Loading...
2325Beachcomber. PPI22-0001 Trusses 1Alpine, an ITW Company 6750 Forum Drive, Suite 305 Orlando, FL 32821 Phone: (800)755-6001 www.alpineitw.com Site Information:Page 1: Customer: W. B. Howland Company, Inc.Job Number: 21-5884 Job Description: Buchaca Address: Beachcomer Trail, ATLANTIC BEACH, FL Job Engineering Criteria: Design Code: FBC 7th Ed. 2020 Res.IntelliVIEW Version: 20.01.01A JRef #: 1XbR2150006 Wind Standard: ASCE 7-16 Wind Speed (mph): 130 Design Loading (psf): 40.00, 55.00 Building Type: Closed This package contains general notes pages, 39 truss drawing(s) and 6 detail(s). Item Drawing Number Truss Item Drawing Number Truss 1 363.21.1129.00314 A1 2 363.21.1128.59391 A2 3 363.21.1128.59595 B1 4 363.21.1129.00094 B2 5 363.21.1128.59969 B3 6 363.21.1128.59672 B4 7 363.21.1128.59516 C1 8 363.21.1129.00032 C2 9 363.21.1128.59861 C3 10 363.21.1129.00080 C4 11 363.21.1129.00142 C4A 12 363.21.1128.59330 C5 13 363.21.1128.59454 C6 14 363.21.1128.59844 D1 15 363.21.1128.59610 F1 16 363.21.1129.00173 F1A 17 363.21.1129.00081 F1B 18 363.21.1129.00111 F1C 19 363.21.1128.59563 F2 20 363.21.1128.59408 F2A 21 363.21.1128.59876 F3 22 363.21.1128.59422 F3A 23 363.21.1128.59938 F3B 24 363.21.1128.59485 F4A 25 363.21.1128.59594 FT2 26 363.21.1128.59766 FT2A 27 363.21.1128.59657 FT3 28 363.21.1128.59626 FT4 29 363.21.1128.59704 M1 30 363.21.1128.59954 M2 31 363.21.1128.59814 P01 32 363.21.1129.00205 P02 33 363.21.1128.59923 P3 34 363.21.1128.59547 V1 35 363.21.1128.59892 V2 36 363.21.1129.00000 V3 37 363.21.1128.59376 V4 38 363.21.1333.19160 F4 39 363.21.1333.37140 FT1 40 A14015ENC160118 41 A14030ENC160118 42 BRCLBSUB0119 43 GBLLETIN0118 44 PB160160118 45 STRBRIBR1014 Florida Certificate of Product Approval #FL1999 Printed 12/29/2021 1:33:43 PM 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 By Toni Gindlesperger at 4:10 pm, Apr 13, 2022 By Mike Jones at 2:25 pm, Apr 20, 2022 General Notes Truss Design Engineer Scope of Work, Design Assumptions and Design Responsibilities: The design responsibilities assumed in the preparation of these design drawings are those specified in ANSI/TPI 1, Chapter 2; and the National Design Standard for Metal Plate Connected Wood Truss Construction, by the Truss Plate Institute. The truss component designs conform to the applicable provisions of ANSI/TPI 1 and NDS, the National Design Specification for Wood Construction by AWC. The truss component designs are based on the specified loading and dimension information furnished by others to the Truss Design Engineer. The Truss Design Engineer has no duty to independently verify the accuracy or completeness of the information provided by others and may rely on that information without liability. The responsibility for verification of that information remains with others neither employed nor controlled by the Truss Design Engineer. The Truss Design Engineer’s seal and signature on the attached drawings, or cover page listing these drawings, indicates acceptance of professional engineering responsibility solely for the truss component designs and not for the technical information furnished by others which technical information and consequences thereof remain their sole responsibility. The suitability and use of these drawings for any particular structure is the responsibility of the Building Designer in accordance with ANSI/TPI 1 Chapter 2. The Building Designer is responsible for determining that the dimensions and loads for each truss component match those required by the plans and by the actual use of the individual component, and for ascertaining that the loads shown on the drawings meet or exceed applicable building code requirements and any additional factors required in the particular application. Truss components using metal connector plates with integral teeth shall not be placed in environments that will cause the moisture content of the wood in which plates are embedded to exceed 19% and/or cause corrosion of connector plates and other metal fasteners. The Truss Design Engineer shall not be responsible for items beyond the specific scope of the agreed contracted work set forth herein, including but not limited to: verifying the dimensions of the truss component, calculation of any of the truss component design loads, inspection of the truss components before or after installation, the design of temporary or permanent bracing and their attachment required in the roof and/or floor systems, the design of diaphragms or shear walls, the design of load transfer connections to and from diaphragms and shear walls, the design of load transfer to the foundation, the design of connections for truss components to their bearing supports, the design of the bearing supports, installation of the truss components, observation of the truss component installation process, review of truss assembly procedures, sequencing of the truss component installation, construction means and methods, site and/or worker safety in the installation of the truss components and/or its connections. This document may be a high quality facsimile of the original engineering document which is a digitally signed electronic file with third party authentication. A wet or embossed seal copy of this engineering document is available upon request. Temporary Lateral Restraint and Bracing: Temporary lateral restraint and diagonal bracing shall be installed according to the provisions of BCSI chapters B1, B2, B7 and/or B10 (Building Component Safety Information, by TPI and SBCA), or as specified by the Building Designer or other Registered Design Professional. The required locations for lateral restraint and/or bracing depicted on these drawings are only for the permanent lateral support of the truss members to reduce buckling lengths, and do not apply to and may not be relied upon for the temporary stability of the truss components during their installation. Permanent Lateral Restraint and Bracing: The required locations for lateral restraint or bracing depicted on these drawings are for the permanent lateral support of the truss members to reduce buckling lengths. Permanent lateral support shall be installed according to the provisions of BCSI chapters B3, B7 and/or B10, or as specified by the Building Designer or other Registered Design Professional. These drawings do not depict or specify installation/erection bracing, wind bracing, portal bracing or similar building stability bracing which are parts of the overall building design to be specified, designed and detailed by the Building Designer. Connector Plate Information: Alpine connector plates are made of ASTM A653 or ASTM A1063 galvanized steel with the following designations, gauges and grades: W=Wave, 20ga, grade 40; H=High Strength, 20ga, grade 60; S=Super Strength, 18ga, grade 60. Information on model code compliance is contained in the ICC Evaluation Service report ESR-1118, available on-line at www.icc-es.org. Fire Retardant Treated Lumber: Fire retardant treated lumber must be properly re-dried and maintained below 19% or less moisture level through all stages of construction and usage. Fire retardant treated lumber may be more brittle than untreated lumber. Special handling care must be taken to prevent breakage during all handling activities. Page 1 of 3 General Notes (continued) Key to Terms: Information provided on drawings reflects a summary of the pertinent information required for the truss design. Detailed information on load cases, reactions, member lengths, forces and members requiring permanent lateral support may be found in calculation sheets available upon written request. BCDL = Bottom Chord standard design Dead Load in pounds per square foot. BCLL = Bottom Chord standard design Live Load in pounds per square foot. CL = Certified lumber. Des Ld = total of TCLL, TCDL, BCLL and BCDL Design Load in pounds per square foot. FRT = Fire Retardant Treated lumber. FRT-DB = D-Blaze Fire Retardant Treated lumber. FRT-DC = Dricon Fire Retardant Treated lumber. FRT-FP = FirePRO Fire Retardant Treated lumber. FRT-FL = FlamePRO Fire Retardant Treated lumber. FRT-FT = FlameTech Fire Retardant Treated lumber. FRT-PG = PYRO-GUARD Fire Retardant Treated lumber. g = green lumber. HORZ(LL) = maximum Horizontal panel point deflection due to Live Load, in inches. HORZ(TL) = maximum Horizontal panel point long term deflection in inches, due to Total Load, including creep adjustment. HPL = additional Horizontal Load added to a truss Piece in pounds per linear foot or pounds. Ic = Incised lumber. FJ = Finger Jointed lumber. L/# = user specified divisor for limiting span/deflection ratio for evaluation of actual L/defl value. L/defl = ratio of Length between bearings, in inches, divided by the vertical Deflection due to creep, in inches, at the referenced panel point. Reported as 999 if greater than or equal to 999. Loc = Location, starting location of left end of bearing or panel point (joint) location of deflection. Max BC CSI = Maximum bending and axial Combined Stress Index for Bottom Chords for of all load cases. Max TC CSI = Maximum bending and axial Combined Stress Index for Top Chords for of all load cases. Max Web CSI= Maximum bending and axial Combined Stress Index for Webs for of all load cases. NCBCLL = Non-Concurrent Bottom Chord design Live Load in pounds per square foot. PL = additional Load applied at a user specified angle on a truss Piece in pounds per linear foot or pounds. PLB = additional vertical load added to a Bottom chord Piece of a truss in pounds per linear foot or pounds PLT = additional vertical load added to a Top chord Piece of a truss in pounds per linear foot or pounds. PP = Panel Point. R = maximum downward design Reaction, in pounds, from all specified gravity load cases, at the indicated location (Loc). -R = maximum upward design Reaction, in pounds, from all specified gravity load cases, at the identified location (Loc). Rh = maximum horizontal design Reaction in either direction, in pounds, from all specified gravity load cases, at the indicated location (Loc). RL = maximum horizontal design Reaction in either direction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the indicated location (Loc). Rw = maximum downward design Reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the identified location (Loc). TCDL = Top Chord standard design Dead Load in pounds per square foot. TCLL = Top Chord standard design Live Load in pounds per square foot. U = maximum Upward design reaction, in pounds, from all specified non-gravity (wind or seismic) load cases, at the indicated location (Loc). VERT(CL) = maximum Vertical panel point deflection in inches due to Live Load and Creep Component of Dead Load in inches. VERT(CTL) = maximum Vertical panel point deflection ratios due to Live Load and Creep Component of Dead Load, and maximum long term Vertical panel point deflection in inches due to Total load, including creep adjustment. VERT(LL) = maximum Vertical panel point deflection in inches due to Live Load. VERT(TL) = maximum Vertical panel point long term deflection in inches due to Total load, including creep adjustment. W = Width of non-hanger bearing, in inches. Refer to ASCE-7 for Wind and Seismic abbreviations. Uppercase Acronyms not explained above are as defined in TPI 1. Page 2 of 3 References: 1. AWC: American Wood Council; 222 Catoctin Circle SE, Suite 201; Leesburg, VA 20175; www.awc.org. 2. ICC: International Code Council; www.iccsafe.org. 3. Alpine, a division of ITW Building Components Group Inc.: 514 Earth City Expressway, Suite 242, Earth City, MO 63045; www.alpineitw.com. 4. TPI: Truss Plate Institute, 2670 Crain Highway, Suite 203, Waldorf, MD 20601; www.tpinst.org. 5. SBCA: Wood Truss Council of America, 6300 Enterprise Lane, Madison, WI 53719; www. sbcacomponents.com. Page 3 of 3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is7-6-10. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 884 /-/-/524 /125 /254 F 780 /-/-/436 /102 /- Wind reactions based on MWFRS B Brg Wid = 6.0 Min Req =1.5 F Brg Wid = 3.5 Min Req =1.5 Bearings B & F are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 349 -982 C - D 466 -873 Chords Tens.Comp. D - E 484 -882 E - F 363 -988 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - H 681 -179 H - G 468 -10 Chords Tens.Comp. G - F 691 -176 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. H - D 381 -216 Webs Tens.Comp. D - G 398 -233 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.020 H 999 240 VERT(CL):0.041 H 999 180 HORZ(LL):0.009 C - - HORZ(TL):0.019 C - - Creep Factor: 2.0 Max TC CSI:0.249 Max BC CSI:0.370 Max Web CSI:0.266 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:A1 Ply: 1 Qty:7 SEQN:469423 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T2 / DrwNo:363.21.1129.00314 /YK 12/29/2021 17'1"8 4'5"7 4'5"7 8'7" 4'1"9 12'8"9 4'1"9 17'1"8 4'4"15 5'9"15 5'9"15 11'4"1 5'6"1 17'1"8 5'9"71'4" 4"13 5"47'6"108'7"12A B C D E F GH 10 12 3X4(A1) 2X4 5X5 4X4 3X4 2X4 2X4(B1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is7-6-10. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 884 /-/-/524 /125 /254 F 780 /-/-/436 /102 /- Wind reactions based on MWFRS B Brg Wid = 6.0 Min Req =1.5 F Brg Wid = 3.5 Min Req =1.5 Bearings B & F are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 349 -982 C - D 466 -873 Chords Tens.Comp. D - E 484 -882 E - F 363 -988 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - H 681 -179 H - G 468 -10 Chords Tens.Comp. G - F 691 -176 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. H - D 381 -216 Webs Tens.Comp. D - G 398 -233 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.020 H 999 240 VERT(CL):0.041 H 999 180 HORZ(LL):0.009 C - - HORZ(TL):0.019 C - - Creep Factor: 2.0 Max TC CSI:0.249 Max BC CSI:0.370 Max Web CSI:0.266 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:A1 Ply: 1 Qty:7 SEQN:469423 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T2 / DrwNo:363.21.1129.00314 /YK 12/29/2021 17'1"8 4'5"7 4'5"7 8'7" 4'1"9 12'8"9 4'1"9 17'1"8 4'4"15 5'9"15 5'9"15 11'4"1 5'6"1 17'1"8 5'9"71'4" 4"13 5"47'6"108'7"12A B C D E F GH 10 12 3X4(A1) 2X4 5X5 4X4 3X4 2X4 2X4(B1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2;Stack Chord: SC2 2x4 SP #2; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to droppedtop chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface,plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is7-2-1. