Loading...
1545 Main Street ROW24-0007 PermitOWNER:ADDRESS:CITY:STATE:ZIP: PAR PRO LTD PO BOX 330177 ATLANTIC BEACH FL 32233-0177 COMPANY:ADDRESS:CITY:STATE:ZIP: Verizon Wireless 14055 Riveredge Drive Tampa FL 33637 TYPE OF CONSTRUCTION: REAL ESTATE NUMBER:ZONING:BUILDING USE GROUP:SUBDIVISION: 172325 0010 SECTION LAND JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK: 1545 MAIN ST RIGHT OF WAY SINGLE OR TWO FAMILY RIGHT OF WAY VERIZON - DIRECT DRILL FIBER CABLE $41532.00 LIST OF CONDITIONS Roll off container company must be on City approved list . Container cannot be placed on City right-of-way. 1 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL Notes: Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is needed, call 247-5878. State Law requires calling Sunshine 811 to have ALL public utilities located BEFORE beginning the work. 2 PUBLIC WORKS DRIVEWAY APRON INFORMATIONAL Notes: All concrete driveway aprons must be 5 inches thick, 4000 psi, with fibermesh from edge of pavement to the property line. Reinforcing rods or mesh are not allowed in the City right-of-way. NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property that may be found in the public records of this county, and there may be additional permits required from other governmental entities such as water management districts, state agencies, or federal agencies. WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION. ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES . ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY. 1 of 2Issued Date: 3/27/2024 PERMIT NUMBER ROW24-0007 ISSUED: 3/27/2024 EXPIRES: 6/25/2024 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 FEES DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT TOTAL: 3 PUBLIC WORKS EROSION CONTROL INSTALLATION INFORMATIONAL Notes: Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247- 5814) to request an Erosion and Sediment Control Inspection prior to start of construction. 4 PUBLIC WORKS DUMPSTERS/ROLL-OFF CONTAINERS INFORMATIONAL Notes: Dumpsters and roll-off containers must be used in compliance with Section 16-8 and must comply with all standards, per City code. 5 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL Notes: Full right-of-way restoration, including sod, is required. 6 PUBLIC WORKS CONSTRUCTION SITE MANAGEMENT INFORMATIONAL Notes: Provide construction site management plan, including location of silt fence, dumpster, portable toilet. Right-of-Way Permit is required if using right-of- way for construction parking. 7 PUBLIC WORKS GRASS INFORMATIONAL Notes: Full site to be grassed. 8 PUBLIC WORKS REVISION INFORMATIONAL Notes: Any plan change must be submitted as a Revision to the Building Department. 9 PUBLIC WORKS DEBRIS REMOVED INFORMATIONAL Notes: All construction debris must be removed from job site by Contractor. 10 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL Notes: Any damage done to infrastructure must be repaired by Contractor. 2 of 2Issued Date: 3/27/2024 PERMIT NUMBER ROW24-0007 ISSUED: 3/27/2024 EXPIRES: 6/25/2024 RIGHT OF WAY PERMIT CITY OF ATLANTIC BEACH 800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 Final Plumbing Final Electrical Final HVAC CC Final Final Building* Swimming Pool Steel Swimming Pool Safety Electrical Grounding & Bonding Swimming Pool Final (Bldg) Swimming Pool Final (PW) Formed Columns/ Beams* Masonry Cell Fill Structural Steel* OTHER: OTHER: OTHER: OTHER: OTHER: Power Pole Silt Fence Piers/ Stem Walls Underground Plumbing Underground Electric Foundation/ Footing Slab** Retaining Wall Footing Driveway Sewer (Building Dept) Sewer Tap (Utilities Dept) Rough Electric* Rough Plumbing/ Top Out* Rough Mechanical* House Wrap Wall Sheathing Roof Sheathing Tie-down Framing Connections Rough Framing Roofing In Progress Window/Door In-Progress Insulation Ceiling Insulation Wall Exterior Lath Stucco Scratch Coat Exterior Siding In-Progress Brick Flashing & Ties Early Power Gas Rough Gas Final* * When all rough electric, plumbing, mechanical are complete but before any work is covered up. * When all gas piping is complete and wallboard is installed but before gas is attached to any appliance. All outlets must be capped and pipe pressurized at a minimum of 15 lbs. * For new living space: When all construction work including electrical, plumbing, mechanical, exterior finish, grading, required paving and landscaping is complete and the building is ready for occupancy, but before being occupied Additional inspections may apply to your project if your project contains these elements: INSPECTIONS REQUIRED FOR BUILDING PERMITS To verify compliance with building codes, inspections of the work authorized are required at various points of the construction. The following inspections are typically required for residential projects: Date: Initial: Date: Initial: ____________________________________________________ Permit No. ___________________________________________________________ Job Address ____________________________________________________ Contractor POST THIS CARD WITH PERMITS AND PERMIT DOCUMENTATION IN FRONT OF BUILDING Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends Building Department Public Works/Utilities Fire Department Phone: 904-247-5826 Phone: 904-247-5834 Phone: 904-630-4789 Fax: 904-247-5845 Fax: 904-247-5843 Fax: 904-630-4203 * When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all electrical, plumbing and mechanical work is in place, but before concrete is poured. * When all structural steel members are in place and all connections are complete, but before such work is covered or concealed. ** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION _____________________________________________________ Permit Type © 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS HH HHHHHHHHHH HH HH CAB SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 1 N/A N/A 3/14/2024 HUB NAME: REMBRANDT TOWERS - JCVNFLTI HUB ADDRESS: ​ 2701 HODGES BLVD JACKSONVILLE, FL, 32224 N LOCATION MAP MAPSCO PAGE #GIS GRID#N.T.S. TABLE OF CONTENTS: ISSUE DATE: March 14, 2024 CONSTRUCTION SET BE/SITE NFID: 1711BBHN.16 JACKSONVILLE, FLORIDA EWO NFID #: 2401BFQK SITE NAME: MAYPORT - A SITE ADDRESS: 1545 MAIN ST, JACKSONVILLE, FL MCImetro ACCESS TRANSMISSION SERVICES, LLC OUTSIDE PLANT CONSTRUCTION FIBER OPTIC CABLE ROUTE COVER SHEET LOCATION MAP CONTACT SHEET GENERAL NOTES/ CLARIFICATION NOTES ABBREVIATIONS SYMBOLS KEY LINE SYMBOLOGY TYPICAL DETAILS CLARIFICATION SUMMARY OUTSIDE PLANT - PLAN TRAFFIC CONTROL PLAN 1 2 3 4 5 6 7 8-12 13 14-20 21-22 © 2024 Microsoft Corporation © 2024 TomTom HH HH HHHH HHHH HH HH CAB N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 2 N/A N/A 3/14/2024 NODE: 1711BBHN.16 MAYPORT - A 2401BFQK STA 33+68 1545 MAIN ST JACKSONVILLE, FL 32246 NODE:30.337342 LONG: -81.419761 JCTI01: 145-156 STA 31-+90 PROPOSED 24X36X24 HH LAT: 30.336971 LONG: -81.41962442 JCTI01; 145-156 STA 25+44 PROPOSED24X36X24 HH LAT: 30.33715128 LONG: -81.42165238 JCTI01; 145-156 STA 20+68 PROPOSED24X36X24 HH ACPT:HH::502384119 LAT:30.33591607 LONG: -81.421572 JCTI01; 145-156 STA 19+10 EXISTING 24X36X24 HH LAT:30.33585963 LONG: -81.42101742 JCTI01; 145-156 