Loading...
WR spreadhseet PPI24-0001 331 2nd St.Comp. By: Date:3/26/2024 Public Works Department City of Atlantic Beach Permit No:PPI24-0001 Address:331 2nd Street Required Storage Volume Criteria: Section 24-68 of the City of Atlantic Beach's Zoning, Subdivsion, and Land Development Regulations requires that stormwater runoff from impervious areas be stored onsite. Volume to be retained is as follows: V = CAR/12 which is the Modified Rational Method for estimating stormwater runoff Where:V = Volume of Runoff to be stored (cubic feet) C = Runoff Coefficient, 0.92, the difference between impervious area (C=1.0) and undeveloped conditions (C=0.08). A = Impervious Area (square feet) R= 25-yr / 24-hr rainfall depth (9.3 inches for Atlantic Beach) Onsite Storage Volume Required for Impervious Area: Lot Area = 7,000 ft2 Impervious Area (A) = 2,765 ft2 =40% V = 0.92 x 2,765.0 x 9.3 /12 V = 1,971 ft3 Provided Storage: Area 1 - Relative Elev.Area Storage Sideslope:2 :1 (ft)(ft2)(ft3) 8.5 544 BOTTOM size:-2 X -2 9.0 979 TOB size:0 X 0 Area 2 - Relative Elev.Area Storage (ft)(ft2)(ft3) 8.5 24 BOTTOM size:-2 X -2 9.0 216 TOB size:0 X 0 Area 3 - Relative Elev.Area Storage (ft)(ft2)(ft3) 0.0 0 BOTTOM size:0 X 0 0.0 0 TOB size:0 X 0 Inground Storage:= A*d/pf Total Storage Area at TOB (A) =1195.0 ft2 Depth to ESHWT from BOTTOM (d) =3.5 ft, default is 2.0 ft, verify onsite ESHWT Pore Factor (pf) =0.4 default is 0.4 Inground Storage Provided =1673.0 ft3 Required Treatment Volume =1,971 ft3 Supplied Treatment Volume =2,114 ft3 D. Martin 381 60 0 Retention WR Worksheet PPI24-0001 331 2nd St. 3/26/2024