Loading...
Item 3AAGENDA ITEM #3A NOVEMBER 25, 2002 November 19, 2002 MEMORANDUM TO: The Honorable Mayor and Members of the City Commission FROM: Jim Hans ~14Tanager SUBJECT: Follow-up eport Decorative Crossines on East Coast Drive; The City Commission has asked staffto estimate the cost of decorative crosswalks to be put at various intersections along East Coast Drive. A previous report was made that brick stamped asphalt could be installed at approximately $3,000 per crossing. The Commission expressed concern that the asphalt would wear away over time thus reducing the effectiveness and beauty of the intersection. Estimates have now been received from the City's Core City Project contractor (Petticoat) for both stamped concrete and brick crossings with a concrete base. The stamped concrete crossing has an estimated cost of $3,500 each. The cost for brick with a concrete base is $5,300 per crossing. If the Commission wishes to add any of these decorative crosswalks to the Core City Project, funding should be provided in the mid-year budget adjustments. Traffic Visibility at llt6 Street/East Coast Intersection; A complaint was raised at the last meeting about poor traffic visibility caused by a palm tree at the intersection of 11th Street and East Coast Drive. The Police Department has inspected the location and has recommended trimming of the palm tree, relocating the "stop ahead" sign and repainting the white stop lines the next time the road is resurfaced. Staff feels that the palm tree can be saved if these actions are taken. By the time of the Commission meeting, the tree should have already been trimmed and the sign moved.