Loading...
ABCC P2 - Bldg 1 - 1-E2-2_1JFSSSSSTAIR 1ST1ACCOUNTING200SECURITY AREA203TELEPHONE AREA203AHVAC / MECHANICALMEZZANINE204KEF1KEF2KSF1KSF2DOAU1RTU1KEF4VRF1FCU5CONFERENCE ROOM215LANDING210APRINTING / POSTAGE211OFFICE 3212OFFICE 2213OFFICE 1214MEMAFCU612D-10D-12D-14D-16D-18D-20D-22D-24333443GAS WATER HEATER WH-25556PROFESSIONALENGINEERNo. 85909WILLIAMS.GADDYJR.STATE OFLICENSEFLORIDADRAWN BY:PROJECT NO.:SCALE:REVISIONNO.DATEDESCRIPTIONTHE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OFSHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OFSHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS.COPYRIGHT © 202326560 AGOURA ROAD, SUITE 106CALABASAS, CA 91302310.670.9144A S S O C I A T E SARCHITECTS + ENGINEERSS H E P P H I R Dwill.s@shep-ae.com112-02-22SD PRICING22-10-23DD PRICING39-07-23PHASE 2 90% CDAtlantic Beach Country ClubPhase 2Construction Documents1600 Selva Marina DriveAtlantic Beach, FL 322331/8" = 1'-0"1-E2.2PHASE 2 -MAIN CLUBHOUSE POWER PLAN -LEVEL 22022-352AuthorFloor Plan1-E2.21MAIN CLUBHOUSE POWER PLAN - LEVEL 2 - PHASE 2SHEET KEYNOTES:X1. NEW REFRIGERATION RACK. ROUTE 4#6 & 1#8G IN 1" CONDUIT FROM CIRCUIT EM-45,47,49 TO REFRIGERATION RACK CONTROL PANEL. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH EQUIPMENT PROVIDER PRIOR TO ROUGH-IN. REFER TO FOOD SERVICE PLANS FOR ADDITIONAL INFORMATION.2. LOCATION OF NEW DISHWASHER HOOD EXHAUST FAN. SPLICE AND EXTEND EXISTING CIRCUITING TO NEW LOCATION AS NEEDED. REFER TO DEMOLITION PLAN FOR ADDITIONAL INFORMATION.3. PROVIDE A FIRE ALARM DUCT SMOKE DETECTOR FOR MECHANICAL EQUIPMENT. MECHANICAL CONTRACTOR TO INSTALL IN DUCTWORK, ELECTRICAL CONTRACTOR TO CONNECTION DETECTOR TO FIRE ALARM SYSTEM.4. PROVIDE 120V CONNECTION TO MOTORIZED DAMPER. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH MECHANICAL DRAWINGS AND MECHANICAL CONTRACTOR PRIOR TO WORK.5. PROVIDE AND INSTALL A WEATHERPROOF 120V-20A GFCI DUPLEX RECEPTACLE IN CAST BOX WITH TAYMAC COVER, CAT. NO. 10310G. CAST BOX SHALL BE SECURED TO STRUCTURAL SUPPORT FRAMING ON THE ROOF TOP EQUIPMENT. CONDUIT SHALL BE RIGID STEEL. PROVIDE CONDUIT SEALING AND FLASHING AT PITCH POCKET. COORDINATE ROOF PENETRATION WITH THE ARCHITECT PRIOR TO WORK. 6. RECEPTACLE TO SERVE FOR GAS WATER HEATER CONTROLS. COORDINATE EXACT LOCATION AND REQUIREMENTS WITH PLUMBING DRAWINGS AND PLUMBING CONTRACTOR PRIOR TO WORK.A. CONDUIT SHOWN OUTSIDE OF THE BUILDING FOR CLARITY ONLY. ALL CONDUITS SHALL REMAIN WITHIN THE WALL OR BUILDING.B. BRANCH CIRCUITS SHALL HAVE THE SAME SIZE CONDUCTORS FOR THE ENTIRE LENGTH OF THE CIRCUIT.C. ALL ELECTRICAL EQUIPMENT, DEVICES AND ASSOCIATED CIRCUITING NOT SHOWN ON THIS PLAN ARE EXISTING TO REMAIN.D. REWORK CIRCUITS AS NEEDED TO MAINTAIN CONTINUITY OF EXISTING DEVICES TO REMAIN.E. COORDINATE CORD & PLUG REQUIREMENTS WITH PURCHASED EQUIPMENT PRIOR TO WORK.F. COORDINATE FINAL LOCATION AND MOUNTING HEIGHTS OF TELEVISIONS, EQUIPMENT, RECEPTACLES WITH INTERIOR ELEVATIONS AND MILLWORK PROVIDER PRIOR TO WORK.G. COORDINATE WITH THE MECHANICAL DRAWINGS AND THE MECHANICAL CONTRACTOR FOR THE EXACT LOCATION AND REQUIREMENTS OF ALL MECHANICAL EQUIPMENT PRIOR TO WORK.H. REFER TO MECHANICAL EQUIPMENT CONNECTION SCHEDULE ON SHEET E0.10 FOR ELECTRICAL REQUIREMENTS. I. EXISTING BREAKERS SERVING CIRCUITS COMPLETELY DEMOLISHED MAY BE REUSED TO SERVE NEW CIRCUITS.J. FIRE ALARM DEVICES SHOWN ON THIS PLAN ARE NEW.GENERAL NOTES