Loading...
ABCC P2 - Bldg 1 - 1-P2.3_1DWGENERAL NOTES 1. SEE 1-P1.0 SHEET FOR GENERAL NOTES, SCHEDULE AND DETAILS. 1 1-P3.1A 1 1 1-P3.0A 1 1-P3.0B 1 1-P3.0A 1 1-P3.0B 1-P3.1B 1 1-P3.2A 1 1-P3.2B 4"ST, SERVING 124GPM, 2980 SQ.FT. SEE CIVIL FOR CONTINUATION. 4"ST 4"ST/AC4"ST/AC3"ST/AC3"ST/AC3"ST/AC 4"OST, SERVING 124GPM,2980 SQ.FT. TERMINATE 6" ABOVE GRADE.4"OST/AC4"OST/AC3"OST/AC3"OST/AC3"OST/AC 4"ST/AC 4"OST /AC 4"OST 4197 Pleasant Hill Rd, Suite 200 Duluth, GA 30096 (p) 770.622.2270 (f) 770.622.2271 Consulting Engineers PROFESSIONA L E N GIN EERNo. 63377J STATE OF L I CENS E FLOR I D A U S T I N B TRA C YDRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 FOR CONSTRUCTION 4 10-31-23 PHASE 2 100% CD As indicated 1-P2.3PHASE 2 -MAIN CLUBHOUSE NEW WORK PLAN-LEVEL 1 -PLUMBING2022-352 CAT 1/8" = 1'-0"1-P2.3 PHASE 2 - MAIN CLUBHOUSE NEW WORK PLAN - LEVEL 1 - PLUMBING1