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L*137 /-/-/63 /-/3 Wind reactions based on MWFRS L Brg Wid = 205 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 450 -428 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 6.06 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.002 B 999 240 VERT(CL):0.004 B 955 180 HORZ(LL):-0.001 D - - HORZ(TL):0.002 D - - Creep Factor: 2.0 Max TC CSI:0.283 Max BC CSI:0.121 Max Web CSI:0.096 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:A2 Ply: 1 Qty:2 SEQN:469426 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T42 / DrwNo:363.21.1128.59391 /YK 12/29/2021 SC1 SC2 17'1"8 2'7"2'(TYP) 3"14 3"14 1'9"12 1'5"14 8'7" 6'9"4 15'3"12 6'8"12 16'10"2 1'6"6 17'1"8 3"6 17'1"8 17'1"81'4" 3'4" (NNL) 2' (NNL) 4"13 5"47'2"18'3"3A B C G K L R 10 12 2X4(C3)3X4(C3) 3X4 3X4 4X4 3X4 2X4(C3)3X4(C3) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2;Stack Chord: SC2 2x4 SP #2; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to droppedtop chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface,plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is7-2-1. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL L*137 /-/-/63 /-/3 Wind reactions based on MWFRS L Brg Wid = 205 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 450 -428 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 6.06 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.002 B 999 240 VERT(CL):0.004 B 955 180 HORZ(LL):-0.001 D - - HORZ(TL):0.002 D - - Creep Factor: 2.0 Max TC CSI:0.283 Max BC CSI:0.121 Max Web CSI:0.096 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:A2 Ply: 1 Qty:2 SEQN:469426 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T42 / DrwNo:363.21.1128.59391 /YK 12/29/2021 SC1 SC2 17'1"8 2'7"2'(TYP) 3"14 3"14 1'9"12 1'5"14 8'7" 6'9"4 15'3"12 6'8"12 16'10"2 1'6"6 17'1"8 3"6 17'1"8 17'1"81'4" 3'4" (NNL) 2' (NNL) 4"13 5"47'2"18'3"3A B C G K L R 10 12 2X4(C3)3X4(C3) 3X4 3X4 4X4 3X4 2X4(C3)3X4(C3) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x6 SP 2400f-2.0E;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is11-0-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 261 /-/-/90 /68 /385 N 1233 /-/-/667 /144 /- I 1051 /-/-/569 /300 /- Wind reactions based on MWFRS B Brg Wid = 3.5 Min Req =1.5 N Brg Wid = 6.0 Min Req =1.5 I Brg Wid = 3.0 Min Req =1.5 Bearings B, N, & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 440 -277 C - D 0 -1114 Chords Tens.Comp. D - E 60 -1496 E - F 13 -418 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - N 0 -404 Chords Tens.Comp. L - K 529 -176 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - C 274 -1126C - L 1422 -98 L - D 201 -937 L - E 968 -108 Webs Tens.Comp. E - K 205 -514K - G 756 -202 G - I 216 -541 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.59 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.057 D 999 240 VERT(CL):0.109 D 999 180 HORZ(LL):-0.029 G - - HORZ(TL):0.056 G - - Creep Factor: 2.0 Max TC CSI:0.666 Max BC CSI:0.782 Max Web CSI:0.651 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B1 Ply: 1 Qty:7 SEQN:469431 /SPEC FROM: RFG Cust: R215 JRef:1XbR2150006 T6 / DrwNo:363.21.1128.59595 /YK 12/29/2021 T3 1"4 5'10"12 18'9" 6' 6' 11'9" 5'9" 16'4"11 4'7"12 21'0"7 4'7"12 24'5"8 3'5"1 24'9" 3"8 6' 6' 11'9" 5'9" 21'0"7 9'3"8 24'5"8 3'5"1 24'9" 3"81'4" 3'2"8 2'3"14 9'3'3"211'11'3"12(a) (a) A B C D E F G H I JKLMN 3 12 10 12 2X4(A1)2X4 4X4 3X4 7X6 4X5(SRS) 3X5 4X8 5X5 7X8 3X62X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T3 2x6 SP 2400f-2.0E;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced on member. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wide clearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is11-0-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 261 /-/-/90 /68 /385 N 1233 /-/-/667 /144 /- I 1051 /-/-/569 /300 /- Wind reactions based on MWFRS B Brg Wid = 3.5 Min Req =1.5 N Brg Wid = 6.0 Min Req =1.5 I Brg Wid = 3.0 Min Req =1.5 Bearings B, N, & I are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 440 -277 C - D 0 -1114 Chords Tens.Comp. D - E 60 -1496 E - F 13 -418 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - N 0 -404 Chords Tens.Comp. L - K 529 -176 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - C 274 -1126C - L 1422 -98 L - D 201 -937 L - E 968 -108 Webs Tens.Comp. E - K 205 -514K - G 756 -202 G - I 216 -541 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.59 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.057 D 999 240 VERT(CL):0.109 D 999 180 HORZ(LL):-0.029 G - - HORZ(TL):0.056 G - - Creep Factor: 2.0 Max TC CSI:0.666 Max BC CSI:0.782 Max Web CSI:0.651 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B1 Ply: 1 Qty:7 SEQN:469431 /SPEC FROM: RFG Cust: R215 JRef:1XbR2150006 T6 / DrwNo:363.21.1128.59595 /YK 12/29/2021 T3 1"4 5'10"12 18'9" 6' 6' 11'9" 5'9" 16'4"11 4'7"12 21'0"7 4'7"12 24'5"8 3'5"1 24'9" 3"8 6' 6' 11'9" 5'9" 21'0"7 9'3"8 24'5"8 3'5"1 24'9" 3"81'4" 3'2"8 2'3"14 9'3'3"211'11'3"12(a) (a) A B C D E F G H I JKLMN 3 12 10 12 2X4(A1)2X4 4X4 3X4 7X6 4X5(SRS) 3X5 4X8 5X5 7X8 3X62X4 2X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T2 2x6 SP 2400f-2.0E;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&Cmember design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is11-0-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL I*157 /-/-/69 /23 /61 Wind reactions based on MWFRS I Brg Wid = 106 Min Req =- Bearing N is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 129 -530 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - I 886 -291 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. A - N 216 -894 Webs Tens.Comp. A - K 910 -264 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. Q - C 444 -346 Gables Tens.Comp. L - Q 446 -341 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 20.23 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.004 A 999 240 VERT(CL):0.005 D 999 180 HORZ(LL):-0.025 C - - HORZ(TL):0.028 C - - Creep Factor: 2.0 Max TC CSI:0.155 Max BC CSI:0.098 Max Web CSI:0.931 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B2 Ply: 1 Qty:1 SEQN:469439 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T19 / DrwNo:363.21.1129.00094 /YK 12/29/2021 T2 W1 9'2"8 1'9"11 1'9"11 3'9"11 2' 5'11"7 2'1"12 7'9"11 1'10"4 9'2"8 1'4"13 1'9"11 1'9"11 3'9"11 2' 5'11"7 2'1"12 7'9"11 1'10"4 8'11" 1'1"5 2'11"86'0"811'(a)(a) (a) (a)A C D F G IKLN Q 10 12 3X4 2.5X6 3X8 5X5 3X4 3X8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2; T2 2x6 SP 2400f-2.0E;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; W1 2x4 SP #2; Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&Cmember design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is11-0-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL I*157 /-/-/69 /23 /61 Wind reactions based on MWFRS I Brg Wid = 106 Min Req =- Bearing N is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - C 129 -530 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - I 886 -291 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. A - N 216 -894 Webs Tens.Comp. A - K 910 -264 Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. Q - C 444 -346 Gables Tens.Comp. L - Q 446 -341 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 20.23 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.004 A 999 240 VERT(CL):0.005 D 999 180 HORZ(LL):-0.025 C - - HORZ(TL):0.028 C - - Creep Factor: 2.0 Max TC CSI:0.155 Max BC CSI:0.098 Max Web CSI:0.931 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B2 Ply: 1 Qty:1 SEQN:469439 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T19 / DrwNo:363.21.1129.00094 /YK 12/29/2021 T2 W1 9'2"8 1'9"11 1'9"11 3'9"11 2' 5'11"7 2'1"12 7'9"11 1'10"4 9'2"8 1'4"13 1'9"11 1'9"11 3'9"11 2' 5'11"7 2'1"12 7'9"11 1'10"4 8'11" 1'1"5 2'11"86'0"811'(a)(a) (a) (a)A C D F G IKLN Q 10 12 3X4 2.5X6 3X8 5X5 3X4 3X8 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is3-2-12. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 565 /-/-/301 /101 /112 F 459 /-/-/239 /98 /- Wind reactions based on MWFRS B Brg Wid = 3.5 Min Req =1.5 F Brg Wid = - Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 419 -1063 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - H 1003 -526 Chords Tens.Comp. H - G 992 -529 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - G 543 -1018 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.039 H 999 240 VERT(CL):0.076 H 999 180 HORZ(LL):0.009 G - - HORZ(TL):0.018 G - - Creep Factor: 2.0 Max TC CSI:0.341 Max BC CSI:0.498 Max Web CSI:0.599 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B3 Ply: 1 Qty:9 SEQN:469442 /MONO FROM: RFG Cust: R215 JRef:1XbR2150006 T56 / DrwNo:363.21.1128.59969 /YK 12/29/2021 1"4 11'6"4 6' 6' 11'5"8 5'5"8 11'7"8 2" 6' 6' 11'5"8 5'5"8 11'7"8 2" 1'4" 3"14 3'2"123'6"8A B C D E FGH 3 12 2X4(A1)2X4 3X4 2X4 4X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is3-2-12. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 565 /-/-/301 /101 /112 F 459 /-/-/239 /98 /- Wind reactions based on MWFRS B Brg Wid = 3.5 Min Req =1.5 F Brg Wid = - Bearing B is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 419 -1063 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. B - H 1003 -526 Chords Tens.Comp. H - G 992 -529 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. C - G 543 -1018 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.039 H 999 240 VERT(CL):0.076 H 999 180 HORZ(LL):0.009 G - - HORZ(TL):0.018 G - - Creep Factor: 2.0 Max TC CSI:0.341 Max BC CSI:0.498 Max Web CSI:0.599 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B3 Ply: 1 Qty:9 SEQN:469442 /MONO FROM: RFG Cust: R215 JRef:1XbR2150006 T56 / DrwNo:363.21.1128.59969 /YK 12/29/2021 1"4 11'6"4 6' 6' 11'5"8 5'5"8 11'7"8 2" 6' 6' 11'5"8 5'5"8 11'7"8 2" 1'4" 3"14 3'2"123'6"8A B C D E FGH 3 12 2X4(A1)2X4 3X4 2X4 4X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Purlins In lieu of structural panels use purlins to brace TC @24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to droppedtop chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface, plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is1-5-6. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL H*127 /-/-/63 /-/6 Wind reactions based on MWFRS H Brg Wid = 67.2 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.049 C 999 240 VERT(CL):0.089 C 700 180 HORZ(LL):-0.009 E - - HORZ(TL):0.016 E - - Creep Factor: 2.0 Max TC CSI:0.465 Max BC CSI:0.415 Max Web CSI:0.090 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B4 Ply: 1 Qty:1 SEQN:469445 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T58 / DrwNo:363.21.1128.59672 /YK 12/29/2021 SC1 1"4 5'7"4 1'1" 1'1" 2'2"11 1'1"11 5'8"8 3'5"13 5'8"8 5'8"81'4" 3'7"9 (NNL) 3"14 1'5"61'9"2A B C E FH 3 12 2X4(C5)3X6(C5) 3X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Purlins In lieu of structural panels use purlins to brace TC @24" oc. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to droppedtop chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface, plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is1-5-6. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL H*127 /-/-/63 /-/6 Wind reactions based on MWFRS H Brg Wid = 67.2 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.049 C 999 240 VERT(CL):0.089 C 700 180 HORZ(LL):-0.009 E - - HORZ(TL):0.016 E - - Creep Factor: 2.0 Max TC CSI:0.465 Max BC CSI:0.415 Max Web CSI:0.090 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:B4 Ply: 1 Qty:1 SEQN:469445 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T58 / DrwNo:363.21.1128.59672 /YK 12/29/2021 SC1 1"4 5'7"4 1'1" 1'1" 2'2"11 1'1"11 5'8"8 3'5"13 5'8"8 5'8"81'4" 3'7"9 (NNL) 3"14 1'5"61'9"2A B C E FH 3 12 2X4(C5)3X6(C5) 3X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&Cmember design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL I 705 /-/-/418 /100 /259 G 601 /-/-/352 /88 /- Wind reactions based on MWFRS I Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 3.5 Min Req =1.5 Bearings I & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 355 -468 Chords Tens.Comp. D - E 371 -470 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. I - C 119 -540 Webs Tens.Comp. E - G 240 -549 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 H 999 240 VERT(CL):0.016 H 999 180 HORZ(LL):0.005 F - - HORZ(TL):0.010 F - - Creep Factor: 2.0 Max TC CSI:0.190 Max BC CSI:0.623 Max Web CSI:0.341 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C1 Ply: 1 Qty:1 SEQN:469480 /SPEC FROM: RFG Cust: R215 JRef:1XbR2150006 T23 / DrwNo:363.21.1128.59516 /YK 12/29/2021 14'1" 3'6"4 3'6"4 7'0"8 3'6"4 10'6"12 3'6"4 14'1" 3'6"4 7'0"8 7'0"8 14'1" 7'0"81'4"2'0"77'10"13A B C D E F GHI 10 12 2X4 2.5X6 3X4 4X4 3X8 3X4 2X4 2.5X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&Cmember design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL I 705 /-/-/418 /100 /259 G 601 /-/-/352 /88 /- Wind reactions based on MWFRS I Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 3.5 Min Req =1.5 Bearings I & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 355 -468 Chords Tens.Comp. D - E 371 -470 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. I - C 119 -540 Webs Tens.Comp. E - G 240 -549 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 H 999 240 VERT(CL):0.016 H 999 180 HORZ(LL):0.005 F - - HORZ(TL):0.010 F - - Creep Factor: 2.0 Max TC CSI:0.190 Max BC CSI:0.623 Max Web CSI:0.341 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C1 Ply: 1 Qty:1 SEQN:469480 /SPEC FROM: RFG Cust: R215 JRef:1XbR2150006 T23 / DrwNo:363.21.1128.59516 /YK 12/29/2021 14'1" 3'6"4 3'6"4 7'0"8 3'6"4 10'6"12 3'6"4 14'1" 3'6"4 7'0"8 7'0"8 14'1" 7'0"81'4"2'0"77'10"13A B C D E F GHI 10 12 2X4 2.5X6 3X4 4X4 3X8 3X4 2X4 2.5X6 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J 708 /-/-/424 /102 /214 H 582 /-/-/345 /81 /- Wind reactions based on MWFRS J Brg Wid = 3.5 Min Req =1.5 H Brg Wid = 3.5 Min Req =1.5 Bearings J & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 