Loading...
2057 VELA NORTE CIR RES23-0244 COAB Permit Form with ConditionsFinal Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: _____________________________________________________ Permit Type ____________________________________________________ Permit No. __________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION PLIDEK SYSTEM ON BALCONY RES23-0244 2057 VELA NORTE CIR GRASTON ROOFING OWNER:ADDRESS:CITY:STATE:ZIP: GRIDER LIVING TRUST 2057 VELA NORTE CIR ATLANTIC BEACH FL 32233-4533 COMPANY:ADDRESS:CITY:STATE:ZIP: GRASTON ROOFING CO INC 2680 FOX HUNT TR JACKSONVILLE FL 32259 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 169506 1094 SELVA NORTE UNIT 01 JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 2057 VELA NORTE CIR RESIDENTIAL ALTERATION RESIDENTIAL PLIDEK SYSTEM ON BALCONY $5473.00 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT BUILDING PERMIT 455-0000-322-1000 0 $80.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $40.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL: $124.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 11/20/2023 PERMIT NUMBER RES23-0244 ISSUED: 11/20/2023 EXPIRES: 5/18/2024 RESIDENTIAL PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 DESCRIPTION ACCOUNT QTY PAID PermitTRAK $124.00 RES23-0244 Address: 2057 VELA NORTE CIR APN: 169506 1094 $124.00 BUILDING $80.00 BUILDING PERMIT 455-0000-322-1000 0 $80.00 BUILDING PLAN REVIEW $40.00 BUILDING PLAN CHECK 455-0000-322-1001 0 $40.00 STATE SURCHARGES $4.00 STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00 STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00 TOTAL FEES PAID BY RECEIPT: R25562 $124.00 Printed: Monday, November 20, 2023 11:48 AM Date Paid: Monday, November 20, 2023 Paid By: GRASTON ROOFING CO INC Pay Method: CREDIT CARD 10117066492 1 of 1 Cashier: TG Cash Register Receipt City of Atlantic Beach Receipt Number R25562 ti BUILDING PERMIT APPLICATION FOR INTERNAL OFFICE USE ONLY 1 City of Atlantic Beach Building Departmentr;:. PERMIT# ES Z 3 Oz-v--t-r.,.. 800 Seminole Road,Atlantic Beach, FL 32233xALL information required to process Phone: (904) 247-5826 Email: Buiiding-Dept(a coab.us Job Address 2057 VELA NORTE OR ATLANTIC BEACH RE# 169506-1094 Legal Description 39-94 08-2S-29E SELVA NORTE UNIT ONE LOT 47 Valuation of Work(Replacement Cost) 5473.70 Heated/Cooled SF Non-Heated/Cooled SF Class of Work: New Addition ®Alteration Repair Move Demo E Pool Window/Door Use of existing/proposed structure(s): Commercial ®Residential •If existing structure,is a fire sprinkler system installed?:Yes No Will tree(s)be removed in association with proposed project? Yes (Must submit separate Tree Removal Permit) No Describe In detail the type of work to be performed: Install 180 sf Plidek underlayment system on balcony I Florida Product Approval# FL 15027.2 For multiple products use Product Approval Information Sheet) Property Owner Information Name Gary Grider Phone 904 463-4606 Address 2057 VELA NORTE CIR City ATLANTIC BEACH State FL Zip 32233 Email griderconstructioninc@yahc Owner or Agent(If Agent,Power of Attorney or Agency Letter Required) Contractor Information Name of Company GRASTON ROOFING COMPANY INC Phone (904)707-3660 Address 2680 FOXHUNT TRAIL City SAINT JOHNS State FL Zip 32259 Qualifying Agent DANIEL R GRASTON State Certification/Registration# CCC058221 Email d67graston@gmail.com Job Site Contact Number 904 710-2912 Worker's Compensation Insurer FRSA-SIF OR Exempt Expiration Date 1/1/24 Architect's Name Email Phone Engineer's Name Email Phone Application is hereby made to obtain a permit to do the work and installations as indicated.I certify that no work or installation has commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS, WELLS,POOLS,FURNACES,BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc. NOTICE:In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in the public records of this city/county,and there may be additional permits required from other governmental entities such as water management districts,state agencies,or federal agencies. OWNER'S AFFIDAVIT:I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable laws regulating construction and zoning. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOU PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE SITE OF THE IMPROVEMENT BEFORE THE FIRST INSPECTION. IF YO INTEND TO OBTAIN FINANCING, C NISJI..T WITH YOUR LENDER OR AN ATTO EYJ/ BEFORE RECORDING YOUR N ICE O COM EME y P Signature of Owner or Agent) S nature of Contractor) Signed and s///worn to(or affirmed)before me this q tt-' day of Signed and sworn to(or affirmed)before me this (+ 1 day of 60OVbyc_-)01r;,;(1,-ee 00VD-01 , d by .00.1)ik1 (7)I'C fliu'J Signature of Notary GJ, c_-)01Jr^-4'\ Signature of Not.-..triapie"ss n : ----',-- -1 I Personally Known OR 'IC.]Produced Identification Personal OR (Produced Identification Type of Identification: CI 0 L, Type of Identification: - f ' , AMY GORMAN Y' BRITTANY GREEN Notary Public-State of Florida i i = Notary Public,State of Florida I ;:4: Commission#HH 376632 ia Commission#HH 273537 f OF ` My Comm.Expires Nov 1,2026Mycomm.expires June 8,2026 JOB COPY NOTICE OF COMMENCEMENT State of FLORIDA Tax Folio No. 1695064094 County of DUVAL To Whom It May Concern: The undersigned hereby informs you that improvements will be made to certain real property,and in accordance with Section 713 of the Florida Statutes,the following information is stated in this NOTICE OF COMMENCEMENT. Legal Description of property being improved: 39-94 08016 SELVA NORTE UNIT ONE LOT 47 o/2z5)-/ Address of property being improved: 2057 VELA NORTE CIR ATLANTIC BEACH General description of improvements: BALCONY WATERPROOFING Owner: GARY GRIDER Address: 2057 VELA NORTE CIR ATLANTIC BEACH Owner's interest in site of the improvement: Fee Simple Titleholder(if other than owner): Name: Contractor: GRASTON ROOFING COMPANY INC Address: 2680 FOXHUNT TRAIL SAINT JOHNS FL 32259 Telephone No.: 707-3660 Fax No: Surety(if any) Address: Amount of Bond$ Telephone No:Fax No: Name and address of any person making a loan for the construction of the improvements Name: Address: Phone No: Fax No: Name of person within the State of Florida,other than himself,designated by owner upon whom notices or other documents may be served:Name: Address: Telephone No:Fax No: In addition to himself, owner designates the following person to receive a copy of the Lienor's Notice as provided in Section 713.06(2)(b),Florida Statues. (Fill in at Owner's option) Name: Address: Telephone No:Fax No: Expiration date of Notice of Commencement(the expiration date is one(1)year from the date of recording unless a different date Is specified): ark_ ill. Iryi THIS SPACE FOR RECORDER'S USE ONLY OWNER A Signed: i, .f,/ Date: Doc#2023233164,OR BK 20867 Page 881, Before me this "1,. day of /Vo in the County of Duval,Stati2 3 Number Pages.1 o Of Florida,has per onally appeared C Gr CI 3Recorded11/09/2023 10:39 AM, 1 r 13.Notary Public at Large,State of Florida,County Duval.y = EJODYPHILLIPSCLERKCIRCUITCOURTDUVALx0, g_< COUNTY My commission expires: '-v v sz_ r' c>aty O RECORDING $10.00 Personally Known: o q 4* O Produced Id ntificatlon: FL OL m c m zC2u--el en V JOB COPY APPLICATION INSTRUCTIONS PLI-DEK SYSTEM WATERPROOF DECK COATING-PLYWOOD SUBSTRATE MATERIALS 3. Maximum deflection of the deck shall be less than 1. 2.5 lbs/sq yd G60 Hot Dipped Galvanized Metal Lath L/360th of the span. 2. Corrosion-resistant staples 4. All inspections, as required by local building 3. Pli-Dek Seam Paper authorities, shall be the responsibility of the 4. GU80 1 Base Coat Powder(gray) contractor, owner, and/or their agent. 5. GU80 1 Top Coat Powder 5. For application instructions in Inclement Weather 6. GU80 1 Custom Top Coat areas, refer to Waterproof Deck Coating-Pli-Dek 7. GU80 1 Liquid Admixture System Application Instructions PD-120-IW. 8. GS88-1 Pigmented Sealer 9. '/,oz. Fiberglass Mat B. Plywood 10. PD Resin 1. Plywood shall be a minimum of 16mm, 5/8" (3/4" 11. PD Flash Coat and Flash Coat Seam Tape or self- recommended) sound and dry, exposure 1 adhering drywall mesh tape(optional) sheathing, and have a maximum span between 12. GS13(Clear or Pigmented)or PD Clear Sealer supports of 410mm (16") on center. All plywood 13. 