800 CAVALLA RD ROW22-008 102-602SYMBOLS:
Work Zone Sign
AHEAD
WORK
ROAD
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
ROAD WORK
END
Work Area
ROAD WORK
END AHEAD
WORK
ROAD
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
ROAD WORK
END
AHEAD
WORK
ROAD
ROAD WORK
END AHEAD
WORK
ROAD
Channelizing Device (See Index 102-600)
Lane Identification and Direction of Traffic
distances for work on the median
with associated work zone sign spacing
9. Omit "Shoulder Closed" signs (W21-5a) along
shoulder in accordance with the Plans.
lane or ridable shoulder, close the lane or
8. If the work encroaches on a marked bicycle
for 3 days or less.
omitted when the work zone is in place
7. Temporary pavement markings may be
hours or less.
temporary condition is in place for 24
distances may be omitted when the
associated work zone sign spacing
Work” Signs (G20-2) along with the
Present”signs (MOT-13-06) and “End Road
6. The “Speeding Fines Doubled When Workers
greater than 45 MPH, use a lane closure.
traveled way and work zone speed is
5. For work less than two feet from the
egress.
to accommodate work vehicle ingress and
work area), use a flagger or lane closure
(excluding establishing and terminating the
through traffic lanes in a one hour period
4. When four or more work vehicles enter the
is required.
removal), only the Road Work Ahead sign
3. For incidental work (e.g. mowing or litter
channelizing device spacing values.
See Index 102-600 for “L”, “X”, "B", and
B = Buffer Length
X = Work Zone Sign Spacing
2. L = Taper Length
shoulder.
of divided roadways, with work on the
and Multilane Roadways, including Medians
1. This Index applies to Two-Lane, Two-Way 10/9/20201:18:37 PMREVISIONDESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2021-22 SHEETINDEX
1
TWO-LANE AND MULTILANE, WORK ON SHOULDER
11/01/20 2102-602
NOTES:
W20-1F (See Note 6)
MOT-13-06
(See Note 6)
G20-2
WITH WORK ZONE SPEED OF 45 MPH OR LESS
SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY
TWO-LANE ROADWAY
(See Note 6)
G20-2
(See Note 6)
MOT-13-06
(See Note 6)
G20-2
SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY
TWO-LANE ROADWAY
(See Note 6)
G20-2
6" White (See Note 7)
B
W21-5a
CLOSED
SHOULDER
RIGHT
W20-1F
W21-5a
CLOSED
SHOULDER
RIGHT
W20-1F
W20-1F
XXX
ƿL
10' Min.
X
X
XX
ƿL
X
X
ROW22-0048
SYMBOLS:
Work Zone Sign
Work Area
AHEAD
WORK
ROAD
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
ROAD WORK
END
ROAD WORK
END
AHEAD
WORK
ROAD
Channelizing Device (See Index 102-600)
Lane Identification and Direction of Traffic
10/9/20201:18:48 PMREVISIONDESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2021-22 SHEETINDEXINDEX
TWO-LANE AND MULTILANE, WORK ON SHOULDER
102-60211/01/20 22
W20-1F (See Note 6)
MOT-13-06
(See Note 6)
G20-2
WITH WORK ZONE SPEED OF 45 MPH OR LESS
SHOULDER WORK LESS THAN 2' FROM THE TRAVELED WAY
MULTILANE ROADWAY
(See Note 6)
G20-2
SHOULDER WORK BETWEEN 2' AND 15' FROM THE TRAVELED WAY
MULTILANE ROADWAY
6" White (See Note 7)
Median
Median
B
CLOSED
SHOULDER
RIGHT
(See Note 9)
W21-5a
CLOSED
SHOULDER
RIGHT
W20-1F
(See Note 9)
W21-5a
XXX
ƿL
10' Min.
X
XX
ƿL
X