Loading...
1205 Hibiscus St ACC21-0053 - Blower Door Test Envelope Leakage Test Report (Blower Door Test) Residential Prescriptive, Performance or ERI Method Compliance 2020 Florida Building Code, Energy Conservation, 7th Edition Jurisdiction: Permit#: Job Information Builder: Community: Lot: NA Address: 1205 Hibiscus St City: Atlantic Beach State: FL Zip: 32233 Air Leakage Test Results Passing results must meet either the Performance, Prescriptive, or ER!Method O PRESCRIPTIVE METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour at a pressure of 0.2 inch w.g.(50 Pascals)in Climate Zones 1 and 2. O PERFORMANCE or ERI METHOD-The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding the selected ACH(50)value,as shown on Form R405-2020(Performance)or R406-2020(ERI),section labeled as infiltration,sub-section ACH50. ACH(50)specified on Form R405-2020-Energy Calc(Performance)or R406-2020(ER1): 7.000 x 60 _ 2712 = Method for calculating building volume: CFM(50) Building Volume ACH(50) O Retrieved from architectural plans PASS •Code software calculated When ACH(50) is less than 3, Mechanical Ventilation installation 0 Field measured and calculated must be verified by building department. R402.4.1.2 Testing.Testing shall be conducted in accordance with ANSI/RESNET/ICC 380 and reported at a pressure of 0.2 inch w.g.(50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5)or(7),Florida Statues.or individuals licensed as set forth in Section 489.105(3)(f),(g),or(i)or an approved third party.A written report of the results of the test shall be signed by the party conducting the test and provided to thecode official.Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors,fireplace and stove doors shall be closed,but not sealed,beyond the intended weatherstripping or other infiltration control measures. 2. Dampers including exhaust,intake,makeup air, back draft and flue dampers shall be closed,but not sealed beyond intended infiltration control measures. 3. Interior doors,if installed at the time of the test,shall be open. 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed. 5. Heating and cooling systems, if installed at the time of the test,shall be turned off. 6.Supply and return registers, if installed at the time of the test,shall be fully open. Testing Company Company Name: Phone: I hereby verify that the above Air Leakage results are in accordance with the 2020 7th Edition Florida Building Code Energy Conservation requirements according to the compliance method selected above. Signature of Tester: Date of Test: Printed Name of Tester: License/Certification#: Issuing Authority: 7/10/2021 5:05:16 PM EnergyGauge®USA 7.0.00-FlaRes2020 FBC 7th Edition(2020)Compliant Software Page 1 of 1 flR403.10.3 Covers. Outdoor heated swimming pools and outdoor permanent spas shall be equipped with a vapor-retardant cover on or at the water surface or a liquid cover or other means proven to reduce heat loss. Exception: Where more than 70 percent of the energy for heating, computed over an operation season, is from site-recovered energy, such as from a heat pump or solar energy source,covers or other vapor-retardant means shall not be required. R403.10.4 Gas-and oil-fired pool and spa heaters. All gas-and oil-fired pool and spa heaters shall have a minimum thermal efficiency of 82 percent for heaters manufactured on or after April 16,2013,when tested in accordance with ANSI Z 21.56. Pool heaters fired by natural or LP gas shall not have continuously burning pilot lights. R403.10.5 Heat pump pool heaters. Heat pump pool heaters shall have a minimum COP of 4.0 when tested in accordance with AHRI 1160,Table 2, Standard Rating Conditions-Low Air Temperature.A test report from an independent laboratory is required to verify procedure compliance.Geothermal swimming pool heat pumps are not required to meet this standard. ❑ R403.11 Portable spas(Mandatory).The energy consumption of electric-powered portable spas shall be controlled by the requirements of APSP-14. D R403.13 