Loading...
Beach Ave 1950 DEPARTMENT OF BUILDING 3479 CITY OF ATLANTIC BEACH, FLORIDA PERMIT NO. PERMIT TO BUILD THIS PERMIT MUST BE POSTED ON JOB Date 8/22 19__Z7 i Valuation$ 23,000 Fee$ 69.00 This permit not valid until above fee has been paid to City Treasurer, and is subject to revocation for violation of applicable provisions of Lw. This is to certify that Windsor Homes has permission to build a residential Classification S/F Dwelling 7.nne Owned by Jacksonville Equities Lot 585 At 584 Block S/D Saltair House No 154 Belvedere According to approved plans which are part of this permit NOTICE—ALL CONCRETE FORMS AND FOOTINGS MUST BE IN- SPECTED BEFORE POURING. PERMIT VOID SIR MONTHS AFTER DATE OF ISSUE f_ � .� ► 0 Building material, rubbish and debris from this work const not be placed in public space, and const be cleared up and hauled away by either contractor or owner. R. C. Vogel l Building Official. FOR OFFICE PERMIT DATE CONTRACTOR USE ONLY NUMBER PLUMBING ELECTRICAL SEWER WATER r FOR OFFICE USE ONLY oG Permit #........................Fee$41..---•--•---- CITY OF ATLANTIC BEACH Valuation $ . .-----•-----..............-•--•-- FLORIDA House *.../ ....---------•---------------------•----------.........----•-......-------•- APPLICATION FOR BUILDING PERMIT Application is hereby made for the approval of the detailed statement of the plans and specifications herewith submitted for the building or other structure described. This application is made in compliance and conformity with the Building Ordinance of the City of Atlantic Beach, Florida, and all provisions of the Laws of the State of Florida, all ordinances of the City of Atlantic Beach and all rules and regulations of the Building Department of the City of Atlantic Beach, shall be complied with, whether herein specified or not. The Contractor or Owner-Builder who has been issued a Building Permit is automatically responsible to ascertain that all sub- contractors engaged by him are duly licensed in the City of Atlantic Beach,Florida. To prevent delay or embarrasment regard- ing intermediate or final inspections it is suggested that a list of sub-contractors be submitted toth's office so that licenses can be verified. Date............................ 3'..T•.------------------------ Owner.:S TEA/ ...... ...............................Address_/-�Y..--- I�G.--=7._.-Telephone Architect........................ .. .........,.......................... ..............-----------Addresa...........................................................Telephone No.........................--.. ContractorBuilder.. ��..................................•---------•---......Address............................................................Telephone No.-•--•-----•---•----•-•-•---- LotNo...................................................Block No...............................Sub Division................................................................................Zone................. ............................................................Street....---....................Side Between......................------------------I...........and.......................................................Sta. Valuation $ 100.!;?......For what purpose will building be used..-fk�C.6...--lP.....Type of construction. o� !�L? ......... .............. . . Dimensions of Building........................................Dimensions of Lot.........................................................Size of Footings....... .................. Size of Piers.....................................Size of Sills---.-_------.-----------.-----Greatest Sill Span in ft...........................Type Roof...................................... How will Building be Heated?...................----------------------__-----------........Will Building be on Solid or Filled Ground?........................................ Size of Ceiling Joists........................................... Distance on Centers............................................. Greatest Span............................................ of.............•----•----- Size of Floor Joists..............................................Distance on Centers----- --- -----------..................... Greatest Span............................................ P Size of Rafters----------- --- -•---•------•----- ---------- Distance on Centers........--- .............. Greatest Span............................................ it A P-PROVED This rectangle is to represent the lot. CITY OF ATLANTIC BEACH Locate the building or buildings in the BUILDING OFFICE right position. Give distance in feet from all lot-lines and existing buildings. MAR 2 1978 •...REAR LOT LINE Two copies of plans and specifications shall .. '1'"11(,""'I"` "' be submitted with application. Inspections required. By, 1. When steel is in place and ready to pour footing. r W 2. When steed is in place and ready to pour columns and/or lintel. Z = 3. When steel is in place and ready to pour beam. '� __S ►� 4. When framing is completed. 5. When rough plumbing is completed,and ready to cover up. o` 6. When septic tank drain field or sewer is laid but before it is covered. r a 7. Electrical inspection by City of Jacksonville. ai vz 8. Final inspection. Note: In case of any rejection,re-inspection MUST be called for after corrections are made. FRONT OF LOT In consideration of permit given for doing the work as described in the above statement, we hereby agree to perform said work in accordance with the attached plans and specifications, which are a part hereof, and in accordance with the building regulations of the City o Atlantic Beach. Signature of Builder. Address.................................................................................................... Signature of Owner- -- ... . ...�� ✓ ..._ Address...ZE. 1....d4.C1 C-2<C.....s.�7.........................