Loading...
ABCC P2 - Bldg 1 - 1-P0.2_1SECURE PIPE HANGER TO STRUCTURE (TYP) THREADED STEEL ROD WITH NUT AND WASHER BOTH SIDES (TYP). CLEVIS HANGER, SHOWN FOR CLARITY. SIZE HANGER FOR COLD PIPE OUTSIDE DIAMETER PLUS INSULATION THICKNESS. DO NOT PENETRATE INSULATION WITH HANGER. PROVIDE A SECTION OF HIGH DENSITY INSULATION OR STYROFOAM BILLETS AT EACH HANGER OF COLD INSULATED PIPE. PROVIDE SHORT INSULATION SHIELD FOR LAPPING INSULATION JACKET OVER HIGH DENSITY INSULATION OR STYROFOAM BILLETS. MAINTAIN VAPOR BARRIER REFER TO SPECIFICATIONS FOR INSULATION TYPES, INSULATION THICKNESSES, HANGER TYPES, HANGER ROD CONNECTIONS TO SRUCTURE AND HANGER SPACING. CLEVIS HANGER, SHOWN FOR CLARITY. SIZE HANGER FOR HOT PIPE OUTSIDE DIAMETER. CUT INSULATION TO FIT AROUND HANGER. SEAL EXPOSED INSULATION ENDS WITH JOINT SEALANT COLD PIPE HOT PIPE SUSPEND PIPE FROM STRUCTURE ABOVE WITH PIPE HANGERS PER SPECIFICATIONS. BRANCH OFF TOP OF GAS PIPE MAIN. REFER TO PLANS FOR PIPE SIZES 3" LONG LINE SIZE DIRT LEG PIPE REDUCED FROM BRANCH PIPE SIZE TO UNIT CONNECTION SIZE, AT UNIT CONNECTION STUB GAS PRESSURE REGULATOR IF SHOWN ON PLANS, RE: SCHEDULES, AND SPECIFICATIONS GAS COCK FULL SIZE OF BRANCH PIPE. REFER TO PLAN FOR SIZE OF BRANCH PIPE INSTALL TEE TEN PIPE DIAMETERS MINIMUM DOWNSTREAM OF PRESSURE REGULATOR, IF REGULATOR SHOWN ON PLANS GROUND JOINT PIPE UNION LINE SIZE TEE, EXIT THRU SIDE OUTLET GAS FIRED UNIT HEATER, RE: MECH PLANS ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITIONS. PROVIDE CONNECTIONS SHOWN IN EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS. VERIFY CONNECTION LOCATIONS BEFORE INSTALLING PIPE RUNS. REFER TO SPECIFICATIONS FOR PIPE AND FITTING MATERIALS AND INSTALLATION. FOR PIPE SIZE(S) REFER TO FLOOR PLANS, PROVIDE GAS COCK, UNION, AND DIRT LEG SAME SIZE AS BRANCH. ROOF INSULATION ROOF DECK LOCATE VTR MINIMUM 3' FROM PROPERTY LINE, 10' HORIZONTAL OR 3' VERTICAL ABOVE ANY BUILDING OPENING OR FRESH AIR INTAKE, AND ONE FOOT FROM ANY VERTICAL SURFACE. REFER TO LOCAL CODES FOR OTHER VENT TERMINATION REQUIREMENTS. LOCATE VTR MINIMUM 18" FROM ADJACENT WALL, PARAPET, EXPANSION JOINT, ROOF DRAIN, EQUIPMENT CURB, OR OTHER ROOF FEATURE. OFFSET IN CEILING SPACE WHERE REQUIRED TO MEET THESE CONDITIONS. INSULATE LAST 6' OF VENT PIPE INSIDE BUILDING PER SPECIFICATIONS. COORDINATE INSTALLATION OF FLASHING AND COUNTERFLASHING CORE DRILL ROOF OR PROVIDE SLEEVE IF REQUIRED BY TYPE OF ROOF DECK & PROVIDE FIRE STOP SEAL BETWEEN PIPE AND SLEEVE OR DECK MINIMUM 12" ABOVE ROOF EXTEND TO HEIGHT OF PARAPET WHEN WITHIN 10' OF PARAPET, OR ABOVE MAXIMUM LOCAL SNOW DEPTH ANCHOR VENT PIPE TO STRUCTURE MINIMUM 12" BELOW ROOF REFER TO SPECIFICATIONS FOR PIPE MATERIALS, FITTINGS, AND CONNECTORS. REFER TO PLANS FOR SIZE AND LOCATION. 4197 Pleasant Hill Rd, Suite 200 Duluth, GA 30096 (p) 770.622.2270 (f) 770.622.2271 Consulting Engineers PROFESSIONA L E N GIN EERNo. 63377J STATE OF L I CENS E FLOR I D A U S T I N B TRA C YDRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 FOR CONSTRUCTION 4 10-31-23 PHASE 2 100% CD 12" = 1'-0" 1-P0.2PLUMBING DETAILS2022-352 CAT 12" = 1'-0"1-P0.2 2 PIPE HANGER DETAIL Detail1-P0.2 3 GAS CONNECTIONS TO HEATING EQUIPMENT Detail1-P0.2 1 VENT THRU ROOF 07-14-23 ADDENDUM#1