40 grit non-skid sand (optional) shall be securely fastened to the supports with screws or ring shank nails spaced in accordance TOOLS with APA guidelines and Building Code requirements. 1. Variable Speed Drill(capable of producing 1000 2. Framing or blocking must support all plywoodRPM's) edges, except as per APA guidelines; blocking is2. Wind-lock B-M1 mixing blade or equivalent not required when tongue and groove plywood is 3. Extension Cord used. 4. Clean 5 Gallon Plastic Containers 3. The plywood surface shall be clean, dry, and free5. Measuring Bucket(1 gal,2 gal,etc.) of dirt, dust, oil, paint, or any other contaminants6. Hand Grinding Stone that may impair adhesion. 7. Level 4. All plywood seams shall be staggered, and 8. Pencil gapped 3.2mm (1/8"). All seams shall be covered 9. Utility Knife with a maximum of 50mm(2")wide flashing paper 10. Scissors tacked in place. NOTE: If plywood is butted tightly, 11. Masking Tape the seams shall be saw cut to provide a 3.2mm 12. 4"x 22"Pool Trowel 1/8") gap between sheets, except tongue & 13. Stainless Steel Trowel groove. Ensure that the tongue and groove section 14. Margin Trowel of the plywood is installed so as to allow for 15. Small Paint Brushes expansion. 16. Paint Roller(3/4"nap) 5. All adjacent edges of the plywood sheets shall not 17. Extension Handle be more than 0.78mm (1/32") out of plane (i.e. 18. Hopper Gun above or below each other). 19. Compressor(1-1/2 horsepower,electric or better) 6. Plywood should be installed with a 6.4mm/.3m 20. Air Hose 1/4") per linear foot slope. Decks with parapet 21. Semi-stiff Broom enclosures must be sloped to a drain or scupper. 22. Dust Mask 7. Any variation from the framing specifications 23. Goggles mentioned in Section I, requires written approval 24. Rubber or Cloth Gloves and system recommendations from Pli-Dek 25. Metal Spiked Golf Shoes Systems, Inc. 26. Tin Snips 27. Hammer C. Flashing 28. Pneumatic Staple Gun The following items that involve flashing must be 29. Hudson or Chapin Sprayer completed or adhered to: 30. Paperless drywall joint tape 1. Flashing shall be minimum 26 gauge galvanized, bonderized sheet metal. (contact Pli-Dek for I. Substrate Inspection/ Preparation Alternatives). A. General 2. Insure ALL metal flashing is wiped clean with a solvent to insure oils are completely removed1. Pli-Dek materials must be applied over sound dry from the Surface. Dissimilar metals; such as exterior grade plywood decks.Copper and galvanized, should NEVER come in Contact Pli-Dek Systems, Inc. for installation direct contact with each other. approvals over OSB substrates.3. Openings shall be flashed before installation of 2. All plywood substrates are recommended to be doors and sliders. NOTE: If doors or sliders have sloped '/4"per foot. been installed without proper flashing, we PLIDEK Waterproof Deck Coating- Pli-Dek System Application Instructions PD- 120 www.plidek.com Rev. 06.22.2016 Page 1 of 6 JOB COPY recommend they be removed and proper flashing 1. It's the General Contractor's,his representative's, installed. or individual owner's responsibility to assure 4. All penetrations, including posts, or other objects adequate drainage. that protrude through the deck shall be installed 2. All plywood substrates are recommended to be and flashed prior to applying the Pli-Dek sloped of 1/4"per foot. materials. 3. If auxiliary slope is required, PD Slope Mix- DP 5. All decks with a parapet surround require a may be applied. (See Sloping Application scupper not less than 76mm (3") wide, and Instructions SM-120 for complete details and 100mm (4") high, spaced a maximum of 3.65m limitations). When this type of sloping will not 12') apart. Any scuppers or overflows shall be accommodate the problem, then drains become installed and flashed prior to applying Pli-Dek a necessity. materials. 