Loading...
ABCC P2 - Bldg 1 - 1-P2.7_1GENERAL NOTES 1. SEE 1-P1.0 SHEET FOR GENERAL NOTES, SCHEDULE AND DETAILS. RTU-1 (405 CFH) DOAU-1 (600 CFH) KSF-1 (138 CFH) KSF-2 (183 CFH) KEF-1 KEF-2 3/4"G 3/4"GAS 1"G 1-1/4"G RELOCATED (E) WATER HEATERS (WH-2). 1-1/2"G 1"G 1-1/2"GAS @ 2 PSI (1920 MBH) 1-1/2"H&CW TO WATER HEATERS 1"G1-1/2"H&CW 3"RD 4"RD 3"RD 4"RD WH-2 3"ORD 4"ORD 4"ORD 3"ORD KEF 4 VRF 1 4197 Pleasant Hill Rd, Suite 200 Duluth, GA 30096 (p) 770.622.2270 (f) 770.622.2271 Consulting Engineers PROFESSIONA L E N GIN EERNo. 63377J STATE OF L I CENS E FLOR I D A U S T I N B TRA C YDRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 FOR CONSTRUCTION 4 10-31-23 PHASE 2 100% CD 1/4" = 1'-0" 1-P2.7PHASE 2 -MAIN CLUBHOUSE NEW WORK PLAN-ROOF -PLUMBING2022-352 CAT 1/4" = 1'-0"1-P2.7 02_MAIN CLUB HOUSE - KITCHEN ROOF PLAN - PLUMBING1