Loading...
309 PLAZA RES23-0026 Main House Upper TRUSS Layout MSA A D1D2D3D4D5HJ7HJ8CJ5 CJ5 CJ5 CJ5 CJ5 CJ1 CJ3 CJ1CJ3CJ5 CJ5 CJ5 CJ5 CJ5 CJ1 CJ3 CJ1CJ3CJ5 D1D2D3D4D5HJ7HJ8CJ5 CJ5 CJ5 CJ5 CJ5 CJ1 CJ3CJ1CJ3 CJ5 CJ5 CJ5 CJ5 CJ5 CJ1 CJ3 CJ1CJ3CJ5 A1B A1 A2 A3 A4 A5HJ7 HJ7CJ5CJ5CJ5CCJ1CJ3CJ1B CJ3B CJ5BCJ5CCJ1CJ3CJ1A CJ3A B1 B2HJ7 HJ7CJ5CJ5CJ1CJ3CJ1 CJ3 CJ5CJ5CJ1CJ3CJ1 CJ3CJ5 B3 B3 B3 B3 B3 B4 B4 B4CJ5A A7 A6 A6 A6 A6 A6 A6 A6 A6 A6 A6 HJ5CJ1 CJ1HJ5CJ1 CJ1CJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CCJ3CV04V02V04V02V024V020V016V012AV08AV04AV024AV020AV016AV012V08V04BAll beams to be supplied by builder All walls shown must be loading36-04-0536-04-0514-08-00 14-08-00 61-04-00 14-00-08 33-02-09 14-00-15 61-04-00 23-02-00 18-00-00 20-02-00 29-10-009-01-11 18-01-0023-01-001X1X 1X1X Hatch Legend 10'-1-1/8" Wall Elev 21'-9" Wall Elev 22'-9" Wall Elev DO NOT ATTEMPT TO ERECTTRUSSES WITHOUT REFERRING TOTHE ENGINEERING DRAWINGS ANDBSCI-B1 SUMMARY SHEETS. ALL PERMANENT BRACING MUST BEIN PLACE PRIOR TO LOADINGTRUSSES. (ie. SHEATHING,SHINGLES, ETC.) ALL INTERIOR BEARING WALLSMUST BE IN PLACE PRIOR TOINSTALLING TRUSSES. REFER TO FINAL ENGINEERINGSHEETS FOR THE FOLLOWING. 1) NUMBER OF GIRDER PLIES ANDNAILING SCHEDULE. 2) BEARING BLOCK REQUIREMENTS. 3) SCAB DETAILS (IF REQUIRED) 4) UPLIFT AND GRAVITY REACTIONS. WARNINGBackcharges Will Not Be AcceptedRegardless of Fault Without PriorNotification By Customer Within 48Hours And Investigation ByProBuild.NO EXECPTIONS. The General Contractor Is ResponsibleFor All Connections Other Than Trussto Truss, Gable Shear Wall, AndConnections. Temporay andPermanent Bracing, And Ceiling AndRoof Diaphram Connections. HARDWARE BEARING HEIGHT SCHEDULE 516 6th Ave. EastBradenton, FL 34208Ph. (941) 746-2161Fax (941) 306-4762 REVISIONS: IMPORTANT This Drawing Must Be Approved AndReturned Before Fabrication WillBegin. For Your Protection Check AllDimensions And Conditions Prior ToApproval Of Plan.SIGNATURE BELOW INDICATES ALLNOTES AND DIMENSIONS HAVEBEEN ACCEPTED. By __________________Date_______ NOTES:1) ALL DIMENSIONS ARE FEET-INCHES-SIXTEENTHS.2) DO NOT CUT OR ALTER TRUSSES IN ANY WAY.3) ALL REACTIONS ARE UNDER 5000 LBS. UNLESSNOTED OTHERWISE.4) ALL UPLIFTS ARE UNDER 1000 LBS. UNLESSNOTED OTHERWISE.5) FRAMING REQUIRED BELOW TRUSSES TO GETDESIRED CEILING CONDITIONS.6) ONLY TRUSS TO TRUSS CONNECTIONS SUPPLIEDW/ TRUSS PACKAGE. ROOF <A>Htu26=2 TOP CHORD:2x4 OVERHANG: SQ.ORPLB.CUT: 6.5/12 & 4/12ROOF PITCH: 12" PLUMB BUILDER:Duval Construction COUNTY: Sarasota DRAWN BY: HLW ENG BY: HLW SUB: Lakehouse Cove MODEL:. ADDRESS: . SCALE: 1/4" = 1' LOT: . JOB#3128248 DATE: 7-25-22 PROJECT:Goldwasser 2nd level ROOF LOADING TCLL: 20 PSFTCDL: 15 PSFBCDL: 10 PSFTOTAL: 45 PSFDURATION: 1.255 PSF TCDL + 5 PSF BCDLUSED TO RESIST UPLIFT FLOOR LOADING TCLL: 40 PSFTCDL: 10 PSFBCDL: 10 PSFTOTAL: 60 PSFDURATION: 1.00SPACING: 24" O.C.DEPTH: 14"& 18" DEEP MWFRS(Directional)/C-C HYBRID WIND ASCE7-16ENCLOSEDEXPOSURE CATEGORY COCCUPANCY CATEGORY IIWIND LOAD 130 MPHWIND IMPORTANCE FACTOR 1.00TRUSSES HAVE BEEN DESIGNED FOR A 10.0 PSF BOTTOM CHORDLIVE LOAD NONCONCURRENT WITH ANY OTHER LIVE LOADS This Truss Engineering package has been reviewed and complies with the design intent applied to this project. SHOP DRAWING APPROVAL STAMP MURRAY ENGINEERING INCORPORATED 157 HAMPTON PT DRIVE, STE. 3 ST. AUGUSTINE - FL - 32092 C.O.A. #26894 - (904) 342-8751 By Toni Gindlesperger at 10:54 am, Feb 16, 2023 By Mike Jones at 11:52 am, Sep 27, 2023