2057 VELA NORTE CIR RES23-0244 COAB Permit Form with ConditionsFinal Plumbing
Final Electrical
Final HVAC
CC Final
Final Building*
Swimming Pool Steel
Swimming Pool Safety
Electrical Grounding & Bonding
Swimming Pool Final (Bldg)
Swimming Pool Final (PW)
Formed Columns/ Beams*
Masonry Cell Fill
Structural Steel*
OTHER:
OTHER:
OTHER:
OTHER:
OTHER:
Power Pole
Silt Fence
Piers/ Stem Walls
Underground Plumbing
Underground Electric
Foundation/ Footing
Slab**
Retaining Wall Footing
Driveway
Sewer (Building Dept)
Sewer Tap (Utilities Dept)
Rough Electric*
Rough Plumbing/ Top Out*
Rough Mechanical*
House Wrap
Wall Sheathing
Roof Sheathing
Tie-down Framing Connections
Rough Framing
Roofing In Progress
Window/Door In-Progress
Insulation Ceiling
Insulation Wall
Exterior Lath
Stucco Scratch Coat
Exterior Siding In-Progress
Brick Flashing & Ties
Early Power
Gas Rough
Gas Final*
* When all rough electric, plumbing, mechanical are complete but before any work is
covered up.
* When all gas piping is complete and wallboard is installed but before gas is
attached to any appliance. All outlets must be capped and pipe pressurized at a
minimum of 15 lbs.
* For new living space: When all construction work including electrical, plumbing,
mechanical, exterior finish, grading, required paving and landscaping is complete
and the building is ready for occupancy, but before being occupied
Additional inspections may apply to your project if your project
contains these elements:
INSPECTIONS REQUIRED FOR BUILDING PERMITS
To verify compliance with building codes, inspections of the work authorized are required at various points of the construction.
The following inspections are typically required for residential projects:
Date: Initial: Date: Initial:
_____________________________________________________
Permit Type
____________________________________________________
Permit No.
__________________________________________________________
Job Address
____________________________________________________
Contractor
POST THIS CARD WITH PERMITS AND PERMIT
DOCUMENTATION IN FRONT OF BUILDING
Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends
Building Department Public Works/Utilities Fire Department
Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789
Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203
* When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all
electrical, plumbing and mechanical work is in place, but before concrete is poured.
* When all structural steel members are in place and all connections are complete,
but before such work is covered or concealed.
** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION
PLIDEK SYSTEM ON BALCONY
RES23-0244
2057 VELA NORTE CIR
GRASTON ROOFING
OWNER:ADDRESS:CITY:STATE:ZIP:
GRIDER LIVING TRUST 2057 VELA NORTE CIR ATLANTIC BEACH FL 32233-4533
COMPANY:ADDRESS:CITY:STATE:ZIP:
GRASTON ROOFING CO
INC 2680 FOX HUNT TR JACKSONVILLE FL 32259
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
169506 1094 SELVA NORTE UNIT 01
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
2057 VELA NORTE CIR RESIDENTIAL ALTERATION
RESIDENTIAL
PLIDEK SYSTEM ON
BALCONY $5473.00
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
BUILDING PERMIT 455-0000-322-1000 0 $80.00
BUILDING PLAN CHECK 455-0000-322-1001 0 $40.00
STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00
STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00
TOTAL: $124.00
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF
COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 2Issued Date: 11/20/2023
PERMIT NUMBER
RES23-0244
ISSUED: 11/20/2023
EXPIRES: 5/18/2024
RESIDENTIAL PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
DESCRIPTION ACCOUNT QTY PAID
PermitTRAK $124.00
RES23-0244 Address: 2057 VELA NORTE CIR APN: 169506 1094 $124.00
BUILDING $80.00
BUILDING PERMIT 455-0000-322-1000 0 $80.00
BUILDING PLAN REVIEW $40.00
BUILDING PLAN CHECK 455-0000-322-1001 0 $40.00
STATE SURCHARGES $4.00
STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00
STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00
TOTAL FEES PAID BY RECEIPT: R25562 $124.00
Printed: Monday, November 20, 2023 11:48 AM
Date Paid: Monday, November 20, 2023
Paid By: GRASTON ROOFING CO INC
Pay Method: CREDIT CARD 10117066492
1 of 1
Cashier: TG
Cash Register Receipt
City of Atlantic Beach
Receipt Number
R25562
ti BUILDING PERMIT APPLICATION FOR INTERNAL OFFICE USE ONLY 1
City of Atlantic Beach Building Departmentr;:. PERMIT# ES Z 3 Oz-v--t-r.,..
800 Seminole Road,Atlantic Beach, FL 32233xALL information required to process
Phone: (904) 247-5826 Email: Buiiding-Dept(a coab.us
Job Address 2057 VELA NORTE OR ATLANTIC BEACH RE# 169506-1094
Legal Description 39-94 08-2S-29E SELVA NORTE UNIT ONE LOT 47
Valuation of Work(Replacement Cost) 5473.70 Heated/Cooled SF Non-Heated/Cooled SF
Class of Work: New Addition ®Alteration Repair Move Demo E Pool Window/Door
Use of existing/proposed structure(s): Commercial ®Residential •If existing structure,is a fire sprinkler system installed?:Yes No
Will tree(s)be removed in association with proposed project? Yes (Must submit separate Tree Removal Permit) No
Describe In detail the type of work to be performed:
Install 180 sf Plidek underlayment system on balcony
I
Florida Product Approval# FL 15027.2 For multiple products use Product Approval Information Sheet)
Property Owner Information Name Gary Grider Phone 904 463-4606
Address 2057 VELA NORTE CIR City ATLANTIC BEACH State FL Zip 32233
Email griderconstructioninc@yahc Owner or Agent(If Agent,Power of Attorney or Agency Letter Required)
Contractor Information Name of Company GRASTON ROOFING COMPANY INC Phone (904)707-3660
Address 2680 FOXHUNT TRAIL City SAINT JOHNS State FL Zip 32259
Qualifying Agent DANIEL R GRASTON State Certification/Registration# CCC058221
Email d67graston@gmail.com Job Site Contact Number 904 710-2912
Worker's Compensation Insurer FRSA-SIF OR Exempt Expiration Date 1/1/24
Architect's Name Email Phone
Engineer's Name Email Phone
Application is hereby made to obtain a permit to do the work and installations as indicated.I certify that no work or installation has
commenced prior to the issuance of a permit and that all work will be performed to meet the standards of all the laws regulating
construction in this jurisdiction. I understand that a separate permit must be secured for ELECTRICAL WORK, PLUMBING,SIGNS,
WELLS,POOLS,FURNACES,BOILERS, HEATERS,TANKS,and AIR CONDITIONERS,etc.
NOTICE:In addition to the requirements of this permit,there may be additional restrictions applicable to this property that may be found in
the public records of this city/county,and there may be additional permits required from other governmental entities such as water
management districts,state agencies,or federal agencies.
OWNER'S AFFIDAVIT:I certify that all the foregoing information is accurate and that all work will be done in compliance with all applicable
laws regulating construction and zoning.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOU PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT
MUST BE RECORDED AND POSTED ON THE SITE OF THE IMPROVEMENT BEFORE THE FIRST
INSPECTION. IF YO INTEND TO OBTAIN FINANCING, C NISJI..T WITH YOUR LENDER OR AN
ATTO EYJ/
BEFORE
RECORDING YOUR N ICE O COM EME
y P
Signature of Owner or Agent) S nature of Contractor)
Signed and s///worn to(or affirmed)before me this q tt-' day of Signed and sworn to(or affirmed)before me this (+
1
day of
60OVbyc_-)01r;,;(1,-ee 00VD-01 , d by .00.1)ik1 (7)I'C fliu'J
Signature of Notary GJ,
c_-)01Jr^-4'\ Signature of Not.-..triapie"ss n : ----',-- -1
I Personally Known OR 'IC.]Produced Identification Personal OR (Produced Identification
Type of Identification: CI 0 L, Type of Identification: - f ' ,
AMY GORMAN
Y' BRITTANY GREEN
Notary Public-State of Florida
i i = Notary Public,State of Florida I ;:4: Commission#HH 376632
ia Commission#HH 273537
f OF ` My Comm.Expires Nov 1,2026Mycomm.expires June 8,2026
JOB COPY
NOTICE OF COMMENCEMENT
State of FLORIDA Tax Folio No. 1695064094
County of DUVAL
To Whom It May Concern:
The undersigned hereby informs you that improvements will be made to certain real property,and in accordance with Section 713
of the Florida Statutes,the following information is stated in this NOTICE OF COMMENCEMENT.
Legal Description of property being improved: 39-94 08016 SELVA NORTE UNIT ONE LOT 47
o/2z5)-/
Address of property being improved: 2057 VELA NORTE CIR ATLANTIC BEACH
General description of improvements: BALCONY WATERPROOFING
Owner: GARY GRIDER Address: 2057 VELA NORTE CIR ATLANTIC BEACH
Owner's interest in site of the improvement:
Fee Simple Titleholder(if other than owner):
Name:
Contractor: GRASTON ROOFING COMPANY INC
Address: 2680 FOXHUNT TRAIL SAINT JOHNS FL 32259
Telephone No.: 707-3660 Fax No:
Surety(if any)
Address: Amount of Bond$
Telephone No:Fax No:
Name and address of any person making a loan for the construction of the improvements
Name:
Address:
Phone No: Fax No:
Name of person within the State of Florida,other than himself,designated by owner upon whom notices or other documents may
be served:Name:
Address:
Telephone No:Fax No:
In addition to himself, owner designates the following person to receive a copy of the Lienor's Notice as provided in Section
713.06(2)(b),Florida Statues. (Fill in at Owner's option)
Name:
Address:
Telephone No:Fax No:
Expiration date of Notice of Commencement(the expiration date is one(1)year from the date of recording unless a different date Is
specified): ark_
ill. Iryi
THIS SPACE FOR RECORDER'S USE ONLY OWNER A
Signed: i, .f,/ Date:
Doc#2023233164,OR BK 20867 Page 881, Before me this "1,. day of /Vo in the County of Duval,Stati2
3
Number Pages.1 o
Of Florida,has per onally appeared C Gr CI 3Recorded11/09/2023 10:39 AM, 1 r 13.Notary Public at Large,State of Florida,County Duval.y = EJODYPHILLIPSCLERKCIRCUITCOURTDUVALx0, g_<
COUNTY My commission expires: '-v v sz_ r' c>aty O
RECORDING $10.00 Personally Known: o q 4* O
Produced Id ntificatlon: FL OL m c
m zC2u--el en
V
JOB COPY
APPLICATION INSTRUCTIONS
PLI-DEK SYSTEM
WATERPROOF DECK COATING-PLYWOOD SUBSTRATE
MATERIALS 3. Maximum deflection of the deck shall be less than
1. 2.5 lbs/sq yd G60 Hot Dipped Galvanized Metal Lath L/360th of the span.
2. Corrosion-resistant staples 4. All inspections, as required by local building
3. Pli-Dek Seam Paper authorities, shall be the responsibility of the
4. GU80 1 Base Coat Powder(gray)
contractor, owner, and/or their agent.
5. GU80 1 Top Coat Powder 5. For application instructions in Inclement Weather
6. GU80 1 Custom Top Coat areas, refer to Waterproof Deck Coating-Pli-Dek
7. GU80 1 Liquid Admixture System Application Instructions PD-120-IW.
8. GS88-1 Pigmented Sealer
9. '/,oz. Fiberglass Mat B. Plywood
10. PD Resin 1. Plywood shall be a minimum of 16mm, 5/8" (3/4"
11. PD Flash Coat and Flash Coat Seam Tape or self- recommended) sound and dry, exposure 1
adhering drywall mesh tape(optional) sheathing, and have a maximum span between
12. GS13(Clear or Pigmented)or PD Clear Sealer supports of 410mm (16") on center. All plywood
13. 40 grit non-skid sand (optional) shall be securely fastened to the supports with
screws or ring shank nails spaced in accordance
TOOLS with APA guidelines and Building Code
requirements.
1. Variable Speed Drill(capable of producing 1000 2. Framing or blocking must support all plywoodRPM's) edges, except as per APA guidelines; blocking is2. Wind-lock B-M1 mixing blade or equivalent not required when tongue and groove plywood is
3. Extension Cord used.
4. Clean 5 Gallon Plastic Containers 3. The plywood surface shall be clean, dry, and free5. Measuring Bucket(1 gal,2 gal,etc.) of dirt, dust, oil, paint, or any other contaminants6. Hand Grinding Stone that may impair adhesion.
7. Level 4. All plywood seams shall be staggered, and
8. Pencil gapped 3.2mm (1/8"). All seams shall be covered
9. Utility Knife with a maximum of 50mm(2")wide flashing paper
10. Scissors tacked in place. NOTE: If plywood is butted tightly,
11. Masking Tape the seams shall be saw cut to provide a 3.2mm
12. 4"x 22"Pool Trowel 1/8") gap between sheets, except tongue &
13. Stainless Steel Trowel groove. Ensure that the tongue and groove section
14. Margin Trowel of the plywood is installed so as to allow for
15. Small Paint Brushes expansion.
16. Paint Roller(3/4"nap) 5. All adjacent edges of the plywood sheets shall not
17. Extension Handle be more than 0.78mm (1/32") out of plane (i.e.
18. Hopper Gun above or below each other).
19. Compressor(1-1/2 horsepower,electric or better) 6. Plywood should be installed with a 6.4mm/.3m
20. Air Hose 1/4") per linear foot slope. Decks with parapet
21. Semi-stiff Broom enclosures must be sloped to a drain or scupper.
22. Dust Mask 7. Any variation from the framing specifications
23. Goggles mentioned in Section I, requires written approval
24. Rubber or Cloth Gloves and system recommendations from Pli-Dek
25. Metal Spiked Golf Shoes Systems, Inc.
26. Tin Snips
27. Hammer C. Flashing
28. Pneumatic Staple Gun The following items that involve flashing must be
29. Hudson or Chapin Sprayer completed or adhered to:
30. Paperless drywall joint tape 1. Flashing shall be minimum 26 gauge galvanized,
bonderized sheet metal. (contact Pli-Dek for
I. Substrate Inspection/ Preparation Alternatives).
A. General 2. Insure ALL metal flashing is wiped clean with a
solvent to insure oils are completely removed1. Pli-Dek materials must be applied over sound dry from the Surface. Dissimilar metals; such as
exterior grade plywood decks.Copper and galvanized, should NEVER come in
Contact Pli-Dek Systems, Inc. for installation direct contact with each other.
approvals over OSB substrates.3. Openings shall be flashed before installation of
2. All plywood substrates are recommended to be doors and sliders. NOTE: If doors or sliders have
sloped '/4"per foot. been installed without proper flashing, we
PLIDEK Waterproof Deck Coating- Pli-Dek System
Application Instructions PD- 120
www.plidek.com Rev. 06.22.2016
Page 1 of 6
JOB COPY
recommend they be removed and proper flashing 1. It's the General Contractor's,his representative's,
installed. or individual owner's responsibility to assure
4. All penetrations, including posts, or other objects adequate drainage.
that protrude through the deck shall be installed 2. All plywood substrates are recommended to be
and flashed prior to applying the Pli-Dek sloped of 1/4"per foot.
materials. 3. If auxiliary slope is required, PD Slope Mix- DP
5. All decks with a parapet surround require a may be applied. (See Sloping Application
scupper not less than 76mm (3") wide, and Instructions SM-120 for complete details and
100mm (4") high, spaced a maximum of 3.65m limitations). When this type of sloping will not
12') apart. Any scuppers or overflows shall be accommodate the problem, then drains become
installed and flashed prior to applying Pli-Dek a necessity.
materials. 4. Pli-Dek requires a galvanized or stainless steel
6. All deck drains must be flanged, and properly drain as per Drain Detail, PD-24, on all plywood
installed to a proper depth. NOTE: Brass drains installations. Please contact Pli-Dek for help in
with a sheet metal flange are recommended. Pli- acquiring these drains. Do not use plastic, cast
Dek requires a galvanized or stainless steel drain iron, or shower drains. If copper drains are used,
as per Drain Detail, PD-24, on all plywood please contact Pli-Dek for instructions on
installations. Please contact Pli-Dek for help in dissimilar metals.
acquiring these drains. Do not use plastic, cast 5. The alternatives available for proper drainage are
iron, or shower drains. If copper drains are used, the responsibility of the General Contractor.
please contact Pli-Dek for instructions on Contact Pli-Dek Systems, Inc. for complete
dissimilar metals. The use of plastic deck drains details.
will void warranty. 6. Additional sloping required on a project should be
7. Gravel stops shall have a maximum ground confirmed through a written proposal given by the
dimension of 3/16". trained applicator prior to the commencement of
8. All flashing must be attached to the substrate with work.
galvanized ring shank nails a minimum 25mm(1")
length.II. Mixing Instructions9. All flashing shall overlap adjacent pieces, a A. Base Coat
minimum of 100mm (4"), installed not to "buck" 1. Pour 3.8L(1 gallon)of GU80-1 Liquid Admixture
water, and be caulked horizontally and vertically into a clean 19L(5 gallon)plastic container.
with a Polyurethane Sealant per ASTM C 920, 2 Add one 21kg (461b.) bag of GU80-1 Base CoatsuchasSika-1a or 221 or equivalent, at the
furthermost edge with a 4" bead of sealant a Wind-
lockray),
and mix thoroughly for 3
blade,
o 4
or
minutes.
uivent,
a B-M1 mixing equivalent,
between any pieces of flashing that powered by a 13mm (1/2") variable speed drill,adjoin. (Surface caulking is NOT acceptable). capable of producing 1000 RPMs. TIP: In areas10. Next apply continuous sealant 1" in both subject to extremely dry and/or hot climates, itdirectionsfromtheseam (vertical and horizontal) may be necessary to add water(up to.47L[1 pint]
and embed 1 7/8" paperless drywall joint tape per mix). To avoid flash drying, it may bewithaputtyknifetotheentireseamtoensurethenecessarytochilltheGU80-1 Liquid Admixturepaperlessdrywalljointtapeiscompletelybeforemixing. A proper safety ventilation mask
embedded in sealant.should be worn when working with all Pli-Dek11. All vertical flashing and door pans shall be coated products
with Fiberglass and PD or PD Flash Coat and
Flash Coat Seam Tape or self-adhering drywall
mesh tape, GU80 Top Coat, and GS88 B. Screed Coat&Knockdown Texture
Pigmented Sealer at the time of applying each 1. Pour 4.75L (1.25 gallons) of GU80-1 Liquid
