Loading...
313 N OCEANWALK DR RES23-0219 COAB Permit Form with ConditionsFinal Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION INTERIOR REMODEL - REMOVE LOAD BEARING WALL RES23-0219 313 N OCEANWALK DR PARAMOUNT CUSTOM HOMES OWNER:ADDRESS:CITY:STATE:ZIP: ANDERSON DONALD D 313 OCEANWALK DR N ATLANTIC BEACH FL 32233-4693 COMPANY:ADDRESS:CITY:STATE:ZIP: PARAMOUNT CUSTOM HOMES LLC 1834 LIVE OAK DR JACKSONVILLE FL 32246 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169463 1510 OCEANWALK UNIT 04 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 313 N OCEANWALK DR RESIDENTIAL ALTERATION RESIDENTIAL INTERIOR REMODEL - REMOVE LOAD BEARING WALL $4000.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 BUILDING NOTICE OF COMMENCEMENT INFORMATIONAL Notes: No inspections may be scheduled until a copy a recorded Notice of Commencement has been submitted to the Building Department 2 BUILDING ROUGH TRADES INSPECTION INFORMATIONAL Notes: THE ROOF MUST BE COMPLETE AND THE BUILDING DRIED IN BEFORE SCHEDULING ROUGH TRADES INSPECTIONS. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 10/17/2023 PERMIT NUMBER RES23-0219 ISSUED: 10/17/2023 EXPIRES: 4/14/2024 RESIDENTIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $75.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $37.50 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $116.50 2 of 2Issued Date: 10/17/2023 PERMIT NUMBER RES23-0219 ISSUED: 10/17/2023 EXPIRES: 4/14/2024 RESIDENTIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 RES23-0219 By Mike Jones at 2:40 pm, Oct 16, 2023REVIEWED FOR CODE COMPLIANCE By Mike Jones at 2:36 pm, Oct 16, 2023 SB36Dishwasher 3 3DB2439B24R B24R 3DB18 B15R B30RB30B18R B18R B21RB21RB24RSB36Dishwasher 3 3DB2439B24R B24R 3DB18 B15R B30RB30B18R B18R B21RB21RB24R OTC302496 UF32596UF22596UF22496 W362124W1842RW1542R W2342LW2142RW2142R3060SH 3060SH 3060SH 3060SH 2860DH 266826683060SH3060SH306880683060SH 3060SH2460DH2460DH3060SH2868 3068 4034PT 2668R R R RR 8' 6' 24'-7 15/16"5'-10 11/16"5'-8"8'-11 7/8" 17'-8" 3' 4' 17" 24" 40" 24 DIRECTION OF FLOOR TRUSSES ABOVEDIRECTION OF FLOOR TRUSSES ABOVE PASS THROUGHDOOR WAY PROPOSED BEAM (LVL) FOOTER PER ORIGINAL PLANS FOOTER PER ORIGINAL PLANS HVAC UNIT KITCHEN FAMILY ROOM KITCHEN FAMILY ROOM EXISTING PROPOSED DRIVEWAYGARAGE LOCATION OF DUMP TRAILER NO CHEMICAL TOILETS ON SITE NO MATERIAL STORED ON SITE EROSION CONTROL NOT NEEDED HOUSE LOADING AND UNLOADING ACCESS AREA CONSTRUCTION PARKING AREAACCES S T O S I T E V I A O C E A N W A L K D R I V E N . DRIVEWAY 12' WIDE 313 OCEANWALK DR. N. ATLANTIC BEACH 32233 (169463 1510) NARRATIVE OF CONSTRUCTION PHASE: CONSTRUCTION WILL CONSIST OF REMOVAL OF LOAD BEARING WALL AND INSTALLATION OF BEAM PER ENGINEERING PROVIDED. CONSTRUCTION SITE MANAGEMENT PLAN SB36 Dishwasher 3 B27 B27 B27 B21R B21L B24R B18RB21R B15RSB36 Dishwasher 3 B27 B27 B27 B21R B21L B24R B18RB21R B15RW362124W2142RW2142L W1842LW303624W1542RW2142R 3060SH 3060SH 3060SH 3060SH 266826683060SH3060SH306880683060SH 3060SH2460DH2460DH3060SH2868 30682668R R 7'-2" 14'-7" 17'-8" 3' 17" 24" 40" 24 DIRECTION OF FLOOR TRUSSES ABOVEDIRECTION OF FLOOR TRUSSES ABOVE PASS THROUGHDOOR WAY PROPOSED BEAM (LVL) FOOTER PER ORIGINAL PLANS FOOTER PER ORIGINAL PLANS HVAC UNIT KITCHEN FAMILY ROOM KITCHEN FAMILY ROOM EXISTING PROPOSED DRIVEWAYGARAGE LOCATION OF DUMP TRAILER NO CHEMICAL TOILETS ON SITE NO MATERIAL STORED ON SITE EROSION CONTROL NOT NEEDED HOUSE LOADING AND UNLOADING ACCESS AREA CONSTRUCTION PARKING AREAACCES S T O S I T E V I A O C E A N W A L K D R I V E N . DRIVEWAY 12' WIDE 313 OCEANWALK DR. N. ATLANTIC BEACH 32233 (169463 1510) NARRATIVE OF CONSTRUCTION PHASE: CONSTRUCTION WILL CONSIST OF REMOVAL OF LOAD BEARING WALL AND INSTALLATION OF BEAM PER ENGINEERING PROVIDED. CONSTRUCTION SITE MANAGEMENT PLAN ANDERSON REMODEL© 