4. Pli-Dek requires a galvanized or stainless steel 6. All deck drains must be flanged, and properly drain as per Drain Detail, PD-24, on all plywood installed to a proper depth. NOTE: Brass drains installations. Please contact Pli-Dek for help in with a sheet metal flange are recommended. Pli- acquiring these drains. Do not use plastic, cast Dek requires a galvanized or stainless steel drain iron, or shower drains. If copper drains are used, as per Drain Detail, PD-24, on all plywood please contact Pli-Dek for instructions on installations. Please contact Pli-Dek for help in dissimilar metals. acquiring these drains. Do not use plastic, cast 5. The alternatives available for proper drainage are iron, or shower drains. If copper drains are used, the responsibility of the General Contractor. please contact Pli-Dek for instructions on Contact Pli-Dek Systems, Inc. for complete dissimilar metals. The use of plastic deck drains details. will void warranty. 6. Additional sloping required on a project should be 7. Gravel stops shall have a maximum ground confirmed through a written proposal given by the dimension of 3/16". trained applicator prior to the commencement of 8. All flashing must be attached to the substrate with work. galvanized ring shank nails a minimum 25mm(1") length.II. Mixing Instructions9. All flashing shall overlap adjacent pieces, a A. Base Coat minimum of 100mm (4"), installed not to "buck" 1. Pour 3.8L(1 gallon)of GU80-1 Liquid Admixture water, and be caulked horizontally and vertically into a clean 19L(5 gallon)plastic container. with a Polyurethane Sealant per ASTM C 920, 2 Add one 21kg (461b.) bag of GU80-1 Base CoatsuchasSika-1a or 221 or equivalent, at the furthermost edge with a 4" bead of sealant a Wind- lockray), and mix thoroughly for 3 blade, o 4 or minutes. uivent, a B-M1 mixing equivalent, between any pieces of flashing that powered by a 13mm (1/2") variable speed drill,adjoin. (Surface caulking is NOT acceptable). capable of producing 1000 RPMs. TIP: In areas10. Next apply continuous sealant 1" in both subject to extremely dry and/or hot climates, itdirectionsfromtheseam (vertical and horizontal) may be necessary to add water(up to.47L[1 pint] and embed 1 7/8" paperless drywall joint tape per mix). To avoid flash drying, it may bewithaputtyknifetotheentireseamtoensurethenecessarytochilltheGU80-1 Liquid Admixturepaperlessdrywalljointtapeiscompletelybeforemixing. A proper safety ventilation mask embedded in sealant.should be worn when working with all Pli-Dek11. All vertical flashing and door pans shall be coated products with Fiberglass and PD or PD Flash Coat and Flash Coat Seam Tape or self-adhering drywall mesh tape, GU80 Top Coat, and GS88 B. Screed Coat&Knockdown Texture Pigmented Sealer at the time of applying each 1. Pour 4.75L (1.25 gallons) of GU80-1 Liquid product. Admixture into a clean 19L (5 gallon) plastic 12. Deck/Wall interfaces and all stairs must be container. flashed. 2. Add one 21kg (461bs.) bag of GU80-1 Top Coat13. When copper flashing/drains are used, ensure powder. Mix thoroughly for 3 to 4 minutes,with athatallgalvanizedmetal; such as, nails, staples, Wind-lock B-M1 mixing blade, or equivalent,lath, drains, etc. does not come into contact with powered by a 13mm (1/2 inch) variable speed copper (do not allow any dissimilar metals to drill, capable of producing 1000 RPMs. TIP: In come in contact with each other). The contact of areas subject to extremely dry, and/or hotthetwodissimilarmetalswillcreaterustandclimates, it may be necessary to add water(up to corrosion (electrolysis). **Contact Pli-Dek 47L[1 pint]per mix).In order to avoid flash dryingSystems, Inc. for additional details and it may be necessary to chill the GU80-1 Liquid recommendations. Admixture before mixing. Proper ventilation 14. Contact Pli-Dek Systems, Inc for written approval masks should be worn at all times when workingonflashingdetailsthatvaryorarenotincludedinwithallPli-Dek Products. Pli-Dek products must Pli-Dek Details. be stored in the shade to prevent overheating and reduction of pot life. D.Sloping 3. If colored cement is required, a Pli-Dek recommended tint pack may be added to the mix PLI4 DEK Waterproof Deck Coating— Pli-Dek System Application Instructions PD- 120 www.plidek.com Rev. 06.22.2016 Page 2 of 6 JOB COPY to achieve the desired color. Note:ensure that all 1. Mix the GU80-1 Base Coat as described in of the colorant is dispersed out of the container. Section II—A. All mixes must be consistent(use the same mix 2. Pour the GU80-1 Base Coat over the metal lath ratios)to maintain color consistency.and