Loading...
3RD REVIEW COMMENTS, RESO22-0036, 3.8.2023CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 BUILDING REVIEW COMMENTS Date: 3/8/2023 Permit #: RESO22-0036 Site Address: 343 PLAZA Review Status: DENIED RE#: 170003 0000 Applicant: Property Owner: LOVE NANCY J Email: Email: nancy@coastaladvantagerealty.com Phone: Phone: 9045536266 THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS. Revisions may not be submitted until ALL departments have completed their respective reviews. Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a few correction items will not be accepted. Correction Comments: 1. I was not aware that spray foam insulation was going to be used for insulation. Please contact the vendor/installer/insulation contractor and ask them to send you the ESR Evaluation Report for the spay foam to be used on this project. This is a Standard Operation Procedure for installation of open and closed cell insulation here in Atlantic Beach. 2. Resubmittals may generate other review comments. Mike Jones Building Inspector/Plans Examiner City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233 (904) 247-5844 Email:mjones@coab.us Resubmittal Notes: All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of completely encircling the change with "clouding". The revision shall also be identified as to the sequence of revision by indicating a triangle with the revision sequence number within it and located adjacent to the cloud. The revision date and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with revisions shall be inserted into each set of drawings. The original sheets must be clearly marked "VOID" but are to be left within the set of drawings. Complete new sets of drawings will not be accepted. ADDITIONAL ITEMS MAY BE REQUIRED DEPENDING UPON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.