Loading...
427 SARGO RD RESA23-0010 ARCH SET_1VLCSL7050 7'0" 17 13/16" 40 9/16" 17 13/16" 6' - 11 1/2" 6'-0 1/2" 6'-0" 70 1/8"2'-0 1/2"2'-0 "22 1/8"VLSP51166 5' 11" 5' 11-1/2" 30-1/2"6'-7 1/2" FRAMEDIRECT SET FIXED52 3/4"5'0"4' - 11 7/16" 63C381 08/04/20 ULTRA SERIES SLIDING WINDOW - 6-9/16'' JAMB - RETRACTABLE SCREEN DOUBLE PANE GLASS VERTICAL CROSS SECTION ADV.1 CLOSED VALLEY DETAIL A 6" (152 mm) 6" (152 mm) Carry GAF underlayment at least 6" (152mm) over GAF leak barrier. Center full width roll of GAF leak barrier. Do not place fasteners within 6" (152mm) of center line. Horizontal laps must be at least 6" (152mm). Extend end of shingle at least 12" (305mm) beyond valley center line. Nail, putting extra fastener in top corner of shingle. Extend starter strip across valley at least 12" (305mm) and weave with opposite side starter strip shingle. Overlying shingles must be cut so they are 2" (52mm) away from valley center line. Clip shingle corners 45° to keep water flow in the valley center. Seal the valley shingles to each other using asphalt plastic cement. WALL FLASHING DETAIL B 2 nails per step flashing Extend GAF leak barrier at least 5"(127mm) up wall. Extend GAF leak barrier at least 5"(127mm) up wall Place metal step flashing just upslope from exposed edge of shingle and extend 5" (127mm) over underlying shingle and 5" (127mm) up the vertical wall. Step flashing pieces overlap each other 2" (51mm) Cover metal flashing with cut shingle. Do NOT nail shingle, install with asphaltic plastic cement. Metal flashing (Nailed to the deck, NOT to the vertical wall) extend up wall at least 5" (127mm) Siding/cladding must be at least 2" (51mm) above the roof surface and covering flashing at least 2" (51mm). SHINGLE INSTALLATION DETAIL C First C o ur s e Seco n d C o ur s e 17"(432m m) Third C o ur s e 6"(152m m) 11"(279m m) Fourt h C o ur s e Fifth C o ur s e GAF Underl a y m e nt Fourth Course: Trim 17" (432mm) off first shingle Third Course: Trim 11" (279mm) off first shingle Second Course: Trim 6" (152mm) off first shingle First Course: Start with full shingle Start at either rake and lay in either direction Place first course of shingles 1/4" – 3/4" (6–19mm) over eave and rake edges, covering starter course overhang, to provide drip edge. 1.Continue each course with whole shingles. SHINGLE INSTALLATION Remaining Courses: Repeat the 1st - 4th course instructions on the remaining courses, starting the fifth course with a full shingle. 2. Strike a chalk line about every 6 courses to check parallel alignment with eaves. NOTES: