Loading...
ABCC P2 - Bldg 1 - 1-M1.1_1LAUNDRY 137 EF 5A CU 1 OAU 1 HP 5 DHP 1 HP 7 HP 6 HP 4 HP 3 HP 9 HP 2B HP 2A EF 2 EF 3A EF 1 EF 3B EF 4 EF 5B UH 1 UH 2 1-M3.1 11-M3.2 1 /11-M3.1/11-M3.2/11-M3.1/11-M3.2(EXISTING) (EXISTING) (EXISTING) (EXISTING) (EXISTING) (EXISTING) (EXISTING) (EXISTING) (EXISTING) (EXISTING) 1. CONSTRUCTION DOCUMENTS ARE BASED UPON A FIELD EXAMINATION OF THE SITE AND AVAILABLE EXISTING BUILDING PLANS, AND THEREFORE, MAY NOT INDICATE ALL EXISTING ITEMS AND SITE CONDITIONS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE WORK AREAS AND SCOPE OF WORK OF THE PROJECT PRIOR TO BID. ADDITIONALLY, PRIOR TO THE ORDERING OR PURCHASING OF ANY EQUIPMENT OR MATERIALS AND PRIOR TO THE INSTALLATION OF ANY NEW WORK, THE CONTRACTOR SHALL EXAMINE THE PREMISES OF WHERE THE WORK WILL BE DONE AND VERIFY IF EXISTING CONDITIONS WILL IN ANY MANNER AFFECT THE WORK UNDER THIS CONTRACT. ANY EXISTING CONDITIONS WHICH ARE APPARENT OR COULD BE REASONABLY INFERRED FROM A VISIT TO THE SITE SHALL NOT BE THE BASIS FOR A CHANGE IN THE CONTRACT AMOUNT. 2. VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, AND SYSTEM COMPONENTS PRIOR TO DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE OWNER/ARCHITECT PRIOR TO PROCEEDING WITH WORK. 3. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS NEEDED TO REMOVE EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. NOT REQUIRED FOR THE PROPER OPERATION OF THE NEW SYSTEMS OR EXISTING TO REMAIN SYSTEMS. REMOVAL WILL BE CONSISTENT WITH THE FINAL CONFIGURATION OF THE SYSTEMS INDICATED ON THE NEW WORK PLANS. ALL ITEMS THAT ARE DEMOLISHED OR DAMAGED SHALL BECOME THE PROPERTY OF THE CONTRACTOR UPON REMOVAL. THE MATERIALS SHALL BE REMOVED IMMEDIATELY FROM THE SITE AND SHALL NOT BE REUSED. DISPOSE OF ALL DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS. 4. PRIOR TO REMOVAL OF ANY MECHANICAL EQUIPMENT, ASSURE THAT ANY ASSOCIATED POWER, GAS, AND CONTROL WIRING HAS BEEN SAFELY DISCONNECTED. 5. PROTECT OPENINGS OF DUCTWORK, PIPING, CONDUIT, ETC. FROM ENTRANCE OF FOREIGN MATERIALS AT ALL TIMES DURING CONSTRUCTION. 6. UNLESS SPECIFICALLY NOTED TO BE REMOVED, EXISTING EQUIPMENT, DUCTWORK PIPING, ETC. IS TO REMAIN. EXISTING ITEMS TO REMAIN AND EXISTING BUILDING SURFACES SHALL BE ADEQUATELY PROTECTED FROM DEMOLITION AND NEW CONSTRUCTION WORK, AS NEEDED. ANY ITEMS DAMAGED SHALL BE ADEQUATELY CLEANED OR REPLACED TO THE OWNERS SATISFACTION TO ORIGINAL CONDITION BEFORE CONSTRUCTION. 7. PATCH ANY HOLES IN STRUCTURE CREATED BY REMOVAL OF DUCTWORK, PIPING, CONDUITS, ETC. ABANDONED ITEMS, ANCHORS, INSERTS, PIPE STUBS, AND OTHER SIMILAR PROJECTIONS NOT BEING CONCEALED BY NEW CONSTRUCTION SHALL BE REMOVED TO A MINIMUM OF 1ā€¯BELOW THE ADJACENT FINISHED SURFACE AND THE DISTURBED AREA PATCHED. 8. REINSULATE DUCTWORK OR PIPING WHERE EXISTING INSULATED DUCTWORK OR PIPING IS PATCHED, CAPPED, ETC. WITH NEW INSULATION MATERIALS THAT MATCH THE EXISTING INSULATION MATERIALS AND R-VALUES. 9. WHERE TEMPORARY SHUTDOWN OF SERVICES IS NEEDED FOR AREAS THAT WILL BE OCCUPIED DURING CONSTRUCTION, THE SHUTDOWN SHALL BE CLOSELY COORDINATED WITH OWNER. ARRANGE WORK TO ASSURE THAT ANY SHUTDOWN OF SERVICES TIME IS AS MINIMAL AS POSSIBLE. GENERAL NOTES DRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 As indicated 1-M1.1PHASE 2 -MAIN CLUBHOUSE OVERALLMECHANICAL DEMOLITION PLAN -LEVEL 12022-352 Author1/8" = 1'-0"1-M1.1 PHASE 2 - MAIN CLUBHOUSE OVERALL MECHANICAL DEMOLITION PLAN - LEVEL 11