Dehumidifiers(Mandatory If installed, a dehumidifier shall conform to the following requirements: 1. The minimum rated efficiency of the dehumidifier shall be greater than 1.7 liters/kWh if the total dehumidifier capacity for the house is less than 75 pints/day and greater than 2.38 liters/kWh if the total dehumidifier capacity for the house is greater than or equal to 75 pints/day. 2. The dehumidifier shall be controlled by a sensor that is installed in a location where it is exposed to mixed house air. 3. Any dehumidifier unit located in unconditioned space that treats air from conditioned space shall be insulated to a minimum of R-2. 4. Condensate disposal shall be in accordance with Section M1411.3.1 of the Florida Building Code, Residential. n R403.13.1 Ducted dehumidifiers. Ducted dehumidifiers shall, in addition to conforming to the requirements of Section R403.13, conform to the following requirements: 1. If a ducted dehumidifier is configured with return and supply ducts both connected into the supply side of the cooling system,a backdraft damper shall be installed in the supply air duct between the dehumidifier inlet and outlet duct. 2. If a ducted dehumidifier is configured with only its supply duct connected into the supply side of the central heating and cooling system, a backdraft damper shall be installed in the dehumidifier supply duct between the dehumidifier and central supply duct. 3. A ducted dehumidifier shall not be ducted to or from a central ducted cooling system on the return duct side upstream from the central cooling evaporator coil. 4. Ductwork associated with a dehumidifier located in unconditioned space shall be insulated to a minimum of R-6. SECTION R404 ELECTRICAL POWER AND LIGHTING SYSTEMS Fi R404.1 Lighting equipment(Mandatory). Not less than 90 percent of the lamps in permanently installed luminaires shall have an efficacy of at least 45 lumens-per-watt or shall utilize lamps with an efficacy of not less than 65 lumens-per-watt. R404.1.1 Lighting equipment(Mandatory). Fuel gas lighting systems shall not have continuously burning pilot lights. 7/10/2021 5:04 PM EnergyGauge®USA 7.0.00-FlaRes2020 FBC 7th Edition(2020) Compliant Software Page 5 of 5 Manual S Compliance Report Job: Hutchcraft-1205Hibisc... E-Gaits Date: Jul 06.2021 Plus, Inc. Entire House By: E-talcs Plus,Inc(1111.6. ) E-Calcs Plus, Inc Serving all of Florida Phone 833 322 5271 Email enc'a@7ecalcsplus corn Web wvvv ecalcsplus corn License HERS Rater IC*0757810 Project Information For: Hutchcraft- 1205 Hibiscus St 1205 Hibiscus St, Atlantic Beach, FL 32233 Cooling Equipment Design Conditions Outdoor design DB 92.8°F Sensible gain: 6405 Btuh Entering coil DB 75.0 F Outdoor design WB: 77.3°F Latent gain: 966 Btuh Entering coil WB: 62.5:F Indoor design DB 75.0°F Total gain 7371 Btuh Indoor RH 50% Estimated airflow- 300 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASHP Manufacturer: Carrier Model: 38MAQB09+40MBC009 Actual airflow: 300 cfm Sensible capacity: 7109 Btuh 111%of load Latent capacity: 1188 Btuh 123%of load Total capacity: 8297 Btuh 113%of load SHR: 86% Heating Equipment Design Conditions Outdoor design DB: 31.8-F Heat loss: 7396 Btuh Entering coil DB: 70.0°F Indoor design DB 70.0 F Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split ASHP Manufacturer. Carrier Model: 38MAQB09+40MBCQ09 Actual airflow: 300 cfm Output capacity: 9000 Btuh 122%of load Capacity balance: 23 'F Supplemental heat required: 0 Btuh Economic balance: -99 'F Meets all requirements of ACCA Manual S. wrightsoft• 2021-Jul-1013.33.56 Right-Sutter UnIversal2021 21 0 07 RSU28254 page 1 s StHutchcraf-1205 Hibiscus St 7 6 2021 rup Calc=tv1J8 Front Door faces W Project SummaryJob: Hutchcraft-1205 Hibisc... E-Calcs Date: Jul 06.2021 Entire House By: E-Calcs Plus.Inc 'IL Plus, Inc. E-Calcs Plus, Inc Serving all o1 Florida Phone 833 322 5271 Email enc@ecalcsplus corn Web www ecalcsplus corn License HERS Rater IDx 0757810 Pro'ect Information For: Hutchcraft- 1205 Hibiscus St 