STA 11+69 EXISTING 24X36X24 HH LAT:30.33568601 LONG: -81.4186772 JCTI01; 145-156 STA 7+59 EXISTING 24X36X24 HH LAT:30.33561425 LONG: -81.41738437 JCTI01; 145-156 STA 0+00 EXISTING 30X60X30 MCI HH LAT:30.33548567 LONG: -81.41498501 JCTI01; 145-156 STA 13+94 EXISTING 24X36X24 HH LAT:30.33575662 LONG: -81.4193853 JCTI01; 145-156 CONTACT SHEET SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 3 N/A N/A 3/14/2024 VERIZON: ENGINEER: MARVIN FISHER TEL: 904-6335481 FDOT ENGINEER: THOMAS WIND EMAIL: marvin.fisher@verizon.com TEL: 850-480-6642 VITTORIO FERRARA EMAIL: thomas.wind@verizon.com vittorio.ferrara@dot.state.fl.us DANELLA: MANAGER: CLINT DODSON TEL: 904-759-8616 SHERMAN WINDLEY EMAIL: cdodson@danella.com sherman.windley@dot.state.fl.us VICE PRESIDENT: DAN HOWICK TEL: 321-259-6124 EMAIL: DHOWICK@DANELLA.COM CLAY COUNTY CHRIS MAYNOR OSP DESIGNER: RANDY BURKHOLDER TEL: 321-259-6124 chris.maynor@claycountygov.com EMAIL:RBURKHOLDER@DANELLA.COM UTILITIES: DIRECTOR: L. DERRIK OWENS TEL: 850-435-1755 STATE GOVERNMENT: FDOT-PERMITS UNITS TEL: 850-981-3000 CITY GOVERNMENT: CTY OF JACKSONVILLE EVA BRUNSON TEL: 904-255-7296 PERMIT ASSISTANT EMAIL: E.BRUNSON@COJ.NET CHARLIE FOX EMAIL: charleef@coj.net SANTONIO WILLIAMS EMAIL: santoniow@coj.net CYRIL HICKS EMAIL: hicksc@coj.net ST JOHNS COUNTY MICHELLE CLINE EMAIL: MCLINE@SJCFL.US EMERGENCY: 911 SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 4 N/A N/A 3/14/2024 GENERAL NOTES / CLARIFICATION NOTES CONSTRUCTION NOTES 1.ALL CONDUIT WILL BE 2" AND 4" ID SCHEDULE 40 (i.e. PVC OR BSP/GSP, MANUFACTURED SPLIT PVC OR SPLIT BSP/GSP), UNLESS SPECIFIED OTHERWISE. 2.CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES 48 HOURS PRIOR TO CONSTRUCTION ACTIVITY. SEE CONTACT SHEET FOR CONTACT NAME AND TELEPHONE NUMBER. 3.ALL UNDERGROUND OBSTRUCTION, WHEN LOCATED, WILL REQUIRE THE PLACEMENT OF A BURIED CABLE MARKER AND THE PLACEMENT OF 4" MANUFACTURED SPLIT PVC, BSP/GSP OVER OR UNDER EACH OBSTRUCTION. 4.SHORING MAY BE REQUIRED AND SHALL COMPLY TO O.S.H.A. STANDARDS. 5.ALL BURIED CONDUIT/CABLE WILL BE PLACED AT 42" MINIMUM COVER UNLESS SPECIFIED OTHERWISE ON THE CONSTRUCTION DRAWINGS. 6.MECHANICAL PROTECTION SHALL BE REQUIRED ANYTIME A 36" MINIMUM COVER IS UNOBTAINABLE UNLESS SPECIFIED OTHERWISE ON THE CONSTRUCTION DRAWINGS. 7.ALL 90 DEGREE BENDS IN CONDUIT CONSTRUCTION WILL BE A MINIMUM 38.2" RADIUS UNLESS SPECIFIED OTHERWISE. ALL SPLIT CONDUIT BENDS AND SOLID PVC BENDS SHALL REQUIRE CONCRETE ENCASEMENT UNLESS SPECIFIED OTHERWISE. 8.OPERATIONS PERSONNEL TO BE CONTACTED BY THE CONTRACTOR 48 HOURS PRIOR TO CONSTRUCTION. SEE CONTACT SHEET FOR CONTACT NAME AND TELEPHONE NUMBER. 9.ALL STATIONING IS BASED ON AS-BUILT INFORMATION, THEREFORE SOME VARIANCE SHOULD BE ANTICIPATED. ADJUST AS NEEDED. 10.RAILROAD COMMUNICATION AND SIGNAL CABLES TO BE LOCATED PRIOR TO CONSTRUCTION ACTIVITY. RAILROAD TO BE GIVEN 48 HOURS NOTICE PRIOR TO CONSTRUCTION. 11.ALL BURIED CABLE MARKER POST AND HARDWARE PLACED AND/OR REMOVED ON ALL NEW AND EXISTING ROUTES SHALL BE IMPLEMENTED AS FOLLOWS: A.ON THOSE ROUTES THAT ARE CONSIDERED TO BE IN A NORTH TO SOUTH GEOGRAPHICAL ORIENTATION, THE SOUTHERN-MOST SIGN AND POST SHOULD BE REMOVED. *FOR NEW ROUTES BEING CONSTRUCTED, ONE SIGN POST WILL BE PLACED AT THE NORTH END OF EACH HANDHOLE. B.ON THOSE ROUTES THAT ARE CONSIDERED TO BE IN A EAST TO WEST GEOGRAPHICAL ORIENTATION, THE WESTERN-MOST SIGN AND POST SHOULD BE REMOVED. *FOR NEW ROUTES BEING CONSTRUCTED, ONE SIGN POST WILL BE PLACED AT THE EAST END OF EACH HANDHOLE. CLARIFICATION NOTES C-100 CONSTRUCTION - NEW UNDERGROUND 1X2" HDPE (BORE/TRENCH/PLOW) C-110 CONSTRUCTION - NEW UNDERGROUND 1X2" HDPE (OPEN CUT/HARDSCAPE) C-120 CONSTRUCTION - NEW UNDERGROUND 1X2" HDPE (MICRO TRENCH) C-200 CONSTRUCTION - EXISTING UNDERGROUND (VZ OWNED/3RD PART) C-300 CONSTRUCTION - AERIAL (NEW/OVERLASH) C-500 CABLE PREP/SPLICING/TESTING (LOOSE TUBE) C-510 CABLE PREP/SPLICING/TESTING (RIBBON) AHD AHEAD AM AMTRAK APPROX APPROXIMATELY ASPH ASPHALT AVE AVENUE B/L BASELINE BK BACK BLDG BUILDING BORO BOROUGH BRG BRIDGE BSP BLACK STEEL PIPE BUS BUSINESS CBNT CABINET C/L CENTER LINE C/O CLEAN OUT CB CATCH BASIN CC CENTER TO CENTER CIP CAST IRON PIPE CIR CIRCLE CK CREEK CM CENTER TO MATCHLINE CMP CORRUGATED METAL PIPE CO.COUNTY CONC CONCRETE COND CONDUIT CR COUNTY ROUTE CT COURT CTY CITY CULV CULVERT CW CENTER TO WALL D DEEP OR DEPTH DB DEED BOOK DEPT DEPARTMENT DI DROP INLET DIA DIAMETER DIST DISTRICT DR DRIVE DWG DRAWING E EAST E.O.P.EDGE OF PAVEMENT E/R EDGE OF ROAD E/S EDGE OF SIDEWALK E/SHD EDGE OF SHOULDER ELEC ELECTRIC EMH ELECTRIC MANHOLE ENC ENCASED EQ EQUATION EQUIP EQUIPMENT FBR FIBER FC FACE OF CURB FH FIRE HYDRANT FND FOUND FOC FIBER OPTIC CABLE FTA FIBER TRANSMISSION A GALV GALVANIZED GM GAS METER GOVT GOVERNMENT GV GAS VALVE HH HANDHOLE HDPE HIGH DENSITY POLYETHYLENE HWY HIGHWAY INC INCORPORATED INT INTERMEDIATE IP IRON PIN JS JUNCTION SPLICE L LOT NUMBER LAT LATITUDE LGTH LENGTH LN LANE LON LONGITUDE LT LEFT M TAX MAP MAX MAXIMUM MC MATCHLINE TO CENTER MH MANHOLE MIN MINIMUM MKR MARKER MON MONUMENT MPG MID POINT GROUND N NORTH N/F NOW OR FORMERLY NO.NUMBER NS NORFOLK SOUTHERN NT NOTE OH OVERHEAD P PARCEL NUMBER P/L PROPERTY LINE PCC PORTLAND CEMENT CONCRETE PG PAGE PI POINT OF INTERSECTION PLCS PLACES PMTR PARKING METER POLY POLYETHYLENE PVC POLYVINYLCHLORIDE R RANGE R/W RIGHT OF WAY RCB REINFORCED CONCRETE BOX RCP REINFORCED CONCRETE PIPE RD ROAD REQD REQUIRED RGS RIGID GALVANIZED STEEL RR RAILROAD RT RIGHT RV RIVER S SOUTH SAN SANITARY SB SPLICE BOX SEC SECTION SEW SEWER SHD SHOULDER SMH SEWER MANHOLE SPL SPLICE SPLMH SPLICE MANHOLE SR STATE ROUTE ST STREET STA STATION STL STEEL STM STORM STR STREAM T-TOWNSHIP ROUTE TR TRAFFIC BOX TEL TELEPHONE TP TEST POINT (WETLAND DELINEATION) TP TRAVERSE POINT TRIB TRIBUTARY TS TRAFFIC SIGNAL TSB TRAFFIC SIGNAL BOX TWP TOWNSHIP TWS TRAFFIC SIGNAL WIRES TYP TYPICAL US UNITED STATES VA VIRGINIA VCP VITRIFIED CLAY PIPE VPP VITRIFIED PLASTIC PIPE VZN VERIZON W WEST OR WIDE W/WITH WH WHITE WM WATER METER WW WALL TO WALL SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 5 N/A N/A 3/14/2024 NORTH ARROW MARKER-NUMBER STATION-NUMBER OFFSET-DIST MARKER-NUMBER STATION-NUMBER OFFSET-DIST MARKER-NUMBER STATION-NUMBER OFFSET-DIST MARKER-NUMBER STATION-NUMBER OFFSET-DIST 48" DOC FT MIN. DEPTH STA. TO STA. 25+00 25+00 23+00 MARKER POLE RIGHT MARKER POLE LEFT EXISTING MARKER POLE RIGHT EXISTING MARKER POLE LEFT FENCE/GATE MILE POST (LEFT) MILE POST (RIGHT) DEPTH OF COVER DEPTH OF COVER EXTRA DEPTH NOTE ELECTRIC MARKER BALL CAUTION WARNING NOTE HAZARD WARNING NOTE STREAM FLOW LINE COORDINATE TICK MARK STATION TICK MARK IRON PIPE/IRON PIN BENCH MARK MONUMENT (SURFACE) MONUMENT (IN CASE) CENTER LINE PROPERTY LINE WATER METER GAS METER WATER GUARD POST FIRE HYDRANT GAS VALVE PAD MOUNTED TRANSFORMER TRANSMISSION TOWER UTILITY POLE UTILITY POLE ANCHOR TELEPHONE RISER TELEPHONE VAULT TELEPHONE MANHOLE ELECTRICAL BOX SAN. SEWER MANHOLE STORM DRAIN CATCH BASIN STORM DRAIN CULVERT STORM DRAIN MANHOLE STATE HIGHWAY ADMIN. MANHOLE WATER VALVE BUS STOP MAIL BOX RIP RAP ROCKERY SHRUBBERY SIGN TREE (CONIFER) TREE (DECIDUOUS) YARD LIGHT STREET LIGHT ASSEMBLY