142 Ocean Blvd DEMO24-0007 PermitOWNER:ADDRESS:CITY:STATE:ZIP:
Providence Construction
Company 4901 Belfort Road Ste. 140 Jacksonville FL 32256
COMPANY:ADDRESS:CITY:STATE:ZIP:
ELEV8 LAND CLEARING &
DEMOLITION 4627 Heckscher Dr JACKSONVILLE FL 32226
TYPE OF
CONSTRUCTION:
REAL ESTATE
NUMBER:ZONING:BUILDING USE
GROUP:SUBDIVISION:
170202 0000 ATLANTIC BEACH
JOB ADDRESS:PERMIT TYPE:DESCRIPTION: VALUE OF WORK:
142 OCEAN BLVD DEMO COMPLETE DEMO - HOUSE AND
GARAGE $16100.00
LIST OF CONDITIONS
Roll off container company must be on City approved list . Container cannot be placed on City right-of-way.
1 PUBLIC UTILITIES UNDERGROUND WATER SEWER UTILITIES INFORMATIONAL
Notes:
Avoid damage to underground water and sewer utilities. Verify vertical and horizontal location of utilities. Hand dig if necessary. If field coordination is
needed, call 247-5878. State Law requires calling Sunshine 811 to have ALL public utilities located BEFORE beginning the work.
NOTICE: In addition to the requirements of this permit, there may be additional restrictions applicable to this property
that may be found in the public records of this county, and there may be additional permits required from other
governmental entities such as water management districts, state agencies, or federal agencies.
WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT
IN YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. A NOTICE OF
COMMENCEMENT MUST BE RECORDED AND POSTED ON THE JOB SITE BEFORE THE FIRST
INSPECTION. IF YOU INTEND TO OBTAIN FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT.
MUST CALL INSPECTION PHONE LINE (904) 247-5814 BY 4 PM FOR NEXT DAY INSPECTION.
ALL WORK MUST CONFORM TO THE CURRENT 6TH EDITION (2017) OF THE FLORIDA BUILDING
CODE, NEC, IPMC, AND CITY OF ATLANTIC BEACH CODE OF ORDINANCES .
ALL CONDITIONS OF PERMIT APPLY, PLEASE READ CAREFULLY.
1 of 3Issued Date: 4/15/2024
PERMIT NUMBER
DEMO24-0007
ISSUED: 4/15/2024
EXPIRES: 10/12/2024
DEMO PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
FEES
DESCRIPTION ACCOUNT QUANTITY PAID AMOUNT
DEMOLITION 455-0000-322-1000 0 $100.00
PU REVIEW BUILDING MOD OR ROW 001-0000-329-1007 0 $25.00
PW REVIEW BUILDING MOD OR ROW 001-0000-329-1004 0 $25.00
2 PUBLIC UTILITIES DISCONNECT AND CAP INFORMATIONAL
Notes:
Disconnect and cap water and sewer lines. Capped sewer line must be located at property line and standpipe must be visible above ground level.
3 PUBLIC UTILITIES INSPECTION PRIOR TO DEMOLITION INFORMATIONAL
Notes:
MUST CALL 247-5814 FOR A PRE-DEMO INSPECTION OF THE DISCONNECTED AND CAPPED WATER AND SEWER LINES PRIOR TO DEMOLITION.
4 PUBLIC WORKS EROSION CONTROL INSTALLATION INFORMATIONAL
Notes:
Full erosion control measures must be installed and approved prior to beginning any earth disturbing activities. Contact the Inspection Line (904-247-
5814) to request an Erosion and Sediment Control Inspection prior to start of construction.
5 PUBLIC WORKS DUMPSTERS/ROLL-OFF CONTAINERS INFORMATIONAL
Notes:
Dumpsters and roll-off containers must be used in compliance with Section 16-8 and must comply with all standards, per City code.
6 PUBLIC WORKS RIGHT OF WAY RESTORATION INFORMATIONAL
Notes:
Full right-of-way restoration, including sod, is required. Full site to be grassed.
7 PUBLIC WORKS CONSTRUCTION SITE MANAGEMENT INFORMATIONAL
Notes:
Provide construction site management plan, including location of silt fence, dumpster, portable toilet. Right-of-Way Permit is required if using right-of-
way for construction parking.
8 PUBLIC WORKS SLAB DRIVEWAY REMOVAL INFORMATIONAL
Notes:
Slab and driveway to be fully removed.
9 PUBLIC WORKS REVISION INFORMATIONAL
Notes:
Any plan change must be submitted as a Revision to the Building Department.
10 PUBLIC WORKS DEBRIS REMOVED INFORMATIONAL
Notes:
All construction debris must be removed from job site by Contractor.
11 PUBLIC WORKS INFRASTRUCTURE INFORMATIONAL
Notes:
Any damage done to infrastructure must be repaired by Contractor.