product. Admixture into a clean 19L (5 gallon) plastic
12. Deck/Wall interfaces and all stairs must be container.
flashed. 2. Add one 21kg (461bs.) bag of GU80-1 Top Coat13. When copper flashing/drains are used, ensure powder. Mix thoroughly for 3 to 4 minutes,with athatallgalvanizedmetal; such as, nails, staples, Wind-lock B-M1 mixing blade, or equivalent,lath, drains, etc. does not come into contact with powered by a 13mm (1/2 inch) variable speed
copper (do not allow any dissimilar metals to drill, capable of producing 1000 RPMs. TIP: In
come in contact with each other). The contact of areas subject to extremely dry, and/or hotthetwodissimilarmetalswillcreaterustandclimates, it may be necessary to add water(up to
corrosion (electrolysis). **Contact Pli-Dek 47L[1 pint]per mix).In order to avoid flash dryingSystems, Inc. for additional details and it may be necessary to chill the GU80-1 Liquid
recommendations. Admixture before mixing. Proper ventilation
14. Contact Pli-Dek Systems, Inc for written approval masks should be worn at all times when workingonflashingdetailsthatvaryorarenotincludedinwithallPli-Dek Products. Pli-Dek products must
Pli-Dek Details. be stored in the shade to prevent overheating and
reduction of pot life.
D.Sloping 3. If colored cement is required, a Pli-Dek
recommended tint pack may be added to the mix
PLI4 DEK Waterproof Deck Coating— Pli-Dek System
Application Instructions PD- 120
www.plidek.com Rev. 06.22.2016
Page 2 of 6
JOB COPY
to achieve the desired color. Note:ensure that all 1. Mix the GU80-1 Base Coat as described in
of the colorant is dispersed out of the container. Section II—A.
All mixes must be consistent(use the same mix 2. Pour the GU80-1 Base Coat over the metal lath
ratios)to maintain color consistency.and trowel, filling all voids at a rate of 25 - 30
square feet per mix. The metal lath must be
C. Custom Top Coat completely covered in the Base Coat.
1. ` our 4.75L (1.25 gallons) of GU80-/Liquid 3. Allow the GU80-1 Base Coat to dry for a minimum
A mixture into a clean 19L (5 gall) plastic of 6 hours prior to applying the next application. If
co iner. the base coat does not cover the lath completely,
2. Add ne 21kg (461bs.) bag of GU80-1 Custom a screed coat is required.
Top at powder. Mix thoroughly for 3 to 4
minutes,with a Wind-lock B-Mi mixing blade, or D.Screed Coat Application
equivalent; powered by a 13mm (1/2") variable 1. Screed coat may not be necessary in all
speed drill, capable of producing 1000 RPMs. applications. Contact Pli-Dek Systems, Inc. for
TIP: In areas stibject to : tremely dry, and/or hot application details and recommendations.
i\ climates, it may .- ne -ssary to add water(up to 2. Prior to the screed coat application, remove any
47L[1 pint]per mi order to avoid flash drying high or rough edges using a hand grinding stone
it may be necess- o chill the GU80-1 Liquid or scraper.
Admixture, befo - mi 'ng. Proper ventilation 3. The deck must be free of all surface
masks should be worn a all time when working contaminants, such as dust, dirt, etc., which will
with all Pli-Dk Products. Poi-Dek products must impair the adhesion of the Ph-Dek GU80 1 Top
be stored i he shade to prevent overheating and Coat.
reductio f pot life. 4. Mix the GU80-1 Top Coat as described in Section
3. If color GU80-1 Custom Top Coat is required, II—B.
a Pli-Dek recommended tint pack relay be added 5. Trowel a screed coat over the base coat at a rate
to the mix to achieve the desired dolor. Note: of 150 square feet per mix. Allow to dry for a
ffisure that all colorant is dispersed out of the minimum of 2-6 hours.
container.
E. Pli-Dek—"F"Fiberglass&Resin t,
All mixes must be consistent(use the same mix **This application becomes required when job
ratios)to maintain color consistency. conditions may experience excessive
movement. Examples: cantilevered decks, large
III. BASE & SCREED COAT spanning decks, etc. Contact Pli-Dek Systems, Inc.
A.General for written recommendations. Some geographic
1. Ensure that the exterior plywood surface has locations may require the Fiberglass and Resin
been prepared in accordance with Section I. ing in A app ica ions.Contact Pli-Dek Systems,
2. Ensure that all proper flashing is in place. Inc.for written verification.
3. Air temperature for application of the Base Coat 1. Air temperature for application of the PD Resin
must be between 10°C (50°F) and 43°C (110°F) and Fiberglass Coat must be between 10°C
and must remain so fora minimum of 2-6 hours. 50°F) and 43°C (110°F) and must remain so in
Ensure humidity levels are low. Do not apply over the acceptable range until the product has cured.
moisture. 2. Mix the PD Resin using a mechanical mixer at
slow speed for approximately 1 minute.
