Loading...
ABCC P2 - Bldg 1 - 1-M3.4_1AHU 6 AHU 9 AHU 4 AHU 3 AHU 5 AHU 7 AHU 2B AHU 2A 2 HVAC / MECHANICAL MEZZANINE 204 1 1 1 1 3 3 3 3 3 3 3 3 4EXISTING 15"x30" RAEXISTING 16"x16" SAEXISTING 12"x14" SA EXISTING 12"x14" SA5 6 5 5 6 6 4 4 4 4 44 4 2 5 5 EXISTING 18"x27" SA5 5 EXISTING 16"x10" RA 5 5 EXISTING 14"x14" SA EXISTING 14"x14" RA 5 5 3EXISTING 14"x12" RA EXISTING 18"x20" RA EXISTING 18"x20" RAEXISTING 16"x16" SAEXISTING 14"x14" RAEXISTING 9"ø SAEXISTING 10"ø SA EXISTING 12"x12" TA 6 6 5 5 TO EXISTING LOUVER (EXISTING) (EXISTING) (EXISTING) (EXISTING)(EXISTING) (EXISTING) (EXISTING) (EXISTING) EXISTING 14"x14" RA 1. CONSTRUCTION DOCUMENTS ARE BASED UPON A FIELD EXAMINATION OF THE SITE AND AVAILABLE EXISTING BUILDING PLANS, AND THEREFORE, MAY NOT INDICATE ALL EXISTING ITEMS AND SITE CONDITIONS. THE CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE WORK AREAS AND SCOPE OF WORK OF THE PROJECT PRIOR TO BID. ADDITIONALLY, PRIOR TO THE ORDERING OR PURCHASING OF ANY EQUIPMENT OR MATERIALS AND PRIOR TO THE INSTALLATION OF ANY NEW WORK, THE CONTRACTOR SHALL EXAMINE THE PREMISES OF WHERE THE WORK WILL BE DONE AND VERIFY IF EXISTING CONDITIONS WILL IN ANY MANNER AFFECT THE WORK UNDER THIS CONTRACT. ANY EXISTING CONDITIONS WHICH ARE APPARENT OR COULD BE REASONABLY INFERRED FROM A VISIT TO THE SITE SHALL NOT BE THE BASIS FOR A CHANGE IN THE CONTRACT AMOUNT. 2. VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, AND SYSTEM COMPONENTS PRIOR TO DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE OWNER/ARCHITECT PRIOR TO PROCEEDING WITH WORK. 3. CONTRACTOR TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS NEEDED TO REMOVE EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. NOT REQUIRED FOR THE PROPER OPERATION OF THE NEW SYSTEMS OR EXISTING TO REMAIN SYSTEMS. REMOVAL WILL BE CONSISTENT WITH THE FINAL CONFIGURATION OF THE SYSTEMS INDICATED ON THE NEW WORK PLANS. ALL ITEMS THAT ARE DEMOLISHED OR DAMAGED SHALL BECOME THE PROPERTY OF THE CONTRACTOR UPON REMOVAL. THE MATERIALS SHALL BE REMOVED IMMEDIATELY FROM THE SITE AND SHALL NOT BE REUSED. DISPOSE OF ALL DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, AND LOCAL REQUIREMENTS. 4. PRIOR TO REMOVAL OF ANY MECHANICAL EQUIPMENT, ASSURE THAT ANY ASSOCIATED POWER, GAS, AND CONTROL WIRING HAS BEEN SAFELY DISCONNECTED. 5. PROTECT OPENINGS OF DUCTWORK, PIPING, CONDUIT, ETC. FROM ENTRANCE OF FOREIGN MATERIALS AT ALL TIMES DURING CONSTRUCTION. 6. UNLESS SPECIFICALLY NOTED TO BE REMOVED, EXISTING EQUIPMENT, DUCTWORK PIPING, ETC. IS TO REMAIN. EXISTING ITEMS TO REMAIN AND EXISTING BUILDING SURFACES SHALL BE ADEQUATELY PROTECTED FROM DEMOLITION AND NEW CONSTRUCTION WORK, AS NEEDED. ANY ITEMS DAMAGED SHALL BE ADEQUATELY CLEANED OR REPLACED TO THE OWNERS SATISFACTION TO ORIGINAL CONDITION BEFORE CONSTRUCTION. 7. PATCH ANY HOLES IN STRUCTURE CREATED BY REMOVAL OF DUCTWORK, PIPING, CONDUITS, ETC. ABANDONED ITEMS, ANCHORS, INSERTS, PIPE STUBS, AND OTHER SIMILAR PROJECTIONS NOT BEING CONCEALED BY NEW CONSTRUCTION SHALL BE REMOVED TO A MINIMUM OF 1”BELOW THE ADJACENT FINISHED SURFACE AND THE DISTURBED AREA PATCHED. 8. REINSULATE DUCTWORK OR PIPING WHERE EXISTING INSULATED DUCTWORK OR PIPING IS PATCHED, CAPPED, ETC. WITH NEW INSULATION MATERIALS THAT MATCH THE EXISTING INSULATION MATERIALS AND R-VALUES. 9. WHERE TEMPORARY SHUTDOWN OF SERVICES IS NEEDED FOR AREAS THAT WILL BE OCCUPIED DURING CONSTRUCTION, THE SHUTDOWN SHALL BE CLOSELY COORDINATED WITH OWNER. ARRANGE WORK TO ASSURE THAT ANY SHUTDOWN OF SERVICES TIME IS AS MINIMAL AS POSSIBLE. GENERAL NOTES 1. REMOVE AND REPLACE A MINIMUM OF 20’-0" OF EXISTING SUPPLY AND RETURN DUCTWORK BEYOND THE MEZZANINE WALL. HAVE THE OWNER'S ENVIRONMENTAL CONSULTANT CONFIRM IF ANY FURTHER REMOVAL IS REQUIRED. CONTRACTOR TO FIELD VERIFY SIZES AND LOCATIONS OF THE EXISTING DUCTWORK AND REPLACE WITH THE SAME SIZE AS EXISTING. REFER TO DRAWING 1-M4.4 FOR NEW WORK. 2. REMOVE THE EXISTING OUTSIDE AIR DUCT CONNECT TO THE LOUVER IN DORMER. SEAL AIRTIGHT ON THE LOUVER OPENING AND PROVIDE INSULATION AS NEEDED TO MEET THE IECC REQUIREMENTS AND CORRECT ANY EXTERIOR FINISHES TO MATCH THE EXISTING ADJACENT SURFACE. 3. REMOVE EXISTING SUPPLY AND RETURN DUCTWORK WITHIN MECAHICAL MEZZANNE AREA AND REPLACE WITH NEW DUCTWORK. REFER TO DRAWING 1-M4.4 FOR NEW WORK. 4. EXISTING EQUIPMENT TO REMIAN. INTERIOR OF THE EQUIPMENT SHOULD BE THOROUGHLY CLEAN. MOLD GROWTH ON NON-POROUS SURFACES INSIDE THE EQUIPMENT MAY BE WIPED CLEAN WITH A MILD DETERGENT. INFESTED FAN BLADES AND COOLING COILS SHALL BE REMOVED FROM THE EQUIPMENT, TAKEN OUTSIDE, AND CLEANED. ONLY EPA APPROVED METHODS SHALL BE USED FOR CLEANING. 5. EXISTING DUCTWORK TO REMAIN. 6. EXISTING DIFFUSER AND GRILLE TO REMAIN. IT SHALL BE CAREFULLY REMOVED AND THOROUGHLY CLEAN. THE INSIDE OF THE BOOT AND THE ACCESSIBLE DUCT SHALL BE CLEANED WITH HEPA VACUUM AND WET WIPING. THE SEAMS AND JOINTS INSIDE THE BOOT SHALL BE SEALED. THE BOOT SHALL BE CAULKED/SEALED TO THE DRYWALL. KEYNOTES DRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 As indicated 1-M3.4PHASE 2 -MAIN CLUBHOUSE MECHANICALDEMOLITION PARTIAL PLAN -LEVEL 2 -HVAC/MECHANICAL MEZZANINE2022-352 Author 1/2" = 1'-0"1-M3.4 PHASE 2 - MAIN CLUBHOUSE DEMOLITION PARTIAL PLAN - LEVEL 2 - HVAC/MECHANICAL MEZZANINE1