826 Ocean RES23-0133 Stamped Truss Layout 2 flr BFS REVISION 11-21-23_1_10
4
0
It
0
0
0
M
0
0
P_
0
It
N
ALL EXTERIOR WALLS HAVE BEEN
HELD BACK 1/2" FOR SHEATHING
34-02-00 , 30-09-08
td�Z�E�I�;• i C II�I�II�Z�:
45-03-00
0
0
of
4-00-00
SHOP DRAWING / SUBMITTAL REVIEW
SABO STRUCTURAL ENGINEERING LLC
09/15/2023
APPROVED
CHRISTOPHER SABOURIN�"L
SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY
AND GENERAL CONFORMANCE TO CONTRACT
DOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLE
FOR CONFIRMING AND CORRELATING DIMENSIONS AT
JOBSITE FOR TOLERANCE. CLEARANCE, QUANTITIES,
FABRICATION PROCESSES AND TECHNIQUES OF
CONSTRUCTION COORDINATION OF THEIR WORK WITH
OTHER TRADES AND FULL COMPLIANCE WITH CONTRACT
DOCUMENTS
0
0
v
0
,.---■111■■F■■1SO■■���■■■�■ iii
o I �16 0
u; o
0 0
cc r> N 15 9
n
TOP OF HDRS
AT 8' 1-1/2"
21-10-12
IEU�IIQ�)• +� "-1 1411111111111111 'S, 1
w - =-- is", i
9-08-12
1
HANGER NOTES
All Roof Hangers To Be HTU26 UON
All Floor Hangers To Be LUS46 UON
F05, F14, F34
HHUS48
TG01, TG02
HHUS26-2
BM7
HGUS412
HATCH LEGEND
0
10'1-1/8"
21'3"
General Notes:
- Per ANSI/TPI 1-2002 all " Truss to Wall"
connections are the responsibility of the Building
Designer, not the Truss Manufacturer.
- Use Manufacturer's specifications for all hanger
connections unless noted otherwise.
Trusses are to be 24" o.c. U.N.O.
- All hangers are to be Simpson or equivalent U.N.O.-
Use
.N.O:Use 10d x 1 1/2" Nails in hanger connections to single
ply girder trusses.
- Trusses are not designed to support brick U.N.O.
- Dimensions are Feet -Inches- Sixteenths
Notes
No back charges will be accepted by Builders
FirstSource unless approved in writing first.
ACQ lumber is corrosive to truss plates. Any ACQ
lumber that comes in contact with truss plates (i.e.
scabbed on tails) must have an approved barrier applied
first.
Refer to BCSI-Bl Summary Sheet -Guide for handling,
Installing and Bracing of Metal Plate Connected Wood
Truss prior to and during truss installation.
It is the responsibility of the Contractor to ensure of the
proper orientation of the truss placement plans as to
the construction documents and field conditions of the
structure orientation. If a reversed or flipped layout is
required, it will be supplied at no extra cost by Builders
Mrstsource.
It is the responsibility of the Contractor to make sure
the placement of trusses are adjusted for plumbing
drops, can lights, set..., so the trusses do not interfere
with these type of items.
All common framed roof or floor systems must be
designed as to NOT impose any loads on the floor
trusses below. The floor trusses have not been designed
to carry any additional loads from above.
This truss placement plan was not created by an
engineer, but rather by the Builders FirstSource staff
and is solely to be used as an installation guide and
does not require a seal. Complete truss engineering and
analysis can be Found on the truss design drawings
which may be sealed by the truss design engineer.
Gable end trusses require continuous bottom chord
bearing. Refer to local codes for wall framing
requirements.
Although all attempts have been made to do so, trusses
may not be designed symmetrically. Please refer to the
individual truss drawings and truss placement plans for
proper orientation and placement.
Builders
,I FirstSource
Freeport
PHONE: 850-835-4541
FAX: 850-835-4532
Jacksonville
PHONE: 904-772-6100
FAX: 904-772-1973
Tampa
PHONE: 813-621-9831
FAX: 813-628-8956
I Aurora Builders
1 826 Ocean Blvd
Young Res.
8/10/23 I GEB I 3537784
MITEK PLATE APPROVAL #'S FL2197-R6, BOISE APPROVAL #'S LVL: FL1644-R2, BCI: FL1392-R2 noo3 3 boe2JobY. x 35
3537795 3537784