Loading...
Ordinance No. 90-91-155 v ORDINANCE NO. 90-91-155 AN ORDINANCE AMENDING THE CODE OF ORDINANCES OF THE CITY OF ATLANTIC BEACH , FLORIDA; AMENDING CHAPTER 24 , ZONING AND SUBDIVISION REGULATIONS : AMENDING ARTICLE II , SECTION 24- 17 , DEFINITIONS; PROVIDING FOR SEVERAB- ILITY ; PROVIDING AN EFFECTIVE DATE . BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF ATLANTIC BEACH , FLORIDA : SECTION 1 . The following definitions are hereby substituted for those presently included in Chapter 24 : GRADE , CALCULATED AVERAGE shall mean the average elevation of a site , calculated prior to excavation , fill or land balancing . The average elevation of the site shall be determined by superimposing a horizontal grid composed of ten equidistant lines by ten equidistant lines , arranged such that the outer perimeter lines shall be substantially aligned with the exterior lot lines , over the existing site . At each of the intersections of the lines of the grid , the existing grade elevation shall be determined by a registered land surveyor using standard practices . The average elevation of the site shall then be determined by adding the one hundred elevations as measured at the points of intersection of the grid together and dividing by one hundred . This calculated average elevation shall be used for all determinations of building heights on that site and shall be recorded in the records of the City . Alternatively , and by mutual concurrence of the property owner and the Zoning Official , on sites where the existing grade is predominantly flat, with few or no variations of grade, the Calculated Average Grade may be calculated by establishing the elevation at the points of intersection of the exterior lot lines plus one point at the approximate center of the property . All points measured shall lie on or within the lot lines of the property . GRADE , FINISHED shall mean the elevation of a site after all fill , land balancing or site preparations have been completed. Finished Grade shall not be used in the calculation of building heights . HEIGHT OF BUILDING shall mean the vertical distance from the Calculated Average Grade of the lot to the highest point of the roof or parapet of the building . SECTION 2 Severability . If any section , sentence, clause , part or phrase of this Ordinance is held to be invalid or unconstitutional by a court of competent jurisdiction, then said holding shall in no way affect the validity of the remaining portions of this Ordinance. SECTION 3 Effective Date . This Ordinance shall take effect immediately upon final passage and adoption . PASSED by the City Commission on first reading this 8th day of July , 1991 . PASSED by the City Commission on second reading this 22nd day of _July 1991 . ATTEST : wrif MA REENKING W LOAM I . GULLIF4' , JR. City Clerk Mayor, Presiding 0 ' er , 'Approved as to form and correctness : C. JE , ESQUIRE ity Atto ey