Loading...
Permit Reviews_7Permit Reviews City of Atlantic Beach Permit Number: RES022-0036 Applied: 6/22/2022 Approved: Issued: Finaled: Status: AWAITING CORRECTIONS Parent Permit: Parent Project: Details: OWNER BUIDER Description: INTERIOR BUILDOUT OF GARAGE Site Address: 343 PLAZA City, State Zip Code: Atlantic Beach, FI 32233 Applicant: <NONE> Owner: LOVE NANCY J Contractor: <NONE> LIST OF REVIEWS SENT DATE RETURNED DATE DUE DATE TYPE CONTACT STATUS REMARKS Review Group: 2ND REVIEW 8/11/2022 8/11/2022 SUBMITTAL Permit Tech APPROVED COMPLETENESS Notes: ONE ATTACHMENT from nancy@coastaladvantagerealty.com ENERGY FORMS AND DUCT LAYOUT 8/11/2022 8/15/2022 8/25/2022 BUILDING Building DENIED Notes: 1. The energy form R402-2020 was not filled out making it incomplete. Please fill out the needed information and sign the last page. Ceiling and wall insulation R -Values needed of the existing building. If not insulated it will have to be. The ceiling will have to be R38 unless it is flat, then if will have to be at least R19. Stick frame wall insulation shall be a minimum of R13, if exterior walls are cmu blockwork the walls shall be inslulated to an R6 value. 7th Edition of the FBC-Existing Building Code; Section R503 ALTERATIONS; R503.2 Change in space conditioning. Also SECTION R505 CHANGE IN OCCUPANCE OR USE. 2. Resubmittals may generate other review comments. Review Group: 3RD REVIEW 3/1/2023 3/1/2023 SUBMITTAL Permit Tech APPROVED COMPLETENESS Notes: ONE ATTACHMENT FORM 402-2020 ENERGY SHEET 3/1/2023 3/8/2023 3/15/2023 BUILDING Building DENIED Notes: 1. I was not aware that spray foam insulation was going to be used for insulation. Please contact the vendor/installer/insulation contractor and ask them to send you the ESR Evaluation Report for the spay foam to be used on this project. This is a Standard Operation Procedure for installation of open and closed cell insulation here in Atlantic Beach. 2. Resubmittals may generate other review comments. Printed: Thursday, 09 March, 2023 1 of 2 CENTRALSQUARE Permit Reviews City of Atlantic Beach Review Group: AUTO 6/22/2022 6/22/2022 SUBMITTAL COMPLETENESS Permit Tech APPROVED Notes: ONE ATTACHMENT OPEN DRIVEWAY PERMIT 6/22/2022 7/11/2022 7/7/2022 ZONING Zoning APPROVED Notes: 6/22/2022 6/30/2022 7/7/2022 BUILDING Building DENIED Notes: 1. Resubmit the survey indicating where on the existing building the build out will occur by highlignting that area and writing notes next to that spot. 2. Submit an existing floor plan showing all equipment that is located in the garage and any existing floor elevation differences. 3. Resubmit the proposed floor plan with every proposed newly created space/room/area labeled. Show where attic access will be. 4. From the 7th Edition of the 2020 FBC-Existing Building Code, choose a methode of construction compliance from Chapter 3; and from Chapter 6, the Classification of Work (Alteration Level). Place this information on the resubmitted proposed floor plan. 5. Please submit documentation from a licensed HVAC contractor that the existing hvac heating and cooling system is sufficient in size to accommodate the proposed garage build -out space. 6. Submit Energy Form R402-2020 for information needed on this proposed build -out. A pdf of the form will be provided. 7. Submit a ductwork floor plan lay out of the proposed build -out area. Should identify supply and returns as well as bathroom exhaust fan, if required. 8. Is there a door separating the bathroom area from the rest of the build -out area? If so call out that door type and size on the proposed floor plan. 9. Submit the Florida Product Approval Information Sheets for all components and cladding items for this proposed build -out. New doors, windows, siding material and the Product Approval Numbers. Installation of new doors and windows will be required at the job site when their installation inspection is requested by you. Siding installation instructions and Evaluation Report, if applicable for this project, are required now at plan review. 10. Submit an electrical floor plan for lighting and receptacle location. Any newly created egress openings will require a switch and exterior lighting at those egress opening. Please show the location of the required smoke detector. 11. Please give a written narrative of what appliances will be installed at the counter shown on the submitted proposed floor plan. Write in on the floor plan those appliance locations. 12. Submit signed and sealed engineered structual plans for any wall alterations that will be required to fill in an opening or open up a wall for the installation of any doors or windows. 13. Please submit the existing elevations of the garage portion of this buiding and the proposed elevations of the walls affected by this proposed garage build -out. 14. Resubmittals may generate other review comments. 15. The link to the revision/correction form is : http://coab.us/DocumentCenter/View/10495/Revision-Request-Correction-to-Comments-Route-Sheet- v20181017?bidld= 16. The email address to send resubmittals is : Building-dept@coab.us 6/22/2022 6/22/2022 7/7/2022 PUBLIC WORKS Public Works NOT APPLICABLE TO DEPARTMENT Notes: 6/22/2022 6/22/2022 7/7/2022 PUBLIC UTILITIES Public Utilities NOT APPLICABLE TO DEPARTMENT Notes: Printed: Thursday, 09 March, 2023 2 of 2 +; CENTRALSQUARE