1205 Hibiscus St, Atlantic Beach, FL 32233 Notes: Desi• n Information Weather: Jacksonville. FL. US Winter Design Conditions Summer Design Conditions Outside db 32 F Outside db 93 'F Inside db 70 F Inside db 75 °F Design TD 38 F Design TD 18 °F Daily range M Relative humidity 50 Moisture difference 52 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 7396 Btuh Structure 6405 Btuh Ducts 0 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 7396 Btuh Use manufacturer's data y Rate/swing multiplier 1.00 Infiltration Equipment sensible load 6405 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Semi-tight Fireplaces 0 Structure 966 Btuh Ducts 0 Btuh Central vent(0 cfm) 0 Btuh HeatingCooling (none) Area(ft') 35351Equipment latent load 966 Btuh Volume (ft') 2808 2808 Air changes/hour 0.41 0.22 Equipment Total Load(Sen+Lat) 7371 Btuh Equiv. AVF (cfm) 19 10 Req. total capacity at 0.75 SHR 0.7 ton Heating Equipment Summary Cooling Equipment Summary Make Carrier Make Carrier Trade Mini Split Trade Mini Split Model 38MAQB09 Cond 38MAQB09 AHRI ref Coil 40MBC009 AHRI ref Efficiency 8.5 HSPF Efficiency 12.0 EER. 16 SEER Heating input Sensible cooling 6750 Btuh Heating output 9000 Btuh @ 47'F Latent cooling 2250 Btuh Temperature rise 27 'F Total cooling 9000 Btuh Actual air flow 300 cfm Actual air flow 300 cfm Air flow factor 0.041 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0.87 Capacity balance point=23°F Backup. Carrier Input= 5 kW, Output = 17061 Btuh. 100 AFUE Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -fie- wriyiitsott 2021-Jul-10133356 Right-Suiteg Universal 2021 21 0 07 RSU28254 Page 1 s STHutchcraft-1205 Hibiscus St 7 6 2021 rup Calc=hiJ8 Front Door faces W Load Short Form Job: Hutchcraft-1205 Hibisc... E-Calcs Date: Jul 06.2021 -� Plus, Inc. Entire House By: E-Calcs Plus,Inc E-Calcs Plus, Inc _ Serving all of Florida Phone 833 322 5271 Email enc a@ecalcsplus corn Web WNW ecalcsplus corn License HERS Rater IN 0757810 Project Information For: Hutchcraft- 1205 Hibiscus St 1205 Hibiscus St. Atlantic Beach, FL 32233 Design Information Htg CIg Infiltration Outside db("F) 32 93 Method Simplified Inside db("F) 70 75 Construction quality Semi-tight Design TD("F) 38 18 Fireplaces 0 Daily range - M Inside humidity ()/a) 50 50 Moisture difference (gr/lb) 34 52 HEATING EQUIPMENT COOLING EQUIPMENT Make Carrier Make Carrier Trade Mini Split Trade Mini Split Model 38MAQB09 Cond 38MA0B09 AHRI ref Coil 40MBC009 AHRI ref Efficiency 8.5 HSPF Efficiency 12.0 EER. 16 SEER Heating input Sensible cooling 6750 Btuh Heating output 9000 Btuh @ 47"F Latent cooling 2250 Btuh Temperature rise 27 "F Total cooling 9000 Btuh Actual air flow 300 cfm Actual air flow 300 cfm Air flow factor 0.041 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 0 87 Ca pacity ba lance point= 23 F Backup: Carrier Input= 5 kW. Output = 17061 Btuh, 100 AFUE I I ROOM NAME Area Htg load Clg load Htg AVF CIg AVF (ft ) (Btuh) (Btuh) (cfm) (cfm) I 1 WIC1 35 946 211 38 10 BA1 50 1234 339 50 16 Living 266 5216 5856 212 274 } I I Entire House p 351 7396 6405 300 300 Other equip loads 0 0 Equip. © 1.00 RSM 6405 Latent cooling 966 1 } TOTALS 351 ' 7396 ' 7371 ' 300 ' 300 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrighlsoft 2021-Jut-10133356 Right-Suite®Universal 2021 21 0 07 RSU28254 Page 1 1 s STHutchcraft-1205 Hibiscus St 7 6 2021 rup Calc=MJ8 Front Door faces W °i° First Floor Livinc L WIC1 BA1 r Garage l l Job#: Hutchcraft- 1205 Hibiscus St E-Calcs Plus, Inc Scale: 1 : 64 Performed by E-Calcs Plus, Inc for: Page 1 Hutchcraft-1205 Hibiscus St Serving all of Florida Right-Suite® Lhiversal 2021 1205 Hibiscus St 21 0 07 RSU28254 Atlantic Beach FL 32233 Phone 833 322 5271 2021-Jul-10 13 3425 www ecalcsplus corn enc@ecalcsplus corn - 1205 Hibiscus St 7 6 2021 r 2020-AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA TABLE 402.4.1.1 a AIR BARRIER AND INSULATION INSPECTION COMPONENT CRITERIA Project Name: Hutchcraft-1205 Hibiscus St Builder Name: Street: 1205 Hibiscus St Permit