trowel, filling all voids at a rate of 25 - 30 square feet per mix. The metal lath must be C. Custom Top Coat completely covered in the Base Coat. 1. ` our 4.75L (1.25 gallons) of GU80-/Liquid 3. Allow the GU80-1 Base Coat to dry for a minimum A mixture into a clean 19L (5 gall) plastic of 6 hours prior to applying the next application. If co iner. the base coat does not cover the lath completely, 2. Add ne 21kg (461bs.) bag of GU80-1 Custom a screed coat is required. Top at powder. Mix thoroughly for 3 to 4 minutes,with a Wind-lock B-Mi mixing blade, or D.Screed Coat Application equivalent; powered by a 13mm (1/2") variable 1. Screed coat may not be necessary in all speed drill, capable of producing 1000 RPMs. applications. Contact Pli-Dek Systems, Inc. for TIP: In areas stibject to : tremely dry, and/or hot application details and recommendations. i\ climates, it may .- ne -ssary to add water(up to 2. Prior to the screed coat application, remove any 47L[1 pint]per mi order to avoid flash drying high or rough edges using a hand grinding stone it may be necess- o chill the GU80-1 Liquid or scraper. Admixture, befo - mi 'ng. Proper ventilation 3. The deck must be free of all surface masks should be worn a all time when working contaminants, such as dust, dirt, etc., which will with all Pli-Dk Products. Poi-Dek products must impair the adhesion of the Ph-Dek GU80 1 Top be stored i he shade to prevent overheating and Coat. reductio f pot life. 4. Mix the GU80-1 Top Coat as described in Section 3. If color GU80-1 Custom Top Coat is required, II—B. a Pli-Dek recommended tint pack relay be added 5. Trowel a screed coat over the base coat at a rate to the mix to achieve the desired dolor. Note: of 150 square feet per mix. Allow to dry for a ffisure that all colorant is dispersed out of the minimum of 2-6 hours. container. E. Pli-Dek—"F"Fiberglass&Resin t, All mixes must be consistent(use the same mix **This application becomes required when job ratios)to maintain color consistency. conditions may experience excessive movement. Examples: cantilevered decks, large III. BASE & SCREED COAT spanning decks, etc. Contact Pli-Dek Systems, Inc. A.General for written recommendations. Some geographic 1. Ensure that the exterior plywood surface has locations may require the Fiberglass and Resin been prepared in accordance with Section I. ing in A app ica ions.Contact Pli-Dek Systems, 2. Ensure that all proper flashing is in place. Inc.for written verification. 3. Air temperature for application of the Base Coat 1. Air temperature for application of the PD Resin must be between 10°C (50°F) and 43°C (110°F) and Fiberglass Coat must be between 10°C and must remain so fora minimum of 2-6 hours. 50°F) and 43°C (110°F) and must remain so in Ensure humidity levels are low. Do not apply over the acceptable range until the product has cured. moisture. 2. Mix the PD Resin using a mechanical mixer at slow speed for approximately 1 minute. B. Plywood Deck Preparation 3. The deck must be free of all surface 1. Lay out 2.5 lbs/sq yd G60 Hot Dipped Galvanized contaminants, such as dust, dirt, etc., which will Metal Lath in a staggered pattern over the entire impair the adhesion of the PD Resin. plywood surface overlapping the metal flashing, 4. Lay out the'A oz.fiberglass mat over entire deck to the edge of the deck surface. surface extending to all edges of the deck. 2. Overlap all edges of metal lath, a minimum of Overlap mat seams a minimum of 1/4" to a 13mm(3/4"). maximum of 1/2". 3. Offset metal lath edges a minimum of 150mm(6") 5. Apply the PD Resin over fiberglass mat, at a rate from plywood seams. (See DECK PLAN in the of approximately 40 - 50 square feet per gallon Pli-Dek Detail Appendix.) with a trowel. Allow to completely dry, usually 6 - 4. Secure metal lath to plywood with a minimum 8 hours depending on temperature. PD Resin 22mm (7/8") crown by a minimum 16mm (5/8") must completely penetrate through the fiberglass long corrosion resistant staples spaced mat. approximately 11/2" on center around the 6. After the PD Resin has cured, remove any loose perimeter and on overlapped lath seams, and areas, where fiberglass was not bonded, and 75mm (3") in the field (approximately 12 staples reapply PD Resin and Fiberglass as needed per square foot). before application of Finish Coat. 5. Additional staples spaced every 1'/2" on center are required where the metal lath overlaps the IV. Finish Options seam paper, as installed in Section I. A. Preparation: C. Base Coat Application PLI DEK Waterproof Deck Coating— Pli-Dek System Application Instructions PD- 120 www.plidek.com Rev. 06.22.2016 Page 3 of 6 JOB COPY 1. Prior to any finish coat installation, the following b. Continuously mix the sealer through the must be completed: application process so the no skid sand a. Grind any rough areas, being careful not to does not settle to the bottom of the pail. damage Fiberglass and PD Resin coat. Rough areas will affect the aesthetic C. Elas c Sand Finish appearance of the finished product. 1. . it tempe re for application of the Sand Finish b. The deck must be free of all surface must be between 10°C (50°F)and 43°C (110°F) contaminants, such as dust, dirt, etc. which and must remain so for a minimum of 8 hours. Do will impair the adhesion of the Finish Coats. not apply over any moisture. 2. Apply a bead of manufacturer's recommended B. own Texture Finish elastomeric joint sealant at all wall-to-deck 1. Air to rature for application of the Knockdown junctions,wood posts,wrought iron posts,etc. Texture Coat must be between 10°C (50°F) and 3. Before application, mix PD Resin using a 43°C (110°F)and must remain so fora minimum mechanical mixer at slow speeds;mix thoroughly of 8 hours. until a homogenous mixture and color is obtained. 2. Mix the GU80-1 Top Coat as described in Section Use care not to allow the entrapment of air into II-A. the mixture. 3. Using a hopper gun, spray the Knockdown 4. Apply PD Resin over the entire deck surface and Coating over the entire deck surface at a rate of flashing using a 3/4" nap roller and a brush at a 150 square feet per mix. CAUTION: AS WITH rate of 75 square feet per gallon. Do not allow PD ANY SPRAY MATERIAL, BE CERTAIN TO Resin to puddle. PROTECT ALL SURROUNDING AREAS 5. Broadcast aggregates of washed, dry, rounded, FROM OVER-SPRAY. crystal silica sand, approximately 16 mesh at a 4. When the material begins to dry, knock down the rate of 100 lbs.per 100 square feet or until refusal material with a trowel. TIP: In order to eliminate depending on skid resistance requirements) into footprints, we suggest wearing metal spiked the wet/uncured PD Resin. shoes(golf shoes)during this process.6. Allow a minimum of 8 hours before removing all 5. Allow the Knockdown to dry a minimum of 2 -6 excess silica sand. hours, depending on weather. 5. Air temperature for application of the GS88-1 6. Remove any sharp edges by scraping the Sealer must be between 13°C (55°F) and 43°C surface with a scraper or trowel. 110°F)and must be allowed to dry for a minimum 7. Apply a bead of Pli-Dek's recommended of 8 hours. Ensure humidity levels elastomeric joint sealant at all wall-to-deck 7. The deck must be free of all surface junctions,wood posts,wrought iron posts, etc. contaminants, such as dust, dirt, etc., which will 8. Air temperature for application of the GS88-1 impair adhesion of the GS88-1 Sealer. Sealer must be between 13°C (55°F) and 43°C 8. Mix the GS88-1 Sealer thoroughly by boxing, 110°F) and must remain so for a minimum of 8 stirring, or by using a mechanical mixer. Box and hours. Ensure humidity levels are low. Do not mix all containers to ensure consistent coloring apply over moisture. throughout. 9. The deck must be free of all surface 9. Apply the GS88-1 Sealer over the dry PD Resin contaminants, such as dust, dirt, etc., which will and Sand Coat, using a 19mm (3/4") nap paint impair adhesion of the GS88-1 Sealer. roller, suitable for latex type coatings (2 coats 10. Mix the GS88-1 Sealer thoroughly with the use of may be necessary.) mechanical mixers. All containers should be 10. To make cleaning easier in high traffic areas, a boxed and mixed to ensure consistent coloring coat of GS13 or PD Clear Sealer may be applied throughout. over the dry GS88-1 Pigmented Sealer at a rate 11. Apply the GS88-1 Sealer over the dry Knockdown of 200 square feet per gallon. Surface will application at a rate of 100 square feet per gallon become more slippery. Use of a non-skid agent is using a 19mm (3/ 4") paint roller nap, suitable for recommended. latex type coatings. Two Coats may be a. Surface will become more slippery. Add necessary.40 grit nonskid sand(approximately 5 oz 12. Allow GS88-1 Sealer coat to dry for a minimum of per gallon)to the GS13 or PD Clear 6 hours. Sealer. 