Loading...
ABCC P2 - Bldg 1 - 1-P3.2A_1DW$D.0 $D.0 $E.0$E.0 $F.0$F.0 $G.0$G.0 $H.0$H.0 $2.1 $2.1 $3.0 $3.0 $3.1 $3.1 $4.0 $4.0 $4.1 $4.1 $5.0 $5.0 SEE SHEET 1-P3.0A FOR CONTINUATION. REPLACE 2"(E)G (3493 CFH) WITH NEW 2-1/2"G (6525 CFH) AT THE METER. ALL THE GAS PIPING DOWNSTREAM OF THIS IS NEW SIZE PER THE RISER. CONTRACTOR TO VERIFY METER CAPACITY AND TO COORDINATE WITH GAS PROVIDER SHOULD A NEW METER BE REQUIRED. NEW 4" FIRE SERVICE. SEE CIVIL FOR CONTINUATION. 4"FIRE UP CONNECT NEW 4"FIRE SERVICE TO EXISTING 4"FIRE SERVICE, CUT, CAP AND ABANDON PIPING AT SOURCE. NEW 4"FIRE SERVICE IN THE CEILING SPACE. L-2L-2 WC-2WC-2 LS-1 WMB 3/4"CW (E) SH-3 CONNECT NEW SHOWER 3/4"H&CW TO EXISTING 2-1/2"CW (E), EXISTING 1-1/4"HW CONNECT NEW SHOWER 3/4"H&CW TO EXISTING 2-1/2"CW (E), 1-1/4"HW (E). CONNECT NEW 3/4"HW, 1-1/2"CW SERVICE TO EXISTING 1"HW, 2-1/2"CW (E). SH-3 1/2"CW UP TO WATER DISPENSER. 1/2"CW 3/4"H&CW 324 3/4"CWEXISTING PLUMBING FIXTURES IN RESTROOM, WATER CLOSETS, LAVATORIES, DRINKING FOUNTAIN, ARE TO REMAIN EXISTING PLUMBING FIXTURES IN RESTROOM, WATER CLOSETS, LAVATORIES, DRINKING FOUNTAIN, ARE TO REMAIN 1"CW 3/4"CW 3/4"H&CW 1/2"GAS 3/4"CW DN RELOCATED WH-3. PROVIDE 1-1/2"CW, 1-1/2"HW AND 1"G 1/2"CW DN TO COFFEE MACHINE 1"G2-1/2"G2-1/2"G 2-1/2"G GENERAL NOTES 1. SEE 1-P1.0 SHEET FOR GENERAL NOTES, SCHEDULE AND DETAILS. 4197 Pleasant Hill Rd, Suite 200 Duluth, GA 30096 (p) 770.622.2270 (f) 770.622.2271 Consulting Engineers PROFESSIONA L E N GIN EERNo. 63377J STATE OF L I CENS E FLOR I D A U S T I N B TRA C YDRAWN BY: PROJECT NO.: SCALE: REVISION NO.DATE DESCRIPTION THE INFORMATION SHOWN ON THESE DRAWINGS IS OWNED BY AND IS THE PROPERTY OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. NO PART THEREOF SHALL BE COPIED, ADAPTED, OR DISTRIBUTED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SHEPPHIRD ASSOCIATES, ARCHITECTS + ENGINEERS. COPYRIGHT © 2023 26560 AGOURA ROAD, SUITE 106 CALABASAS, CA 91302 310.670.9144 A S S O C I A T E S ARCHITECTS + ENGINEERS S H E P P H I R D will.s@shep-ae.com 1 12-02-22 SD PRICING 2 2-10-23 DD PRICING 3 9-07-23 PHASE 2 90% CD Atlantic Beach Country Club Phase 2 Construction Documents 1600 Selva Marina Drive Atlantic Beach, FL 32233 FOR CONSTRUCTION 4 10-31-23 PHASE 2 100% CD 1/4" = 1'-0" 1-P3.2APHASE 2 -MAIN CLUBHOUSE PARTIAL PLAN -WATER2022-352 CAT 1/4" = 1'-0"1-P3.2A PHASE 2 - MAIN CLUBHOUSE PARTIAL PLAN - KITCHEN PLAN - WATER & GAS1