427 SARGO RD RESA23-0010 ARCH SET_1VLCSL7050
7'0"
17 13/16" 40 9/16" 17 13/16"
6' - 11 1/2"
6'-0 1/2"
6'-0"
70 1/8"2'-0 1/2"2'-0 "22 1/8"VLSP51166
5' 11"
5' 11-1/2"
30-1/2"6'-7 1/2" FRAMEDIRECT SET FIXED52 3/4"5'0"4' - 11 7/16"
63C381
08/04/20
ULTRA SERIES
SLIDING WINDOW -
6-9/16'' JAMB - RETRACTABLE SCREEN
DOUBLE PANE GLASS
VERTICAL CROSS SECTION
ADV.1
CLOSED VALLEY DETAIL A
6"
(152 mm)
6"
(152 mm)
Carry GAF underlayment
at least 6" (152mm) over
GAF leak barrier.
Center full width roll of
GAF leak barrier.
Do not place fasteners
within 6" (152mm) of
center line. Horizontal
laps must be at least 6"
(152mm).
Extend end of
shingle at least 12"
(305mm)
beyond valley
center line. Nail,
putting extra
fastener in top
corner of shingle.
Extend starter strip
across valley
at least 12" (305mm)
and weave with
opposite side starter
strip shingle.
Overlying shingles
must be cut so they
are 2" (52mm) away
from valley center
line. Clip shingle
corners 45° to keep
water flow in the
valley center. Seal
the valley shingles to
each other using
asphalt plastic
cement.
WALL FLASHING DETAIL B
2 nails per step
flashing
Extend GAF leak
barrier at least
5"(127mm) up wall.
Extend GAF leak
barrier at least
5"(127mm) up wall
Place metal step
flashing just
upslope from
exposed edge of
shingle and extend
5" (127mm) over
underlying shingle
and 5" (127mm) up
the vertical wall.
Step flashing pieces
overlap each other
2" (51mm)
Cover metal flashing
with cut shingle. Do
NOT nail shingle,
install with asphaltic
plastic cement.
Metal flashing
(Nailed to the deck,
NOT to the vertical
wall) extend up wall
at least 5" (127mm)
Siding/cladding must
be at least 2"
(51mm) above the
roof surface and
covering flashing at
least 2" (51mm).
SHINGLE INSTALLATION DETAIL C
First
C
o
ur
s
e
Seco
n
d
C
o
ur
s
e
17"(432m
m)
Third
C
o
ur
s
e
6"(152m
m)
11"(279m
m)
Fourt
h
C
o
ur
s
e
Fifth
C
o
ur
s
e
GAF
Underl
a
y
m
e
nt
Fourth Course:
Trim 17" (432mm)
off first shingle
Third Course:
Trim 11" (279mm)
off first shingle
Second Course:
Trim 6" (152mm)
off first shingle
First Course:
Start with full shingle
Start at either rake and
lay in either direction
Place first course of shingles
1/4" – 3/4" (6–19mm) over eave and
rake edges, covering starter course
overhang, to provide drip edge.
1.Continue each
course with whole
shingles.
SHINGLE
INSTALLATION
Remaining
Courses:
Repeat the
1st - 4th course
instructions on the
remaining courses,
starting the fifth course with a full shingle.
2. Strike a chalk
line about every 6
courses to check
parallel alignment
with eaves.
NOTES: