Loading...
REVIEW COMMENTS, RES23-0016, 02.10.2023 CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800 BUILDING REVIEW COMMENTS Date: 2/10/2023 Permit #: RES23-0016 Site Address: 831 BEACH AVE Review Status: DENIED RE#: 170330 0000 Applicant: CASTLE RIDGE BUILDERS INC Property Owner: GRAHAM JAMES E Email: Ron@castleridgebuilders.com Email: KIM.GRAHAM@FULLSOURCE.COM Phone: 9045341737 Phone: 9044160712 9042398444 THIS REVIEW IS ONE OF MULTIPLE DEPARTMENT REVIEWS. Revisions may not be submitted until ALL departments have completed their respective reviews. Revisions submitted MUST respond to EACH department review. Submittals that respond to only one or a few correction items will not be accepted. Correction Comments: 1. The Manual J information, that would correspond to the Manual S information, was not submitted at this submittal. Please include the Manual Js that correspond to the Manual S report submitted. 2. Please submit a truss layout plan from the engineered truss designer/manufacturer. 3. There is a descrepancy in the living space square footing of the Energy Calculation documents and the Design drawings of 1614.5 square feet. Please review and clarify and resubmit the neccesary documents revised with the changed numbers clouded as usually for a revision. Unclouded revison documents will not be acceptable. 4. Area Schedule title box figures from page A1 do not make sense. Please review and revise or write a narrative of exclamation of the figure totals. 5. There are some component and cladding items and their installation procedures that go through plan review. For those items it is requested that the manufacturer’s installation instructions and Evaluation Reports be submitted. That information can be found on the DBPR’s product approval website and is preffered that the information come from there. Sometimes the installation instructions is the same as the Evaluation Report, in that case only one submittal is needed. Another note is that these items all have in-progress-inspections that are needed during there installations and our inspectors will work with that operation closely when those inspections are requested. Those items are : Siding, soffits, windows/doors and non-shingled roofing systems. 6. Concerning windows and doors installed: The sliding glass doors/windows that can be seen from the beach are required to meet Turtle Glass standards. Ordinance 95-17-114 of Atlantic Beach, FL, amending Chapter 5, Parks and Parks, to add Article IV, Sea Turtle Protection. Glazing visible from the beach shall be tinted/treated to achieve an industry-approved, inside-to-outside light transmittance value of 45% or less. Such transmittance is limited to the visible spectrum (400 to 700 nanometers) and is measured as the percentage of light that is tranmitted through the glass. 7. Please show that the new sliding glass door and windows, that are applicable, will meet the above standard for light transmittance or provide a means of tinting that will produce the standard. All documentation shall be reviewed by the A.B. Building Department. 8. If glazing is to be tinted/treated, the application shall be installed to receive an approved final inspection for this permit application. 9. Resubmittals may generate other review comments. 10. The link to the revision/correction form is : http://coab.us/DocumentCenter/View/10495/Revision- Request-Correction-to-Comments-Route-Sheet-v20181017?bidId= 11. The email address to send resubmittals is : Building-dept@coab.us Mike Jones Building Inspector/Plans Examiner City of Atlantic Beach 800 Seminole Road Atlantic Beach, FL 32233 (904) 247-5844 Email:mjones@coab.us Resubmittal Notes: All revisions and changes shall clearly stand out from the rest of the drawing on the sheet as a revision by way of completely encircling the change with “clouding”. The revision shall also be identified as to the sequence of revision by indicating a triangle with the revision sequence number within it and located adjacent to the cloud. The revision date and revision sequence number shall also be indicated in a conspicuous location in the title block for each sheet on which a revision for that sequence occurs. For projects still in the initial review stage and permit pending, all sheets with revisions shall be inserted into each set of drawings. The original sheets must be clearly marked “VOID” but are to be left within the set of drawings. Complete new sets of drawings will not be accepted. ADDITIONAL ITEMS MAY BE REQUIRED DEPENDING UPON NEW INFORMATION AND CLARITY OF FINAL PLANS SUBMITTED FOR REVIEW.