Loading...
Item 4G AGENDA [TEM # 4G JANUARY 8, 2007 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Engineering Assistance for Consumptive Use Permit Renewal SUBMITTED BY: Donna Kaluzniak, Utility Director DATE: January- 2, 2007 BACKGROUND: The City's Consumptive Use Permit Renewal application for the water system is due to the St. Johns River Water Management District by May 17, 2007. Engineering assistance is required to complete the application process. The City will be using one of our approved annual contract engineers, Bowen Civil Engineering, Inc. to perform the work, in the amount of $25,380.99. Our contract engineers are authorized to perform work on projects under $30,000. We will keep the Commission informed on the progress of the renewal process and any new expected requirements of the permit. BUDGET: A total of $40,000 was budgeted for Consumptive Use Permit Renewal in the Water Fund under account number 400-5502-533-3100. RECOMMENDATION: Approve the use of the City's annual contract engineer, Bowen Civil Engineering, to assist the City with completing the Consumptive Use Permit Renewal process for $25,380.99. ATTACHMENTS: 1. Proposal from Bowen Civil Engineering. REVIEWED BY CITY MANAGER: ~. how=rl CtvtL ~rl~trls_~trlc, lrlc, 6885 Belfort Oaks Place, Suite 110 Jacksonville, Florida 32216-6242 Telephone: 904-737-0090 ~"" Fax: 904-737-0040 E-mail: cbeng@boweneng.com December 6, 2006 ~"" Donna Kaluzniak, CEP Utility Director City of Atlantic Beach 1200 Sandpiper Lane `~ Atlantic Beach, FL 32233-4318 Re: Proposal for Engineering Services -Consumptive Use Permit Renewal Dear Ms. Kaluzniak: AGENDA ITEM # 4G JANUARY 8, 2007 ~"" ~ It is our pleasure to submit a proposal to the City of Atlantic Beach to provide professional engineering services for the renewal of the City's St. Johns River Water Management District's Consumptive Use Permit for the city's water supply infrastructure. This work will be performed under the current Technical „~ Consulting Services Agreement dated January 24, 2005. SALARY RATE ADJUSTMENT Since these services will be provided after the contract anniversary date, we have adjusted our hourly rates in the original contract by 6.0% for the 2007 year. This rate adjustment was derived using the Consumer Price Index for All Urban Consumers for the South Urban region. Attached is a worksheet showing our calculation for the rate adjustment. BASIC SERVICES The scope of work was prepared in accordance with the scope of work provided by the city and the requirements of the SJRWMD Applicant's Handbook -Consumptive Use of Water -Chapter 40C-2, F.A.C. ""' Our review of the available information indicates the City has been in compliance with the current CUP. It is also appears that there is no significant growth anticipated in the water system. The goal of the renewal process will be to demonstrate compliance with the existing conditions with a moderate growth in the ~, water system. Therefore, the attached scope does not include work effort associated with groundwater modeling for compliance purposes. FEES AND PAYMENT The total fee for providing the Services outlined above, including reimbursables, is $25,380.99. The attached fee summary worksheet supports these costs. "~' This proposal does not include the professional services involving groundwater modeling, well andlor distribution system modifications. If these items or similar items are required by SJRWMD to complete the permit application process, the City may amend the agreement for this work to include any additional ~,,, permitting requirements not covered under this scope of work. Roadway Drainage • Utilities Land Development ~"" AGENDA