Loading...
ABCC P2 - Bldg 1 - 1-A3.0_1FFF FFUP UP EXIT EXITEXITDryer Washer 1 1-A6.2 1 1-A6.1 2 1-A6.2 2 1-A6.3 2 1-A6.3 1 1-A6.3 1 1-A6.3 BAKE SHOP 131B DRY STORAGE 131C COOLER 131F BEER COOLER 131D FREEZER 131E CHEF & SOUSE CHEF 131A BEER / WINE COOLER 131M KITCHEN 131 DINING LOGGIA 124 BAR PANTRY 131L OUTSIDE SERVICE SNACK BAR 131K CORRIDOR 131N BREAK ROOM 133 CORRIDOR 136 AQUATICS STAFF 138 ELECTRICAL SERVICE 131G MECHANICAL SERVICE 131H DRY STORAGE 1 132A OFFICE, TBD 132B CATERING DIR. / TBD 132C CORRIDOR 132 STORAGE 132D STORAGE 132E FOOD & BEVERAGE OFFICE 131I WASH STATION 131J KITCHEN 131HALL 128 TABLE STORAGE 129MULTI-PURPOSE ROOM 126 DINING HALL 125 BULK COOLER 132G BULK FREEZER 132 F LAUNDRY 137 MEN'S POOL RESTROOM 142 REFUSE & RECYCLING 113G WOMEN'S POOL RESTROOM 145 09.01 POOL STORAGE 140 140 10.04 07.01 10.04 10.04 07.03 131A 131K-1 07.02 06.01 09.02 14.01 04.01 09.03 08.01 06.01 10.01 10.01 10.01 135134 137 138133-1131G 131H 132B 132A 132C OHC-1 132-2 132-1145-1 133-2 131N-2 131N-1127A-1 127B-1 142-1 RR 135 RR 134 131L 131K-206.01 10.04 W138-206.07 10.02 2 1-A5.8 1 1-A5.8 4.14.0 6 0-A0.78 4 0-A0.78 GP2 1 1-A7.2 3 1-A7.2 4 1-A7.2 3 1-A7.3 2.0 2.1 3.0 B E A.1 D F H 3.1 C G 5.0 5 1-A7.3 6 1-A7.3 10.03 LOCKER 139 STORAGE 136A 136A W140 W133-1 W133-2 W133-3 W132CW132B-1W132B-2OHC-2 0-A0.78 1 2' - 3"4"4"B.1 09.03 09.04131CSLOPE SLOPE 11.01 22.01 09.04 1' - 5" 1 0-A0.99 127A-2 127B-2 131B 08.02 08.02132-3131I 2 0-A0.99 26.01 08.03 W131K-1 W131K-2 5' - 3" 4 1-A7.3 10.05 W138-1 DRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OFSHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OFSHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 1/4" = 1'-0"9/7/2023 4:47:55 PM Autodesk Docs://2022-352 ABCC/R22_ABCC_BLDG1_ARCH.rvt1-A3.0PHASE 2 -MAIN CLUBHOUSE PARTIAL PLAN -KITCHEN2022-352 WRS / MW / MJ / NY KEYNOTES 0 1 2 4 8FEET 1/4" = 1'-0" SCALE:1 PHASE 2 - MAIN CLUBHOUSE PARTIAL PLAN - KITCHEN PLAN NO. DESCRIPTION DETAIL █ DIVISION 04 - MASONRY 04.01 (N) CMU SITE WALL W BRICK VENEER (PUBLIC FACING) & CAP. PREP WITH BLOCK FILLER AND PAINT. █ DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06.01 REMEDIATION: REMOVE ALL SIDING AND ZIP OSB SHEATHING. REPLACE SHEATHING AS REQUIRED PER STRUCTURAL PRIOR TO ADDING INTERIOR FINISHES. 06.07 (N) 2x6 WALL TO CEILING TO ACCOMODATE PLUMBING & RECESSED BABY CHANGING STATION █ DIVISION 07 - THERMAL & MOISTURE PROTECTION 07.01 NEW WALL INFILL 07.02 REMEDIATION: REMOVE AND REPLACE ALL WEATHERSTRIPPING. REMOVE AND RESET DOORS AS REQUIRED. ADD BUMP STOP THRESHOLD TO ALL DOOR OPENINGS WITH APPROVED AMERIKOOLER COMPONENTS. SEALWIDTH BELOW DOOR JAMB WITH SPRAY FOAM CAPPED WITH SILICONE SEALANT. 07.03 WINDOW INFILL █ DIVISION 08 - OPENINGS 08.01 SINGLE PANEL SLIDING SERVICE WINDOW. SEE 2/0-A0.99 & 0-A0.25 08.02 EXISTING WINDOW TO REMAIN. APPLY PRIVACY FILM 08.03 BI-PARTING SLIDING SERVICE WINDOW. SEE 1/0-A0.99 & 0-A0.25 █ DIVISION 09 - FINISHES 09.01 GYP. WALL BOARD & PAINT 09.02 REMEDIATION: CUT OUT AND REMOVE ENTIRE SECONDARY RUBBER FLOOR. REFURBISH FLOOR SURFACE WITH URETHANE RESINOUS FLOORING TO MATCH KITCHEN. SEE FINISH SCHEDULE 09.03 NEW ROLL-IN (ACCESSIBLE) TILE SHOWER, SLOPE FLOOR TO DRAIN. SEE ID 09.04 LINEAR TRENCH DRAIN WITH POLSIHED CHROME FINISH. SLOPE FLOOR TO DRAIN. SEE PLUMBING █ DIVISION 10 - SPECIALTIES 10.01 EXPANSION JOINT COVER 10.02 MOTORIZED SHADE, TYPICAL. BOD: "FLEXSHADE ZIP XL" BY DRAPER 10.03 EMPLOYEE LOCKERS. SEE ID 10.04 AIR GAP COVER 10.05 VENTLESS FIREPLACE, SEE ID. █ DIVISION 11 - EQUIPMENT 11.01 WASHING MACHINE AND DRYER BY OWNER █ DIVISION 14 - EQUIPMENT 14.01 NEW KITCHEN EQUIPMENT, TYPICAL. SEE FS █ DIVISION 22 - PLUMBING 22.01 UTILITY SINK. SEE PLUMBING █ DIVISION 26 - ELECTRICAL 26.01 (N) WALL-MOUNTED SCONCE LIGHT. MATCH EXISTING CAMPUS STANDARDS