B. Plywood Deck Preparation 3. The deck must be free of all surface
1. Lay out 2.5 lbs/sq yd G60 Hot Dipped Galvanized contaminants, such as dust, dirt, etc., which will
Metal Lath in a staggered pattern over the entire impair the adhesion of the PD Resin.
plywood surface overlapping the metal flashing, 4. Lay out the'A oz.fiberglass mat over entire deck
to the edge of the deck surface. surface extending to all edges of the deck.
2. Overlap all edges of metal lath, a minimum of Overlap mat seams a minimum of 1/4" to a
13mm(3/4"). maximum of 1/2".
3. Offset metal lath edges a minimum of 150mm(6") 5. Apply the PD Resin over fiberglass mat, at a rate
from plywood seams. (See DECK PLAN in the of approximately 40 - 50 square feet per gallon
Pli-Dek Detail Appendix.) with a trowel. Allow to completely dry, usually 6 -
4. Secure metal lath to plywood with a minimum 8 hours depending on temperature. PD Resin
22mm (7/8") crown by a minimum 16mm (5/8") must completely penetrate through the fiberglass
long corrosion resistant staples spaced mat.
approximately 11/2" on center around the 6. After the PD Resin has cured, remove any loose
perimeter and on overlapped lath seams, and areas, where fiberglass was not bonded, and
75mm (3") in the field (approximately 12 staples reapply PD Resin and Fiberglass as needed
per square foot). before application of Finish Coat.
5. Additional staples spaced every 1'/2" on center
are required where the metal lath overlaps the IV. Finish Options
seam paper, as installed in Section I. A. Preparation:
C. Base Coat Application
PLI DEK Waterproof Deck Coating— Pli-Dek System
Application Instructions PD- 120
www.plidek.com Rev. 06.22.2016
Page 3 of 6
JOB COPY
1. Prior to any finish coat installation, the following b. Continuously mix the sealer through the
must be completed: application process so the no skid sand
a. Grind any rough areas, being careful not to does not settle to the bottom of the pail.
damage Fiberglass and PD Resin coat.
Rough areas will affect the aesthetic C. Elas c Sand Finish
appearance of the finished product. 1. . it tempe re for application of the Sand Finish
b. The deck must be free of all surface must be between 10°C (50°F)and 43°C (110°F)
contaminants, such as dust, dirt, etc. which and must remain so for a minimum of 8 hours. Do
will impair the adhesion of the Finish Coats. not apply over any moisture.
2. Apply a bead of manufacturer's recommended
B. own Texture Finish elastomeric joint sealant at all wall-to-deck
1. Air to rature for application of the Knockdown junctions,wood posts,wrought iron posts,etc.
Texture Coat must be between 10°C (50°F) and 3. Before application, mix PD Resin using a
43°C (110°F)and must remain so fora minimum mechanical mixer at slow speeds;mix thoroughly
of 8 hours. until a homogenous mixture and color is obtained.
2. Mix the GU80-1 Top Coat as described in Section Use care not to allow the entrapment of air into
II-A. the mixture.
3. Using a hopper gun, spray the Knockdown 4. Apply PD Resin over the entire deck surface and
Coating over the entire deck surface at a rate of flashing using a 3/4" nap roller and a brush at a
150 square feet per mix. CAUTION: AS WITH rate of 75 square feet per gallon. Do not allow PD
ANY SPRAY MATERIAL, BE CERTAIN TO Resin to puddle.
PROTECT ALL SURROUNDING AREAS 5. Broadcast aggregates of washed, dry, rounded,
FROM OVER-SPRAY. crystal silica sand, approximately 16 mesh at a
4. When the material begins to dry, knock down the rate of 100 lbs.per 100 square feet or until refusal
material with a trowel. TIP: In order to eliminate depending on skid resistance requirements) into
footprints, we suggest wearing metal spiked the wet/uncured PD Resin.
shoes(golf shoes)during this process.6. Allow a minimum of 8 hours before removing all
5. Allow the Knockdown to dry a minimum of 2 -6 excess silica sand.
hours, depending on weather. 5. Air temperature for application of the GS88-1
6. Remove any sharp edges by scraping the Sealer must be between 13°C (55°F) and 43°C
surface with a scraper or trowel. 110°F)and must be allowed to dry for a minimum
7. Apply a bead of Pli-Dek's recommended of 8 hours. Ensure humidity levels
elastomeric joint sealant at all wall-to-deck 7. The deck must be free of all surface
junctions,wood posts,wrought iron posts, etc. contaminants, such as dust, dirt, etc., which will
8. Air temperature for application of the GS88-1 impair adhesion of the GS88-1 Sealer.
Sealer must be between 13°C (55°F) and 43°C 8. Mix the GS88-1 Sealer thoroughly by boxing,
110°F) and must remain so for a minimum of 8 stirring, or by using a mechanical mixer. Box and
hours. Ensure humidity levels are low. Do not mix all containers to ensure consistent coloring
apply over moisture. throughout.