ITEM # 4G JANUARY 8, 2007 Ms. Kaluzniak December 6, 2006 Page 2 We are looking forward to working with the City of Atlantic Beach on this project. We can proceed with this effort upon final written authorization from you. Thank you. Sincerely, '~` Chantal Bowen, PE President ,~, CB:DLsh Enclosures: Salary Rate Adjustment Fee Summary Worksheets ~"' Scope of Services ~. ~. S:1ProJedslA6 -Continuing Services\proposals\WO#3 -CUP Renewal\Fee Proposal CUP.doc AGENDA ITEM # 4G JANUARY 8, 2007 CITY OF ATLANTIC BEACH -CONTINUING SERVICES CONTRACT CONTRACT RATE ADJUSTMENT BCE No: 05-009 Change % Change 2005 in CPI 2006 in CPI Principal $ 48.57 4.3% $50.66 1.7% Project Manager $ 42.80 4.3% $44.64 1.7% Project Engineer $ 38.32 4.3% $39.97 1.7% Project Engineer $ 27.74 4.3% $28.93 1.7% CADD Technician $ 23.06 4.3% $24.05 1.7% Clerical $ 13.77 4.3% $14.36 1.7% °~ Change in CPI Calculat ion for 2006 Rates: CPI for Oct 2006: 191.5 Less CPI for Jan 2005: 183.6 = Index Point Change: 7.9 _ % Change 4.3% Change in CPI Calculation for 2006 Rates: CPI for Oct 2006: 194.7 Less CPI for Jan 2006: 191.5 =Index Point Change: 3.2 _ % Change 1.7% NOTE: % Change in CPI is based on the South Urban Index for All Goods. 2007 $51.51 $45.39 $40.64 $29.42 $24.45 $14.60 #or AGENDA ITEM # 4G JANUARY 8, 2007 CONTRACT FEE SUMMARY FOR PUBLIC WORKS CITY OF ATLANTIC BEACH. FLORIDA PART ONE'- GENERAL 1. PROJECT 2. PROPOSAL NUMBER SJRWMD CUP Renewal 3. CONSULTANT 4. DATE OF PROPOSAL Bowen Civil Engineering, Inc. 12/12/2006 PART TWO -LABOR RELATED COSTS 5. DIRECT LABOR HOURLY ESTIMATED ESTIMATED TOTAL RATE HOURS COST Principal $ 51.51 2 $ 103.02 Project Manager $ 45.39 27 $ 1,202.84 Project Engineer $ 40.64 8 $ 325.12 Technician $ 29.42 0 $ - CADDTechnician $ 24.45 0 $ - CleriCal $ 14.60 2 $ 29.20 TOTAL DIRECT LABOR 39 5 1,660.18 Avg. Labor Rate 43.12 6. OVERHEAD (COMBINE FRINGE BENEFIT AND ADMINISTRATIVE) $ 2,490.26 OVERHEAD RATE -150% X TOTAL DIRECT LABOR 7. SUBTOTAL -LABOR + OVERHEAD (ITEMS 58:6) $ 4,150.44 8. PROFIT -LABOR RELATED COSTS (ITEM 7) X 10% $ 415.04 PART THREE -OTHER-COSTS 9. MISCELLANEOUS DIRECT COSTS ORIGINAL REPRODUCIBLE -VELLUM PLOTS $0.00 BLUELINES - 24"x36" b0.00 PAPER COPIES $50.00 SHIPPING $36.00 MISCELLANEOUS DIRECT COSTS SUBTOTAL $ 86.00 10. SUBCONTRACTS -LUMP SUM J. COLLINS ENGINEERING ASSOCIATES 520,893.00 (Includes 510,760 hydrogeological services from Yovaish Engineering Sciences) SUB-CONTRACT SUBTOTAL 520,693.00 TOTAL LUMP SUM AMOUNT (ITEMS 5,8,8,9 810) $25,344.48 11. REIMBURSABLE COSTS (LIMITING AMOUNT) TRAVEL 536.51 OTHER (SPECIFY) SUBTOTAL REIMBURSABLE $ 36.51 PART FOUR-SUMMARY TOTAL AMOUNT OF CONTRACT (LUMP SUM PLUS REIMBURSABLE) ITEMS 5,8,8,9,10,811 $ 25,380.99 S:\ProiectsVlB - ConBnufnp Services\proposals\WW3 - CUP Renewel\[BCE Manhoun -CUP Renewal.xlsJManhouni Ar+ J ~ ~ ~" J Q U to W = J U W H N 0 ~ D Q U c R v N 'c ~ r= v F- Z ~ W = D) a a ._ _ a lCJ t(y ~t t17 et N to to lf) O 01 O V'. ~ (O ~ f7 ~ V' O ll') 69 O ~O~OOLL~~OON ~ O O O O O r (h 00 ~~ 0 0000000000 ~ o oooo.-oo.- N O 0000~00Y'f ~ M r+ EJ~d09 tA~~H09 C07 ~ fN O U 00000000000 ° rn o 00 ~~ c+~ ONONr-000O OD CD O 0000 00 n C 0 ~ ~ ~-- ~ ~ ~ O C ~ ~ ~ C'J N ~N~tN~~ V~'O NNO O O r 0 f+ ') 69 Nj EA O O O O O O N O O O N~ ~ ~~ O O t~ 0 0 f0 M fD ~tO~c700 ~ ~ ~E09~~~~~ N F» r» ~ N d C E N N d N E~ N 7 V O O rn C O a a~ pink ~~~ 3~~ ~.s~ 303 3 a `-° L ~' rn E 0 . o ~ ~Qw m ~ 0~0 y o o~ ~ ~a ~ N,C dl 0 ~ ~U'~ N~ c~r. ~ W _ c~ x a~ ~ na a> > ~ o C ° ~ ~ c m ~" ~" W x m ~+'a c~ ~ "v a~ ° Z u =aa~-~5vi af0i o o ~ N~j ~v m » i 'Z ~ _ '~ c~ c~ rnom m ~~ - -- Y YYYYY d G) C ~^ ~ ~ ~. x ~.