TRAFFIC SIGNAL POLE FLASHING WARNING SYSTEM JUNCTION BOX R/R CROSSING GATE R/R CROSSING SIGN R/R CROSSING SIGNAL SIGNAL CONTROLLER FOREIGN MARKERS RAILROAD MILE MARKER ELECTRICAL MANHOLE PROPOSED VERIZON HANDHOLE NODE NODE ID SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 6 N/A N/A 3/14/2024 SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 7 N/A N/A 3/14/2024 ABOVE GROUND PIPING BRUSH/TREE LINE CULVERT/DRAIN PIPE CENTERLINE ROAD DRAINAGE FLOWLINE OR STREAM FACE OF CURB EDGE OF STREET/ROAD (PAVED) EDGE OF GRAVEL ROAD FENCE LINE EDGE OF SIDEWALK GUARDRAIL PAVEMENT MARKINGS PROPERTY LINE RAILROAD RIGHT OF WAY LINE LEASED CONDUIT DIRECT BURIED CABLE BURIED CONDUIT CONCRETE ENCASED CATV CATV CATV BOC S/W S/W P/LP/LP/LP/L R/W R/W L L HHSECTION, TOWNSHIP, COUNTY & RANGE LINES EDGE OF WATER, WET LAND CONTOUR LINE CONTOUR INDEX UTILITY - AERIAL ELECTRIC UTILITY - BURIED ELECTRIC UTILITY - FIBER OPTIC TELEPHONE UTILITY - BURIED GAS UTILITY - BURIED SANITARY SEWER UTILITY - BURIED STORM DRAIN UTILITY - AERIAL TELEPHONE UTILITY - BURIED TELEPHONE UTILITY-BURIED CABLE TV UTILITY-AERIAL CABLE TV UTILITY - BURIED WATER WALL - RETAINING PROPOSED FIBER OPTIC CABLE/CONDUIT TRAFFIC SIGNAL WIRES WET LANDS E E E E GAS GAS GAS SAN SAN T RET RET RET RET TS W SD SD =|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|==|= WL WL WL HH SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 8 N.T.S. N.T.S. 3/14/2024 SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 9 N.T.S. N.T.S. 3/14/2024 SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 10 N.T.S. N.T.S. 3/14/2024 Armorcast Products Company reserves the right to update or discontinue product information at any time without notice. www.armorcastprod.com ARMORCAST PRODUCTS COMPANY POLYMER CONCRETEBOXESPOLYMER CONCRETE STANDARD DIMENSIONS A6001974 THIS PRODUCT IS LISTED TO APPLICABLE UL STANDARDS AND REQUIRMENTS BY UL. 1/2” TYP. 24” x 36” BOX ASSEMBLY Tel: (818) 982-3600 Fax: (818) 982-7742 20K LOAD RATING SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 11 N.T.S. N.T.S. 3/14/2024 VARIES FINISHED GRADE MCI MARKER SPLICE HANDHOLE SIGN I.D. NUMBER CALL MCI1-800-624-9675AND THE LOCAL ONE CALL48 HOURS BEFORE DIGGINGIN THIS VICINITY WARNING TUBULAR MARKER 8' STEEL POST DRIVEN 4'-0" INTO GROUND 6'-1.75" 4'-0" 6" SPLICE HANDHOLE COVER NOT SHOWN FOR CLARITY DETAIL "A" PLAN VIEW DETAIL "B-1" C-LOK GROUND ROD INSTALLATION METHOD DETAIL "B" INSTALLATION DETAIL GROUND LOCATIONS FIBER CABLE CONDUIT GROUND ROD 3 WIRES #6 SOLID COLOR CODED FIBER OPTIC CABLE FIBER OPTIC CABLE CONDUIT FIBER CABLE HDPE DUCT FOR HARNESS TEMPORARY GROUNDING BEFORE SPLICING SEE DETAIL "B-3" R&UOW DETAIL "B-3" TEMPORARY GROUNDING (INCLUDING SPURB CABLE) DETAIL "B-2" C-LOK CONNECTOR SPUR FIBER CABLE 1" STAINLESS STEEL HOSE CLAMPS SOUTHWEST FIBER CABLE BLACK WIRE FROM SURGE ARRESTER ATTACH TO RPS OF CABLE YELLOW WIRE FROM SURGE ARRESTER ATTACHED TO RPS OF CABLE BLUE WIRE FROM SURGE ARRESTER ATTACHED TO RPS CABLE HDPE DUCT FOR HARNESS NORTHEAST FIBER CABLE GREEN WIRE TO SURGE ARRESTER (#6 WIRE) CABLE GROUNDING INSTALLATION DETAILS (FOR CONTRACTOR INSTALLATION) NOTE: SEE DETAIL "B-1" THIS SHEET FOR INSTALLATION METHOD. NOTES: 1. OSP CONTRACTOR SHALL INSTALL THE FOLLOWING MCI FURNISHED MATERIALS: ·6' TUBULAR MARKER WITH HARDWARE (1) ·SPLICE HANDHOLE ·GROUND ROD AND FIGURE 8 CONNECTOR ·PULL WIRE HARNESS FROM HANDHOLE TO MARKER 2. THE CONTRACTOR WILL FURNISH AND INSTALL THE HDPE, LENGTH AS REQUIRED PER THE DRAWINGS SUPPLIED. 3. ALL MCI AND CONTRACTOR FURNISHED MATERIALS SHALL BE IN PLACE PRIOR TO PLACEMENT OF THE FIBER OPTIC CABLE, AT WHICH TIME THE TEMPORARY GROUND CONNECTION WILL BE MADE IN ACCORDANCE WITH DETAIL "A'. 