Office: Duval County City, State, Zip: Atlantic Beach, FL,32233 Permit Number: Owner: Jurisdiction: Design Location: FL,Jacksonville U COMPONENT AIR BARRIER CRITERIA INSULATION INSTALLATION CRITERIA General A continuous air barrier shall be installed in the building envelope. Air-permeable insulation shall The exterior thermal envelope contains a continuous air barrier. not be used as a sealing material. requirements Breaks or joints in the air barrier shall be sealed. The air barrier in any dropped ceiling/soffit shall be aligned with The insulation in any dropped ceiling/soffit Ceiling/attic the insulation and anygaps in the air barrier shall be sealed. 9 P shall be aligned with the air barrier. Access openings,drop down stairs or knee wall doors to unconditioned attic spaces shall be sealed. Walls The junction of the foundation and sill plate shall be sealed. Cavities within corners and headers of frame walls The junction of the top plate and the top of exterior walls shall be shall be insulated by completely filling the cavity sealed. with a material having a thermal resistance of R-3 Knee walls shall be sealed. per inch minimum. Exterior thermal envelope insulation for framed walls shall be installed in substantial contact and continuous alignment with the air barrier. Windows, skylights The space between window/door jambs and framing,and and doors skylights and framing shall be sealed. Rim joists Rim joists shall include the air barrier. Rim joists shall be insulated. Floors The air barrier shall be installed at any exposed edge of Floor framing cavity insulation shall be installed to (including insulation. maintain permanent contact with the underside of above-garage subfloor decking, or floor framing cavity insulation and cantilevered shall be permitted to be in contact with the top side floors) of sheathing,or continuous insulation installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members. Crawl space walls Exposed earth in unvented crawl spaces shall be covered with Where provided instead of floor insulation, insulation a Class I vapor retarder with overlapping joints taped. shall be permanently attached to the crawlspace walls. Shafts, penetrations Duct shafts, utility penetrations,and flue shafts opening to exterior or unconditioned space shall be sealed. Batts in narrow cavities shall be cut to fit,or narrow Narrow cavities cavities shall be filled by insulation that on installation readily conforms to the available cavity spaces. Garage separation Air sealing shall be provided between the garage and conditioned spaces. Recessed lighting Recessed light fixtures installed in the building thermal envelope Recessed light fixtures installed in the building shall be sealed to the finished surface. thermal envelope shall be air tight and IC rated. Plumbing and wiring Batt insulation shall be cut neatly to fit around wiring and plumbing in exterior walls,or insulation that on installation readily conforms to available space shall extend behind oioing and wiring. Shower/tub The air barrier installed at exterior walls adjacent to showers and Exterior walls adjacent to showers and tubs shall on exterior wall tubs shall separate them from the showers and tubs. be insulated. Electrical/phone box or The air barrier shall be installed behind electrical or communication exterior walls boxes or air-sealed boxes shall be installed. HVAC register boots HVAC supply and return register boots that penetrate building thermal envelope shall be sealed to the sub-floor,wall covering or Concealed When required to be sealed,concealed fire sprinklers shall only be sprinklers sealed in a manner that is recommended by the manufacturer. Caulking or other adhesive sealants shall not be used to fill voids between fire sprinkler cover plates and walls or ceilings. a. In addition, inspection of log walls shall be in accordance with the provisions of ICC-400. 7/10/2021 5:04 PM EnergyGauge®USA 7.0.00-FlaRes2020 FBC 7th Edition(2020) Compliant Software Page 1 of 1