712 AMBERJACK LN RESO23-0033 COAB Permit Form with ConditionsFinal Plumbing
Final Electrical
Final HVAC
CC Final
Final Building*
Swimming Pool Steel
Swimming Pool Safety
Electrical Grounding & Bonding
Swimming Pool Final (Bldg)
Swimming Pool Final (PW)
Formed Columns/ Beams*
Masonry Cell Fill
Structural Steel*
OTHER:
OTHER:
OTHER:
OTHER:
OTHER:
Power Pole
Silt Fence
Piers/ Stem Walls
Underground Plumbing
Underground Electric
Foundation/ Footing
Slab**
Retaining Wall Footing
Driveway
Sewer (Building Dept)
Sewer Tap (Utilities Dept)
Rough Electric*
Rough Plumbing/ Top Out*
Rough Mechanical*
House Wrap
Wall Sheathing
Roof Sheathing
Tie-down Framing Connections
Rough Framing
Roofing In Progress
Window/Door In-Progress
Insulation Ceiling
Insulation Wall
Exterior Lath
Stucco Scratch Coat
Exterior Siding In-Progress
Brick Flashing & Ties
Early Power
Gas Rough
Gas Final*
* When all rough electric, plumbing, mechanical are complete but before any work is
covered up.
* When all gas piping is complete and wallboard is installed but before gas is
attached to any appliance. All outlets must be capped and pipe pressurized at a
minimum of 15 lbs.
* For new living space: When all construction work including electrical, plumbing,
mechanical, exterior finish, grading, required paving and landscaping is complete
and the building is ready for occupancy, but before being occupied
Additional inspections may apply to your project if your project
contains these elements:
INSPECTIONS REQUIRED FOR BUILDING PERMITS
To verify compliance with building codes, inspections of the work authorized are required at various points of the construction.
The following inspections are typically required for residential projects:
Date: Initial: Date: Initial:
_____________________________________________________
Permit Type
____________________________________________________
Permit No.
__________________________________________________________
Job Address
____________________________________________________
Contractor
POST THIS CARD WITH PERMITS AND PERMIT
DOCUMENTATION IN FRONT OF BUILDING
Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends
Building Department Public Works/Utilities Fire Department
Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789
Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203
* When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all
electrical, plumbing and mechanical work is in place, but before concrete is poured.
* When all structural steel members are in place and all connections are complete,
but before such work is covered or concealed.
** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION
SCREEN ROOM
RESO23-0033
712 AMBERJACK LN
CALL THE SCREEN GUYS
OWNER:ADDRESS:CITY:STATE:ZIP:
DURBIN TIMOTHY R 712 AMBERJACK LN ATLANTIC BEACH FL 32233-4205
COMPANY:ADDRESS:CITY:STATE:ZIP:
CALL THE SCREEN GUYS
INC 1840 MEALY ST S Atlantic Beach FL 32233
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
171126 0000 ROYAL PALMS UNIT 01
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
712 AMBERJACK LN
RESIDENTIAL OTHER SINGLE OR
TWO FAMILY RESIDENTIAL
OTHER
SCREEN ROOM $12000.00
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
1 PUBLIC WORKS EROSION CONTROL INSTALLATION INFORMATIONAL
Notes:
Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247-
5814) to request an Erosion and Sediment Control Inspection prior to start of construction.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF
COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 2Issued Date: 4/17/2023
PERMIT NUMBER
RESO23-0033
ISSUED: 4/17/2023
EXPIRES: 10/14/2023
RESIDENTIAL OTHER PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00
BUILDING PERMIT 455-0000-322-1000 0 $115.00
BUILDING PLAN CHECK 455-0000-322-1001 0 $57.50
PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00
STATE DBPR SURCHARGE 455-0000-208-0700 0 $6.71
STATE DCA SURCHARGE 455-0000-208-0600 0 $4.48
WORK WITHOUT PERMIT 455-0000-322-1000 0 $0.00
WORK WITHOUT PERMIT 455-0000-322-1000 0 $225.00
ZONING REVIEW SINGLE AND TWO FAMILY USES 001-0000-329-1003 0 $100.00
TOTAL: $583.69
2 PUBLIC WORKS ON SITE RUNOFF INFORMATIONAL
Notes:
All runoff must remain on-site during construction.