4. AFTER CONNECTION OF THE TEMPORARY GROUND, THE CONTRACTOR SHALL SEAL THE ENDS OF THE FIBER OPTIC CABLE TO PREVENT THE ENTRY OF MOISTURE. 5. AFTER INSTALLATION OF THE FIBER OPTIC CABLE AND WIRING HARNESS BY THE CONTRACTOR, THE CONTRACTOR SHALL SEAL ALL DUCT LINE OPENINGS WITH MCI APPROVED MATERIAL TO PREVENT THE ENTRY OF MOISTURE. 6. MARKER AND HANDHOLE SHOULD BE PLACED IN LINE WITH THE NORTHERN CORNER OF THE SPLICE HANDHOLE FOR NORTH/SOUTH ROUTES, THE EASTERN CORNER OF THE SPLICE HANDHOLE FOR EAST/WEST ROUTES. CABLE ROUTE FIBER OPTIC 1. WITH GROUND WIRE IN SMALL GROOVE, HOOK "C" COMPONENT AROUND ROD. 2. INSERT WEDGE COMPONENT BETWEEN ROD AND WIRE. 3. PUSH WEDGE COMPONENT BETWEEN ROD AND WIRE TO SECURE ASSEMBLY. 4. COMPLETE CONNECTION USING PILLARS. 5. ENSURE SECURING LOCK IS VISIBLE IN "INSPECTION WINDOW". SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 12 N.T.S. N.T.S. 3/14/2024 A-1 A-1 TUBULAR MARKER DETAILS CALL 1-800-6 AND THE LOC 48 HOURS BE IN THIS MCI 24-9675 AL ONE CALL FORE DIGGING VICINITY SIGN I.D. NUMBER CALL MCI1-800-624-9675AND THE LOCAL ONE CALL48 HOURS BEFORE DIGGINGIN THIS VICINITYWARNINGFIBEROPTICCABLEROUTE 6" 4'0" 6'-1.75" STEEL POST INSIDE TUBULAR MARKER EXISTING GRADE 8' STEEL POST DRIVEN 4'-0 INTO GROUND 3.75" O.D. 6'0" 3.75" O.D. 1.75" 1'10" 3" 0.50" DIA. BOLT HOLE (BOTH SIDE) SEE SECTION A-1 & DETAIL "D" THIS SHEET THICKNESS MATERIAL 0.125" SLEEVE (WHITE) THICKNESS MATERIAL 0.125" MARKER (ORANGE) TUBULAR MARKER 8' STEEL POST 1.5" BOLT SEE DETAIL "D" 1.5" 0.375"-16 THREADS DETAIL "A"DETAIL "B"DETAIL "C" DETAIL "D" INSTALLATION VIEW FRONT VIEW SIDE VIEW TUBULAR MARKER SECTION A-1 1.5" BOLT 3.75" O.D. 6'0" 3.75" O.D. 1.75" 1'10" 6" 0.50" DIA. BOLT HOLE (BOTH SIDE) SEE SECTION A-1 & DETAIL "D" THIS SHEET THICKNESS MATERIAL 0.125" SIGN I.D. NUMBER CALL MCI 1-800-624-9675 AND THE LOCAL ONE CALL48 HOURS BEFORE DIGGINGIN THIS VICINITY FIBEROPTICCABLER OUTENUMBER SIGN I.D. W A R N I N G C A B L E R O U T E F I B E R O P T I C SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 13 N.T.S. N.T.S. 3/14/2024 CLCLCLEOP BOCEOP EOP EOPS/W S/W S/W S/W S/WCL CL CL CLR/WR/WR/WWWSDSDSDSDSSSSGASGASGASGASGASGASGAS R/W R/W WSDSDSSGASGASGASR/WWSDSSGASGASGASWSD SD SDSSGASGASGASGAS GASOHE OHEOHEOHEOHEFH MAYPORT RD45 MPHLEVY RD 45 MPH 100'HHSTA 0+00 EXISTING 30X60X30 MCI HH ACPT:HH::501406370 EXISING SPLICE CLOSURE FIB:SPLCL::500272102 REFERENCE WO: 1801AHXN.9 PLACE 1 X 100' SLACK LOOP:UNDERGROUND::500784251 LAT: 30.33548567 LONG: -81.41498501 JCTI01; 145-156 HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH STA 0+00STA 1+00STA 2+0067'37'4'16'C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985832 759' 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 16'3'11'19'N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 14 1"=40' 1"=40' 3/14/2024MATCH TO SHEET 15 EOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOPS/WS/WS/WS/WS/WS/WS/WS/WCL CL CL CL CL CL CL CL R/WR/WR/WR/WWWSDSDSDSDSDSSSSGASGASGASGASGASGASGASGASGASR/WR/WWSDSDSDSSGASGASGASGASGASGASR/WWSDSDSSGASGASGAS R/W R/W R/W R/W R/W R/W R/WOHEOHEOHEOHEOHEOHEOHEFH X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X XX XX XXX OHELEVY RD 45 MPH HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHSTA 3+00STA 4+00STA 5+00STA 6+00STA 7+007'16'10'16'12'12'C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985832 759' 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 68'34'21'13'61'24'24'14'N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 15 1"=40' 