Loading...
15xx Richardson - RES21-0187 Retention Calculations - 2nd Version 3-16-22Comp. By: Date:3/4/2022 Public Works Department City of Atlantic Beach Permit No: Address:1505 Richardson Lane Required Storage Volume Criteria: Section 24-66 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations requires that stormwater runoff from impervious areas be stored onsite. Volume to be retained is as follows: V = CAR/12 which is the Modified Rational Method for estimating stormwater runoff Where:V = Volume of Runoff to be stored (cubic feet) C = Runoff Coefficient, 0.92, the difference between impervious area (C=1.0) and undeveloped conditions (C=0.08). A = Impervious Area (square feet) R= 25-yr / 24-hr rainfall depth (9.3 inches for Atlantic Beach) Onsite Storage Volume Required for Impervious Area: Lot Area = 6,081 ft2 Impervious Area (A) = 2,373 ft2 =39.0% V = 0.92 x 2,372.8 x 9.3 / V = 1,692 ft3 Required Provided Storage: Area 1 - Relative Elev.Area Storage Sideslope:2 :1 (ft)(ft2)(ft3) 0.0 158 BOTTOM size:0 X 1.0 397 TOB size:0 X Area 2 - Relative Elev.Area Storage (ft)(ft2)(ft3) 0.0 10 BOTTOM size:-4 X SCS 277 31 By Toni Gindlesperger at 2:10 pm, Mar 16, 2022 1.0 52 TOB size:0 X Area 3 - Relative Elev.Area Storage (ft)(ft2)(ft3) 0.0 66 BOTTOM size:-4 X 1.0 165 TOB size:0 X Area 4 - Relative Elev.Area Storage (ft)(ft2)(ft3) 0.0 25 BOTTOM size:-4 X 1.0 81 TOB size:0 X Inground Storage:= A*d/pf Total Storage Area at TOB (A) =695.1 ft2 Depth to ESHWT from BOTTOM (d) =2.0 ft, default is 2.0 ft, verify onsite ESHWT Pore Factor (pf) =0.4 default is 0.4 Inground Storage Provided =556.1 ft3 Required Treatment Volume =1,692 ft3 Supplied Treatment Volume =1,033 ft3 31 115 53 Section 24-66 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations requires that stormwater runoff from impervious areas be stored onsite. Volume to be retained is as follows: C = Runoff Coefficient, 0.92, the difference between impervious area (C=1.0) 12 0 0 -4 0 -4 0 -4 0