9. The deck must be free of all surface 9. Apply the GS88-1 Sealer over the dry PD Resin
contaminants, such as dust, dirt, etc., which will and Sand Coat, using a 19mm (3/4") nap paint
impair adhesion of the GS88-1 Sealer. roller, suitable for latex type coatings (2 coats
10. Mix the GS88-1 Sealer thoroughly with the use of may be necessary.)
mechanical mixers. All containers should be 10. To make cleaning easier in high traffic areas, a
boxed and mixed to ensure consistent coloring coat of GS13 or PD Clear Sealer may be applied
throughout. over the dry GS88-1 Pigmented Sealer at a rate
11. Apply the GS88-1 Sealer over the dry Knockdown of 200 square feet per gallon. Surface will
application at a rate of 100 square feet per gallon become more slippery. Use of a non-skid agent is
using a 19mm (3/
4") paint roller nap, suitable for recommended.
latex type coatings. Two Coats may be a. Surface will become more slippery. Add
necessary.40 grit nonskid sand(approximately 5 oz
12. Allow GS88-1 Sealer coat to dry for a minimum of per gallon)to the GS13 or PD Clear
6 hours. Sealer.
13. To make cleaning easier in high traffic areas, a b. Continuously mix the sealer through the
coat of GS13 or PD Clear Sealer may be applied application process so the no skid sand
over the dry GS88-1 Pigmented Sealer at a rate does not settle to the bottom of the pail.
of 200 square feet per gallon. Surface will
become more slippery. Use of a non-skid agent is D. Pli-Dek — "U": Underlayment for Tile or Con_cretg C<i
recommended. it ish
a. Surface will become more slippery. Add Note: The vertical leg of all flashings should be coated
40 grit nonskid sand(approximately 5 oz with Fiberglass and PD Resin or PD Flash Coat and
per gallon)to the GS13 or PD Clear Flash Coat Seam Tape or self-adhering drywall mesh
Sealer. tape.
1. Air temperature for application of the Con-Dek
U" must be between 10°C (50°F) and 43°C
PLI4 DEIC Waterproof Deck Coating— Pli-Dek System
Application Instructions PD- 120
www.plidek.com Rev. 06.22.2016
Page 4 of 6
JOB COPY
110°F), and must remain so for a minimum of 8 over the dry GS88-1 Pigmented Sealer at a rate
hours. Do not apply over any moisture. of 200 square feet per gallon. (Surface will
2. Apply a bead of Pli-Dek's recommended become more slippery. Use of a non-skid agent
elastomeric joint sealant at all wall-to-deck is recommended.
junctions.wood posts,wrought iron posts,etc. a. Surface will become more slippery. Add
3. The vertical leg of all flashings should be coated 40 grit nonskid sand(approximately 5 oz
with Fiberglass and PD Resin or PD Flash Coat per gallon)to the GS13 or PD Clear
and Flash Coat Seam Tape or self-adhering Sealer.
drywall mesh tape. b. Continuously mix the sealer through the
4. PD Resin should not be exposed to construction application process so the no skid sand
traffic. does not settle to the bottom of the pail.
5. Mix the Pli-Dek GU80-1 Top Coat as described in
II-A. F. Epoxy Stone Finish
6. Apply a screed coat of GU80-1 Top Coat over the °Contact Pli-Dek Syst s, Inc.for written instructions.
entire deck at a rate of 150 square feet per mix.
Allow to dry for a minimum of 2-6 hours. Mix the G.Custom Fini • Simulated Tile,Brick,and Stone
GU80-1 Top Coat as described in Section II—B. 1. Air t per re for application of the Custom
7. Allow a minimum of 8 hours prior to installing any Finish must be-JZetween 10°C (50°F) and 43°C
finished product over the PD Resin and sand 110°F) and must remain so for a minimum of 8
surface or screed coat. hours.
8. *Optional: Broadcast aggregates of washed, dry, 2. Mix the GU80-1 Custom Top Coat as described
rounded crystal silica sand, approximately 16 in Section II - B.Add the selected color tint pack
mesh, at a rate of 100lbs. per 200 square feet. to establish the desired grout color. Note: All
mixes must be consistent (use the same mix
E. Potyacrylic Sm Finish ratios)to maintain color consistency.
1. A m rature for application of the Polyacrylic 3. The deck must be free of all surface
smoo i fa sh must be between 10°C (50°F) and contaminants, such as dust, dirt, etc. which will
4 (110°F)and must remain so for a minimum impair adhesion of the GU80 1 Custom Top
f 8 hours. It may be necessary to grind the rough Coat.
ridges of the Base Clot to minimize chatter lines. 4. Trowel a tinted GU80-1 Top Coat over the entire
2 Mix the GU80-1 Top Coat as described in Section deck surface at a rate of 150 square feet per mix.
II—B. Allow to dry for a minimum of 2 — 6 hours.
