Loading...
ABCC P2 - Bldg 1 - 1-A2.11_24.02.0 2.1 3.0 B E D F H 3.1 C G 2 3/8" / 1'-0"1'-0" / 1'-0"1'-0" / 1'-0" 1'-0" / 1'-0"1'-0" / 1'-0"1'-0" / 1'-0"1'-0" / 1'-0"4" / 1'-0"FLAT ROOF 1 FLAT ROOF 2 FLAT ROOF 3 FLAT ROOF 4 07.01 07.01 07.01 07.01 07.14 07.13 07.02 06.01 06.01 06.01 07.03 07.04 07.04 07.05 07.05 07.06 07.07 07.08 07.01 07.01 07.01 07.10 23.01 07.03 22.01 07.07 07.12 08.02 07.01 1/4" / 1'-0"1/4" / 1'-0" 08.01 07.15 07.16 08.03 3' - 8 1/2"1/4" / 1'-0"1/4" / 1'-0"DRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OFSHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OFSHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 1/4" = 1'-0"9/7/2023 4:47:52 PM Autodesk Docs://2022-352 ABCC/R22_ABCC_BLDG1_ARCH.rvt1-A2.11PHASE 2 -MAIN CLUBHOUSE NEW WORK PLAN-ROOF DRAINAGE PLAN2022-352 Author KEYNOTES NO. DESCRIPTION DETAIL █ DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES 06.01 REMEDIATION: REPLACE EXISTING MOISTURE-DAMAGED ZIP OSB SHTG AT REMOVED FRIEZE AND TRIM (CONTINOUS WITH REPLACED SHEATHING FROM BELOW) █ DIVISION 07 - THERMAL & MOISTURE PROTECTION 07.01 GUTTER & DOWNSPOUT 07.02 REMEDIATION: PROVIDE AND INSTALL NEW FLASHING AT ALL REMAINING SCREEN WALL POST PENETRATIONS. TYPICAL AT EXISTING FLAT ROOF 07.03 EXTEND TPO BASE FLASHING TO TIE IN WITH DRAINING PERIMETER EDGE METAL. 07.04 ROOF REPLACEMENT: FULLY ADHERED TPO OVER COVERBOARD AND TAPERED POLYISO INSULATION SLOPED AT 1/4":12" MIN. 07.05 NEW ROOF AREA: FULLY ADHERED TPO OVER COVERBOARD AND TAPERED POLYISO INSULATION SLOPED AT 1/4":12" MIN. 07.06 GALVALUME STANDING SEAM ROOFING OVER HIGH TEMPERATURE SELF-ADHERED UNDERLAYMENT OVER STRUCTURAL PLYWOOD DECK. MECHANICALLY SEAMED. PROFILE AND COATING TO MATCH EXISTING. 07.07 TIE IN EXISTING STANDING SEAM ROOF WITH NEW 07.08 STANDING SEAM AWNING WITH GUTTER & DOWNSPOUT 07.10 DRAINING PERIMETER EDGE METAL WITH MEMBRANE COATING.INCORPORATE GUTTER AND DOWNSPOUT TO MATCH EXISTING 07.12 REMEDIATION: SEAL ALL WALL PENETRATIONS BELOW WATER HEATERS. REPLACE BOTTOM OF WALL FLASHING WITH STAINESS STEEL FLASHING. 07.13 REMEDIATION: FILL ALL PENETRATION POCKETS PER DETAIL. TYPICAL AT EXISTING FLAT ROOF 07.14 DRIP EDGE 07.15 ROOF SUMP WITH PRIMARY & SECONDARY ROOF DRAIN, TYP. 07.16 TAPERED ROOF CRICKET, TYP. █ DIVISION 08 - OPENINGS 08.01 FRP WRAPPED TIMBER EQUIPMENT SCREEN FRAME (FRAME WRAP) WITHKYNAR COATED ALUMINUM FIXED LOUVERS. 42" MINIMUM HEIGHT ABOVE ADJACENT LOW SLOPE ROOF. SHOP DRAWING REQUIRED. 08.02 SKYLIGHT, TYP. PLACEMENT PER STRUCTURES 08.03 MECHANICAL SCREEN WALL WITH GATE █ DIVISION 22 - PLUMBING 22.01 PROVIDE MECHANICAL WELL WITH PRIMARY AND OVERFLOW ROOF DRAINS █ DIVISION 23 - HEATING, VENTILATION, & AIR CONDITIONING 23.01 ROOFTOP HVAC EQUIPMENT, TYP. SEE MECHANICAL. FINAL LAYOUT T.B.D.