal flashings must also be primed with a suitable asphalt primer for metal, and primer must be thoroughly dry and any solvents evaporated prior to application of membrane flashing. Base Sheet Application In new construction or re-roofing applications, an appropriate CertainTeed' base sheet must be installed over the substrate. Unless otherwise specified, b se sheet must be overlapped min. 4" at endlaps and 2' at sidelaps. For mechanical attachment of the base ply on insulated steel substrates, the base sheet at a minimum may be fastened with approved fasteners 12" o.c. on 4' side laps and 18" o.c. in two staggered rows in the field of the sheet 12" in from the edge. For mailable substrates, base sheet must be mechanically fastened in accordance with NRCA standards (fasteners placed every 9" o.c. at sidelaps and every 18" o.c. in two staggered rows in the field of the • sheet; the two stag- s • gered rows are placed 12" from each sidelap). n. For non-nailable sur- d Js faces, spot mopping with hot asphalt at the ''` • minimum rate of one > ' 12" circle every 24" o.c. y J in ail directions, using _ 7 appropriate type asphalt at the '° 11 Roof Relief Vents If roof relief vents are deemed appropriate they should be of a suitable type with minimum 4" flange and weather resistant hood, spaced 20' from roof edge perimeter and every 40' o.c. thereafter. Proper Tools To the professional roofer, the importance ofro er tools is understood. However, p p / here's a brief recap of the ideal tools for applying Flintlastic modified bitumen: law • For torch applications, a U.L. listed torch designed specifically fur trie application of modified bitumen ' membrane with U.L. listed high-pressure ' . hose, and U.L. listed regulator. Use an appropriate length field torch for applying the field roof membrane, and a "detail" torch for accomplishing flashing details. • Propane tank with pressure gauge. • At least one ABC type fire extinguisher, fully charged (min. 20 lbs.) per each operating torch and the appropriate number of fire extinguishers at the kettle area if hot asphalt is used. • For hot asphalt applications, appropriate asphalt heating, handling and application equipment. Mop size should be not less than 32 ounces. • For self-adhering applications, 18" wide, 2"-4" diameter industrial steel roller for pressing membrane into place; long-handled (standing) roller with 1/8"-1/4" nap for applying primer (1/8" nap for smooth surfaces, 1/4" nap for more porous surfaces); caulk gun for applying beads of FlintBond adhesive; hand-held hot air welding gun such as the Leister Triac'"' (1 10 volt power required) or Primus Sievert PNS-4'" Hot Air Kit; seam probing tool to check for small voids. • A roofer's hooked blade knife (the hooked blade is ideal for cutting the membrane). • A roofer's trowel with beveled edges and rounded tip (allows smoothing of details without cutting or marking the membrane); trowels that allow adequate room between the roofer's gloved fingers and the warm membrane are the best. Proper Attire - Long pants and long sleeved shirts. 17 • Leather work shoes with synthetic or smooth leather soles. • Leather work gloves that adequately shield the wrist area. Refer also to the "Safety" section on page 53 for information regarding proper work attire. Roof Layout As with most types of roof installations, Flintlastic modified bitumen roof installation begins at the low point of the roof with successive rolls installed so that no laps are against the flow of water. When membrane is applied with hot asphalt, where roof slope is 1" per foot or less, sidelaps are installed perpendicular to the direction of the roof slope. In situations where the roof slope exceeds 1" per foot, rolls are installed with the sidelaps running parallel to the slope direction. APP modified membranes can be installed with sidelaps perpendicular to the slope where roof slope is 2" per foot or less (over 2" install sidelaps parallel to roof slope direction). Additionally, where roof slope exceeds 1" per foot for SBS modified and self-adhering membranes or 2" per foot for APP modified "back-nailing" of membrane is required. Refer to the General Recommendations section of the CertainTeed Commercial Roof Systems Manual for back-nailing guidelines. Endlaps are to be staggered. In multi-ply applications, membrane sidelaps must also be staggered. T2 Ian 3'Apan F 39 Mr le gm- E as€ F l iftast c rLrtfa ,c hltiiax*cf iia FWatastz NRX14teA Sr V $rte S 1urr4.1 Cap Snap! Sheet &lumen Cap Sheet In multi-ply systems,stagger sidelaps from Stagger field sidelaps from interply and base sheet sidelaps base sheet sidelaps Warning: Flintlastic Modified Bitumen application may require the use of hot asphalt and/or an open flame roofing torch. Improper application practices may cause physical injury to the applicator or damage to the property. Refer to the current CertainTeed Commercial Roof Systems Manual for further information. 18 T /�Na r?apxing: can 0104.01k halnxi Fldller / bpth Idea z`r. f:.. Idaihr' . /:::...:: `\.. . "dna IdDde.f . o o • �� \ i i ; :.. ftdt f. ..8"ac._stsgycrady.ddtsd .. •.a / to thrnred halkir' t` Nailer spacing; �f For polyester.Flntlastic membranes: Header Shed: `S8S 3 SA l'-3"slope:32'a.c. 5'minimum � >3"slope:1 S'a4 Incocts ap pan bath nd field -APP ?'