Item 8AAGENDA ITEM # 8A SEPTEMBER 22, 2008 CITY OF ATLANTIC BEACH CITY COMMISSION MEETING STAFF REPORT AGENDA ITEM: Royal Palms Sewer Rehabilitation -Continuation SUBNIITTED BY: Donna Kaluzniak, Utility Director DATE: September 12, 2008 BACKGROUND: As recommended in the Sewer Master Plan Update, the City Commission allocated funds for sewer rehabilitation in the budget. The City Commission authorized staff to "piggyback" on JEA's contracts with Insituform Technologies, Inc. for Cured-in-Place Pipe to perform sewer system rehabilitation in the Royal Palms azea in the amount of $711,951.15 plus a 5% contingency for FY08. A total of $84,000 has been requested for the FY09 budget. Using the JEA contract unit prices for Insituform shown on the attached spreadsheet, the cost for cured-in-place pipe rehabilitation Royal Palms is $84,0()0. BUDGET: A total of $84 is requested for the FY09 budget in the Sewer Fund for this project, in account number 410-5506-535-6300. RECOMMENDATION: Authorize Insituform Technologies, Inc. to continue providing cured-in- place piping work in the Royal Palms subdivision in the amount of $84,000, using pricing in JEA Contract No. WCS-066-07. ATTACHMENTS: 1. Spreadsheet showing JEA unit prices for Insituform. REVIEWED BY CITY AGENDA ITEM # 8A SEPTEMBER 22, 2008 TASK SUMMARY /PRICING ESTIMATE -CIPP UNIT PRICE CONTRACT - 2007 PA #: ~ 83,937.58 Atlantic Beach -Royal Palms FY09 Item Spec SC Est. Units Description Unit Prices Total No. No. No. Q Price 1 6.9.6 0 LS Testing Allowance $ 25,000.00 $ - Furnish and install 8" CIPP lining, 6 mm 2 961.1 1,050 LF thick $ 2s.so $ 2s,lao.oo MM Add for each 1.5 mm difference from 6.0 mm thick 2A 0 THICKER for 8" CIPP @ ($1.50 per 1.5 mm change) $ 2.00 $ - Furnish and install 10" CIPP lining 6.0 mm 3 961.1 1100 LF thick $ 31.20 S 34,320.00 MM Add for each 1.5 mm difference from 6.0 mm thick 3A O THICKER for 10" CIPP @ ($1.90 per 1.5 mm change) $ 2.00 $ - Furnish and install 12" CIPP lining, 6.0 4 961.1 LF mm thick $ 32.0 $ - MM Add for each 1.5 mm difference from 6.0 mm thick 4A 0 THICKER for 12" CIPP @ ($2.20per 1.5 mm change) $ 2.50 $ - Furnish and install 15" CIPP lining, 7.5 5 961.1 LF mm thick S 42.50 ; - MM Add for each 1.5 mm difference from 7.5 mm thick 5A O THICKER for 15" CIPP @ ($2.80per 1.5 mm change) $ 3.00 $ - Furnish and install 16" CIPP lining, 7.5 6 961.1 0 LF mm thick $ a~.9o $ - MM Add for each 1.5 mm difference from 7.5 mm thick 6A O THICKER for 16" CIPP @ ($2.40 per 1.5 mm change) $ 3.00 $ - Furnish and install 18" CIPP lining, 9.0 7 961.1 0 LF mm thick $ as.so i - MM Add for each 1.5 mm difference from 9.0 mm thick 7A O THICKER for 18" CIPP @ ($4.50 per 1.5 mm change) $ 4.50 $ - Furnish and install 20" CIPP lining, 9.0 8 961.2 LF mm thick S 59.20 $ - MM Add for each 1.5 mm difference from 9.0 mm thick SA O THICKER for 20" CIPP @ ($4.90 per 1.5 mm change) $ 5.00 $ - Furnish and install 21" CIPP lining, 9.0 9 961.2 0 LF mm thick $ s1.so S - MM Add for each 1.5 mm difference from 9.0 mm thick 9A O THICKER for 21" CIPP @ ($5.00 per 1.5 mm change) $ 5.50 $ - Furnish and install 24" CIPP lining, 9.0 10 961.2 LF mm thick $ s1.5o S - MM Add for each 1.5 mm difference from 9.0 mm thick 10A 1 THICKER for 24" CIPP @ ($6.00 per 1.5 mm change) $ 6.00 $ - Furnish and install 30" CIPP lining, 12.0 11 961.2 0 LF