357 -467 Chords Tens.Comp. D - E 358 -468 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. J - C 114 -539 E - H 184 -441 Webs Tens.Comp. G - H 685 -721 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 I 999 240 VERT(CL):0.017 I 999 180 HORZ(LL):0.004 C - - HORZ(TL):0.009 C - - Creep Factor: 2.0 Max TC CSI:0.204 Max BC CSI:0.614 Max Web CSI:0.444 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C2 Ply: 1 Qty:7 SEQN:469486 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T35 / DrwNo:363.21.1129.00032 /YK 12/29/2021 14'1" 3'6"4 3'6"4 7'0"8 3'6"4 10'6"12 3'6"4 14'1" 3'6"4 7'0"8 7'0"8 14'1" 7'0"81'4"82'0"73"87'10"13A B C D E F G HIJ 10 12 2X4 2.5X6 3X4 4X4 3X8 3X4 2X42X4 5X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J 708 /-/-/424 /102 /214 H 582 /-/-/345 /81 /- Wind reactions based on MWFRS J Brg Wid = 3.5 Min Req =1.5 H Brg Wid = 3.5 Min Req =1.5 Bearings J & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 357 -467 Chords Tens.Comp. D - E 358 -468 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. J - C 114 -539 E - H 184 -441 Webs Tens.Comp. G - H 685 -721 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 I 999 240 VERT(CL):0.017 I 999 180 HORZ(LL):0.004 C - - HORZ(TL):0.009 C - - Creep Factor: 2.0 Max TC CSI:0.204 Max BC CSI:0.614 Max Web CSI:0.444 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C2 Ply: 1 Qty:7 SEQN:469486 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T35 / DrwNo:363.21.1129.00032 /YK 12/29/2021 14'1" 3'6"4 3'6"4 7'0"8 3'6"4 10'6"12 3'6"4 14'1" 3'6"4 7'0"8 7'0"8 14'1" 7'0"81'4"82'0"73"87'10"13A B C D E F G HIJ 10 12 2X4 2.5X6 3X4 4X4 3X8 3X4 2X42X4 5X6 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x6 SP 2400f-2.0E; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J 708 /-/-/424 /101 /212 H 571 /-/-/342 /78 /- Wind reactions based on MWFRS J Brg Wid = 5.5 Min Req =1.5 H Brg Wid = 5.5 Min Req =1.5 Bearings J & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 230 -466 Chords Tens.Comp. D - E 226 -467 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. J - C 40 -538 E - H 99 -387 Webs Tens.Comp. G - H 522 -664 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 I 999 240 VERT(CL):0.017 I 999 180 HORZ(LL):0.004 C - - HORZ(TL):0.009 C - - Creep Factor: 2.0 Max TC CSI:0.180 Max BC CSI:0.601 Max Web CSI:0.649 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C3 Ply: 1 Qty:6 SEQN:469448 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T31 / DrwNo:363.21.1128.59861 /YK 12/29/2021 14'1" 3'6"4 3'6"4 7'0"8 3'6"4 10'6"12 3'6"4 13'7"8 3'0"12 14'1" 5"8 7'0"8 7'0"8 13'7"8 6'7" 14'1" 5"8 1'4"82'0"73"87'10"13A B C D E F G HIJ 10 12 2X4 2.5X6 3X4 4X4 3X8 3X4 2X42.5X6 4X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x6 SP 2400f-2.0E; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J 708 /-/-/424 /101 /212 H 571 /-/-/342 /78 /- Wind reactions based on MWFRS J Brg Wid = 5.5 Min Req =1.5 H Brg Wid = 5.5 Min Req =1.5 Bearings J & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. C - D 230 -466 Chords Tens.Comp. D - E 226 -467 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. J - C 40 -538 E - H 99 -387 Webs Tens.Comp. G - H 522 -664 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 I 999 240 VERT(CL):0.017 I 999 180 HORZ(LL):0.004 C - - HORZ(TL):0.009 C - - Creep Factor: 2.0 Max TC CSI:0.180 Max BC CSI:0.601 Max Web CSI:0.649 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C3 Ply: 1 Qty:6 SEQN:469448 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T31 / DrwNo:363.21.1128.59861 /YK 12/29/2021 14'1" 3'6"4 3'6"4 7'0"8 3'6"4 10'6"12 3'6"4 13'7"8 3'0"12 14'1" 5"8 7'0"8 7'0"8 13'7"8 6'7" 14'1" 5"8 1'4"82'0"73"87'10"13A B C D E F G HIJ 10 12 2X4 2.5X6 3X4 4X4 3X8 3X4 2X42.5X6 4X6 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 708 /-/-/424 /102 /214 H 582 /-/-/345 /81 /- Wind reactions based on MWFRS N Brg Wid = 3.5 Min Req =1.5 H Brg Wid = 3.5 Min Req =1.5 Bearings N & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 234 -671 C - D 217 -549 Chords Tens.Comp. D - E 220 -550 E - F 190 -673 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. L - K 535 -198 Chords Tens.Comp. K - I 516 -135 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. B - N 261 -681 B - L 502 -108 I - F 454 -121 Webs Tens.Comp. F - G 159 -610 G - H 163 -627 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.010 K 999 240 VERT(CL):0.020 K 999 180 HORZ(LL):0.011 H - - HORZ(TL):0.023 H - - Creep Factor: 2.0 Max TC CSI:0.250 Max BC CSI:0.308 Max Web CSI:0.262 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C4 Ply: 1 Qty:5 SEQN:469469 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T50 / DrwNo:363.21.1129.00080 /YK 12/29/2021 14'1" 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"8 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"81'4"82'0"73"81'7'10"13A B C D E F G H I JK LMN 10 12 3X4 2.5X6 5X62X4 3X4 4X4 3X8 3X4 5X62X4 3X42X4 4X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Rt Bearing Leg: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&C member design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 708 /-/-/424 /102 /214 H 582 /-/-/345 /81 /- Wind reactions based on MWFRS N Brg Wid = 3.5 Min Req =1.5 H Brg Wid = 3.5 Min Req =1.5 Bearings N & H are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 234 -671 C - D 217 -549 Chords Tens.Comp. D - E 220 -550 E - F 190 -673 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. L - K 535 -198 Chords Tens.Comp. K - I 516 -135 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. B - N 261 -681 B - L 502 -108 I - F 454 -121 Webs Tens.Comp. F - G 159 -610 G - H 163 -627 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.010 K 999 240 VERT(CL):0.020 K 999 180 HORZ(LL):0.011 H - - HORZ(TL):0.023 H - - Creep Factor: 2.0 Max TC CSI:0.250 Max BC CSI:0.308 Max Web CSI:0.262 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C4 Ply: 1 Qty:5 SEQN:469469 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T50 / DrwNo:363.21.1129.00080 /YK 12/29/2021 14'1" 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"8 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"81'4"82'0"73"81'7'10"13A B C D E F G H I JK LMN 10 12 3X4 2.5X6 5X62X4 3X4 4X4 3X8 3X4 5X62X4 3X42X4 4X6 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&Cmember design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 709 /-/-/423 /103 /217 G 601 /-/-/349 /86 /- Wind reactions based on MWFRS M Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 3.5 Min Req =1.5 Bearings M & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 229 -671 C - D 217 -549 Chords Tens.Comp. D - E 221 -550 E - F 192 -681 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - J 539 -191 Chords Tens.Comp. J - H 516 -129 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. B - M 257 -681 B - K 502 -104 Webs Tens.Comp. H - F 522 -131 F - G 152 -576 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.009 J 999 240 VERT(CL):0.020 J 999 180 HORZ(LL):0.011 G - - HORZ(TL):0.024 G - - Creep Factor: 2.0 Max TC CSI:0.250 Max BC CSI:0.308 Max Web CSI:0.199 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C4A Ply: 1 Qty:1 SEQN:469483 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T52 / DrwNo:363.21.1129.00142 /YK 12/29/2021 14'1" 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"8 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"81'4"82'0"71'7'10"13A B C D E F G HIJ KLM 10 12 3X4 2.5X6 5X62X4 3X4 4X4 3X8 3X4 5X62X4 3X4 3X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Wind Wind loads based on MWFRS with additional C&Cmember design. Left end vertical exposed to wind pressure. Deflectionmeets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is7-10-13. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M 709 /-/-/423 /103 /217 G 601 /-/-/349 /86 /- Wind reactions based on MWFRS M Brg Wid = 3.5 Min Req =1.5 G Brg Wid = 3.5 Min Req =1.5 Bearings M & G are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 229 -671 C - D 217 -549 Chords Tens.Comp. D - E 221 -550 E - F 192 -681 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - J 539 -191 Chords Tens.Comp. J - H 516 -129 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. B - M 257 -681 B - K 502 -104 Webs Tens.Comp. H - F 522 -131 F - G 152 -576 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.009 J 999 240 VERT(CL):0.020 J 999 180 HORZ(LL):0.011 G - - HORZ(TL):0.024 G - - Creep Factor: 2.0 Max TC CSI:0.250 Max BC CSI:0.308 Max Web CSI:0.199 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C4A Ply: 1 Qty:1 SEQN:469483 /COMN FROM: RFG Cust: R215 JRef:1XbR2150006 T52 / DrwNo:363.21.1129.00142 /YK 12/29/2021 14'1" 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"8 2'3"8 2'3"8 7'0"8 4'9" 11'9"8 4'9" 14'1" 2'3"81'4"82'0"71'7'10"13A B C D E F G HIJ KLM 10 12 3X4 2.5X6 5X62X4 3X4 4X4 3X8 3X4 5X62X4 3X4 3X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2;Stack Chord: SC2 2x4 SP #2; Plating Notes All plates are 2X4 except as noted. (**) 1 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to droppedtop chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface, plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is7-6-4. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL U*141 /-/-/64 /-/4 Wind reactions based on MWFRS U Brg Wid = 169 Min Req =- Bearing U is a rigid surface. Members not listed have forces less than 375# Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B - U 393 -285 Gables Tens.Comp. T - C 461 -155 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 J 999 240 VERT(CL):0.007 J 999 180 HORZ(LL):0.002 L - - HORZ(TL):0.005 L - - Creep Factor: 2.0 Max TC CSI:0.292 Max BC CSI:0.035 Max Web CSI:0.250 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C5 Ply: 1 Qty:1 SEQN:469477 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T39 / DrwNo:363.21.1128.59330 /YK 12/29/2021 SC1 SC2 14'1" 1'0"8 2'(TYP) 10"12 2'1"5 2'1"5 7'0"8 4'11"3 12'3"4 5'2"12 14'1" 1'9"12 14'1" 14'1"1'4" 3'7"9 (NNL) 2' (NNL)2'0"77'6"4A B C D G J L M ST U 10 12 3X5(**) 2.5X6 3X4 3X4 3X4 4X4 3X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2;Stack Chord: SC2 2x4 SP #2; Plating Notes All plates are 2X4 except as noted. (**) 1 plate(s) require special positioning. Refer toscaled plate plot details for special positioningrequirements. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one face and 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. End verticals not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to droppedtop chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface, plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is7-6-4. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL U*141 /-/-/64 /-/4 Wind reactions based on MWFRS U Brg Wid = 169 Min Req =- Bearing U is a rigid surface. Members not listed have forces less than 375# Maximum Gable Forces Per Ply (lbs) Gables Tens.Comp. B - U 393 -285 Gables Tens.Comp. T - C 461 -155 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 J 999 240 VERT(CL):0.007 J 999 180 HORZ(LL):0.002 L - - HORZ(TL):0.005 L - - Creep Factor: 2.0 Max TC CSI:0.292 Max BC CSI:0.035 Max Web CSI:0.250 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C5 Ply: 1 Qty:1 SEQN:469477 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T39 / DrwNo:363.21.1128.59330 /YK 12/29/2021 SC1 SC2 14'1" 1'0"8 2'(TYP) 10"12 2'1"5 2'1"5 7'0"8 4'11"3 12'3"4 5'2"12 14'1" 1'9"12 14'1" 14'1"1'4" 3'7"9 (NNL) 2' (NNL)2'0"77'6"4A B C D G J L M ST U 10 12 3X5(**) 2.5X6 3X4 3X4 3X4 4X4 3X4 2X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2;Stack Chord: SC2 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 66 plf at -1.38 to 66 plf at 5.02TC: From 33 plf at 5.02 to 33 plf at 9.06TC: From 66 plf at 9.06 to 66 plf at 14.96BC: From 5 plf at -1.38 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.02BC: From 10 plf at 5.02 to 10 plf at 9.06BC: From 20 plf at 9.06 to 20 plf at 14.08BC: From 5 plf at 14.08 to 5 plf at 14.96BC: 65 lb Conc. Load at 5.02, 7.02, 9.06 Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads and reactions based on MWFRS. Left end vertical exposed to wind pressure. Deflection meets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL V*132 /-/-/-/23 /- T 774 /-/-/-/80 /- P 774 /-/-/-/80 /- N*112 /-/-/-/18 /- Wind reactions based on MWFRS V Brg Wid = 35.5 Min Req =- T Brg Wid = 4.0 Min Req =1.5 P Brg Wid = 4.0 Min Req =1.5 N Brg Wid = 35.5 Min Req =- Bearings V, T, P, & P are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs)Chords Tens.Comp. E - G 48 -406 Chords Tens.Comp. G - I 48 -407 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. T - E 85 -594 Webs Tens.Comp. I - P 87 -599 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.006 F 999 240 VERT(CL):0.015 F 999 180 HORZ(LL):0.004 F - - HORZ(TL):0.008 F - - Creep Factor: 2.0 Max TC CSI:0.294 Max BC CSI:0.083 Max Web CSI:0.191 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C6 Ply: 1 Qty:1 SEQN:469498 /GABL FROM: RFG Page 1 of 2 Cust: R215 JRef:1XbR2150006 T54 / DrwNo:363.21.1128.59454 /YK 12/29/2021 SC1 SC2 3'1"8 7'10"3'1"8 1'0"8 4'(TYP) 2'1"5 2'1"5 3'1"8 1'0"3 7'0"8 3'11" 10'11"8 3'11" 11'11"11 1'0"3 14'1" 2'1"5 3'1"8 3'1"8 7'0"8 3'11" 10'11"8 3'11" 14'1" 3'1"81'4"8 10"8 3'8"1 (NNL) 3'8"1 (NNL)2'0"77'6"4A B D E G I J L M NPRTV 10 12 3X43X4 3X4 3X4 3X4 4X4 3X8 3X4 3X4 3X4 3X43X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3;Stack Chord: SC1 2x4 SP #2;Stack Chord: SC2 2x4 SP #2; Special Loads ------(Lumber Dur.Fac.=1.25 / Plate Dur.Fac.=1.25)TC: From 66 plf at -1.38 to 66 plf at 5.02TC: From 33 plf at 5.02 to 33 plf at 9.06TC: From 66 plf at 9.06 to 66 plf at 14.96BC: From 5 plf at -1.38 to 5 plf at 0.00 BC: From 20 plf at 0.00 to 20 plf at 5.02BC: From 10 plf at 5.02 to 10 plf at 9.06BC: From 20 plf at 9.06 to 20 plf at 14.08BC: From 5 plf at 14.08 to 5 plf at 14.96BC: 65 lb Conc. Load at 5.02, 7.02, 9.06 Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads and reactions based on MWFRS. Left end vertical exposed to wind pressure. Deflection meets L/360. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL V*132 /-/-/-/23 /- T 774 /-/-/-/80 /- P 774 /-/-/-/80 /- N*112 /-/-/-/18 /- Wind reactions based on MWFRS V Brg Wid = 35.5 Min Req =- T Brg Wid = 4.0 Min Req =1.5 P Brg Wid = 4.0 Min Req =1.5 N Brg Wid = 35.5 Min Req =- Bearings V, T, P, & P are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs)Chords Tens.Comp. E - G 48 -406 Chords Tens.Comp. G - I 48 -407 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. T - E 85 -594 Webs Tens.Comp. I - P 87 -599 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.006 F 999 240 VERT(CL):0.015 F 999 180 HORZ(LL):0.004 F - - HORZ(TL):0.008 F - - Creep Factor: 2.0 Max TC CSI:0.294 Max BC CSI:0.083 Max Web CSI:0.191 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:C6 Ply: 1 Qty:1 SEQN:469498 /GABL FROM: RFG Page 1 of 2 Cust: R215 JRef:1XbR2150006 T54 / DrwNo:363.21.1128.59454 /YK 12/29/2021 SC1 SC2 3'1"8 7'10"3'1"8 1'0"8 4'(TYP) 2'1"5 2'1"5 3'1"8 1'0"3 7'0"8 3'11" 10'11"8 3'11" 11'11"11 1'0"3 14'1" 2'1"5 3'1"8 3'1"8 7'0"8 3'11" 10'11"8 3'11" 14'1" 3'1"81'4"8 10"8 3'8"1 (NNL) 3'8"1 (NNL)2'0"77'6"4A B D E G I J L M NPRTV 10 12 3X43X4 3X4 3X4 3X4 4X4 3X8 3X4 3X4 3X4 3X43X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to dropped top chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface,plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is 7-6-4. Job Number:21-5884 Buchaca Truss Label:C6 Ply: 1 Qty:1 SEQN:469498 /GABL FROM: RFG Page 2 of 2 Cust: R215 JRef:1XbR2150006 T54 / DrwNo:363.21.1128.59454 /YK 12/29/2021 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Stacked top chord must NOT be notched or cut inarea (NNL). Dropped top chord braced at 24" ocintervals. Attach stacked top chord (SC) to dropped top chord in notchable area using 3x4 tie-plates 24"oc. Center plate on stacked/dropped chord interface,plate length perpendicular to chord length. Splice topchord in notchable area using 3x6. The overall height of this truss excluding overhang is 7-6-4. Job Number:21-5884 Buchaca Truss Label:C6 Ply: 1 Qty:1 SEQN:469498 /GABL FROM: RFG Page 2 of 2 Cust: R215 JRef:1XbR2150006 T54 / DrwNo:363.21.1128.59454 /YK 12/29/2021 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is1-6-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 288 /-/-/160 /78 /52 E 177 /-/-/96 /38 /- Wind reactions based on MWFRS B Brg Wid = 3.5 Min Req =1.5 E Brg Wid = - Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.006 B - - Creep Factor: 2.0 Max TC CSI:0.269 Max BC CSI:0.180 Max Web CSI:0.128 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:D1 Ply: 1 Qty:12 SEQN:469501 /MONO FROM: RFG Cust: R215 JRef:1XbR2150006 T10 / DrwNo:363.21.1128.59844 /YK 12/29/2021 1"4 4'7"4 4'6"8 4'6"8 4'8"8 2" 4'6"8 4'6"8 4'8"8 2" 1'4" 3"14 1'6"1'9"12A B CD EF 3 12 2X4(A1) 2X4 2.5X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Left cantilever is exposed to wind Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is1-6-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL B 288 /-/-/160 /78 /52 E 177 /-/-/96 /38 /- Wind reactions based on MWFRS B Brg Wid = 3.5 Min Req =1.5 E Brg Wid = - Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.003 B - - HORZ(TL):0.006 B - - Creep Factor: 2.0 Max TC CSI:0.269 Max BC CSI:0.180 Max Web CSI:0.128 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:D1 Ply: 1 Qty:12 SEQN:469501 /MONO FROM: RFG Cust: R215 JRef:1XbR2150006 T10 / DrwNo:363.21.1128.59844 /YK 12/29/2021 1"4 4'7"4 4'6"8 4'6"8 4'8"8 2" 4'6"8 4'6"8 4'8"8 2" 1'4" 3"14 1'6"1'9"12A B CD EF 3 12 2X4(A1) 2X4 2.5X6 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AE 862 /-/-/-/-/- R 862 /-/-/-/-/- AE Brg Wid = 5.5 Min Req =1.5 R Brg Wid = 3.5 Min Req =1.5 Bearings AE & R are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1581 C - D 0 -2946 D - E 0 -2946 E - F 0 -3829 F - G 0 -4284 G - H 0 -4284 H - I 0 -4321 Chords Tens.Comp. I - J 0 -4316 J - K 0 -3823 K - L 0 -3823 L - M 0 -2947 M - N 0 -2947 N - O 0 -1580 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. AE-AD 887 0 AD-AC 2311 0 AC-AB 2311 0 AB-AA 3483 0 AA- Z 4133 0 Z - Y 4133 0 Y - X 4324 0 Chords Tens.Comp. X - W 4321 0 W -V 4139 0 V - U 3481 0 U - T 2312 0 T - S 2312 0 S - R 887 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. AE- B 0 -1206 B -AD 965 0 AD- C 0 -1016 C -AB 843 0 AB- E 0 -712 E -AA 470 0 AA- F 0 -413 Y - H 256 -380 Webs Tens.Comp. W -J 472 -99 J - V 0 -438 V - L 463 0 L - U 0 -709 U - N 844 0 N - S 0 -1017 S - O 965 0 O - R 0 -1206 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.376 H 746 480 VERT(CL):0.517 H 542 360 HORZ(LL):0.050 B - - HORZ(TL):0.069 B - - Creep Factor: 2.0 Max TC CSI:0.215 Max BC CSI:0.342 Max Web CSI:0.459 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1 Ply: 1 Qty:20 SEQN:469658 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T43 / DrwNo:363.21.1128.59610 /YK 12/29/2021 3"8 23'9" 4'15'9"4' 3" 1'3" 2'6" 1'3"12 (TYP) 2'6"2'6"2'6" 1'3" 3" 11'10"8 11'10"8 13'3" 1'4"8 23'9" 10'6"1'4"1"8 ++++ A B C D E F G H I J K L M N O P RSTUVWXYZAAABACADAE 1.5X31X4 3X5 4X5 4X5 3X5 1X4 5X6 3X5W=2.5X6 1X4 4X4 2.5X6 1X4 3X5 3X5 W=3X4 1X4 5X6 3X5 4X5 4X5 1X4 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AE 862 /-/-/-/-/- R 862 /-/-/-/-/- AE Brg Wid = 5.5 Min Req =1.5 R Brg Wid = 3.5 Min Req =1.5 Bearings AE & R are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1581 C - D 0 -2946 D - E 0 -2946 E - F 0 -3829 F - G 0 -4284 G - H 0 -4284 H - I 0 -4321 Chords Tens.Comp. I - J 0 -4316 J - K 0 -3823 K - L 0 -3823 L - M 0 -2947 M - N 0 -2947 N - O 0 -1580 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. AE-AD 887 0 AD-AC 2311 0 AC-AB 2311 0 AB-AA 3483 0 AA- Z 4133 0 Z - Y 4133 0 Y - X 4324 0 Chords Tens.Comp. X - W 4321 0 W -V 4139 0 V - U 3481 0 U - T 2312 0 T - S 2312 0 S - R 887 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. AE- B 0 -1206 B -AD 965 0 AD- C 0 -1016 C -AB 843 0 AB- E 0 -712 E -AA 470 0 AA- F 0 -413 Y - H 256 -380 Webs Tens.Comp. W -J 472 -99 J - V 0 -438 V - L 463 0 L - U 0 -709 U - N 844 0 N - S 0 -1017 S - O 965 0 O - R 0 -1206 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.376 H 746 480 VERT(CL):0.517 H 542 360 HORZ(LL):0.050 B - - HORZ(TL):0.069 B - - Creep Factor: 2.0 Max TC CSI:0.215 Max BC CSI:0.342 Max Web CSI:0.459 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1 Ply: 1 Qty:20 SEQN:469658 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T43 / DrwNo:363.21.1128.59610 /YK 12/29/2021 3"8 23'9" 4'15'9"4' 3" 1'3" 2'6" 1'3"12 (TYP) 2'6"2'6"2'6" 1'3" 3" 11'10"8 11'10"8 13'3" 1'4"8 23'9" 10'6"1'4"1"8 ++++ A B C D E F G H I J K L M N O P RSTUVWXYZAAABACADAE 1.5X31X4 3X5 4X5 4X5 3X5 1X4 5X6 3X5W=2.5X6 1X4 4X4 2.5X6 1X4 3X5 3X5 W=3X4 1X4 5X6 3X5 4X5 4X5 1X4 3X5 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require different connections than indicated. Refer to manufacturer publication foradditional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'6" uses the followingsupport conditions: 23'6"Bearing Q (23'6", 10'1"2) HUS46 Supporting Member: (2)2x6 SP 2400f-2.0E(4) 0.148"x3" nails into supportingmember,(4) 0.148"x3" nails into supportedmember. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AD 860 /-/-/-/-/- Q 873 /-/-/-/-/- AD Brg Wid = 5.5 Min Req =1.5 Q Brg Wid = - Bearing AD is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1576 C - D 0 -2936 D - E 0 -2936 E - F 0 -3813 F - G 0 -4263 G - H 0 -4263 H - I 0 -4296 Chords Tens.Comp. I - J 0 -4290 J - K 0 -3790 K - L 0 -3790 L - M 0 -2910 M - N 0 -2910 N - O 0 -1540 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. AD-AC 884 0 AC-AB 2304 0 AB-AA 2304 0 AA- Z 3469 0 Z - Y 4115 0 Y - X 4115 0 X - W 4298 0 Chords Tens.Comp. W -V 4296 0 V - U 4109 0 U - T 3447 0 T - S 2273 0 S - R 2273 0 R - Q 844 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. AD- B 0 -1203 B -AC 961 0 AC- C 0 -1012 C -AA 839 0 AA- E 0 -708 E - Z 466 0 Z - F 0 -410 X - H 259 -375 Webs Tens.Comp. V - J 475 -95 J - U 0 -440 U - L 466 0 L - T 0 -712 T - N 846 0 N - R 0 -1019 R - O 967 0 O - Q 0 -1177 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.372 H 751 480 VERT(CL):0.512 H 546 360 HORZ(LL):0.050 B - - HORZ(TL):0.068 B - - Creep Factor: 2.0 Max TC CSI:0.213 Max BC CSI:0.340 Max Web CSI:0.461 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1A Ply: 1 Qty:2 SEQN:469576 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T17 / DrwNo:363.21.1129.00173 /YK 12/29/2021 3"8 23'9" 4'15'9"4' 3" 1'3" 2'6" 1'3"12 (TYP) 2'6"2'6"2'6" 1'3" 3" 11'10"8 11'10"8 13'3" 1'4"8 23'9" 10'6"1'4"1"8 ++ A B C D E F G H I J K L M N O P QRSTUVWXYZAAABACAD 1.5X31X4 3X5 4X5 4X5 3X5 1X4 5X6 3X5W=3X4 1X4 4X4 2.5X6 1X4 3X5 3X5 W=3X4 1X4 5X6 3X5 4X5 4X5 2X4 3X5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require different connections than indicated. Refer to manufacturer publication foradditional information. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end, unless unsupported chord end has 85% platingcoverage. Bearing at location x=23'6" uses the followingsupport conditions: 23'6"Bearing Q (23'6", 10'1"2) HUS46 Supporting Member: (2)2x6 SP 2400f-2.0E(4) 0.148"x3" nails into supportingmember,(4) 0.148"x3" nails into supportedmember. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AD 860 /-/-/-/-/- Q 873 /-/-/-/-/- AD Brg Wid = 5.5 Min Req =1.5 Q Brg Wid = - Bearing AD is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1576 C - D 0 -2936 D - E 0 -2936 E - F 0 -3813 F - G 0 -4263 G - H 0 -4263 H - I 0 -4296 Chords Tens.Comp. I - J 0 -4290 J - K 0 -3790 K - L 0 -3790 L - M 0 -2910 M - N 0 -2910 N - O 0 -1540 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. AD-AC 884 0 AC-AB 2304 0 AB-AA 2304 0 AA- Z 3469 0 Z - Y 4115 0 Y - X 4115 0 X - W 4298 0 Chords Tens.Comp. W -V 4296 0 V - U 4109 0 U - T 3447 0 T - S 2273 0 S - R 2273 0 R - Q 844 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. AD- B 0 -1203 B -AC 961 0 AC- C 0 -1012 C -AA 839 0 AA- E 0 -708 E - Z 466 0 Z - F 0 -410 X - H 259 -375 Webs Tens.Comp. V - J 475 -95 J - U 0 -440 U - L 466 0 L - T 0 -712 T - N 846 0 N - R 0 -1019 R - O 967 0 O - Q 0 -1177 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.372 H 751 480 VERT(CL):0.512 H 546 360 HORZ(LL):0.050 B - - HORZ(TL):0.068 B - - Creep Factor: 2.0 Max TC CSI:0.213 Max BC CSI:0.340 Max Web CSI:0.461 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1A Ply: 1 Qty:2 SEQN:469576 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T17 / DrwNo:363.21.1129.00173 /YK 12/29/2021 3"8 23'9" 4'15'9"4' 3" 1'3" 2'6" 1'3"12 (TYP) 2'6"2'6"2'6" 1'3" 3" 11'10"8 11'10"8 13'3" 1'4"8 23'9" 10'6"1'4"1"8 ++ A B C D E F G H I J K L M N O P QRSTUVWXYZAAABACAD 1.5X31X4 3X5 4X5 4X5 3X5 1X4 5X6 3X5W=3X4 1X4 4X4 2.5X6 1X4 3X5 3X5 W=3X4 1X4 5X6 3X5 4X5 4X5 2X4 3X5 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 1X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AK*109 /-/-/-/-/- T 465 /-/-/-/-/- AK Brg Wid = 140 Min Req =- T Brg Wid = 3.5 Min Req =1.5 Bearings AK & T are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. J - K 0 -464 K - L 0 -472 L - M 0 -1148 M - N 0 -1148 Chords Tens.Comp. N - O 0 -1153 O - P 0 -1153 P - Q 0 -732 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. AA- Z 1067 -1281 Z - Y 464 0Y - X 940 0 X - W 1227 0 Chords Tens.Comp. W -V 1012 0 V - U 1012 0U - T 453 0 Maximum Web Forces Per Ply(lbs)Webs Tens.Comp. AA- J 0 -506 Y - L 0 -635 P - U 0 -390 Webs Tens.Comp. U - Q 389 0 Q - T 0 -616 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.098 L 999 480 VERT(CL):0.136 L 999 360 HORZ(LL):-0.008 Q - - HORZ(TL):0.012 Q - - Creep Factor: 2.0 Max TC CSI:0.233 Max BC CSI:0.398 Max Web CSI:0.185 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1B Ply: 1 Qty:1 SEQN:469544 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T9 / DrwNo:363.21.1129.00081 /YK 12/29/2021 3"8 23'9" 4'1"8 15'7"8 4' 3"8 1'2"4 0"12 (TYP) 1'2"4 1'2"4 0"12 0"12 1'3" 1'3" 1'2"4 1'2"4 1'3" 1'3"12 1'3"12 2'6" 1'3"12 1'3"12 2'6" 1'3" 2"8 23'9" 11'11" 11'11" 13'3"8 1'4"8 23'9"8 10'6"1'4"1"8 + A B C D E F G H I J K L M N O P Q R TUVWXYZ AAABACADAEAFAGAHAIAJAK 1.5X3 2.5X6 3X4 3X4 3X4 3X4 4X4 3X4 2.5X6 2.5X6W=3X4 3X4 2.5X6 4X4 3X4 2.5X6 3X5 3X4 3X4 W=3X4 3X4 4X4 3X4 3X4 3X4 3X4 2.5X6 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 1X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL AK*109 /-/-/-/-/- T 465 /-/-/-/-/- AK Brg Wid = 140 Min Req =- T Brg Wid = 3.5 Min Req =1.5 Bearings AK & T are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. J - K 0 -464 K - L 0 -472 L - M 0 -1148 M - N 0 -1148 Chords Tens.Comp. N - O 0 -1153 O - P 0 -1153 P - Q 0 -732 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. AA- Z 1067 -1281 Z - Y 464 0Y - X 940 0 X - W 1227 0 Chords Tens.Comp. W -V 1012 0 V - U 1012 0U - T 453 0 Maximum Web Forces Per Ply(lbs)Webs Tens.Comp. AA- J 0 -506 Y - L 0 -635 P - U 0 -390 Webs Tens.Comp. U - Q 389 0 Q - T 0 -616 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.098 L 999 480 VERT(CL):0.136 L 999 360 HORZ(LL):-0.008 Q - - HORZ(TL):0.012 Q - - Creep Factor: 2.0 Max TC CSI:0.233 Max BC CSI:0.398 Max Web CSI:0.185 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1B Ply: 1 Qty:1 SEQN:469544 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T9 / DrwNo:363.21.1129.00081 /YK 12/29/2021 3"8 23'9" 4'1"8 15'7"8 4' 3"8 1'2"4 0"12 (TYP) 1'2"4 1'2"4 0"12 0"12 1'3" 1'3" 1'2"4 1'2"4 1'3" 1'3"12 1'3"12 2'6" 1'3"12 1'3"12 2'6" 1'3" 2"8 23'9" 11'11" 11'11" 13'3"8 1'4"8 23'9"8 10'6"1'4"1"8 + A B C D E F G H I J K L M N O P Q R TUVWXYZ AAABACADAEAFAGAHAIAJAK 1.5X3 2.5X6 3X4 3X4 3X4 3X4 4X4 3X4 2.5X6 2.5X6W=3X4 3X4 2.5X6 4X4 3X4 2.5X6 3X5 3X4 3X4 W=3X4 3X4 4X4 3X4 3X4 3X4 3X4 2.5X6 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Plating Notes All plates are 1X4 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N*109 /-/-/-/-/- N Brg Wid = 183 Min Req =- Bearing Z is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 M 999 480 VERT(CL):0.000 M 999 360 HORZ(LL):0.000 M - - HORZ(TL):0.000 M - - Creep Factor: 2.0 Max TC CSI:0.097 Max BC CSI:0.023 Max Web CSI:0.032 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1C Ply: 1 Qty:1 SEQN:469553 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T29 / DrwNo:363.21.1129.00111 /YK 12/29/2021 3"8 15'3"4 1'2"8 1'4"(TYP) 11"12 11"12 2"12 1'0"4 13'9"4 3" 15'3"8 1'3"4 1'3"4 15'3"8 14'0"4 1'4"A B M NZ 1.5X3 2.5X6 