-3"slope:32'ac. odea at the ridge 6,d >3"slope;l8'o.c. terminated . / For all fiber glass membranes: at the molar ./ >1'slope:S'o.c. Back Nailing Diagram Basic Application: Flintlastic APP Modified Bitumen Prepare the substrate as described on page 10. Flintlastic APP modified bitumen must be applied using a professional roofer's torch. Use of hand-held roofing torches is recommended and affords the most control. If multiple burner torching machines are utilized care must be taken to assure uniform heat application and to avoid overheating of the membrane. Begin membrane application by ,"sy- n- r ;, unrolling the roll and aligning the ' �' = sidelaps. Re-roll the roll halfway. a `: Standing on the unrolled portion to � prevent shifting, begin torching the - exposed polyethylene side of the rolled portion. Walk forward as `'. you torch, pushing the heated coil VierrOrane_.1 forward and into place with your boot. 11:;.xov.;3 _ Position and align the roll 19 Proper torching procedure involves passing the torch flame in an "L" pattern across the coiled portion of the roll and up the sidelap area. As subsequent rolls are installed, heat is applied both to the roll and the exposed laps of the membrane being overlapped onto. As it is heated, the roll becomes shiny and the polyethylene film melts away. Adequate heat is confirmed when a uniform flow of melted bitumen compound flows evenly in a 1/4"-1 2" uniform bead that oozes from the applied membrane's edges. Be sure to heat the entire roll evenly; not just the lap areas. with extra concentration at the laps. Once at the end of the roll re-roll the untorched half; pulling back to beyond the starting point as much as possible, and repeat the torching procedure. �} ' v• ,-. , n ,- , r .,, ^,---,K1:-,,,,,,,,-i`s . ? zr ' ., t@ x �r � ; 42406. `: "11114411\ 1-CS' v ilip iiik,_ ... , ./.,..,,:,,_,,,,,,, . , ,. . s.: , _. 3" E Sidelap " '''',.,_ '-' 1:{' .k7 ' 's-y rf •:1 L �` Uniform Bitumen ' ua=.: Flow t/4" a 1/2" Proper torching, in an "L" pattern,assures uniform 1/4"-1/2'compound and flow at laps and adequate heat across the coil Trim the lower outside corner of the roll at an angle as shown. Overlap subsequent rolls 3" at sidelaps (or as specified, min. 3") and 6" at endlaps. Sidelap lines are generally indicated for the applicators' convenience. 20 �C t Sidelap 4 N ' 1 eSt LSI 45) es Overlap Flintlastic STA sidelaps a minimum of 3" Trim the upper outside corner of the subsequent rolls as shown. All trimmed corners will be covered with the subsequent rolls. . TO ..~ ev ,i-k. ti .4,a ry ° . ',» . =, a Lt � y- - * .6 f 4irY - Pr j' � ' „s:), • :' � ��'r. " 'Na'‘..›... DT ". ''4AL k1 tom.. �T '‘'..t.%F 1,..1_41011, t1,�.r 01 4,,,::,-�. ri' •js s' wi ?� kr • ,,r..��..T��yy�y 1.4 V—.,e ms t^ $ -' SA i r L 3 ` c 1<f,•� �' °,A,, .rte,,,° t�'!i;A miTATt "-*4-•-..„ ie ., ..• r. $_tip:LT, _ -.Fc . _ .. 'faS _ , ir "gam 'ter t,S -� Endlap cuts are made at an angle as shown 21 Material Handling and Storage • Store rolls upright on pallet in dry area. • Store indoors in a ventilated area. • Keep rolls protected from exposure to heat, sun, cold and moisture. .(• Do not double stack pallets. .; • Do not store rolls on their sides. • Use care in the handling of the rolls. • Do not overload the roof. Stagger the rolls across the roof. Avoid excessive weight in a concentrated =.�'f� area. �.r Weather Precautions % :Do not attempt application if weather conditions Awl substrate are not dry, Do not attempt application if ice, frost, moisture or snow is present. Rolls can be installed in cold weather if conditions are dry, the rolls have not been allowed to freeze and proper cold weather handling and storage procedures are followed. Store rolls in a heated area until just prior to use and do not proceed with installation if rolls have been allowed to freeze or weather conditions are unsuitable. In extremely warm weather, use caution when walking on freshly installed material to avoid "tracking" warm asphalt; when torch applying smooth APP membrane in very warm weather the installer may want to utilize a roll puller and work from front side of the roll (as is the standard torch method for SBS membranes) to avoid tracking. Roof Slope and Drainage The roof surface that is to receive the roof membrane shall have slope to water collection devices. A drainage calculation determining the quantity of water that will fall on the roof and how it is to be taken off the roof is a part of good roof design. Model building codes and good roofing practice have established a minimum slope for roofs at 1/4":12 running inches. Codes also recognize the challenges to meet this criterion in reroofing of existing buildings. All roof areas shall be designed and installed to drain without holding water on the roof surface. Water collection on the roof surface can be detrimental to the roof membrane and may void an existing warranty. Water should not pond in drain sumps or any other collection area that is covered in roof membrane. Limited and minor areas of ponding may be accepted by CertainTeed under the terms of the warranty; however, sacrificial surfacing may be required to maintain the warranty. 10