Loading...
Item 8AAGENDA ITEM # 8A FEBRUARY 25, 2008 CITY OF ATLANTIC BEACH CITY COMMISSION REPORT STAFF REPORT AGENDA ITEM: REQUEST FOR PROPOSALS # 08-01 PROFESSIONAL CONSULTANT SERVICES TO PERFORM A WATER AND SEWER IMPACT FEE RATE STUDY DATE: February 10, 2008 SUBMITTED BY: Nelson Van Liere, Finance Director BACKGROUND: The City of Atlantic Beach's Public Utility System is facing a new wave of regulatory requirements soon to be mandated by the St. Johns Water Management District and the Florida Department of Environmental Protection. Reductions in allowable total maximum daily limits of nitrogen and other chemicals will require large amounts of capital improvements to the sewer treatment plants as well as significant increases in operating costs. In an effort to appropriately allocate the cost of these improvements between our existing customers and new customers from future development, it is necessary to review our existing impact fees and determine if changes are needed. The City's current rates have been in existence more than ten years and they were not set as the result of any cost study. The City requested proposals from qualified firms for a study that will adjust our rates based on the expected growth in the system and the cost estimates of the needed improvements. The report will also consider the value of the existing system to arrive at the most appropriate rate for the utility. It is staff's opinion that impact fees are most likely going to be a significant funding source for future improvements to the system. The fees imposed must be representative of the cost of providing those new services. After reviewing the proposals, staff felt HDR had the best combination of AGENDA ITEM # 8A FEBRUARY 25, 2008 qualifications, experience and estimated costs to perform the project. In addition, HDR is already working on the Wastewater and TMDL compliance plan for the City and will have the best understanding of information gained from that study. BUDGET: The operating expenses budget for the utility fund has sufficient balances to fund the impact fee study. No increase in impact fees attributable to this project have been budgeted at this time due to the uncertainty of the amount of change in the rate. RECOMMENDATION: Authorize the City Manager to enter into an agreement with HDR Engineering Inc. to perform a Water and Sewer Impact Fee Study in the amount of the proposed estimate of $15,500. CITY MANAGER APPRO~ED:~ AGENDA ITEM # 8A FEBRUARY 25, 2008 City of Atlantic Beach RFP 08-01 PROFESSIONAL CONSULTANT SERVICES TO PERFORM A WATER AND SEWER IMPACT FEE RATE STUDY Item Max Points Burton ~ Associates Duncan Associates GAI Consul- tents HDR Muni- Financial Introductory Letter/Ca abili 10 9 8.5 7.5 9.5 9 Personnel 10 9.5 9 8.5 10 8.5 Ex erience/Similar' 20 19 18 16.5 19 16 References 10 9.5 10 10 10 10 Price Pro oral 50 45 25 50 48 0 Total Points 100 92.0 70.5 92.5 96.5 43.5 Price -Amount $16,947 $29,550 $14,495 $15,500 $43,850 Availability Accessibili Local Texas Local Local & National Orlando National Re wired Forms Note: forms not si ned Si nature form X X X X X Qualifications Statement X X X X X Omissions X X X X X Non-Collusive AfFdavit X X X X X Public Enti Crime X X X X X Dru Free Work lace X X X X X Indemn~cation X X X X X