3X4 2X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Plating Notes All plates are 1X4 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N*109 /-/-/-/-/- N Brg Wid = 183 Min Req =- Bearing Z is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 M 999 480 VERT(CL):0.000 M 999 360 HORZ(LL):0.000 M - - HORZ(TL):0.000 M - - Creep Factor: 2.0 Max TC CSI:0.097 Max BC CSI:0.023 Max Web CSI:0.032 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F1C Ply: 1 Qty:1 SEQN:469553 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T29 / DrwNo:363.21.1129.00111 /YK 12/29/2021 3"8 15'3"4 1'2"8 1'4"(TYP) 11"12 11"12 2"12 1'0"4 13'9"4 3" 15'3"8 1'3"4 1'3"4 15'3"8 14'0"4 1'4"A B M NZ 1.5X3 2.5X6 3X4 2X4 2X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL O 447 /-/-/-/-/- J 447 /-/-/-/-/- O Brg Wid = 3.5 Min Req =1.5 J Brg Wid = 3.5 Min Req =1.5 Bearings O & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -716 C - D 0 -1077 D - E 0 -1081 Chords Tens.Comp. E - F 0 -1077 F - G 0 -716 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. O - N 446 0 N - M 968 0 M - L 1081 0 Chords Tens.Comp. L - K 968 0 K - J 446 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. O - B 0 -606B - N 376 0 Webs Tens.Comp. K - G 376 0G - J 0 -606 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.052 D 999 480 VERT(CL):0.077 D 999 360 HORZ(LL):0.011 J - - HORZ(TL):0.017 B - - Creep Factor: 2.0 Max TC CSI:0.304 Max BC CSI:0.356 Max Web CSI:0.179 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F2 Ply: 1 Qty:1 SEQN:469547 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T1 / DrwNo:363.21.1128.59563 /YK 12/29/2021 3"8 12'5" 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 7'0"8 1'8" 12'5" 5'4"8 1'4"+ A B C D E F G H JKLMNO 1.5X31X4 2.5X6 3X4 3X4 3X4 3X4 1X4 1X4 3X4 3X4 3X4 3X4 1X4 2.5X6 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL O 447 /-/-/-/-/- J 447 /-/-/-/-/- O Brg Wid = 3.5 Min Req =1.5 J Brg Wid = 3.5 Min Req =1.5 Bearings O & J are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -716 C - D 0 -1077 D - E 0 -1081 Chords Tens.Comp. E - F 0 -1077 F - G 0 -716 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. O - N 446 0 N - M 968 0 M - L 1081 0 Chords Tens.Comp. L - K 968 0 K - J 446 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. O - B 0 -606B - N 376 0 Webs Tens.Comp. K - G 376 0G - J 0 -606 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.052 D 999 480 VERT(CL):0.077 D 999 360 HORZ(LL):0.011 J - - HORZ(TL):0.017 B - - Creep Factor: 2.0 Max TC CSI:0.304 Max BC CSI:0.356 Max Web CSI:0.179 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F2 Ply: 1 Qty:1 SEQN:469547 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T1 / DrwNo:363.21.1128.59563 /YK 12/29/2021 3"8 12'5" 3"2'6" (TYP) 1'3"12 1'3"12 3" 5'4"8 5'4"8 7'0"8 1'8" 12'5" 5'4"8 1'4"+ A B C D E F G H JKLMNO 1.5X31X4 2.5X6 3X4 3X4 3X4 3X4 1X4 1X4 3X4 3X4 3X4 3X4 1X4 2.5X6 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Plating Notes All plates are 1X4 except as noted. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is 1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M*72 /-/-/-/-/- M Brg Wid = 148 Min Req =- Bearing W is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 K 999 480 VERT(CL):0.000 K 999 360 HORZ(LL):0.000 K - - HORZ(TL):0.000 K - - Creep Factor: 2.0 Max TC CSI:0.065 Max BC CSI:0.016 Max Web CSI:0.021 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F2A Ply: 1 Qty:1 SEQN:469550 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T5 / DrwNo:363.21.1128.59408 /YK 12/29/2021 3"8 12'5" 1'2"8 1'4" (TYP) 10"8 10"8 3" 1'0"4 10'10"12 3" 1'3"4 1'3"4 12'5" 11'1"12 1'4"A B K MW 1.5X3 2.5X6 3X4 2X4 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Bracing Sheathing is required for any longitudinal(drag)forces. All connections to be designed by the building designer. Plating Notes All plates are 1X4 except as noted. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is 1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL M*72 /-/-/-/-/- M Brg Wid = 148 Min Req =- Bearing W is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 16.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 K 999 480 VERT(CL):0.000 K 999 360 HORZ(LL):0.000 K - - HORZ(TL):0.000 K - - Creep Factor: 2.0 Max TC CSI:0.065 Max BC CSI:0.016 Max Web CSI:0.021 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F2A Ply: 1 Qty:1 SEQN:469550 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T5 / DrwNo:363.21.1128.59408 /YK 12/29/2021 3"8 12'5" 1'2"8 1'4" (TYP) 10"8 10"8 3" 1'0"4 10'10"12 3" 1'3"4 1'3"4 12'5" 11'1"12 1'4"A B K MW 1.5X3 2.5X6 3X4 2X4 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended connection based on manufacturertested capacities and calculations. Conditions mayexist that require different connections than indicated. Refer to manufacturer publication for additionalinformation. Additional connection required to evenlydistribute hanger reaction throughout all plies ofsupporting girder. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. (J) Hanger Support Required, by others Bearing W (0', 10'1"2) HUS46Supporting Member: (3)2x6 SP 2400f-2.0E(4) 0.148"x3" nails into supportingmember,(4) 0.148"x3" nails into supported member. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Negative reaction(s) of -502# MAX. from a non-windload case requires uplift connection. See MaximumReactions. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL W 17 /-502 /-/-/-/- V 1574 /-/-/-/-/- O 701 /-/-/-/-/- W Brg Wid = -Min Req =- V Brg Wid = 4.0 Min Req =1.5 O Brg Wid = 5.5 Bearings V & O are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1129 0 C - D 1129 0 D - E 0 -390 E - F 0 -1384 F - G 0 -1384 Chords Tens.Comp. G - H 0 -1711 H - I 0 -1711 I - J 0 -1715 J - K 0 -1708 K - L 0 -1109 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. W -V 0 -537 U - T 993 0 T - S 993 0 S - R 1640 0 Chords Tens.Comp. R - Q 1715 0 Q - P 1510 0 P - O 687 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. W -B 752 0 B - V 0 -874 V - D 0 -1199 D - U 860 0 U - E 0 -840 Webs Tens.Comp. E - S 532 0 Q - K 405 0 K - P 0 -558 P - L 588 0 L - O 0 -935 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.117 I 999 480 VERT(CL):0.161 I 999 360 HORZ(LL):0.015 O - - HORZ(TL):0.021 O - - Creep Factor: 2.0 Max TC CSI:0.548 Max BC CSI:0.571 Max Web CSI:0.410 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F3 Ply: 1 Qty:3 SEQN:469621 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T8 / DrwNo:363.21.1128.59876 /YK 12/29/2021 3"8 2'10"14'4"8 3" 1'2"12 1'2"12 3" 1'3"2'6"1'3"12 (TYP)2'6"1'3" 3" 17'2"8 2'10" 2'10" 10'8"8 7'10"8 11'10" 1'1"8 17'2"8 5'4"8 1'4"+ A B C D E F G H I J K L M OPQRSTUVW 2X4 3X5 3X5 2X4 3X8 4X4 4X4 W=3X4 1X4 2.5X6 W=3X41X4 1X4 1X4 2.5X6 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended connection based on manufacturertested capacities and calculations. Conditions mayexist that require different connections than indicated. Refer to manufacturer publication for additionalinformation. Additional connection required to evenlydistribute hanger reaction throughout all plies ofsupporting girder. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. (J) Hanger Support Required, by others Bearing W (0', 10'1"2) HUS46Supporting Member: (3)2x6 SP 2400f-2.0E(4) 0.148"x3" nails into supportingmember,(4) 0.148"x3" nails into supported member. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridging recommendations. Negative reaction(s) of -502# MAX. from a non-windload case requires uplift connection. See MaximumReactions. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL W 17 /-502 /-/-/-/- V 1574 /-/-/-/-/- O 701 /-/-/-/-/- W Brg Wid = -Min Req =- V Brg Wid = 4.0 Min Req =1.5 O Brg Wid = 5.5 Bearings V & O are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 1129 0 C - D 1129 0 D - E 0 -390 E - F 0 -1384 F - G 0 -1384 Chords Tens.Comp. G - H 0 -1711 H - I 0 -1711 I - J 0 -1715 J - K 0 -1708 K - L 0 -1109 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. W -V 0 -537 U - T 993 0 T - S 993 0 S - R 1640 0 Chords Tens.Comp. R - Q 1715 0 Q - P 1510 0 P - O 687 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. W -B 752 0 B - V 0 -874 V - D 0 -1199 D - U 860 0 U - E 0 -840 Webs Tens.Comp. E - S 532 0 Q - K 405 0 K - P 0 -558 P - L 588 0 L - O 0 -935 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.117 I 999 480 VERT(CL):0.161 I 999 360 HORZ(LL):0.015 O - - HORZ(TL):0.021 O - - Creep Factor: 2.0 Max TC CSI:0.548 Max BC CSI:0.571 Max Web CSI:0.410 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F3 Ply: 1 Qty:3 SEQN:469621 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T8 / DrwNo:363.21.1128.59876 /YK 12/29/2021 3"8 2'10"14'4"8 3" 1'2"12 1'2"12 3" 1'3"2'6"1'3"12 (TYP)2'6"1'3" 3" 17'2"8 2'10" 2'10" 10'8"8 7'10"8 11'10" 1'1"8 17'2"8 5'4"8 1'4"+ A B C D E F G H I J K L M OPQRSTUVW 2X4 3X5 3X5 2X4 3X8 4X4 4X4 W=3X4 1X4 2.5X6 W=3X41X4 1X4 1X4 2.5X6 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL R 801 /-/-/-/-/- L 781 /-/-/-/-/- R Brg Wid = 3.5 Min Req =1.5 L Brg Wid = 5.5 Min Req =1.5 Bearings R & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1280 C - D 0 -2077 D - E 0 -2077 E - F 0 -2157 Chords Tens.Comp. F - G 0 -2157 G - H 0 -2144 H - I 0 -1300 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. R - Q 752 0 Q - P 1786 0P - O 2227 0 Chords Tens.Comp. O - N 2157 0 N - M 1806 0M - L 787 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. R - B 0 -1051 B - Q 734 0 Q - C 0 -703 C - P 396 0 Webs Tens.Comp. N - H 585 0 H - M 0 -704 M - I 714 0 I - L 0 -1070 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.157 O 999 480 VERT(CL):0.216 O 781 360 HORZ(LL):0.029 B - - HORZ(TL):0.040 B - - Creep Factor: 2.0 Max TC CSI:0.502 Max BC CSI:0.860 Max Web CSI:0.350 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F3A Ply: 1 Qty:1 SEQN:469628 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T3 / DrwNo:363.21.1128.59422 /YK 12/29/2021 3"8 14'6" 3" 1'3" 2'6"1'3"12 (TYP) 2'6"1'3" 3" 8' 8' 9'1"8 1'1"8 14'6" 5'4"8 1'4"+ A B C D E F G H I J LMNOPQR 2X4 3X5 1X4 1X4 1X4 1X4 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL R 801 /-/-/-/-/- L 781 /-/-/-/-/- R Brg Wid = 3.5 Min Req =1.5 L Brg Wid = 5.5 Min Req =1.5 Bearings R & L are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1280 C - D 0 -2077 D - E 0 -2077 E - F 0 -2157 Chords Tens.Comp. F - G 0 -2157 G - H 0 -2144 H - I 0 -1300 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. R - Q 752 0 Q - P 1786 0P - O 2227 0 Chords Tens.Comp. O - N 2157 0 N - M 1806 0M - L 787 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. R - B 0 -1051 B - Q 734 0 Q - C 0 -703 C - P 396 0 Webs Tens.Comp. N - H 585 0 H - M 0 -704 M - I 714 0 I - L 0 -1070 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.157 O 999 480 VERT(CL):0.216 O 781 360 HORZ(LL):0.029 B - - HORZ(TL):0.040 B - - Creep Factor: 2.0 Max TC CSI:0.502 Max BC CSI:0.860 Max Web CSI:0.350 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F3A Ply: 1 Qty:1 SEQN:469628 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T3 / DrwNo:363.21.1128.59422 /YK 12/29/2021 3"8 14'6" 3" 1'3" 2'6"1'3"12 (TYP) 2'6"1'3" 3" 8' 8' 9'1"8 1'1"8 14'6" 5'4"8 1'4"+ A B C D E F G H I J LMNOPQR 2X4 3X5 1X4 1X4 1X4 1X4 3X5 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Plating Notes All plates are 1X4 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL V 60 /-/-/-/-/- L*108 /-/-/-/-/- V Brg Wid = 5.5 Min Req =1.5 L Brg Wid = 147 Min Req =- Bearings V & V are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 K 999 480 VERT(CL):0.000 K 999 360 HORZ(LL):0.000 K - - HORZ(TL):0.000 K - - Creep Factor: 2.0 Max TC CSI:0.120 Max BC CSI:0.026 Max Web CSI:0.034 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F3B Ply: 1 Qty:1 SEQN:469631 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T25 / DrwNo:363.21.1128.59938 /YK 12/29/2021 3"8 12'9"8 1'2"8 1'4" (TYP) 1'0"12 1'0"12 1'3"4 3" 1'0"4 11'4"12 1'3"4 1'3"4 12'9"8 11'6"4 1'4"A B K LV 1.5X3 2.5X6 3X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP #2;Bot chord: 4x2 SP #2; Webs: 4x2 SP #3; Plating Notes All plates are 1X4 except as noted. Additional Notes See detail STRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL V 60 /-/-/-/-/- L*108 /-/-/-/-/- V Brg Wid = 5.5 Min Req =1.5 L Brg Wid = 147 Min Req =- Bearings V & V are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 K 999 480 VERT(CL):0.000 K 999 360 HORZ(LL):0.000 K - - HORZ(TL):0.000 K - - Creep Factor: 2.0 Max TC CSI:0.120 Max BC CSI:0.026 Max Web CSI:0.034 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F3B Ply: 1 Qty:1 SEQN:469631 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T25 / DrwNo:363.21.1128.59938 /YK 12/29/2021 3"8 12'9"8 1'2"8 1'4" (TYP) 1'0"12 1'0"12 1'3"4 3" 1'0"4 11'4"12 1'3"4 1'3"4 12'9"8 11'6"4 1'4"A B K LV 1.5X3 2.5X6 3X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL T 870 /-/-/-/-/- M 850 /-/-/-/-/- T Brg Wid = 3.5 Min Req =1.5 M Brg Wid = 3.5 Min Req =1.5 Bearings T & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1438 C - D 0 -1438 D - E 0 -2316 E - F 0 -2632 Chords Tens.Comp. F - G 0 -2630 G - H 0 -2374 H - I 0 -2374 I - J 0 -1453 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. T - S 742 0 S - R 1996 0R - Q 2630 0 Q - P 2632 0 Chords Tens.Comp. P - O 2597 0 O - N 2019 0N - M 861 0 Maximum Web Forces Per Ply(lbs)Webs Tens.Comp. T - B 0 -1083 B - S 945 0 S - D 0 -759 D - R 465 0 R - E 0 -522 Webs Tens.Comp. O - I 484 0 I - N 0 -787 N - J 823 0 J - M 0 -1171 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.150 F 999 480 VERT(CL):0.206 F 891 360 HORZ(LL):0.024 M - - HORZ(TL):0.033 M - - Creep Factor: 2.0 Max TC CSI:0.162 Max BC CSI:0.367 Max Web CSI:0.450 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F4A Ply: 1 Qty:1 SEQN:469618 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T41 / DrwNo:363.21.1128.59485 /YK 12/29/2021 3"8 15'9" 3" 1'1"12 1'3"12 (TYP) 2'6"2'6"1'3" 3" 6'7"12 6'7"12 7'9" 1'1"4 15'9" 8'1'4"+ A B C D E F G H I J K MNOPQRST 2X4 3X5 4X5 1X4 4X6 1X4 1X4 1X4 4X4 4X4 1X4 3X5 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL T 870 /-/-/-/-/- M 850 /-/-/-/-/- T Brg Wid = 3.5 Min Req =1.5 M Brg Wid = 3.5 Min Req =1.5 Bearings T & M are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1438 C - D 0 -1438 D - E 0 -2316 E - F 0 -2632 Chords Tens.Comp. F - G 0 -2630 G - H 0 -2374 H - I 0 -2374 I - J 0 -1453 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. T - S 742 0 S - R 1996 0R - Q 2630 0 Q - P 2632 0 Chords Tens.Comp. P - O 2597 0 O - N 2019 0N - M 861 0 Maximum Web Forces Per Ply(lbs)Webs Tens.Comp. T - B 0 -1083 B - S 945 0 S - D 0 -759 D - R 465 0 R - E 0 -522 Webs Tens.Comp. O - I 484 0 I - N 0 -787 N - J 823 0 J - M 0 -1171 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.150 F 999 480 VERT(CL):0.206 F 891 360 HORZ(LL):0.024 M - - HORZ(TL):0.033 M - - Creep Factor: 2.0 Max TC CSI:0.162 Max BC CSI:0.367 Max Web CSI:0.450 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F4A Ply: 1 Qty:1 SEQN:469618 /SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T41 / DrwNo:363.21.1128.59485 /YK 12/29/2021 3"8 15'9" 3" 1'1"12 1'3"12 (TYP) 2'6"2'6"1'3" 3" 6'7"12 6'7"12 7'9" 1'1"4 15'9" 8'1'4"+ A B C D E F G H I J K MNOPQRST 2X4 3X5 4X5 1X4 4X6 1X4 1X4 1X4 4X4 4X4 1X4 3X5 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP M-31;Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W2,W4,W10,W12 2x4 SP #2; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @ 3.25" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Repeat nailing as each layer is applied. Use equalspacing between rows and stagger nails in each rowto avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 567 plf at 0.00 to 567 plf at 8.54TC: From 517 plf at 8.54 to 517 plf at 13.96 BC: From 10 plf at 0.00 to 10 plf at 8.54BC: From 5 plf at 8.54 to 5 plf at 13.96BC: 808 lb Conc. Load at 8.54BC: 17 lb Conc. Load at 9.12,11.12,13.12 Hangers / Ties (J) Hanger Support Required, by others Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 4293 /-/-/-/-/- H 4321 /-/-/-/-/- N Brg Wid = 5.5 Min Req =1.5 H Brg Wid = - Bearing N is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -4501 C - D 0 -4501 Chords Tens.Comp. D - E 0 -4718 E - F 0 -4718 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 2956 0 M - L 2956 0 L - K 5310 0 Chords Tens.Comp. K - J 5310 0 J - I 3024 0 I - H 3024 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -3146 B - L 1670 0C - L 0 -376 L - D 0 -884 Webs Tens.Comp. D - J 0 -647 J - F 1831 0F - H 0 -3219 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.130 K 999 480 VERT(CL):0.279 K 600 360 HORZ(LL):0.020 A - - HORZ(TL):0.044 A - - Creep Factor: 2.0 Max TC CSI:0.268 Max BC CSI:0.557 Max Web CSI:0.517 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT2 Ply: 3 Qty:1 SEQN:469625 /FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T32 / DrwNo:363.21.1128.59594 /YK 12/29/2021 3 Complete Trusses Required W2 W4 W10 W12 13'11"8 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"12 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"121'4"A B C D E F G HIJKLMN 2X4 4X10 6X10 2X4 2X4 5X10 4X8 2X4 2X4 5X10 6X10 2X4 2X4 4X10 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP M-31;Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; W2,W4,W10,W12 2x4 SP #2; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @ 3.25" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Repeat nailing as each layer is applied. Use equalspacing between rows and stagger nails in each rowto avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 567 plf at 0.00 to 567 plf at 8.54TC: From 517 plf at 8.54 to 517 plf at 13.96 BC: From 10 plf at 0.00 to 10 plf at 8.54BC: From 5 plf at 8.54 to 5 plf at 13.96BC: 808 lb Conc. Load at 8.54BC: 17 lb Conc. Load at 9.12,11.12,13.12 Hangers / Ties (J) Hanger Support Required, by others Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL N 4293 /-/-/-/-/- H 4321 /-/-/-/-/- N Brg Wid = 5.5 Min Req =1.5 H Brg Wid = - Bearing N is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -4501 C - D 0 -4501 Chords Tens.Comp. D - E 0 -4718 E - F 0 -4718 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. N - M 2956 0 M - L 2956 0 L - K 5310 0 Chords Tens.Comp. K - J 5310 0 J - I 3024 0 I - H 3024 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. N - B 0 -3146 B - L 1670 0C - L 0 -376 L - D 0 -884 Webs Tens.Comp. D - J 0 -647 J - F 1831 0F - H 0 -3219 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.130 K 999 480 VERT(CL):0.279 K 600 360 HORZ(LL):0.020 A - - HORZ(TL):0.044 A - - Creep Factor: 2.0 Max TC CSI:0.268 Max BC CSI:0.557 Max Web CSI:0.517 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT2 Ply: 3 Qty:1 SEQN:469625 /FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T32 / DrwNo:363.21.1128.59594 /YK 12/29/2021 3 Complete Trusses Required W2 W4 W10 W12 13'11"8 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"12 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"121'4"A B C D E F G HIJKLMN 2X4 4X10 6X10 2X4 2X4 5X10 4X8 2X4 2X4 5X10 6X10 2X4 2X4 4X10 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 768 /-/-/-/-/- H 768 /-/-/-/-/- K Brg Wid = 5.5 Min Req =1.5 H Brg Wid = - Bearing K is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -2303 C - D 0 -2303 Chords Tens.Comp. D - E 0 -2303 E - F 0 -2303 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - J 1494 0 J - I 2529 0 Chords Tens.Comp. I - H 1494 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. K - B 0 -1606 B - J 885 0 Webs Tens.Comp. I - F 885 0 F - H 0 -1606 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.144 D 999 480 VERT(CL):0.198 D 846 360 HORZ(LL):0.030 H - - HORZ(TL):0.041 H - - Creep Factor: 2.0 Max TC CSI:0.231 Max BC CSI:0.796 Max Web CSI:0.422 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT2A Ply: 1 Qty:2 SEQN:469525 /FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T26 / DrwNo:363.21.1128.59766 /YK 12/29/2021 13'11"8 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"12 4'9"12 4'9"12 9'1"12 4'4" 13'11"8 4'9"121'4"A B C D E F G HIJK 2X4 4X6 4X5 2X4 4X10 3X4 2X4 4X10 4X5 2X4 4X6 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties (J) Hanger Support Required, by others Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 768 /-/-/-/-/- H 768 /-/-/-/-/- K Brg Wid = 5.5 Min Req =1.5 H Brg Wid = - Bearing K is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -2303 C - D 0 -2303 Chords Tens.Comp. D - E 0 -2303 E - F 0 -2303 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - J 1494 0 J - I 2529 0 Chords Tens.Comp. I - H 1494 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. K - B 0 -1606 B - J 885 0 Webs Tens.Comp. I - F 885 0 F - H 0 -1606 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.144 D 999 480 VERT(CL):0.198 D 846 360 HORZ(LL):0.030 H - - HORZ(TL):0.041 H - - Creep Factor: 2.0 Max TC CSI:0.231 Max BC CSI:0.796 Max Web CSI:0.422 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT2A Ply: 1 Qty:2 SEQN:469525 /FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T26 / DrwNo:363.21.1128.59766 /YK 12/29/2021 13'11"8 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"12 4'9"12 4'9"12 9'1"12 4'4" 13'11"8 4'9"121'4"A B C D E F G HIJK 2X4 4X6 4X5 2X4 4X10 3X4 2X4 4X10 4X5 2X4 4X6 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 100 plf at 0.00 to 100 plf at 3.00BC: From 10 plf at 0.00 to 10 plf at 3.00BC: 873 lb Conc. Load at 0.44, 1.77 Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is 1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D 1269 /-/-/-/-/- C 808 /-/-/-/-/- D Brg Wid = 4.0 Min Req =1.5 C Brg Wid = - Bearing D is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 B 999 480 VERT(CL):0.000 B 999 360 HORZ(LL):-0.000 B - - HORZ(TL):0.000 B - - Creep Factor: 2.0 Max TC CSI:0.160 Max BC CSI:0.240 Max Web CSI:0.033 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT3 Ply: 2 Qty:1 SEQN:469579 /FLAT FROM: RFG Page 1 of 2 Cust: R215 JRef:1XbR2150006 T20 / DrwNo:363.21.1128.59657 /YK 12/29/2021 2 Complete Trusses Required 3' 3' 3'1'4"A B CD 4X5 3X6 3X6 4X5 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x6 SP 2400f-2.0E; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 2 Rows @ 4.00" o.c. (Each Row)Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 100 plf at 0.00 to 100 plf at 3.00BC: From 10 plf at 0.00 to 10 plf at 3.00BC: 873 lb Conc. Load at 0.44, 1.77 Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is 1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL D 1269 /-/-/-/-/- C 808 /-/-/-/-/- D Brg Wid = 4.0 Min Req =1.5 C Brg Wid = - Bearing D is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.000 B 999 480 VERT(CL):0.000 B 999 360 HORZ(LL):-0.000 B - - HORZ(TL):0.000 B - - Creep Factor: 2.0 Max TC CSI:0.160 Max BC CSI:0.240 Max Web CSI:0.033 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT3 Ply: 2 Qty:1 SEQN:469579 /FLAT FROM: RFG Page 1 of 2 Cust: R215 JRef:1XbR2150006 T20 / DrwNo:363.21.1128.59657 /YK 12/29/2021 2 Complete Trusses Required 3' 3' 3'1'4"A B CD 4X5 3X6 3X6 4X5 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended connection based on manufacturer tested capacities and calculations. Conditions mayexist that require different connections than indicated.Refer to manufacturer publication for additionalinformation. Additional connection required to evenlydistribute hanger reaction throughout all plies of supporting girder. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=2'9" ,y=10'1"2 uses the followingsupport conditions: 2'9"Bearing C (2'9", 10'1"2) HGUS26-2Supporting Member: (3)2x6 SP 2400f-2.0E(20) 0.148"x3" nails into supportingmember,(6) 0.148"x3" nails into supportedmember. Job Number:21-5884 Buchaca Truss Label:FT3 Ply: 2 Qty:1 SEQN:469579 /FLAT FROM: RFG Page 2 of 2 Cust: R215 JRef:1XbR2150006 T20 / DrwNo:363.21.1128.59657 /YK 12/29/2021 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by SimpsonStrong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended connection based on manufacturer tested capacities and calculations. Conditions mayexist that require different connections than indicated.Refer to manufacturer publication for additionalinformation. Additional connection required to evenlydistribute hanger reaction throughout all plies of supporting girder. Hanger specified assumes connection to supportingchord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% plating coverage. Bearing at location x=2'9" ,y=10'1"2 uses the followingsupport conditions: 2'9"Bearing C (2'9", 10'1"2) HGUS26-2Supporting Member: (3)2x6 SP 2400f-2.0E(20) 0.148"x3" nails into supportingmember,(6) 0.148"x3" nails into supportedmember. Job Number:21-5884 Buchaca Truss Label:FT3 Ply: 2 Qty:1 SEQN:469579 /FLAT FROM: RFG Page 2 of 2 Cust: R215 JRef:1XbR2150006 T20 / DrwNo:363.21.1128.59657 /YK 12/29/2021 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP M-31; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @ 2.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 100 plf at 0.00 to 100 plf at 13.96BC: From 10 plf at 0.00 to 10 plf at 13.96TC: 1051 lb Conc. Load at 2.02, 4.02, 6.02, 8.02 10.02,12.02,13.85 Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is2-0-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 3909 /-/-/-/-/- H 4982 /-/-/-/-/- K Brg Wid = 5.5 Min Req =1.6 H Brg Wid = - Bearing K is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -4067 C - D 0 -4067 Chords Tens.Comp. D - E 0 -4078 E - F 0 -4078 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - J 2659 0 J - I 4517 0 Chords Tens.Comp. I - H 2698 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. K - B 0 -3216 B - J 1744 0 C - J 0 -664J - D 0 -574 D - I 0 -559 Webs Tens.Comp. E - I 0 -653 I - F 1710 0 F - H 0 -3260G - H 0 -617 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.149 D 999 480 VERT(CL):0.204 D 819 360 HORZ(LL):0.042 A - - HORZ(TL):0.057 A - - Creep Factor: 2.0 Max TC CSI:0.890 Max BC CSI:0.623 Max Web CSI:0.881 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT4 Ply: 2 Qty:1 SEQN:469531 /FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T4 / DrwNo:363.21.1128.59626 /YK 12/29/2021 2 Complete Trusses Required 13'11"8 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"12 4'9"12 4'9"12 9'1"12 4'4" 13'11"8 4'9"122'A B C D E F G HIJK 2X4 4X8 6X8 2X4 5X10 3X4 2X4 5X10 6X8 2X4 4X8 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP M-31; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @ 2.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 100 plf at 0.00 to 100 plf at 13.96BC: From 10 plf at 0.00 to 10 plf at 13.96TC: 1051 lb Conc. Load at 2.02, 4.02, 6.02, 8.02 10.02,12.02,13.85 Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is2-0-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL K 3909 /-/-/-/-/- H 4982 /-/-/-/-/- K Brg Wid = 5.5 Min Req =1.6 H Brg Wid = - Bearing K is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -4067 C - D 0 -4067 Chords Tens.Comp. D - E 0 -4078 E - F 0 -4078 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. K - J 2659 0 J - I 4517 0 Chords Tens.Comp. I - H 2698 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. K - B 0 -3216 B - J 1744 0 C - J 0 -664J - D 0 -574 D - I 0 -559 Webs Tens.Comp. E - I 0 -653 I - F 1710 0 F - H 0 -3260G - H 0 -617 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.149 D 999 480 VERT(CL):0.204 D 819 360 HORZ(LL):0.042 A - - HORZ(TL):0.057 A - - Creep Factor: 2.0 Max TC CSI:0.890 Max BC CSI:0.623 Max Web CSI:0.881 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT4 Ply: 2 Qty:1 SEQN:469531 /FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T4 / DrwNo:363.21.1128.59626 /YK 12/29/2021 2 Complete Trusses Required 13'11"8 2'5"12 2'5"12 4'9"12 2'4" 6'11"12 2'2" 9'1"12 2'2" 11'5"12 2'4" 13'11"8 2'5"12 4'9"12 4'9"12 9'1"12 4'4" 13'11"8 4'9"122'A B C D E F G HIJK 2X4 4X8 6X8 2X4 5X10 3X4 2X4 5X10 6X8 2X4 4X8 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require different connections than indicated. Refer to manufacturer publication foradditional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=2'3" ,y=10'1"2 uses the following support conditions: 2'3"Bearing D (2'3", 10'1"2) HUS26Supporting Member: (1)2x6 SP 2400f-2.0E(14) 0.148"x3" nails into supportingmember,(4) 0.148"x3" nails into supportedmember. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 0-11-6. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E 223 /-/-/128 /79 /35 D 65 /-/-/42 /12 /- Wind reactions based on MWFRS E Brg Wid = 4.0 Min Req =1.5 D Brg Wid = - Bearing E is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.000 B - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.216 Max BC CSI:0.039 Max Web CSI:0.036 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:M1 Ply: 1 Qty:3 SEQN:469489 /MONO FROM: RFG Cust: R215 JRef:1XbR2150006 T22 / DrwNo:363.21.1128.59704 /YK 12/29/2021 2'6" 2'6" 2'6"1'4" 3"14 11"61'3"2A B C DE 3 12 2X4(A1) 2X4 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Hangers / Ties Simpson Construction Hardware is specified based onthe most current information provided by Simpson Strong-Tie. Please refer to the most recent SimpsonStrong-Tie catalog for additional information. Recommended hanger connections are based onmanufacturer tested capacities and calculations.Conditions may exist that require different connections than indicated. Refer to manufacturer publication foradditional information. Hanger specified assumes connection to supporting chord is located a minimum of five times the depth ofthe supporting chord from any unsupported end,unless unsupported chord end has 85% platingcoverage. Bearing at location x=2'3" ,y=10'1"2 uses the following support conditions: 2'3"Bearing D (2'3", 10'1"2) HUS26Supporting Member: (1)2x6 SP 2400f-2.0E(14) 0.148"x3" nails into supportingmember,(4) 0.148"x3" nails into supportedmember. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes The overall height of this truss excluding overhang is 0-11-6. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E 223 /-/-/128 /79 /35 D 65 /-/-/42 /12 /- Wind reactions based on MWFRS E Brg Wid = 4.0 Min Req =1.5 D Brg Wid = - Bearing E is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.000 B - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.216 Max BC CSI:0.039 Max Web CSI:0.036 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:M1 Ply: 1 Qty:3 SEQN:469489 /MONO FROM: RFG Cust: R215 JRef:1XbR2150006 T22 / DrwNo:363.21.1128.59704 /YK 12/29/2021 2'6" 2'6" 2'6"1'4" 3"14 11"61'3"2A B C DE 3 12 2X4(A1) 2X4 2X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-0-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is0-11-6. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E*124 /-/-/69 /103 /31 Wind reactions based on MWFRS E Brg Wid = 30.0 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.000 B - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.243 Max BC CSI:0.039 Max Web CSI:0.042 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:M2 Ply: 1 Qty:2 SEQN:469492 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T38 / DrwNo:363.21.1128.59954 /YK 12/29/2021 2'6" 2'6" 2'6"1'4" 3"14 11"61'3"2A B C DE 3 12 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-0-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14015ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is0-11-6. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL E*124 /-/-/69 /103 /31 Wind reactions based on MWFRS E Brg Wid = 30.0 Min Req =- Bearing B is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 15.00 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):NA VERT(CL):NA HORZ(LL):0.000 B - - HORZ(TL):0.001 B - - Creep Factor: 2.0 Max TC CSI:0.243 Max BC CSI:0.039 Max Web CSI:0.042 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:M2 Ply: 1 Qty:2 SEQN:469492 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T38 / DrwNo:363.21.1128.59954 /YK 12/29/2021 2'6" 2'6" 2'6"1'4" 3"14 11"61'3"2A B C DE 3 12 2X4(A1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes Refer to DWG PB160160118 for piggyback details. The overall height of this truss excluding overhang is5-9-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-8 /-/211 /86 /265 B*76 /-/-/80 /66 /- Wind reactions based on MWFRS A Brg Wid = 5.2 Min Req =1.5 B Brg Wid = 75.3 Min Req =- Bearings A & B are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 137 -476 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 23.99 ft TCDL: 5.0 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):-0.002 D 999 240 VERT(CL):0.002 D 999 180 HORZ(LL):-0.004 D - - HORZ(TL):0.005 D - - Creep Factor: 2.0 Max TC CSI:0.209 Max BC CSI:0.038 Max Web CSI:0.108 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:P01 Ply: 1 Qty:7 SEQN:469520 /SPEC FROM: RFG Cust: R215 JRef:1XbR2150006 T59 / DrwNo:363.21.1128.59814 /YK 12/29/2021 6'10"11 7"7 7"7 3'8"4 3'0"13 6'10"12 3'2"8 7"7 7"7 3'8"4 3'0"13 6'10"12 3'2"8 0"4 5'7"91"10 5'9"3A B C D E F 10 12 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes Refer to DWG PB160160118 for piggyback details. The overall height of this truss excluding overhang is5-9-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-8 /-/211 /86 /265 B*76 /-/-/80 /66 /- Wind reactions based on MWFRS A Brg Wid = 5.2 Min Req =1.5 B Brg Wid = 75.3 Min Req =- Bearings A & B are a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 137 -476 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 23.99 ft TCDL: 5.0 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 4.50 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):-0.002 D 999 240 VERT(CL):0.002 D 999 180 HORZ(LL):-0.004 D - - HORZ(TL):0.005 D - - Creep Factor: 2.0 Max TC CSI:0.209 Max BC CSI:0.038 Max Web CSI:0.108 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:P01 Ply: 1 Qty:7 SEQN:469520 /SPEC FROM: RFG Cust: R215 JRef:1XbR2150006 T59 / DrwNo:363.21.1128.59814 /YK 12/29/2021 6'10"11 7"7 7"7 3'8"4 3'0"13 6'10"12 3'2"8 7"7 7"7 3'8"4 3'0"13 6'10"12 3'2"8 0"4 5'7"91"10 5'9"3A B C D E F 10 12 2X4(A1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Refer to DWG PB160160118 for piggyback details. The overall height of this truss excluding overhang is5-4-10. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*120 /-/-/77 /71 /77 G /-189 Wind reactions based on MWFRS A Brg Wid = 75.6 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 135 -557 Chords Tens.Comp. B - D 96 -464 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. A - I 499 -108 I - G 516 -115 Chords Tens.Comp. G - F 527 -118 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. D - G 398 -245 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 24.00 ft TCDL: 5.0 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):-0.001 D 999 240 VERT(CL):0.002 A 999 180 HORZ(LL):-0.010 E - - HORZ(TL):0.010 E - - Creep Factor: 2.0 Max TC CSI:0.144 Max BC CSI:0.088 Max Web CSI:0.118 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:P02 Ply: 1 Qty:1 SEQN:469513 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T28 / DrwNo:363.21.1129.00205 /YK 12/29/2021 6'3"10 2'3"10 2'3"10 3'1"2 9"8 4'3"10 1'2"8 6'3"10 2' 2'3"10 2'3"10 3'1"2 9"8 4'3"10 1'2"8 6'3"10 2'5'3"A B D E F GI 10 12 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not becut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&C member design. Right end vertical not exposed to wind pressure. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Refer to DWG PB160160118 for piggyback details. The overall height of this truss excluding overhang is5-4-10. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*120 /-/-/77 /71 /77 G /-189 Wind reactions based on MWFRS A Brg Wid = 75.6 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 135 -557 Chords Tens.Comp. B - D 96 -464 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. A - I 499 -108 I - G 516 -115 Chords Tens.Comp. G - F 527 -118 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. D - G 398 -245 Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 24.00 ft TCDL: 5.0 psf BCDL: 2.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: Any GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: No FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):-0.001 D 999 240 VERT(CL):0.002 A 999 180 HORZ(LL):-0.010 E - - HORZ(TL):0.010 E - - Creep Factor: 2.0 Max TC CSI:0.144 Max BC CSI:0.088 Max Web CSI:0.118 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:P02 Ply: 1 Qty:1 SEQN:469513 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T28 / DrwNo:363.21.1129.00205 /YK 12/29/2021 6'3"10 2'3"10 2'3"10 3'1"2 9"8 4'3"10 1'2"8 6'3"10 2' 2'3"10 2'3"10 3'1"2 9"8 4'3"10 1'2"8 6'3"10 2'5'3"A B D E F GI 10 12 3X4(D1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Gable end supports 8" max rake overhang. Topchord must not be cut or notched. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Refer to DWG PB160160118 for piggyback details. The overall height of this truss excluding overhang is13-10-6. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-14 /-/163 /166 /207 B*76 /-/-/62 /24 /- G -/-14 /-/31 /32 /- J /-130 H /-133 Wind reactions based on MWFRS A Brg Wid = 5.2 Min Req =1.5 B Brg Wid = 179 Min Req =- G Brg Wid = 5.2 Min Req =1.5 Bearings A, B, & G are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 20.08 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 D 999 240 VERT(CL):0.002 D 999 180 HORZ(LL):0.003 E - - HORZ(TL):0.004 E - - Creep Factor: 2.0 Max TC CSI:0.220 Max BC CSI:0.067 Max Web CSI:0.119 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:P3 Ply: 1 Qty:3 SEQN:469654 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T44 / DrwNo:363.21.1128.59923 /YK 12/29/2021 7"7 14'11"8 7"7 3'5"12 4' (TYP) 7"7 7"7 8'1"3 7'5"12 15'6"15 7'5"12 16'2"6 7"7 7"7 7"7 15'6"15 14'11"8 16'2"6 7"7 0"46'7"101"10 6'9"4A B D F G HJ 10 12 2X4(A1) 4X4 2X4(A1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Gable end supports 8" max rake overhang. Topchord must not be cut or notched. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. Refer to DWG PB160160118 for piggyback details. The overall height of this truss excluding overhang is13-10-6. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A -/-14 /-/163 /166 /207 B*76 /-/-/62 /24 /- G -/-14 /-/31 /32 /- J /-130 H /-133 Wind reactions based on MWFRS A Brg Wid = 5.2 Min Req =1.5 B Brg Wid = 179 Min Req =- G Brg Wid = 5.2 Min Req =1.5 Bearings A, B, & G are a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 20.08 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.001 D 999 240 VERT(CL):0.002 D 999 180 HORZ(LL):0.003 E - - HORZ(TL):0.004 E - - Creep Factor: 2.0 Max TC CSI:0.220 Max BC CSI:0.067 Max Web CSI:0.119 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:P3 Ply: 1 Qty:3 SEQN:469654 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T44 / DrwNo:363.21.1128.59923 /YK 12/29/2021 7"7 14'11"8 7"7 3'5"12 4' (TYP) 7"7 7"7 8'1"3 7'5"12 15'6"15 7'5"12 16'2"6 7"7 7"7 7"7 15'6"15 14'11"8 16'2"6 7"7 0"46'7"101"10 6'9"4A B D F G HJ 10 12 2X4(A1) 4X4 2X4(A1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is7-1-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J*111 /-/-/47 /-/6 Wind reactions based on MWFRS J Brg Wid = 399 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 20.08 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.33 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 A 999 240 VERT(CL):0.012 A 999 180 HORZ(LL):0.004 J - - HORZ(TL):0.007 J - - Creep Factor: 2.0 Max TC CSI:0.304 Max BC CSI:0.189 Max Web CSI:0.275 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V1 Ply: 1 Qty:1 SEQN:469637 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T34 / DrwNo:363.21.1128.59547 /YK 12/29/2021 33'3"6 4'7"11 4'0"4(TYP)3'11"12 4'4'3'11"12 8'6"3 8'6"3 24'9"2 16'2"15 33'3"6 8'6"3 33'3"6 33'3"67'1"3A C F H J MQ 10 12 3X4(D1) 4X5 3X5 3X5 3X5 4X5 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is7-1-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J*111 /-/-/47 /-/6 Wind reactions based on MWFRS J Brg Wid = 399 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 20.08 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.33 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.008 A 999 240 VERT(CL):0.012 A 999 180 HORZ(LL):0.004 J - - HORZ(TL):0.007 J - - Creep Factor: 2.0 Max TC CSI:0.304 Max BC CSI:0.189 Max Web CSI:0.275 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V1 Ply: 1 Qty:1 SEQN:469637 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T34 / DrwNo:363.21.1128.59547 /YK 12/29/2021 33'3"6 4'7"11 4'0"4(TYP)3'11"12 4'4'3'11"12 8'6"3 8'6"3 24'9"2 16'2"15 33'3"6 8'6"3 33'3"6 33'3"67'1"3A C F H J MQ 10 12 3X4(D1) 4X5 3X5 3X5 3X5 4X5 3X4(D1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is5-5-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J*106 /-/-/44 /13 /5 Wind reactions based on MWFRS J Brg Wid = 351 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 17.52 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.002 G 999 240 VERT(CL):0.003 G 999 180 HORZ(LL):0.002 I - - HORZ(TL):0.003 I - - Creep Factor: 2.0 Max TC CSI:0.219 Max BC CSI:0.177 Max Web CSI:0.160 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V2 Ply: 1 Qty:1 SEQN:469640 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T21 / DrwNo:363.21.1128.59892 /YK 12/29/2021 29'3"6 2'7"11 4'0"4(TYP)3'11"12 4'4'3'11"12 6'6"3 6'6"3 22'9"2 16'2"15 29'3"6 6'6"3 29'3"6 29'3"65'5"3A C F H J MQ 10 12 3X4(D1) 4X4 3X4 3X4 3X4 4X4 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Loading Truss passed check for 20 psf additional bottomchord live load in areas with 42"-high x 24"-wideclearance. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is5-5-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL J*106 /-/-/44 /13 /5 Wind reactions based on MWFRS J Brg Wid = 351 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 17.52 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.002 G 999 240 VERT(CL):0.003 G 999 180 HORZ(LL):0.002 I - - HORZ(TL):0.003 I - - Creep Factor: 2.0 Max TC CSI:0.219 Max BC CSI:0.177 Max Web CSI:0.160 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V2 Ply: 1 Qty:1 SEQN:469640 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T21 / DrwNo:363.21.1128.59892 /YK 12/29/2021 29'3"6 2'7"11 4'0"4(TYP)3'11"12 4'4'3'11"12 6'6"3 6'6"3 22'9"2 16'2"15 29'3"6 6'6"3 29'3"6 29'3"65'5"3A C F H J MQ 10 12 3X4(D1) 4X4 3X4 3X4 3X4 4X4 3X4(D1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is3-9-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL H*86 /-/-/43 /13 /4 Wind reactions based on MWFRS H Brg Wid = 303 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 18.36 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.010 A 999 240 VERT(CL):0.021 A 999 180 HORZ(LL):-0.005 H - - HORZ(TL):0.012 H - - Creep Factor: 2.0 Max TC CSI:0.310 Max BC CSI:0.181 Max Web CSI:0.096 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V3 Ply: 1 Qty:1 SEQN:469645 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T16 / DrwNo:363.21.1129.00000 /YK 12/29/2021 25'3"6 4'7"15 3'11"12(TYP)4'4' 4'6"3 4'6"3 20'9"2 16'2"15 25'3"6 4'6"3 25'3"6 25'3"63'9"3A B E G H JN 10 12 3X4(D1) 4X4 3X4 3X4 3X4 4X4 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Plating Notes All plates are 2X4 except as noted. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is3-9-3. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL H*86 /-/-/43 /13 /4 Wind reactions based on MWFRS H Brg Wid = 303 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 18.36 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: h/2 to h C&C Dist a: 3.00 ft Loc. from endwall: not in 9.00 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.010 A 999 240 VERT(CL):0.021 A 999 180 HORZ(LL):-0.005 H - - HORZ(TL):0.012 H - - Creep Factor: 2.0 Max TC CSI:0.310 Max BC CSI:0.181 Max Web CSI:0.096 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V3 Ply: 1 Qty:1 SEQN:469645 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T16 / DrwNo:363.21.1129.00000 /YK 12/29/2021 25'3"6 4'7"15 3'11"12(TYP)4'4' 4'6"3 4'6"3 20'9"2 16'2"15 25'3"6 4'6"3 25'3"6 25'3"63'9"3A B E G H JN 10 12 3X4(D1) 4X4 3X4 3X4 3X4 4X4 3X4(D1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is8-5-13. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*130 /-/-/58 /33 /17 Wind reactions based on MWFRS A Brg Wid = 243 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 22.39 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 6.06 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 F 999 240 VERT(CL):0.003 E 999 180 HORZ(LL):-0.005 D - - HORZ(TL):0.007 E - - Creep Factor: 2.0 Max TC CSI:0.122 Max BC CSI:0.062 Max Web CSI:0.125 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V4 Ply: 1 Qty:1 SEQN:469651 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T7 / DrwNo:363.21.1128.59376 /YK 12/29/2021 20'3"12 2'7"11 2'(TYP) 10'1"15 10'1"15 20'3"12 10'1"13 20'3"12 20'3"12 0"48'5"13(a) A F K P 10 12 3X4(D1) 4X4 3X4 3X4(D1) **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP #2;Bot chord: 2x4 SP #2; Webs: 2x4 SP #3; Bracing (a) Continuous lateral restraint equally spaced onmember. Plating Notes All plates are 2X4 except as noted. Loading Truss designed to support 1-4-0 top chord outlookersand cladding load not to exceed 5.00 PSF one faceand 24.0" span opposite face. Top chord must not be cut or notched, unless specified otherwise. Wind Wind loads based on MWFRS with additional C&Cmember design. Wind loading based on both gable and hip roof types. Additional Notes See DWGS A14030ENC160118 & GBLLETIN0118 forgable wind bracing and other requirements. The overall height of this truss excluding overhang is8-5-13. Maximum Reactions (lbs), or *=PLF Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL A*130 /-/-/58 /33 /17 Wind reactions based on MWFRS A Brg Wid = 243 Min Req =- Bearing A is a rigid surface. Members not listed have forces less than 375# Loading Criteria (psf) TCLL:20.00 TCDL:10.00 BCLL:0.00 BCDL:10.00 Des Ld:40.00 NCBCLL:10.00 Soffit:2.00 Load Duration: 1.25 Spacing: 24.0 " Wind Criteria Wind Std:ASCE 7-16 Speed:130 mph Enclosure: Closed Risk Category: II EXP: C Kzt: NA Mean Height: 22.39 ft TCDL: 5.0 psf BCDL: 5.0 psf MWFRS Parallel Dist: 0 to h/2 C&C Dist a: 3.00 ft Loc. from endwall: not in 6.06 ft GCpi: 0.18 Wind Duration: 1.60 Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.003 F 999 240 VERT(CL):0.003 E 999 180 HORZ(LL):-0.005 D - - HORZ(TL):0.007 E - - Creep Factor: 2.0 Max TC CSI:0.122 Max BC CSI:0.062 Max Web CSI:0.125 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:V4 Ply: 1 Qty:1 SEQN:469651 /GABL FROM: RFG Cust: R215 JRef:1XbR2150006 T7 / DrwNo:363.21.1128.59376 /YK 12/29/2021 20'3"12 2'7"11 2'(TYP) 10'1"15 10'1"15 20'3"12 10'1"13 20'3"12 20'3"12 0"48'5"13(a) A F K P 10 12 3X4(D1) 4X4 3X4 3X4(D1) 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Hangers / Ties (J) Hanger Support Required, by others Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL X 1021 /-/-/-/-/- O 1001 /-/-/-/-/- X Brg Wid = -Min Req =- O Brg Wid = 3.5 Bearing O is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1735 C - D 0 -2982 D - E 0 -2982 E - F 0 -3576 F - G 0 -3576 Chords Tens.Comp. G - H 0 -3676 H - I 0 -3667 I - J 0 -3008 J - K 0 -3008 K - L 0 -1774 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. X - W 979 0W -V 2462 0 V - U 3415 0 U - T 3680 0 T - S 3676 0 Chords Tens.Comp. S - R 3405 0R - Q 3405 0 Q - P 2491 0 P - O 1026 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. X - B 0 -1366 B - W 1051 0 W -C 0 -1011 C - V 707 0 V - E 0 -588 U - G 149 -396 Webs Tens.Comp. S - I 587 -34 I - Q 0 -540 Q - K 702 0 K - P 0 -997 P - L 1041 0 L - O 0 -1394 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.262 G 826 480 VERT(CL):0.361 G 600 360 HORZ(LL):0.041 B - - HORZ(TL):0.056 B - - Creep Factor: 2.0 Max TC CSI:0.283 Max BC CSI:0.539 Max Web CSI:0.501 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F4 Ply: 1 Qty:2 SEQN:473019 SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T11 DrwNo:363.21.1333.19160 /YK 12/29/2021 3"8 18'6" 3" 1'3" 2'6"1'3"12 (TYP) 2'6"2'6"1'3" 3" 9'3" 9'3" 10'6" 1'3" 18'6" 8'1'4"+ A B C D E F G H I J K L M OPQRSTUVWX 2X4 3X6 4X5 4X5 1X4 3X6 W=3X4 1X4 1X4 W=H0308 1X4 3X6 4X5 4X5 1X4 3X6 1.5X3 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 4x2 SP M-31;Bot chord: 4x2 SP M-31; Webs: 4x2 SP #3; Plating Notes All plates are 3X4 except as noted. Hangers / Ties (J) Hanger Support Required, by others Additional Notes + 2x6 continuous strongback. See detailSTRBRIBR1014 for bracing and bridgingrecommendations. Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL X 1021 /-/-/-/-/- O 1001 /-/-/-/-/- X Brg Wid = -Min Req =- O Brg Wid = 3.5 Bearing O is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. B - C 0 -1735 C - D 0 -2982 D - E 0 -2982 E - F 0 -3576 F - G 0 -3576 Chords Tens.Comp. G - H 0 -3676 H - I 0 -3667 I - J 0 -3008 J - K 0 -3008 K - L 0 -1774 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. X - W 979 0W -V 2462 0 V - U 3415 0 U - T 3680 0 T - S 3676 0 Chords Tens.Comp. S - R 3405 0R - Q 3405 0 Q - P 2491 0 P - O 1026 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. X - B 0 -1366 B - W 1051 0 W -C 0 -1011 C - V 707 0 V - E 0 -588 U - G 149 -396 Webs Tens.Comp. S - I 587 -34 I - Q 0 -540 Q - K 702 0 K - P 0 -997 P - L 1041 0 L - O 0 -1394 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Yes FT/RT:12(0)/10(0) Plate Type(s): WAVE, HS Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.262 G 826 480 VERT(CL):0.361 G 600 360 HORZ(LL):0.041 B - - HORZ(TL):0.056 B - - Creep Factor: 2.0 Max TC CSI:0.283 Max BC CSI:0.539 Max Web CSI:0.501 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:F4 Ply: 1 Qty:2 SEQN:473019 SY42 FROM: RFG Cust: R215 JRef:1XbR2150006 T11 DrwNo:363.21.1333.19160 /YK 12/29/2021 3"8 18'6" 3" 1'3" 2'6"1'3"12 (TYP) 2'6"2'6"1'3" 3" 9'3" 9'3" 10'6" 1'3" 18'6" 8'1'4"+ A B C D E F G H I J K L M OPQRSTUVWX 2X4 3X6 4X5 4X5 1X4 3X6 W=3X4 1X4 1X4 W=H0308 1X4 3X6 4X5 4X5 1X4 3X6 1.5X3 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP M-31;Bot chord: 2x4 SP M-31; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 130 plf at 0.00 to 130 plf at 18.50BC: From 10 plf at 0.00 to 10 plf at 18.50 Hangers / Ties (J) Hanger Support Required, by others Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL R 1295 /-/-/-/-/- J 1295 /-/-/-/-/- R Brg Wid = -Min Req =- J Brg Wid = 3.5 Bearing J is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -1204 B - C 0 -2083 C - D 0 -2613 D - E 0 -2815 Chords Tens.Comp. E - F 0 -2815 F - G 0 -2615 G - H 0 -2083 H - I 0 -1204 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. Q - P 1358 0 P - O 2186 0O - N 2673 0 Chords Tens.Comp. N - M 2675 0 M - L 2186 0L - K 1358 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. A - R 0 -628 A - Q 1315 0 Q - B 0 -570 B - P 819 0 P - C 0 -381 C - O 483 0 Webs Tens.Comp. M - G 485 0 G - L 0 -382 L - H 819 0 H - K 0 -569 K - I 1315 0 I - J 0 -628 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.152 E 999 480 VERT(CL):0.265 E 836 360 HORZ(LL):0.024 A - - HORZ(TL):0.041 A - - Creep Factor: 2.0 Max TC CSI:0.129 Max BC CSI:0.378 Max Web CSI:0.626 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT1 Ply: 2 Qty:1 SEQN:473023 FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T12 DrwNo:363.21.1333.37140 /YK 12/29/2021 2 Complete Trusses Required 18'6" 2'5"1 2'5"1 4'8"6 2'3"5 6'11"11 2'3"5 9'3" 2'3"5 11'6"5 2'3"5 13'9"10 2'3"5 16'0"15 2'3"5 18'6" 2'5"1 2'5"1 2'5"1 4'8"6 2'3"5 6'11"11 2'3"5 9'3" 2'3"5 11'6"5 2'3"5 13'9"10 2'3"5 16'0"15 2'3"5 18'6" 2'5"11'4"A B C D E F G H I JKLMNOPQR 4X6 2X4 4X6 4X4 4X4 3X4 3X4 5X5 2X4 3X8 3X4 5X5 3X4 4X4 4X4 4X6 4X6 2X4 **WARNING**READ AND FOLLOW ALL NOTES ON THIS DRAWING!**IMPORTANT**FURNISH THIS DRAWING TO ALL CONTRACTORS INCLUDING THE INSTALLERSTrusses require extreme care in fabricating, handling, shipping, installing and bracing. Refer to and follow the latest edition of BCSI (BuildingComponent Safety Information, by TPI and SBCA) for safety practices prior to performing these functions. Installers shall provide temporarybracing per BCSI. Unless noted otherwise, top chord shall have properly attached structural sheathing and bottom chord shall have a properlyattached rigid ceiling. Locations shown for permanent lateral restraint of webs shall have bracing installed per BCSI sections B3, B7, or B10,as applicable. Apply plates to each face of truss and position as shown above and on the Joint Details, unless noted otherwise. Refer todrawings 160A-Z for standard plate positions. Refer to job's General Notes page for additional information. Alpine, a division of ITW Building Components Group Inc. shall not be responsible for any deviation from this drawing, any failure to build thetruss in conformance with ANSI/TPI 1, or for handling, shipping, installation and bracing of trusses. A seal on this drawing or cover pagelisting this drawing, indicates acceptance of professional engineering responsibility solely for the design shown. The suitability and use of thisdrawing for any structure is the responsibility of the Building Designer per ANSI/TPI 1 Sec.2. For more information see these web sites: Alpine: alpineitw.com; TPI: tpinst.org; SBCA: sbcacomponents.com; ICC: iccsafe.org; AWC: awc.org 6750 Forum DriveSuite 305Orlando FL, 32821 Lumber Top chord: 2x4 SP M-31;Bot chord: 2x4 SP M-31; Webs: 2x4 SP #3; Nailnote Nail Schedule:0.128"x3", min. nailsTop Chord: 1 Row @12.00" o.c. Bot Chord: 1 Row @12.00" o.c.Webs : 1 Row @ 4" o.c.Use equal spacing between rows and stagger nailsin each row to avoid splitting. Special Loads ------(Lumber Dur.Fac.=1.00 / Plate Dur.Fac.=1.00)TC: From 130 plf at 0.00 to 130 plf at 18.50BC: From 10 plf at 0.00 to 10 plf at 18.50 Hangers / Ties (J) Hanger Support Required, by others Purlins The TC of this truss shall be braced with attachedspans at 24" oc in lieu of structural sheathing. Additional Notes Truss must be installed as shown with top chord up. The overall height of this truss excluding overhang is1-4-0. Maximum Reactions (lbs) Gravity Non-Gravity Loc R+/ R-/ Rh / Rw / U / RL R 1295 /-/-/-/-/- J 1295 /-/-/-/-/- R Brg Wid = -Min Req =- J Brg Wid = 3.5 Bearing J is a rigid surface. Members not listed have forces less than 375# Maximum Top Chord Forces Per Ply (lbs) Chords Tens.Comp. A - B 0 -1204 B - C 0 -2083 C - D 0 -2613 D - E 0 -2815 Chords Tens.Comp. E - F 0 -2815 F - G 0 -2615 G - H 0 -2083 H - I 0 -1204 Maximum Bot Chord Forces Per Ply(lbs) Chords Tens.Comp. Q - P 1358 0 P - O 2186 0O - N 2673 0 Chords Tens.Comp. N - M 2675 0 M - L 2186 0L - K 1358 0 Maximum Web Forces Per Ply(lbs) Webs Tens.Comp. A - R 0 -628 A - Q 1315 0 Q - B 0 -570 B - P 819 0 P - C 0 -381 C - O 483 0 Webs Tens.Comp. M - G 485 0 G - L 0 -382 L - H 819 0 H - K 0 -569 K - I 1315 0 I - J 0 -628 Loading Criteria (psf) TCLL:40.00 TCDL:10.00 BCLL:0.00 BCDL:5.00 Des Ld:55.00 NCBCLL:10.00 Soffit:0.00 Load Duration: 1.00 Spacing: 24.0 " Wind Criteria Wind Std:NA Speed:NA mph Enclosure: NA Category: NA EXP: NA Kzt: NA Mean Height: NA ft TCDL: NA psf BCDL: NA psf MWFRS Parallel Dist: NA C&C Dist a: NA ft Loc. from endwall: NA I: NA GCpi: NA Wind Duration: NA Snow Criteria (Pg,Pf in PSF) Pg: NA Ct: NA CAT: NA Pf: NA Ce: NA Lu: NA Cs: NA Snow Duration: NA Building Code: FBC 7th Ed. 2020 Res. TPI Std:2014 Rep Fac: Varies by Ld Case FT/RT:20(0)/10(0) Plate Type(s): WAVE Defl/CSI Criteria PP Deflection in loc L/defl L/# VERT(LL):0.152 E 999 480 VERT(CL):0.265 E 836 360 HORZ(LL):0.024 A - - HORZ(TL):0.041 A - - Creep Factor: 2.0 Max TC CSI:0.129 Max BC CSI:0.378 Max Web CSI:0.626 VIEW Ver: 20.01.01A.0724.11 Job Number:21-5884 Buchaca Truss Label:FT1 Ply: 2 Qty:1 SEQN:473023 FLAT FROM: RFG Cust: R215 JRef:1XbR2150006 T12 DrwNo:363.21.1333.37140 /YK 12/29/2021 2 Complete Trusses Required 18'6" 2'5"1 2'5"1 4'8"6 2'3"5 6'11"11 2'3"5 9'3" 2'3"5 11'6"5 2'3"5 13'9"10 2'3"5 16'0"15 2'3"5 18'6" 2'5"1 2'5"1 2'5"1 4'8"6 2'3"5 6'11"11 2'3"5 9'3" 2'3"5 11'6"5 2'3"5 13'9"10 2'3"5 16'0"15 2'3"5 18'6" 2'5"11'4"A B C D E F G H I JKLMNOPQR 4X6 2X4 4X6 4X4 4X4 3X4 3X4 5X5 2X4 3X8 3X4 5X5 3X4 4X4 4X4 4X6 4X6 2X4 12/29/2021 FL REG# 278, Yoonhwak Kim, FL PE #86367 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/29/2021FL REG# 278, Yoonhwak Kim, FL PE #86367 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/29/2021FL REG# 278, Yoonhwak Kim, FL PE #86367 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/29/2021FL REG# 278, Yoonhwak Kim, FL PE #86367 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/29/2021FL REG# 278, Yoonhwak Kim, FL PE #86367 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/29/2021FL REG# 278, Yoonhwak Kim, FL PE #86367 514 Earth City Expressway Suite 242 Earth City, MO 63045 12/29/2021FL REG# 278, Yoonhwak Kim, FL PE #86367