1"=40' 3/14/2024MATCH TO SHEET 14MATCH TO SHEET 16 CLCLCLEOPEOP EOP EOP EOP EOP S/WS/WS/WS/WS/WS/WS/WS/WCL CL CL CL CL CL CL CL R/WR/WR/WWWSDSDSDSDSSSSGASGASGASGASGASGASGASR/WR/WWWSDSDSDSSSSGASGASGASGASGASGASR/WSDGASGASWSDSSGASGAS R/W R/W R/W R/W R/W R/WR/WR/WOHEOHEOHEOHEOHEOHEOHEOHEOHE FHWFH LEVY RD 45 MPH ORCHARD ST45 MPHROSE ST45 MPHMEALY ST45 MPH100' 100'HHHHSTA 7+59 EXISTING 24X36X24 HH ACPT:HH::501486575 REFERENCE WO: 1801AHXN.9 PLACE 1 X 100' SLACK LOOP:UNDERGROUND::500784216 LAT: 30.33561425 LONG: -81.41738437 JCTI01; 145-156 STA 11+69 EXISTING 24X36X24 HH ACPT:HH::501486574 REFERENCE WO: 1801AHXN.9 PLACE 1 X 100' SLACK LOOP:SLACK::500877155 LAT: 30.33568601 LONG: -81.4186772 JCTI01; 145-156 HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHSTA 8+00STA 9+00STA 10+00STA 11+00STA 12+00STA 7+59STA 11+6912'11'C-200 EXISTING CONDUIT OSP:SPANPATH::501020983 410' PROPOSED 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 C-200 EXISTING CONDUIT OSP:UGSPAN::500348925 225' PROPOSED 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985832 759' 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 60'24'23'13'24'59'23'12'N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 16 1"=40' 1"=40' 3/14/2024 MATCH TO SHEET 15MATCH TO SHEET 17 CLCLEOPEOP EOP EOP EOP EOP S/WS/WS/WS/WS/WS/WS/WS/WEOPEOPCL CL CL CL CL CL CL CL CLR/WSDGASGASR/WR/WR/WWWSDSDSDSDSSSSGASGASGASGASGASGASGASGASR/WR/WR/WWWWSDSDSDSDSDSSSSSSGASGASGASGASGASGASGASGAS R/W R/W R/W R/W R/W R/W R/W OHEOHEOHEOHEOHEOHEOHEFH W VIOLET ST45 MPHHIBISCUS ST45 MPH100'HHSTA 13+94 EXISTING 24X36X24 HH ACPT:HH::501486576 REFERENCE WO: 1801AHXN.9 PLACE 1 X 100' SLACK LOOP:UNDERGROUND::500784157 LAT: 30.33575662 LONG: -81.4193853 JCTI01; 145-156 HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHSTA 13+00STA 14+00STA 15+00STA 16+00STA 17+00STA 13+9412'12'10'14'C-200 EXISTING CONDUIT OSP:UGSPAN::500348925 225' PROPOSED 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 C-200 EXISTING CONDUIT OSP:SPANPATH::501021777 516' PROPOSED 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 LEVY RD 45 MPH 24'60'24'12'56'24'21'10'N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 17 1"=40' 1"=40' 3/14/2024 MATCH TO SHEET 16MATCH TO SHEET 18 CLCLCLEOP EOP EOP EOP EOPEOPEOPEOPEOP S/WS/WEOP EOP EOP CL CL CL CL CL CLCLCLCLCLCL SDGASGASGASR/WR/WR/WR/WWWWSDSDSDSDSDSDSSSSSSGASGASGASGASGASGASGASGASGASGASGASR/WR/WR/WWWSDSDSDSDSDSSSSGASGASGASGASGASGASGASGASR/W R/W R/W R/W R/W R/WR/WSDGASGASWSDSDSSGASGASGASGAS OHEOHEOHEOHEOHEOHEFH FHS/WS/WS/WS/WLEVY RD 45 MPH STOCKS ST45 MPHMAIN ST45 MPHLEVY RD 45 MPH 100' 100' 100'HHHHSTA 19+10 EXISTING 24X36X24 HH ACPT:HH::501486678 REFERENCE WO: 1801AHXN.9 PLACE 1 X 100' SLACK LOOP:UNDERGROUND::500784250 LAT: 30.33585963 LONG: -81.42101742 JCTI01; 145-156 STA 20+68 PROPOSED 24X36X24 HH ACPT:HH::502384119 PROPOSED SPLICE LOCATION FIB:SPLCL::500768377 PLACE 2 X 100' SLACK LOOP:SLACK::500784229 LOOP:UNDERGROUND::500784248 LAT: 30.33591607 LONG: -81.421572 JCTI01; 145-156 HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH H HHHH H H H H H H H H H HHH H H H HHH H H H H H H H H HHH H H H HHH H H H HHH H H H H H H H H HHH H H H HHH H H H HHH H H H HHH H H HHH H H H HHH H H H HHH H H H H H H H H H H H H H H HHH H H H HHH H H H HHH H H HHH H H H HHH FOC M A R K E R STA 18+00STA 19+00STA 20+00STA 21+00 STA 22+00 STA 23+00 STA 19+10STA 20+869'15'5'12'14'7'8'9' 4' 6'8' C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985850 176' 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985904 458' 12CT FIBER TAIL FIB:TAIL::500898687 1282' SPLICE FIBERS 1-12 