3. Trowel a screed coat over the entire deck surface Decorative scroll lines can be achieved at this
at a rate of 150 square feet per mix.Allow it to dry step prior to screed coat drying, as long as no
for a minimum of 6 hours. templates or tape are going to be used.)
4. It may be necessary to apply an additional coat of 5. Install one of the various types of stencil patterns
GU80-1 Custom Top Coat to create a smoother or install tape pattern over cured screed coat to
finish. Coverage rate should be approximately achieve desired pattern finish.
200 square feet per mix. **Please note: Surface 6. Mix the GU80-1 Custom Top Coat as described
will not be perfectly smooth and will have some in Section II—B.
imperfections/variations.7. Trowel a tinted screed coat over the stenciled or
5. Apply a bead of Pli-Dek recommended taped deck surface at a rate of 150 square feet
elastomeric joint sealant to all wall-to-deck per mix.Allow to dry for a minimum of 2-6 hours.
junctions,wood posts,wrought iron posts,etc. 8. Apply desired stain/shading using a low pressure
6. Air temperature for application of the GS88-1 sprayer, soft broom, or sponge. Contact Pli-Dek
Sealer must be between 13°C (55°F) and 43°C Systems, Inc. for complete details.
110°F)and must remain dry for a minimum of 8 9. Remove stencil or tape pattern.
hours. Ensure humidity levels are low. Do not 10. The deck must be free of all surface
apply over moisture. contaminants, such as dust, dirt, etc., which will
7. Prior to color coat application,remove any high or impair adhesion of the GS13 of PD Clear Sealer.
rough edges using a hand grinding stone or 11. Apply a coat of GS13 of PD Clear Sealer or GS13
scraper. Clear Sealer at a rate of 200 square feet per
8. The deck must be free of all surface gallon. (2 coats may be necessary).
contaminants, such as dust, dirt, etc., which will a. Surface will become more slippery. Add
impair adhesion of the GS88-1 Sealer. 40 grit nonskid sand(approximately 5 oz.
9. Mix the GS88-1 Sealer thoroughly by mixing with per gallon)to the GS13 or PD Clear
the use of a mechanical mixer. Box mix all Sealer.
containers to ensure consistent coloring b. Continuously mix the sealer through the
throughout.application process so the no skid sand
10. Apply the GS88-1 Sealer using a 19mm (3/4")does not settle to the bottom of the pail.
nap paint roller, suitable for latex type coatings,
at a rate of 100 square feet per gallon (2 coats
may be necessary).
11. To make cleaning easier in high traffic areas, a
coat of GS13 or PD Clear Sealer may be applied
PLIDEK Waterproof Deck Coating—Pli-Dek System
Application Instructions PD- 120
www.plidek.com Rev. 06.22.2016
Page 5 of 6
JOB COPY
V. Slip and Fall Precautions
OSHA, American Disabilities Act (ADA), and The Federal
Housing Act(FHA)have now set enforceable standards for
slip-resistance on pedestrian surfaces. Pli-Dek Systems,
Inc. recommends the use of angular slip-resistant
aggregate in all coatings or flooring systems that may be
exposed to wet, oily/greasy, or otherwise potentially
slippery conditions. It is the end users responsibility to
provide a flooring system that meets current safety
standards. Pli-Dek Systems, Inc or its sales agents will not
be responsible for injury incurred in a slip and fall accident.
Please consult local building codes for the current
coefficient of friction requirement.
Disclaimer
Information contained in this specification conforms to
standard detail and product recommendations for the
installation of the Pli-Dek products as of the date of
publication of this document and is presented in good faith.
Pli-Dek Systems, Inc. assumes no liability, expressed or
implied, as to the architecture, engineering or
workmanship of any project. To insure that you are using
the latest, most complete information, contact Pli-Dek
Systems, Inc., at:
41610 Date St,Suite 104
Murrieta,CA 92562
Tel.:(800)364-0287
Website:www.plidek.com
The Trained Applicator Certificate indicates certain
employees of the company have been instructed in the
proper application of Pli-Dek products and have received
copies of the Pli-Dek Application Instructions and
Specifications. The Trained Contractor Program is not an
apprenticeship. Each trained contractor is an independent
company and bears responsibility for its own
workmanship. Pli-Dek Systems, Inc. assumes no liability
for the workmanship of a trained contractor.
PL/4DEK Waterproof Deck Coating— Pli-Dek System
Application Instructions PD- 120
1\\\\\.ulidek.com Rev. 06.22.2016
Page 6 of 6
JOB COPY