3 PUBLIC WORKS DUMPSTERS/ROLL-OFF CONTAINERS INFORMATIONAL
Notes:
Dumpsters and roll-off containers must be used in compliance with Section 16-8 and must comply with all standards, per City code.
4 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL
Notes:
Full right-of-way restoration, including sod, is required.
5 PUBLIC WORKS DOCUMENT IMPERVIOUS AREA INFORMATIONAL
Notes:
Strongly suggest thorough documentation of impervious areas be recorded.
6 PUBLIC WORKS GRASS INFORMATIONAL
Notes:
Full site to be grassed.
7 PUBLIC WORKS REVISION INFORMATIONAL
Notes:
Any plan change must be submitted as a Revision to the Building Department.
8 PUBLIC WORKS DEBRIS REMOVED INFORMATIONAL
Notes:
All construction debris must be removed from job site by Contractor.
9 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL
Notes:
Any damage done to infrastructure must be repaired by Contractor.
2 of 2Issued Date: 4/17/2023
PERMIT NUMBER
RESO23-0033
ISSUED: 4/17/2023
EXPIRES: 10/14/2023
RESIDENTIAL OTHER PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
RESO23-0033171126-0000By Mike Jones at 2:16 pm, Apr 03, 2023REVIEWED FOR CODE COMPLIANCE
RESO23-0033171126-0000
RESO23-0033By Mike Jones at 2:38 pm, Apr 03, 2023
Page 1 of 2
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
(904) 247-5800
BULLETIN 2-18
To: All Permit Applicants.
From: Dan Arlington, CBO
City Building Official
Date: May 9, 2018
Re: PRE-CONSTRUCTION, FORM BOARD, AND FINAL POST-
CONSTRUCTION SURVEYS REQUIRED.
Per COAB, Section 24-66(a), a PRE-CONSTRUCTION TOPOGRAPHICAL SURVEY and a POST-
CONSTRUCTION TOPOGRAPHICAL SURVEY are required for any new development.
Sec. 24-66. - Stormwater, drainage, storage and treatment requirements.
(a) Topography and grading. All lots and development sites shall be constructed and graded in such a manner so that the
stormwater drains to the adjacent street, an existing natural element used to convey stormwater (see section 22-303,
definitions: Stormwater management system), or a city drainage structure after meeting onsite storage requirements, as set
forth within this section. The city shall be provided with a pre-construction topographical survey prior to the issuance of a
development permit and a post-construction topographical survey prior to the issuance of a certificate of occupancy.
Elevations in all topographic surveys will be referenced to NAVD 1988. Said surveys shall be prepared by a licensed Florida
surveyor, and the requirement for either or both surveys may be waived by the director of public works if determined to be
unnecessary.
1. A pre-construction topographical survey must be provided with the building permit
application for any new development over 250 square feet.
2. A site survey, showing Finished Floor Elevation (FFE), Building Restriction Lines (BRL),
and distances to property lines must be on site for the Slab Inspection, where the proposed
structures are less than 0.5 feet from any BRL.
NOTE: A Form Board Elevation Certificate, signed by a licensed surveyor, may suffice, where
the proposed structures are greater than 0.5 feet from all BRLs.
(Blank Form Board Certificates are provided by the City)
3. A final post-construction topographical survey must be provided before the Final
Inspections can be scheduled.
Page 2 of 2
The surveys must be original document; prepared by a licensed surveyor; signed, sealed, and
dated; drawn to scale; and should be of sufficient size and clarity to indicate the location,
nature, and extent of the new work and the existing structures on the site. The surveys must also
show the locations and dimensions of the following: all impervious surfaces, pavers (new and
previously existing, not removed by construction), setbacks, distances from lot lines, finished
floor elevation, street address, site drainage patterns, and established finished grades. Where
on-site stormwater retention is required, elevations must be shown to fully define the retention
areas.
All elevations should reference NAVD 1988 and the elevation and location of the benchmark
for the survey should be indicated.
If the structure is located in a flood zone, please provide finish floor elevations for all floor
levels, including garages, enclosures, and habitable spaces. Additionally, a preliminary FEMA
Elevation Certificate is required before the slab is poured and a final Elevation Certificate is
required before final C.O. inspection, per FEMA and NFIP Guidelines.
Other features to be shown include flood zone boundary lines, base flood elevations (BFE),
flood ways, the Coastal Construction Control Line (CCCL), all easements, storm water
retention areas, all storm water requirements of COAB, Land Development Regulations,
Section 24-66 and any other development features.
All fill dirt must be approved by Public Works before delivery.
The pre-construction, form board, and final post-construction surveys are important documents
for ensuring adequate drainage throughout neighborhoods, code compliance, and archiving this
information in the permanent record. We appreciate your cooperation in this matter.
DJA 5/9/2018, 10/02/2018
1
IMPORTANT
PERMIT AND INSPECTION NOTES
BUILDING.
1. The City Sea Turtle Protection Ordinance applies where land either has frontage on Beach Avenue, the
Cloister Condominium, or is located eastward of Seminole Road from 20th Street northward to the City Limits.
2. No fill dirt can be delivered without prior approval from Public Works. Per COAB, 24-68.
3. The bottom of all foundation footings must be minimum 12 inches below existing grade, per COAB, 24-68
and FBC-B, Section 403.1.4. Site conditions may require footings to be deeper or higher above finished grade.
Please review COAB Bulletin 1-16 to ensure minimum Finished Floor Elevation (FFE).
4. Fill dirt inside foundation walls must be compacted in 8-inch lifts, per FBC-R506.2.1. Please submit
compaction tests, from a third-party testing agency, for every 16 inches of fill or fraction thereof.
5. At Final Inspection, a 6-inch clearance between exterior wall coverings and final grade (top of sod or mulch)
will be required, per FBC-R318.7. Please plan FFE and lot grading accordingly.
6. Where questionable soils are found, during inspection, soil and compaction tests may be required, per FBC-
R401.
7. Please provide a form-board or stem wall elevation form, from a licensed surveyor, for slab inspection.
8. Please review COAB Bulletin 2-18 to determine if a survey with setbacks and dimensions to property lines is
required for slab inspection.
9. The placement and protection of steel reinforcement (Rebar) must comply with FBC-R606 (Masonry) and
R608 (Concrete), including required Standard Hooks at top and bottom of vertical rebar.
10. Inspections:
a. In-Progress Inspections are required for Exterior Siding and Window and Door Inspections and
should be scheduled for the first day of work.
b. A Scratch-Coat Inspection is required for stucco work. If you intend to apply a double-up, brown-
coat, please call the Building Department to schedule a same-day Scratch-Coat Inspection.
c. All roofing projects require an In-Progress Inspection, Residential and Commercial.
d. The roof must be complete and the building dried in before scheduling rough trades inspections.
11. The joint tape for ZIP Board products is considered the dry-in or House Wrap for the building and must be
inspected before covering over. All holes and penetrations in the sheathing and overdriven nails must be
sealed.
12. Please post the building permit documents in a conspicuous location, before start of construction,
including the Building Permit, Notice Of Commencement (NOC), and Construction Site Management Plan. The
Police Department may review the management plan for compliance and parking.
13. Blocking any sidewalk or street is prohibited without prior approval from the Police Department and City
Manager.
2
14. All work must match the approved plans. All changes to the approved plans must be re-submitted for plan
review and approved before it can be inspected. Building inspectors are not authorized to approve changes to
the approved plans in the field. (See Mechanical)
15. Where excavation is required for new construction, the provisions of FBC-B, Section 3307 will apply,
including a 10-Day prior notice to adjoining property owners and protection of adjoining properties. Where
the excavation exceeds 24 inches, temporary retaining walls must designed by the Engineer Of Record (EOR)
and installed during or immediately after excavation.
