Loading...
ABCC P2 - Bldg 2 - T-0.6_1DRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 9/7/2023 1:20:23 PM Autodesk Docs://2022-352 ABCC/R22_ABCC_SITE.rvtT0.6SHEET LIST -BAG DROP -PHASE 22022-352 Author SHEET NO.SHEET NAME TITLE T-0.0 TITLE SHEET T-0.6 SHEET LIST T-1.4 PHASE 2 - OVERALL SITE PLAN T-2.25 PHASE 2 - MAIN CLUBHOUSE AXONOMETRIC AND PERSPECTIVE VIEWS CIVIL C-2.02 EXISTING CONDITION AND DEMOLITION PLAN C-3.00 OVERAL SITE PLAN C-3.01 SITE PLAN - AREA 1 C-4.01 GRADING AND DRAINAGE PL C-5.01 UTILITY PLAN STRUCTURAL 0-S0.20 YOUTH PAVILION STRUCTURAL GENERAL NOTES 0-S0.22 BAG DROP COMPONENTS AND CLADDING 0-S0.60 YOUTH PAVILION AND STORAGE SHED SPECIFICATIONS 0-S0.61 YOUTH PAVILION AND STORAGE SHED SPECIFICATIONS 0-S3.22 BAG DROP FOUNDATION DETAILS 0-S6.23 BAG DROP FRAMING DETAILS 2-S3.1 BAG DROP FOUNDATION & ROOF FRAMING PLAN ARCHITECTURAL 0-A0.1 ARCHITECTURAL GENERAL NOTES, SYMBOLS & ABBREVIATIONS 0-A0.77 PHASE 2 - EXTERIOR CASEWORK DETAILS, BAG DROP 0-A0.81 STEEP SLOPE ROOF DETAILS 1-A2.10 PHASE 2 - BAG DROP NEW WORK PLANS & ELEVATIONS PLUMBING 2-P1-00 PLUMBING COVER SHEET 2-P1-01 YOUTH PAVILLION PLUMBING PLAN ELECTRICAL 2-E0.1 ELECTRICAL COVER SHEET 2-E2.0 YOUTH PAVILION & SHED POWER PLANS 2-E3.0 YOUTH PAVILION & SHED LIGHTING PLANS 2-E4.0 YOUTH PAVILION & SHED PANEL SCHEDULES FOOD SERVICE 2-FS1.10 FOODSERVICE EQUIPMENT PLAN