~ ~ ~ x d = d ~ . N fq W N N tll o a _ N m C7in ~~HH~~U w ~~ o~av L m OI Ql Oa OI ~ ti ~ ~ ~O tD V' of fN W C ~,, o c ~ ~ Q 0 E ~ Q V o m V ~ ~ 0 0 1- F- a 3 m N C C U m 4 0 S y AGENDA ITEM # 4G JANUARY 8, 2007 0 61 AGENDA ITEM # 4G JANUARY 8, 2007 MANHOUR & REIMBURSEABLES BREAKDOWN December 5, 2006 ('_itv of Atlantic Reach. Fl. - CiRWMD (1 iP Renewal LABOR COSTS Man Hours/l.abor Rates WORK BREAKDOWN Hourl Rate PR $40.00 SE $34.55 PM $40.00 PG $30.91 DES/CAD $ 27.30 Clerical $13.00 TOTAL Task 1-Historical Document Review 0 6 0 40 0 0 $1,443.70 Task II - Preappligtion meeting w/SJRWMD 0 8 0 8 0 0 $523.68 Task III -Prepare CUP Permit Application 0 34 0 32 6 22 $2,613.62 & Supporting Documentation Task IV -Post Appliption Meeting w/SJRWMD 0 8 0 8 0 0 $523.68 Task V -Response to Two(2) RAIs 0 16 0 20 4 22 $1,566.20 Task VI - InGude Well #2R in Permit 0 8 0 8 0 0 $523.68 Totals 0 80 0 116 10 44 $7,194.56 Principal Senior Engineer Project Manager Professional Geologist/Hydrogeologist Senior Designer/CAD Technician Clerical SUBTOTAL DIRECT LABOR COSTS OVERHEAD at 2.5 PROFIT ON OH/DL - 10% TOTAL LABOR FEE REIMBURSABLE COSTS Mileage Telephone & Postage Copying SUBTOTAL REIMBURSABLE COSTS TOTAL ENGINEERING COST antity 1500 1 2000 it MI LS SHTS ice $0.41 $100.00 $0.10 $0.00 $2,764.00 $0.00 $3,585.56 $273.00 $572.00 $7,194.56 $17,986.40 $1,798.64 $19,785.04 $607.50 $100.00 $200.00 $907.50 $20,693 r-, CITY OF ATLANTIC BEACH CONSUMPTIVE USE PERMIT RENEWAL SCOPE OF SERVICES AGENDA ITEM # 4G JANUARY 8, 2007 The City of Atlantic Beach currently has a Consumptive Use Permit from the St. Johns River Water Management District. Permit No. 810 was issued on November 12, 2002 and expires on November 12, 2007. The City requires assistance with the renewal of the above permit to include: 1. Preparation of the application form and associated information, data and documents. Request will be fora 20-year permit. a. Include any required maps, tables or charts. b. Provide a list of adjacent land owners as required. 2. One pre-application meeting with the SJRWMD. 3. One post-application meeting with SJRWMD. 4. Response to up to two Requests for Additional Information (RAI). If the RAI includes requests for extremely time-consuming or dij~cult materials (such as a full study or extremely detailed analysis), additional costs will be negotiated. S. Permit renewal will include request to add Well # 2R to the wellfield. Well will be located on Walter Ave. in Atlantic Beach. (Well location and permitting were discussed with SJRWMD during well design that was completed by CH2MHi11. During this same meeting, we discussed leaving the 2 wells at Water Plant #4 alone until this next permit renewal. We are determining whether the Water Plant #4 will be abandoned or will stay active). ,~, In addition, the scope of work does not include groundwater modeling, well and/or distribution system modifications if these items or similar items are required by SJRWMD to complete the permit application process such as may be required per a Request for Additional Information (RAI). The City may amend the agreement for this work to include any additional permitting requirements not covered under this scope of work. The Owner (City of Atlantic Beach) will provide the required historical data, reports and records to support the required CUP permit renewal process including but not limited to water supply historical records (well withdrawaUwaterguality history); plans/records/correspondence of recent well permitting, design, construction and abandonment data; existing CUP permit; population records/projections; applicable WMD correspondence from last CUP renewal process, permit application fee; previous reuse feasibility reports; and the current Water Conservation Plan.