EXISTING BUILDINGS – REMODELS, RENOVATIONS, ADDITIONS, CHANGE OF OCCUPANCY.
1. Existing buildings are reviewed and permitted under the Florida Building Code-Existing Buildings (FBC-
EB). The applicant must specify the method of compliance, per FBC-EB 301.1, and include that
information on the plans, with the Design Criteria and Code Analysis.
2. The requirements for the method specified will be found in the corresponding FBC-EB Chapter.
3. When it is discovered during construction that the Compliance Method is not correct, or the project
has expanded into another Compliance Method, revised plans will be required to update the Permit.
No inspections will be conducted until the approved revisions are on site.
4. Any wall opened by removing interior or exterior wall coverings is considered a Work Area, and current
provisions for Energy Conservation, including weatherproofing and insulation will apply.
5. Building inspectors are not authorized to approve changes to the approved plans in the field.
ROOFING.
a. The roof sheathing for all new construction must remain uncovered until the Roof Sheathing
Inspection is approved.
b. All roofing projects require an In-Progress Inspection.
c. Sheathing installation and replacement guidelines per APA.
d. Underlayment must conform to FBC-R Table 905.1.1
e. Shingles must conform to ASTM D3161 G or H, or ASTM D7158 F
ELECTRICAL.
1. Electrical work must comply with the provisions of the 2014 NEC.
2. Anti-Oxidant Compound is required on all exterior aluminum wiring connections, unless the Listing
Approval Documents for the conductors and the termination points, at each end, specifically allow
connection without the compound. (Three documents will be required)
PLUMBING.
1. Water supply and drain pipes must be insulated outside of conditioned areas, per FBC-R, P2603.5.
2. Where the entire sanitary drainage system is replaced, the existing building drain and building sewer
3
must be internally examined to verify proper size and slope and that piping is not broken or obstructed,
per FBC-R, P2502.1.
3. COAB requires an additional sewer cleanout near the sewer tap with a T-1 concrete box for protection.
4. Water service piping must be properly supported and covered by a minimum of 12 inches of soil, per
FBC-R, P2604.3.
MECHANICAL.
1. All equipment and duct work must match the approved plans and Energy Sheets.
The Manual S is the approved duct plan, and the as-built duct work must match the approved plans, or
a revised Manual S or equivalent must be submitted for review. An equivalent must include duct and
trunk layout and sizes, available static pressure, actual air flow, and total effective length, signed by the
Mechanical Contractor with State License Number.
FUEL GAS.
1. Fuel gas systems from the regulator to the appliances must comply with the FBC-Gas.
2. LP gas storage systems and outside piping must comply with NFPA 58.
3. All underground gas piping and tubing must be buried with 12-inches of cover.
4. CSST gas piping must comply with the manufacturer’s installation instructions and terms of approval.
4
01/23/20, 02/13/20
i L:LtJ
7 `
Japp;` CITY OF ATLANTIC BEACH
r A j 800 SEMINOLE ROAD
1- ATLANTIC BEACH,FL 32233
904)247-5800
P-1.01119
BULLETIN 2-18
To:All Permit Applicants.
From: Dan Arlington, CBO
City Building Official
Date: May 9, 2018
Re: PRE-CONSTRUCTION, FORM BOARD, AND FINAL POST-
CONSTRUCTION SURVEYS REQUIRED.
Per COAB, Section 24-66(a), a PRE-CONSTRUCTION TOPOGRAPHICAL SURVEY and a POST-
CONSTRUCTION TOPOGRAPHICAL SURVEY are required for any new development.
Sec.24-66.-Stormwater,drainage,storage and treatment requirements.
a) Topography and grading. All lots and development sites shall be constructed and graded in such a manner so that the
stormwater drains to the adjacent street, an existing natural element used to convey stormwater(see section 22-303,
definitions: Stormwater management system),or a city drainage structure after meeting onsite storage requirements, as set
forth within this section.The city shall be provided with a pre-construction topographical survey prior to the issuance ofa
development permit and a post-construction topographical survey prior to the issuance of a certificate of occupancy.
