Loading...
Main Street Presentation- Commission Meeting 01.24.2022MAIN STREET COMPLETE STREETS IMPLEMENTATION Agenda Project Approach Community Engagement •Existing Conditions •Site Visits •Public Meetings Short Term Recommendations Long Term Recommendations Funding Strategy Project Team Heather Neville, AICP Uyen Dang, PE Project Approach 1.Informative Approach 2.Complete Streets Policy 3.Review of existing conditions and data 4.Conduct and engage residents 5.Review of reference manuals 6.Short-term and long-term recommendations 7.Strategic funding plan Project Location Dutton Island Road West Levy road West 1 st Street Existing Conditions ◦No Sidewalks –ADA access ◦No Dedicated Bicycle Facilities ◦Low Parking Utilization ◦Dark ◦Faded Pavement Markings ◦Walkers –pet friendly Location Main Street Limits West 1st Street to Dutton Island Road Commission Brittany Norris -Seat 5 Length 1 mile Walk: 20 mins Bike: 5 mins Function Classification Local Collector Road Posted Speed 25 mph Existing Lane Configuration 2 lanes with some on street parking Main Street Crash Statistics 3-year crash data from 11/18 –11/21 Total of 5 crashes 3/5 crashes involved Parked vehicle 3/5 crashes during daytime NO pedestrian and bicyclist crash Data from Signal Four Analytics : 11/1/2019 to 11/1/2021 Traffic Data 25MPH Posted Speed 1100 Block 85th Percentile 2020 = 29 2021 = 25 ADT 2020 = 558 2021 = 548 Parking Count 6:00 p.m. 11/30/2021 1 East Side North of 8th Street Data from COAB Police Department–2/11/202 to 2/20/2020 and 1/24/2021 to 1/31/2021 Communication Plan o Internal Stakeholder Meeting o Survey o Door to door flyer o Social Media Share o Press Coverage o Trackable share and QR code o Public Meeting Survey Results Safe Streets and Project Tradeoffs Hierarchy 1.Parking 2.Trees 3.Easement on private property for sidewalk 4.Slower Street Implementation Strategies ◦Do nothing ◦Policy Changes & Updates ◦New or additional Programs ◦Short-Term Scalable Projects ◦Long-Term Rebuild Recommendations ◦Complete Streets Website ◦completestreetsAB.com ◦Introduce Sharrows ◦Reintroduce the Bicycle Connectivity Network ◦Public Education Campaign ◦Street Play, Cyclovia and other open streets event ◦Additional Lighting ◦Coordinate with JEA for 37 poles ◦Update and enhance signing and pavement markings ◦Redesign of existing mini roundabout ◦Increase ADA Accessibility ◦Option 1: Pedestrian Lane ◦Option 2: Advisory Shoulder Option 1: Pedestrian Lane Option 1: Short-Term Cost Benefit Phase Cost Contractor Planning $53,020 Design $63,870 Construction (CON) $258,120 CON 20% Contingency $51,624 CEI $0 Total $426,634 Option 2: Advisory Shoulder Option 2: Advisory Shoulder Cost Benefit Phase Cost Internal Cost Contractor Planning $53,020 $53,020 Design $42,580 $42,580 Construction $43,020 $172,080 CON 20% Contingency $8,604 $34,416 CEI $0 $0 Total $147,224 $302,096 Long-Term Option 1: Slow Street Long-Term Option 1: Cost Benefit Phase Cost Planning $200,000 Design $600,000 Construction (CON)$3,817,480 CON Contingency 20% $764,496 CEI $190,874 Total $5,571,850 Long-Term Option 2: Advisory Bike Lane Long-Term Option 2: Cost Benefit Phase Cost Planning $200,000 Design $600,000 Construction (CON) $3,817,480 CON Contingency 20% $764,496 CEI $190,874 Total $5,571,850 Cost Estimate Overall Option 1 Option 2 Internal Option 2 External Long-Term Planning $53,020 $53,020 $53,020 $200,000 Design $63,870 $42,580 $42,580 $600,000 Construction $258,120 $43,020 $172,080 $3,817,480 Construction 20% Contingency $51,624 $8,604 $34,416 $764,496 CEI $0 $0 $0 $190,874 Total $426,634 $147,224 $302,096 $5,571,850 Strategic Funding oSelect policies, procedures, and projects the city leadership and resident's desire. oFunding mechanisms include: oGeneral fund, oBonding for larger projects, oGrant funds from state and federal resources. oFDOT TAP/LAP, Federal Transportation Fund, Safe Routes to School, etc. Next Steps o Staff Recommends: o Short Term Option 2 o Long Term Option 2 o City of Atlantic Beach adopt the Main Street Complete Streets Implementation Plan o Develop a capital improvement plan short-term improvements for approved options o Develop funding strategy for long term improvements o Apply for Grants o Etc.