C-200 EXISTING CONDUIT OSP:SPANPATH::501021777 516' PROPOSED 144CT FIBER CABLE FIB:BUR::500898705 2085' SPLICE FIBERS 1-12 7'7'54'24'11'20'63' 29'22'13' N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 18 1"=40' 1"=40' 3/14/2024 MATCH TO SHEET 19 MATCH TO SHEET 17 EOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XWFHX XX X X X X X XX X X X X X X XX X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X XS/WX X X X X X X X X X XX X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X XX X X X X X X X X X X X X X X X X X X X X X XX X X X XX X X X X X X X X X XS/WCLCLCLCLCLR/WWSDSDSSGASGASGASR/WR/WWWSDSDSDSSSSGASGASGASGASGASR/WR/WR/WR/WR/WR/WR/WR/WWWR/WR/WR/WR/WR/WGASSD SD SD SD SD SD S/WS/WS/WS/WS/WS/WMAIN ST45 MPHHHSTA 25+44 PROPOSED 24X36X24 HH ACPT:HH::502384198 LAT: 30.33715128 LONG: -81.42165238 JCTI01; 145-156 HH H H H HHH H H H HHH H H HHH H H H HHH H H H HHH H H H H H H H H H H H H H H HHH H H H HHH H H H HHH H H HHH H H H HHH H H H HHH H H H HHH H H H H H H H H HHH H H H HHH H H H HHH H H H H H H H H HHH H H H HHH H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H FOC M A R K E R STA 24+00 STA 25+00 STA 26+00STA 27+00STA 28+00STA 25+44 5'8' 4'10' 3'14'12'5'4'5'4'C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985904 458' 12CT FIBER TAIL FIB:TAIL::500898687 1282' SPLICE FIBERS 1-12 C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985926 646' 12CT FIBER TAIL FIB:TAIL::500898687 1282' SPLICE FIBERS 1-12 64' 28'22'14'37'20'8'9'N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 19 1"=40' 1"=40' 3/14/2024 MATCH TO SHEET 18 MATCH TO SHEET 20 EOP EOP EOP X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X XX X X X X X X X X X X X X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X XXX X X X X X XXX X X X X X XXX X X X X X XXX X X X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XXX X X X X X XXX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X XX X X X X X X X X X X X X XX X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X X X X X X X X X X XX X X X X X X X X X X XX XXXXX XXXXX XXX XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X FHR/WR/WR/WR/WR/WWWWR/WR/WR/WR/WR/WR/WSD MAYPORT - A 100'HHCAB STA 31-+90 PROPOSED 24X36X24 HH ACPT:HH::502384199 LAT: 30.336971 LONG: -81.41962442 JCTI01; 145-156 NODE: 1711BBHN.16 MAYPORT - A 2401BFQK STA 33+68 1545 MAIN ST JACKSONVILLE, FL 32246 STRU:CAB::502384211 FIBER EQUIPMENT FIB:GHT::500598675 FIB:HDFP::500598714 PLACE 1 X 100' SLACK LOOP:SLACK::500784218 LAT: 30.337342 LONG: -81.419761 JCTI01: 145-156 1545 MAIN ST JACKSONVILLE FL 32246 H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H H HHH H H H H H H HHH H H H H H H HHH H H H H H H HHH H H H H H H HHH H H H H H H HHH H H H H H H HHH H H H H H H H HHHHHHHHHHHHHHHHHHHHHHHHH H H H H H H FOC M A R K E RSTA 29+00STA 30+00STA 31+00STA 32+00STA 33+00STA 31+90STA 33+686'3'7'6'7'6'77'R/WR/W11' C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985926 646' 12CT FIBER TAIL FIB:TAIL::500898687 1282' SPLICE FIBERS 1-12 C-100 PROPOSED 1-2" HDPE CONDUIT AT A MINIMUM DEPTH OF 4' BY DIRECTIONAL BORE OSP:SPANPATH::500985927 178' 12CT FIBER TAIL FIB:TAIL::500898687 1282' SPLICE FIBERS 1-12 37'20'10'7'N SCALE HORIZONTAL: VERTICAL: MP:TO MP: SHEET:OF FILE: DATE: DRAWN BY: REVISIONS DATE DESCRIPTION INITIAL PROJECT: CLARIFICATION NO.QUANTITY JACKSONVILLE, FLORIDAMCI metroACCESS TRANSMISSION SERVICES CORPOUTSIDE PLANT CONSTRUCTION22 JACKSONVILLE, FLORIDA, DUVAL COUNTY 1711BBHN.16 SITE NAME: JACKSONVILLE, FLORIDA 1711BBHN.16 MAYPORT - A R.BURKHOLDER 20 1"=40' 1"=40' 3/14/2024MATCH TO SHEET 19 LEVY RD