Elevations in all topographic surveys will be referenced to NAVD 1988. Said surveys shall be prepared by a licensed Florida
surveyor,and the requirement for either or both surveys may be waived by the director of public works if determined to be
unnecessary.
1. A pre-construction topographical survey must be provided with the building permit
application for any new development over 400 square feet.
2. A site survey, showing Finished Floor Elevation (FFE), Building Restriction Lines (BRL),
and distances to property lines must be on site for the Slab Inspection, where the proposed
structures are less than 0.5 feet from any BRL.
NOTE: A Form Board Elevation Certificate, signed by a licensed surveyor, may suffice, where
the proposed structures are greater than 0.5 feet from all BRLs.
Blank Form Board Certificates are provided by the City)
3. A final post-construction topographical survey must be provided before the Final
Inspections can be scheduled.
Page 1 of 2
The surveys must be prepared by a licensed surveyor, drawn to scale, and should be of
sufficient size and clarity to indicate the location, nature, and extent of the new work and the
existing structures on the site. The surveys must also show the locations and dimensions of the
following: all impervious surfaces, pavers (new and previously existing, not removed by
construction), setbacks, distances from lot lines, finished floor elevation, street address, site
drainage patterns, and established finished grades. Where on-site stormwater retention is
required, elevations must be shown to fully define the retention areas.
All elevations should reference NAVD 1988 and the elevation and location of the benchmark
for the survey should be indicated.
If the structure is located in a flood zone, please provide finish floor elevations for all floor
levels, including garages, enclosures, and habitable spaces. Additionally, a preliminary FEMA
Elevation Certificate is required before the slab is poured and a final Elevation Certificate is
required before final C.O. inspection, per FEMA and NFIP Guidelines.
Other features to be shown include flood zone boundary lines, base flood elevations (BFE),
flood ways, the Coastal Construction Control Line (CCCL), all easements, storm water
retention areas, all storm water requirements of COAB, Land Development Regulations,
Section 24-66 and any other development features.
All fill dirt must be approved by Public Works before delivery.
The pre-construction, form board, and final post-construction surveys are important documents
for ensuring adequate drainage throughout neighborhoods, code compliance, and archiving this
information in the permanent record. We appreciate your cooperation in this matter.
DJA 5/9/2018
Page 2 of 2
By Toni Gindlesperger at 2:07 pm, Apr 06, 2023
By Toni Gindlesperger at 2:09 pm, Apr 06, 2023
DESCRIPTION ACCOUNT QTY PAID
PermitTRAK $583.69
RESO23-0033 Address: 712 AMBERJACK LN APN: 171126 0000 $583.69
BLDG SUBSEQUENT PLAN REVIEW FEES $50.00
BLDG 2ND PLAN REVIEW FEE 455-0000-322-1006 0 $50.00
BUILDING $115.00
BUILDING PERMIT 455-0000-322-1000 0 $115.00
BUILDING PLAN REVIEW $57.50
BUILDING PLAN CHECK 455-0000-322-1001 0 $57.50
PUBLIC WORKS PLAN REVIEW $25.00
PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00
STATE SURCHARGES $11.19
STATE DBPR SURCHARGE 455-0000-208-0700 0 $6.71
STATE DCA SURCHARGE 455-0000-208-0600 0 $4.48
WORK WITHOUT PERMIT $225.00
WORK WITHOUT PERMIT 455-0000-322-1000 0 $225.00
ZONING PLAN REVIEW $100.00
ZONING REVIEW SINGLE AND TWO FAMILY
USES 001-0000-329-1003 0 $100.00
TOTAL FEES PAID BY RECEIPT: R22935 $583.69
Printed: Monday, April 17, 2023 3:06 PM
Date Paid: Monday, April 17, 2023
Paid By: CALL THE SCREEN GUYS INC
Pay Method: CREDIT CARD 852242235
1 of 1
Cashier: TG
Cash Register Receipt
City of Atlantic Beach
Receipt Number
R22935