13. To make cleaning easier in high traffic areas, a b. Continuously mix the sealer through the coat of GS13 or PD Clear Sealer may be applied application process so the no skid sand over the dry GS88-1 Pigmented Sealer at a rate does not settle to the bottom of the pail. of 200 square feet per gallon. Surface will become more slippery. Use of a non-skid agent is D. Pli-Dek — "U": Underlayment for Tile or Con_cretg C<i recommended. it ish a. Surface will become more slippery. Add Note: The vertical leg of all flashings should be coated 40 grit nonskid sand(approximately 5 oz with Fiberglass and PD Resin or PD Flash Coat and per gallon)to the GS13 or PD Clear Flash Coat Seam Tape or self-adhering drywall mesh Sealer. tape. 1. Air temperature for application of the Con-Dek U" must be between 10°C (50°F) and 43°C PLI4 DEIC Waterproof Deck Coating— Pli-Dek System Application Instructions PD- 120 www.plidek.com Rev. 06.22.2016 Page 4 of 6 JOB COPY 110°F), and must remain so for a minimum of 8 over the dry GS88-1 Pigmented Sealer at a rate hours. Do not apply over any moisture. of 200 square feet per gallon. (Surface will 2. Apply a bead of Pli-Dek's recommended become more slippery. Use of a non-skid agent elastomeric joint sealant at all wall-to-deck is recommended. junctions.wood posts,wrought iron posts,etc. a. Surface will become more slippery. Add 3. The vertical leg of all flashings should be coated 40 grit nonskid sand(approximately 5 oz with Fiberglass and PD Resin or PD Flash Coat per gallon)to the GS13 or PD Clear and Flash Coat Seam Tape or self-adhering Sealer. drywall mesh tape. b. Continuously mix the sealer through the 4. PD Resin should not be exposed to construction application process so the no skid sand traffic. does not settle to the bottom of the pail. 5. Mix the Pli-Dek GU80-1 Top Coat as described in II-A. F. Epoxy Stone Finish 6. Apply a screed coat of GU80-1 Top Coat over the °Contact Pli-Dek Syst s, Inc.for written instructions. entire deck at a rate of 150 square feet per mix. Allow to dry for a minimum of 2-6 hours. Mix the G.Custom Fini • Simulated Tile,Brick,and Stone GU80-1 Top Coat as described in Section II—B. 1. Air t per re for application of the Custom 7. Allow a minimum of 8 hours prior to installing any Finish must be-JZetween 10°C (50°F) and 43°C finished product over the PD Resin and sand 110°F) and must remain so for a minimum of 8 surface or screed coat. hours. 8. *Optional: Broadcast aggregates of washed, dry, 2. Mix the GU80-1 Custom Top Coat as described rounded crystal silica sand, approximately 16 in Section II - B.Add the selected color tint pack mesh, at a rate of 100lbs. per 200 square feet. to establish the desired grout color. Note: All mixes must be consistent (use the same mix E. Potyacrylic Sm Finish ratios)to maintain color consistency. 1. A m rature for application of the Polyacrylic 3. The deck must be free of all surface smoo i fa sh must be between 10°C (50°F) and contaminants, such as dust, dirt, etc. which will 4 (110°F)and must remain so for a minimum impair adhesion of the GU80 1 Custom Top f 8 hours. It may be necessary to grind the rough Coat. ridges of the Base Clot to minimize chatter lines. 4. Trowel a tinted GU80-1 Top Coat over the entire 2 Mix the GU80-1 Top Coat as described in Section deck surface at a rate of 150 square feet per mix. II—B. Allow to dry for a minimum of 2 — 6 hours. 3. Trowel a screed coat over the entire deck surface Decorative scroll lines can be achieved at this at a rate of 150 square feet per mix.Allow it to dry step prior to screed coat drying, as long as no for a minimum of 6 hours. templates or tape are going to be used.) 4. It may be necessary to apply an additional coat of 5. Install one of the various types of stencil patterns GU80-1 Custom Top Coat to create a smoother or install tape pattern over cured screed coat to finish. Coverage rate should be approximately achieve desired pattern finish. 