2 of 3Issued Date: 4/15/2024
PERMIT NUMBER
DEMO24-0007
ISSUED: 4/15/2024
EXPIRES: 10/12/2024
DEMO PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
Final Plumbing
Final Electrical
Final HVAC
CC Final
Final Building*
Swimming Pool Steel
Swimming Pool Safety
Electrical Grounding & Bonding
Swimming Pool Final (Bldg)
Swimming Pool Final (PW)
Formed Columns/ Beams*
Masonry Cell Fill
Structural Steel*
OTHER:
OTHER:
OTHER:
OTHER:
OTHER:
Power Pole
Silt Fence
Piers/ Stem Walls
Underground Plumbing
Underground Electric
Foundation/ Footing
Slab**
Retaining Wall Footing
Driveway
Sewer (Building Dept)
Sewer Tap (Utilities Dept)
Rough Electric*
Rough Plumbing/ Top Out*
Rough Mechanical*
House Wrap
Wall Sheathing
Roof Sheathing
Tie-down Framing Connections
Rough Framing
Roofing Dry-In
Window/Door In-Progress
Insulation Ceiling
Insulation Wall
Exterior Lath
Stucco Scratch Coat
Exterior Siding In-Progress
Brick Flashing & Ties
Early Power
Gas Rough
Gas Final*
* When all rough electric, plumbing, mechanical are complete but before
any work is covered up.
* When all gas piping is complete and wallboard is installed but before
gas is attached to any appliance. All outlets must be capped and pipe
pressurized at a minimum of 15 lbs.
* For new living space: When all construction work including electrical, plumbing,
mechanical, exterior finish, grading, required paving and landscaping is complete
and the building is ready for occupancy, but before being occupied
Additional inspections may apply to your project if your project
contains these elements:
INSPECTIONS REQUIRED FOR BUILDING PERMITS
To verify compliance with building codes, inspections of the work authorized are required at various points of the construction.
The following inspections are typically required for residential projects:
Date: Initial: Date: Initial:
_____________________________________________________
Permit Type
____________________________________________________
Permit No.
__________________________________________________________
Job Address
____________________________________________________
Contractor
POST THIS CARD WITH PERMITS AND PERMIT
DOCUMENTATION IN FRONT OF BUILDING
Construction Hours per City Code: 7am—7pm Weekdays; 9am—7pm Weekends
Building Department - Phone: 904-247-5826 - Email: Building-Dept@coab.us
Public Works/Utilities - Phone: 904-247-5834
Fire Department - Phone: 904-630-4789
* When forms and reinforcing steel, anchor bolts, sleeves and inserts, and all
electrical, plumbing and mechanical work is in place, but before concrete is poured.
* When all structural steel members are in place and all connections are
complete, but before such work is covered or concealed.
** FORM BOARD ELEVATION CERTIFICATE MUST BE ON-SITE FOR SLAB INSPECTION
STATE DBPR SURCHARGE 455-0000-208-0700 0 $2.00
STATE DCA SURCHARGE 455-0000-208-0600 0 $2.00
TOTAL: $154.00
3 of 3Issued Date: 4/15/2024
PERMIT NUMBER
DEMO24-0007
ISSUED: 4/15/2024
EXPIRES: 10/12/2024
DEMO PERMIT
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD
ATLANTIC BEACH, FL 32233
16,100.00
1
CITY OF ATLANTIC BEACH
800 SEMINOLE ROAD ATLANTIC BEACH, FL 32233 (904) 247-5800
BULLETIN 4-18
To: All Permit Applicants. From: Dan Arlington, CBO
City Building Official
Date: October 30, 2018
Re: DEMOLITION OF STRUCTURES.
Please use the general Building Permit Application Form for Demo Permits and include a Site Management Plan, showing all structures to be demolished and to remain, erosion and sediment
control plans with installation details, proposed use of the right-of-way and parking; a property
survey; and the contractor’s documents needed to obtain a building permit.
1. It is the responsibility of the contractor to: a. Contact JEA to disconnect electric power. b. Disconnect and cap off water, sewer, and gas lines. The contractor must call to
schedule an inspection of the disconnected and capped water and sewer lines prior to
demolition.
c. Start a Construction Water Account. (See Items 8 – 11 on Page 2)
2. The demolition contractor must provide written notice to the owners of all adjacent
properties, not less than 10 Days prior to start of demolition, per FBC-EB, Section 1502. Adjacent properties must be protected from damage during excavation, demolition, and construction activities. 3. Silt fences must be in place and approved by Public Works before beginning demolition. 4. All underground tanks, concrete slabs and foundations must be removed with the
buildings, unless otherwise approved by the City. The site should be left graded and
clean for Final Inspection.
5. Removal of any trees requires a separate Tree Removal Permit, per COAB Code
Of Ordinances, Section 23-21.
2
6. Protection of trees and vegetation during construction is required, per COAB Code
Of Ordinances, Section 23-32.
7. Prior approval, from the Building Department, is required before blocking any part of
the right-of-way or side walk.
Dust and wind-borne debris generated from the demolition of a structure is considered unsafe and a hazard to the public health, safety, and welfare of residents in the surrounding areas.
When demolishing a structure, the following steps are required to ensure that the minimum dust and debris leaves the property:
8. At least two hoses, with nozzles, capable of reaching to all areas of the property must be on site with an adequate water supply. 9. The structure must be sprayed with water for one hour before demolition begins. 10. The hoses must be used continuously during demolition, wetting down the structure, the debris pile, and truck beds when being filled.
ASBESTOS.
11. All roofing and siding made from asbestos containing materials (ACM) are considered
friable and must be removed from the structure, following NESHAP Guidelines, before
demolition begins. This includes all commercial and one and two family residential dwellings. Please call for a Pre-Demolition Inspection, before demolition begins, and a Final Inspection, when demolition is complete.
NOTES.
1. A construction water account can be obtained at the Water Department in City Hall.
2. Any new residence using the original building sewer piping shall be internally examined
to verify correct size, slope, is not broken or obstructed, and a clean out at the property line with an RT-1 concrete cover is required to comply with current City requirements.
10/30/18, 12/28/18, 10/23/2020