Loading...
ABCC P2 - Bldg 1 - 1-M4.5_11. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO CONSTRUCTION. ANY CONFLICTS AND DISCREPANCIES SHALL NOTIFY THE ARCHITECT PRIOR TO THE CONSTRUCTION START. 2. DUCTWORK SHALL MOUNT AS HIGH AS POSSIBLE TO MAXIMIZE THE CEILING SPACE. 3. PROVIDE MANUFACTURER'S CLEARANCE AROUND ALL ABOVE CEILING MECHANICAL EQUIPMENT. 4. REFER TO ARCHITECTURAL DRAWINGS FOR CEILING TYPE. 5. PROVIDE REMOTE BALANCING DAMPERS FOR ANY NON-ACCESSIBLE DIFFUSERS. 6. PROVIDE CEILING ACCESS PANEL FOR ANY NON-ACCESSIBLE CEILING EQUIPMENT AND DAMPERS. 7. EXHAUST OUTLETS SHALL BE LOCATED MININUM 10'-0" HORIZONTALLY OR 3'-0" ABOVE ANY BUILDING OPENING AND INTAKE OPENING. 8. VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, AND SYSTEM COMPONENTS PRIOR TO DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL NOTIFY THE OWNER/ARCHITECT PRIOR TO PROCEEDING WITH WORK. 9. WHERE TEMPORARY SHUTDOWN OF SERVICES IS NEEDED FOR AREAS THAT WILL BE OCCUPIED DURING CONSTRUCTION, THE SHUTDOWN SHALL BE CLOSELY COORDINATED WITH OWNER. ARRANGE WORK TO ASSURE THAT ANY SHUTDOWN OF SERVICES TIME IS AS MINIMAL AS POSSIBLE. GENERAL NOTES XC1.2 XC1.3 XC1.4 XC1.5 E 05_MCH T.O.PL -DINING HALL 14' -0" 06_MCH T.O.PL -DORMERS 25' -9" 07_MCH T.O. RIDGE 30' -4 3/4" 03_MCH - T.O.PL. - LOUNGE / GABLES / KITCHEN / R.R. 12' -10 1/4" 04_MCH F.F. @ SECOND FLR 13' -10 1/4" E$E.0 AHU 2B AHU 2A 20"x18" RA 20"x18" RA14"x14" OA14"x14" OAEXISTING 18"ø SAEXISTING 18"ø SA EXISTING 18"ø SA EXISTING 18"ø SA (EXISTING)(EXISTING) EXISTING 20"x18" RA EXISTING 20"x18" RA XC1.4XC1.5 05_MCH T.O.PL -DINING HALL 14' -0" 06_MCH T.O.PL -DORMERS 25' -9" 07_MCH T.O. RIDGE 30' -4 3/4" 03_MCH - T.O.PL. - LOUNGE / GABLES / KITCHEN / R.R. 12' -10 1/4" 04_MCH F.F. @ SECOND FLR 13' -10 1/4" AHU 3 (EXISTING)8"x8" OAEXISTING 10"x16" RA 14"x12" SA 10"x16" RA EXISTING 14"x12" SA XC1.4 XC1.5 05_MCH T.O.PL -DINING HALL 14' -0" 06_MCH T.O.PL -DORMERS 25' -9" 07_MCH T.O. RIDGE 30' -4 3/4" 03_MCH - T.O.PL. - LOUNGE / GABLES / KITCHEN / R.R. 12' -10 1/4" 04_MCH F.F. @ SECOND FLR 13' -10 1/4" AHU 4 (EXISTING) 14"x14" RA EXISTING 14"x14" RA 14"x14" SA 8"x8" OA EXISTING 14"x14" SA XC1.2XC1.3 E 05_MCH T.O.PL -DINING HALL 14' -0" 06_MCH T.O.PL -DORMERS 25' -9" 07_MCH T.O. RIDGE 30' -4 3/4" 03_MCH - T.O.PL. - LOUNGE / GABLES / KITCHEN / R.R. 12' -10 1/4" 04_MCH F.F. @ SECOND FLR 13' -10 1/4" E$E.0 AHU 5 (EXISTING)14"x14" OA27"x18" SA EXISTING 27"x18" SA 30"x15" RA EXISTING 30"x15" RA EXISTING 16"x16" SUPPLY DUCT TO AHU-7 XC1.2XC1.3XC1.4XC1.5 E 05_MCH T.O.PL -DINING HALL 14' -0" 06_MCH T.O.PL -DORMERS 25' -9" 07_MCH T.O. RIDGE 30' -4 3/4" 03_MCH - T.O.PL. - LOUNGE / GABLES / KITCHEN / R.R. 12' -10 1/4" 04_MCH F.F. @ SECOND FLR 13' -10 1/4" E$E.0 AHU 9 (EXISTING)VRF SYSTEM CONTROLLER BAS NETWORK CONTROLLER AHU 6 (EXISTING) 22"x14" OA 12"x14" SA 16"x16" SA 10"x10" OA14"x14" RA EXISTING 15"x30" RETURN DUCT TO AHU-5 EXISTING 14"x14" SUPPLY DUCT TO AHU-7 8"x8" OA 12"x14" RA XC1.2XC1.3 E 05_MCH T.O.PL -DINING HALL 14' -0" 06_MCH T.O.PL -DORMERS 25' -9" 07_MCH T.O. RIDGE 30' -4 3/4" 03_MCH - T.O.PL. - LOUNGE / GABLES / KITCHEN / R.R. 12' -10 1/4" 04_MCH F.F. @ SECOND FLR 13' -10 1/4" E$E.0 AHU 7 (EXISTING)EXISTING 16"x16" SAEXISTING 14"x14" RA EXISTING 14"x14" RA 8"x8" OA16"x16" SA 18"x22" OA DRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 As indicated 1-M4.5PHASE 2 -MAIN CLUBHOUSE MECHANICALMEZZAMINE SECTIONS2022-352 Author 1/2" = 1'-0"1-M4.5 AHU-2A AND AHU-2B1 1/2" = 1'-0"1-M4.5 AHU-32 1/2" = 1'-0"1-M4.5 AHU-43 1/2" = 1'-0"1-M4.5 AHU-54 1/2" = 1'-0"1-M4.5 AHU-6 AND AHU-95 1/2" = 1'-0"1-M4.5 AHU-76