2023DATE: Oct. 3 2023FLOOR PLAN NTS 1SHEET NUMBERCRC1329610 904.614.9284 jeff@paramounthomesjax.comJeff L. Holden313 Oeanwalk Dr. N. Jacksonville Beach Fl. 32204DRAWN BY:By Toni Gindlesperger at 3:58 pm, Oct 06, 2023 By Toni Gindlesperger at 3:58 pm, Oct 06, 2023 By Mike Jones at 2:42 pm, Oct 16, 2023 This item has been digitallysigned and sealed by StephenL. McCorvey on the dateadjacent to the seal.Printed copies of thisdocument are not consideredsigned and sealed and thesignature must be verified onany electronic copies.10/03/2023Stephen L. McCorveyDig ita lly signed by Stephen L. McCorveyDN: E=steve@inspectjacksonville.com, CN=Stephen L. McCorvey, O=Fortress Engineering Group LLC, SERIALNUMBER=AATL20230607301277, L=Jacksonville, S=Flor ida, C=USDate: 2023.10.03 09:13:31-04'00 'By Toni Gindlesperger at 3:52 pm, Oct 06, 2023By Mike Jones at 2:45 pm, Oct 16, 2023 This item has been digitallysigned and sealed by StephenL. McCorvey on the dateadjacent to the seal.Printed copies of thisdocument are not consideredsigned and sealed and thesignature must be verified onany electronic copies.10/03/2023 1 IMPORTANT PERMIT AND INSPECTION NOTES BUILDING. 1. The City Sea Turtle Protection Ordinance applies where land either has frontage on Beach Avenue, the Cloister Condominium, or is located eastward of Seminole Road from 20th Street northward to the City Limits. 2. No fill dirt can be delivered without prior approval from Public Works. Per COAB, 24-68. 3. The bottom of all foundation footings must be minimum 12 inches below existing grade, per COAB, 24-68 and FBC-B, Section 403.1.4. Site conditions may require footings to be deeper or higher above finished grade. Please review COAB Bulletin 1-16 to ensure minimum Finished Floor Elevation (FFE). 4. Fill dirt inside foundation walls must be compacted in 8-inch lifts, per FBC-R506.2.1. Please submit compaction tests, from a third-party testing agency, for every 16 inches of fill or fraction thereof. 5. At Final Inspection, a 6-inch clearance between exterior wall coverings and final grade (top of sod or mulch) will be required, per FBC-R318.7. Please plan FFE and lot grading accordingly. 6. Where questionable soils are found, during inspection, soil and compaction tests may be required, per FBC- R401. 7. Please provide a form-board or stem wall elevation form, from a licensed surveyor, for slab inspection. 8. Please review COAB Bulletin 2-18 to determine if a survey with setbacks and dimensions to property lines is required for slab inspection. 9. The placement and protection of steel reinforcement (Rebar) must comply with FBC-R606 (Masonry) and R608 (Concrete), including required Standard Hooks at top and bottom of vertical rebar. 10. Inspections: a. In-Progress Inspections are required for Exterior Siding and Window and Door Inspections and should be scheduled for the first day of work. b. A Scratch-Coat Inspection is required for stucco work. If you intend to apply a double-up, brown- coat, please call the Building Department to schedule a same-day Scratch-Coat Inspection. c. All roofing projects require an In-Progress Inspection, Residential and Commercial. d. The roof must be complete and the building dried in before scheduling rough trades inspections. 11. The joint tape for ZIP Board products is considered the dry-in or House Wrap for the building and must be inspected before covering over. All holes and penetrations in the sheathing and overdriven nails must be sealed. 12. Please post the building permit documents in a conspicuous location, before start of construction, including the Building Permit, Notice Of Commencement (NOC), and Construction Site Management Plan. The Police Department may review the management plan for compliance and parking. 