200 square feet per mix. **Please note: Surface 6. Mix the GU80-1 Custom Top Coat as described will not be perfectly smooth and will have some in Section II—B. imperfections/variations.7. Trowel a tinted screed coat over the stenciled or 5. Apply a bead of Pli-Dek recommended taped deck surface at a rate of 150 square feet elastomeric joint sealant to all wall-to-deck per mix.Allow to dry for a minimum of 2-6 hours. junctions,wood posts,wrought iron posts,etc. 8. Apply desired stain/shading using a low pressure 6. Air temperature for application of the GS88-1 sprayer, soft broom, or sponge. Contact Pli-Dek Sealer must be between 13°C (55°F) and 43°C Systems, Inc. for complete details. 110°F)and must remain dry for a minimum of 8 9. Remove stencil or tape pattern. hours. Ensure humidity levels are low. Do not 10. The deck must be free of all surface apply over moisture. contaminants, such as dust, dirt, etc., which will 7. Prior to color coat application,remove any high or impair adhesion of the GS13 of PD Clear Sealer. rough edges using a hand grinding stone or 11. Apply a coat of GS13 of PD Clear Sealer or GS13 scraper. Clear Sealer at a rate of 200 square feet per 8. The deck must be free of all surface gallon. (2 coats may be necessary). contaminants, such as dust, dirt, etc., which will a. Surface will become more slippery. Add impair adhesion of the GS88-1 Sealer. 40 grit nonskid sand(approximately 5 oz. 9. Mix the GS88-1 Sealer thoroughly by mixing with per gallon)to the GS13 or PD Clear the use of a mechanical mixer. Box mix all Sealer. containers to ensure consistent coloring b. Continuously mix the sealer through the throughout.application process so the no skid sand 10. Apply the GS88-1 Sealer using a 19mm (3/4")does not settle to the bottom of the pail. nap paint roller, suitable for latex type coatings, at a rate of 100 square feet per gallon (2 coats may be necessary). 11. To make cleaning easier in high traffic areas, a coat of GS13 or PD Clear Sealer may be applied PLIDEK Waterproof Deck Coating—Pli-Dek System Application Instructions PD- 120 www.plidek.com Rev. 06.22.2016 Page 5 of 6 JOB COPY V. Slip and Fall Precautions OSHA, American Disabilities Act (ADA), and The Federal Housing Act(FHA)have now set enforceable standards for slip-resistance on pedestrian surfaces. Pli-Dek Systems, Inc. recommends the use of angular slip-resistant aggregate in all coatings or flooring systems that may be exposed to wet, oily/greasy, or otherwise potentially slippery conditions. It is the end users responsibility to provide a flooring system that meets current safety standards. Pli-Dek Systems, Inc or its sales agents will not be responsible for injury incurred in a slip and fall accident. Please consult local building codes for the current coefficient of friction requirement. Disclaimer Information contained in this specification conforms to standard detail and product recommendations for the installation of the Pli-Dek products as of the date of publication of this document and is presented in good faith. Pli-Dek Systems, Inc. assumes no liability, expressed or implied, as to the architecture, engineering or workmanship of any project. To insure that you are using the latest, most complete information, contact Pli-Dek Systems, Inc., at: 41610 Date St,Suite 104 Murrieta,CA 92562 Tel.:(800)364-0287 Website:www.plidek.com The Trained Applicator Certificate indicates certain employees of the company have been instructed in the proper application of Pli-Dek products and have received copies of the Pli-Dek Application Instructions and Specifications. The Trained Contractor Program is not an apprenticeship. Each trained contractor is an independent company and bears responsibility for its own workmanship. Pli-Dek Systems, Inc. assumes no liability for the workmanship of a trained contractor. PL/4DEK Waterproof Deck Coating— Pli-Dek System Application Instructions PD- 120 1\\\\\.ulidek.com Rev. 06.22.2016 Page 6 of 6 JOB COPY