mm thick $ 94.10 S - MM Add for each 1.5 mm difference from 12.0 mm thick 11A O THICKER for 30" CIPP @ ($6.00 per 1.5 mm change) $ 7.00 $ - Furnish and install 36" CIPP lining, 13.5 12 961.2 LF mm thick $ 117.90 $ - MM Add for each 1.5 mm difference from 13.5 mm thick 12A O THICKER for 36" CIPP @ ($5.50 per 1.5 mm change) $ 8.00 $ - Furnish and install 42" CIPP lining, 13.5 13 961.2 0 LF mm thick $ 12s.1o $ - MM Add for each 1.5 mm difference from 13.5 mm thick 13A O THICKER for 42" CIPP @ ($6.40 per 1.5 mm change) $ 8.00 $ - Furnish and instal148" CIPP lining, 15.0 14 961.2 0 LF mm thick S 173.40 $ - MM Add for each 1.5 mm difference from 15.0 mm thick 14A o THICKER for 48" CIPP @ ($16.60 per 1.5 mm change) $ 15.00 $ - Furnish and install 54" CIPP lining, 21.0 15 961.2 0 LF mm thick $ 238.60 S - 9/15/2008 page 1 of 4 AGENDA ITEM # 8A SEPTEMBER 22, 2008 TASK SUMMARY /PRICING ESTIMATE -CIPP UNIT PRICE CONTRACT - 2007 PA #: $ 83,937.58 Atlantic Beach -Royal Palms FY09 Item No. Spec No. SC No. Est. Q Units Description Unit Prices Total Price 15A MM THICKER Add for each 1.5 mm difference from 21.0 mm thick for 54" CIPP @ ($18.90 per 1.5 mm change) $ 20.00 $ - 6 31 0 F Pipe Bursting 3" - 4" Service Lateral to 4.5" OD SDR 19, HDPE (0' - 4' Deep) 3" - 8" Sewer Service lateral to 4.5", 6.625", 9.05" OD SDR 19, HDPE or 6" or 8" PVC SDR35 Conformin to ASTM D3034-74 All De the 3ti.oo - 22 966 0 EA Adjust/Reset Manhole Frame and 32" Dia Cover, U to One Foot ; sso.oo S - 23 962 0 VF Adjust/Reset Manhole Frame and 32" Dia Cover, Item 23 ,Excess Over Foot ; 186.00 ; - 32 963.1 0 EA Lateral Connection (DFW Flexible Saddle to PVC 8" -12" HDPE, 0' - 4' Dee ; sso.oo ; - 33 963.1 0 EA Lateral Connection (DFW Flexible Saddle to PVC 8" -12" HDPE, 4' - 8' Dee ; 1,065.00 ; - 34 963.1 0 EA Lateral Connection (DFW Flexible Saddle to PVC 8" -12" HDPE, 8' -12' Dee ; 1,330.00 ; - 35 963.1 0 EA Lateral Connection (DFW Flexible Saddle to PVC 8" -12" HDPE, 12' -16' Dee ; 1,600.00 S - 36 963.2 0 EA Lateral Connection (DFW Flexible Saddle to HDPE 8" -12" HDPE, 0' - 4' Dee $ 855.00 ; - 37 963.2 0 EA Lateral Connection (DFW Flexible Saddle to HDPE 8" -12" HDPE, 4' - 8' Dee $ 1,065.00 ; - 38 963.2 0 EA Lateral Connection (DFW Flexible Saddle to HDPE 8" -12" HDPE, 8' -12' Dee ; 1,330.00 ; - 39 963.2 0 EA Lateral Connection (DFW Flexible Saddle to HDPE 8" -12" HDPE, 12' -16' Dee ; 1,600.00 S - 44 963.4 53 EA Reconnect existing services using robotic internal cutter ; 175.00 E 9,25.00 45 963.5 EA Hammer Tap Removal ; 210.00 ; - 46 964 0 EA Lateral Connection Deemed Inactive (0' - 4' Dee ; ~so.0o ; - 47 964 0 EA Lateral Connection Deemed Inactive (4' - 8' Dee $ 1,065.00 ; - 48 964 0 EA Lateral Connection Deemed Inactive (8' -12' Dee $ 1,220.00 E - 49 964 0 EA Lateral Connection Deemed Inactive (12'-16' Dee ; 1,540.00 ; - 50 965 2,200 LF CCTV and Light Clean 8" - 21" Dia pipe $ 3.50 ; 7,700.00 51 965 LF CCN and Light Clean 24" - 54" Dia pipe $ 8.50 5 - 52 965.1 LF Tuberculation Removal 8" -12" Diameter ; 20.00 ; - 53 965.1 0 LF Tuberculation Removal 14" -18" Diameter ; 25.00 ; - 54 965.1 LF Tuberculation Removal 20" - 24" Diameter $ 31.00 ; - 55 965.1 LF Tuberculation Removal 27" - 42" Diameter $ 35.00 ; - 56 966 LF Bypass Pumping - 18" - 21" pipe $ 18.50 S - 59 966 LF Bypass Pumping - 24" - 36" pipe $ 56.00 ; - 62 966 0 LF B ass Pum in - 42" - 54" i e ; 66.00 ; - 68 408-4 0 CY A-3 Soil Backfill ; 18.20 ; - 69 408-8 0 CY Plowable Fill $ 121.10 ; - 70 427.1 0 EA T e "A" Manhole 0' - 4' Dee ; 2,625.00 ; - 71 427.1 0 EA T e "A" Manhole 4' - 6' Dee ; 3,160.00 ; - 72 427.1 0 EA T e "A" Manhole 6' - 8' Dee ; 3,630.00 ; - 9/15/2008 page 2 of 4 AGENDA ITEM # 8A SEPTEMBER 22, 2008 TASK SUMMARY /PRICING ESTIMATE - CIPP UNIT PRICE CONTRACT - 2007 Pa #: $ s3,s37.5s Atlantic Beach -Royal Palms FY09 Item Spec SC Est. Units Description Unit Prices Total No. No. No. Price 73 427.1 0 EA T e "A" Manhole 8' -10' Dee $ a,8so.oo $ - 74 427.1 0 EA T e "B" Manhole 0' - 4' Dee $ 3,630.00 S - 75 427.1 0 EA T e "B" Manhole 4' - 6' Dee $ a,s~5.00 $ - 76 427.1 0 EA T e "B" Manhole 6' - 8' Dee $ 5,525.00 5 - 77 427.1 0 EA T e "B" Manhole 8' -10' Dee $ 6,160.00 E - Connection to Existing Manhole 6" Service 94 427.4 0 EA Lateral $ 160.00 S - 95 428.1 0 LF Sewer Pi in 6" - 12", PVC 0' - 4' Dee $ 81.00 $ - 96 428.1 0 LF Sewer Pi in 6" -12", PVC 4' - 8' Dee $ 106.00 $ - 97 428.1 LF Sewer Piping 6" -12", PVC (8' - 12' Deep) $ 133.00 S - 98 428.1 0 LF Sewer Pi in 6" -12", PVC 12' -16' Dee $ 186.00 $ - 99 428.1 0 LF Sewer Pi in 14" -18", PVC 0' - 4' Dee $ 101.00 5 - 100 428.1 0 LF Sewer Pi in 14" -18", PVC 4' - 8' Dee $ 133.00 $ - 101 428.1 0 LF Sewer Pi in 14" -18", PVC 8' -12' Dee $ 162.00 $ - 102 428.1 0 LF Sewer Pi in 14" -18", PVC 12' - 16' Dee $ 230.00 $ - Remove 8~ Replace 6" -12" PVC (0' - 4' 103 428.2 0 EA Dee $ 1,510.00 S - Remove 8~ Replace 6" -12" PVC (4' - 8' 104 428.2 0 EA Dee $ 1,610.00 $ - Remove & Replace 6" -12" PVC (8' -12' 105 428.2 EA Deep) $ 2,440.00 S - Remove & Replace 6" - 12" PVC (12' -16' 106 428.2 0 EA Dee $ 2,975.00 S - Remove & Replace 14" -18" PVC (0' - 4' 107 428.2 0 EA Dee $ 1,510.00 S - Remove & Replace 14" -18" PVC (4' - 8' 108 428.2 0 EA Dee $ 1,610.00 S - Remove & Replace 14" -18" PVC (8' -12' 109 428.2 0 EA Dee $ 2,440.00 S - Remove & Replace 14" -18" PVC (12' -16' 110 428.2 0 EA Dee $ 3,oao.oo S - Remove and Replace Lateral 6" PVC SDR35 Conforming to ASTM D3034-74 (0' - 4' 111 428.4 0 LF Dee $ 38.00 $ - Remove and Replace Lateral 6" PVC SDR35 Conforming to ASTM D3034-74 (4' - 8' 112 428.4 0 LF Dee $ 45.00 $ - Remove and Replace Lateral 6" PVC SDR35 Conforming to ASTM D3034-74 (8' -12' 113 428.4 0 LF Dee $ 66.00 $ - Remove and Replace Lateral 6" PVC SDR35 Conforming to ASTM D3034-74 (12' - 16' 114 428.4 0 LF Dee $ 83.00 $ - 115 428.6 0 LF Yard Pi in - 4" $ 35.00 S - 116 428.6 0 LF Yard Pi in - 6" $ 38.00 $ - 117 441-1 0 SY Soddin $ 8.00 $ - Paving Removal $ Repair -Cross Cut & Patch COJ Standard Case X Permanent 127 490-1 0 SY Pavement Re lacement $ 65.00 $ - Remove and Replace Sidewalk (All Types & 136 491-1 0 SY Thickness $ 82.50 5 - 9/15/2008 page 3 of 4 AGENDA ITEM # 8A SEPTEMBER 22, 2008 TASK SUMMARY /PRICING ESTIMATE - CIPP UNIT PRICE CONTRACT - 2007 PA #: $ 83,937.58 Atlantic Beach -Royal Palms FY09 Item No. Spec No. SC No. Est. Units Description Unit Prices Total Price 137 491-2 0 SY Remove and Replace Driveway (All Types 8 Thickness $ 85.50 $ - 138 491-3 0 LF Remove and Replace Curb 8~ Gutter (All T es & Thickness $ 22.00 $ - 140 6.12.5 LS Su lemental Work Authorization SWA $100,000.00 $ - 7.3.16 Percent General Conditions 1.50% $ 4,502.58 $ 83,937.58 9/15/2008 page 4 of 4