13. Blocking any sidewalk or street is prohibited without prior approval from the Police Department and City Manager. 2 14. All work must match the approved plans. All changes to the approved plans must be re-submitted for plan review and approved before it can be inspected. Building inspectors are not authorized to approve changes to the approved plans in the field. (See Mechanical) 15. Where excavation is required for new construction, the provisions of FBC-B, Section 3307 will apply, including a 10-Day prior notice to adjoining property owners and protection of adjoining properties. Where the excavation exceeds 24 inches, temporary retaining walls must designed by the Engineer Of Record (EOR) and installed during or immediately after excavation. EXISTING BUILDINGS – REMODELS, RENOVATIONS, ADDITIONS, CHANGE OF OCCUPANCY. 1. Existing buildings are reviewed and permitted under the Florida Building Code-Existing Buildings (FBC- EB). The applicant must specify the method of compliance, per FBC-EB 301.1, and include that information on the plans, with the Design Criteria and Code Analysis. 2. The requirements for the method specified will be found in the corresponding FBC-EB Chapter. 3. When it is discovered during construction that the Compliance Method is not correct, or the project has expanded into another Compliance Method, revised plans will be required to update the Permit. No inspections will be conducted until the approved revisions are on site. 4. Any wall opened by removing interior or exterior wall coverings is considered a Work Area, and current provisions for Energy Conservation, including weatherproofing and insulation will apply. 5. Building inspectors are not authorized to approve changes to the approved plans in the field. ROOFING. a. The roof sheathing for all new construction must remain uncovered until the Roof Sheathing Inspection is approved. b. All roofing projects require an In-Progress Inspection. c. Sheathing installation and replacement guidelines per APA. d. Underlayment must conform to FBC-R Table 905.1.1 e. Shingles must conform to ASTM D3161 G or H, or ASTM D7158 F ELECTRICAL. 1. Electrical work must comply with the provisions of the 2014 NEC. 2. Anti-Oxidant Compound is required on all exterior aluminum wiring connections, unless the Listing Approval Documents for the conductors and the termination points, at each end, specifically allow connection without the compound. (Three documents will be required) PLUMBING. 1. Water supply and drain pipes must be insulated outside of conditioned areas, per FBC-R, P2603.5. 2. Where the entire sanitary drainage system is replaced, the existing building drain and building sewer 3 must be internally examined to verify proper size and slope and that piping is not broken or obstructed, per FBC-R, P2502.1. 3. COAB requires an additional sewer cleanout near the sewer tap with a T-1 concrete box for protection. 4. Water service piping must be properly supported and covered by a minimum of 12 inches of soil, per FBC-R, P2604.3. MECHANICAL. 1. All equipment and duct work must match the approved plans and Energy Sheets. The Manual S is the approved duct plan, and the as-built duct work must match the approved plans, or a revised Manual S or equivalent must be submitted for review. An equivalent must include duct and trunk layout and sizes, available static pressure, actual air flow, and total effective length, signed by the Mechanical Contractor with State License Number. FUEL GAS. 1. Fuel gas systems from the regulator to the appliances must comply with the FBC-Gas. 2. LP gas storage systems and outside piping must comply with NFPA 58. 3. All underground gas piping and tubing must be buried with 12-inches of cover. 4. CSST gas piping must comply with the manufacturer’s installation instructions and terms of approval. 4 01/23/20, 02/13/20